This document contains a series of Requests for Information (RFIs) related to a federal contract opportunity for the demolition of several buildings at a Department of Veterans Affairs (VA) facility.
The key details are:
- The contract opportunity is for the demolition of Buildings #2, 3, 4, 5, 13, and 14, with Solicitation Number 36C24124B0037.
- The RFIs address various issues, including the presence and removal of lead-based paint, the availability of updated asbestos reports, the status of building utilities, and the potential for soil contamination.
- The VA's responses indicate that contractors should bid based solely on the information provided in the solicitation documents, and that updated reports and any necessary change orders will be provided to the winning contractor prior to abatement work.
- The VA confirms that buildings will be vacated of personnel and movable equipment prior to demolition, and that there is no suspicion of soil contamination, but that a change order will be issued if contaminated soil is discovered.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B1: The Lead Paint sec on 028333.13 states: “removing and disposal of lead paint at interior and exterior loca ons indicated in exis ng condi ons report”. The intent is not to remove any paint, but rather perform the demoli on following OSHA Lead in Construc on rules, correct?
Correct.
B2: Lead Paint sec on 02833.13 references sec on “Demoli on Disturbing Lead‐Based Paint:
Sec on 02 41 00, DEMOLITION”. I cannot locate this sec on. Can you provide it?
Contrac ng will issue Sec on 02 41 00, DEMOLITION.
B3: The asbestos report is from 2009 and it appears that some of the asbestos has been removed since then. Can you provide an updated list of materials?
Contractors are to bid based solely on ACM informa on provided during solicita on.
Prior to abatement, VA will provide winning contractor with comprehensive, up‐to‐date ACM report, and a change order will be issued, as necessary.
B4: Inside building 5, the sheet flooring has been removed, however, the white felt backing, which is where the asbestos would be found in a linoleum sample, is s ll on the floor. Should we carry this as an abatement item?
Contractors are to bid based solely on ACM informa on provided during solicita on.
Prior to abatement, VA will provide winning contractor with comprehensive, up‐to‐date ACM report, and a change order will be issued, as necessary.
B5: The asbestos reports all state that exploratory demoli on was not performed, and no roofing samples were collected. Would it be possible to have a pre‐demoli on survey performed to iden fy hidden condi ons? This is suggested in the asbestos sec on 028213.41
A. Quote from reports: “ATC did not perform exploratory demoli on to iden fy suspect materials located in concealed areas such as under fixed equipment, cabinetry, par on walls, within wall cavi es or chases, plenums, or disassemble mechanical equipment or electrical gear or below grade on the founda on, etc. in an a empt to iden fy hidden ACM. ATC did not iden fy any asbestos‐containing materials under carpe ng. Due to the limited access under the carpe ng, ATC recommends that addi onal inves ga ons be performed prior to removal of the carpet. Addi onal suspect materials may be present in these or other inaccessible areas that were not included in this inspec on.”
Contractors are to bid based solely on ACM informa on provided during solicita on.
Prior to abatement, VA will provide winning contractor with comprehensive, up‐to‐date ACM report, and a change order will be issued, as necessary.
B6: Appendix A is missing from the reports. Can this be provided?
Contrac ng will issue Appendix A’s for all buildings.
B7: Can the hydrant at Building 5 be brought back into service for demoli on dust suppression?
The hydrant at building 5 is out‐of‐service, but the hydrant between buildings 2 and 3 is available for use in dust suppression.
B8: Will the buildings be emp ed of office equipment and materials prior to demoli on?
Buildings will be vacated of personnel and movable equipment and materials. Only construc on materials will remain in buildings.
B9: The Asbestos sec on 028213.41 states: “This work will be asbestos abatement prior to the total demoli on of the facility as indicated by the scope of work. RACM discovered during total demoli on is also within the scope of this specifica on. The extent of the abatement is for informa onal purposes only and is based on the best informa on available at the me of the specifica on prepara on. The Abatement Contractor shall sa sfy themselves as to the extent of the work. Nothing in this sec on may be interpreted as limi ng the extent of work otherwise required by this contract and related documents.” Is this saying that the abatement contractor owns any and all asbestos whether it has been discovered or not
Contractors are to bid based solely on ACM informa on provided during solicita on.
Prior to abatement, VA will provide winning contractor with comprehensive, up‐to‐date ACM report, and a change order will be issued, as necessary.
B10: We no ced the crawlspace floor was covered with a rubber material with termina on bars on the walls. And that the pipes had been abated and reinsulated with fiberglass. This is the type of asbestos contamina on encapsula on that the VA has done in the past. Can you confirm that the soils below the buildings are not contaminated with asbestos?
VA does not suspect soil contamina on. Contractor to bid assuming that there will be no contaminated soil disposal. If soil is found to be contaminated, VA will issue a change‐order.