ATTACHMENT C - Design and Construction Experience Project Data Sheet.doc

DOC document 86 KB Posted

Attached to
NMIC-1 Replace Chillers and Controls/Install Chiller Catwalks Project, NMIC, Suitland, Maryland
Solicitation number
N4008020R5270
Issued by

About this file

This document contains a federal solicitation for design-build services and replacement of chillers and controls systems at the National Maritime Intelligence Center in Suitland, Maryland. The two-phase solicitation seeks replacement of the building's chiller plant equipment, system components excluding condenser water equipment and distribution, and an all-inclusive replacement of the HVAC control system for major source equipment, distribution, and terminal equipment. The design-build proposal includes performance criteria, requirements, and a 15% design development concept for the chiller and controls replacement. The Naval Facilities Engineering Command is the contracting agency.

View the file

Other files

File Type Posted
AMENDMENT 0013.pdf PDF
Site Visit Photos.zip ZIP file
Amendment 0012.pdf PDF
AMENDMENT 0011.pdf PDF
AMENDMENT 0010.pdf PDF
AMENDMENT 0009.pdf PDF
AMENDMENT 0008.pdf PDF
AMENDMENT 0007.pdf PDF
AMENDMENT 0006.pdf PDF
NMIC SITE VISIT Sign in Sheet PHASE II.pdf PDF
AMENDMENT 0005.pdf PDF
NMIC-1 - RFP - Vol 2 of 2 Part 9.pdf PDF
NMIC-1 - RFP - Vol 2 of 2 Part 2 of 8.pdf PDF
NMIC-1 - RFP - Vol 2 of 2 Part 4 of 8.pdf PDF
NMIC-1 - RFP - Vol 2 of 2 Part 1 of 8.pdf PDF
AMENDMENT 0004.pdf PDF
NMIC-1 - RFP - Vol 2 of 2 Part 3 of 8.pdf PDF
NMIC-1 - RFP - Vol 2 of 2 Part 8 of 8.pdf PDF
NMIC-1 - RFP - Vol 2 of 2 Part 5 of 8.pdf PDF
NMIC-1 - RFP - Vol 2 of 2 Part 6 of 8.pdf PDF
NMIC-1 - RFP - Vol 2 of 2 Part 7 of 8.pdf PDF
AMENDMENT 0003.pdf PDF
NMIC-1 - RFP - Vol 1b - Final Submission.pdf PDF
NMIC-1 - RFP - Vol 1a - Final Submission.pdf PDF
NMIC CHILLERS Price Schedule.docx DOCX document
ATTACHMENT E - HISTORICAL SMALL BUSINESS UTILIZATION.docx DOCX document
NMIC - 1 - BASIS OF DESIGN - FINAL SUBMISSION.pdf PDF
Small Business Subcontracting Plan.doc DOC document
5512 SECURITY ACCESS FORM.pdf PDF
AMENDMENT 0002 - PHASE II.pdf PDF
ATTACHMENT F - SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD) - Copy.docx DOCX document
NMIC-1 - RFP - Vol 2 - Final Submission - 12.10.20.pdf PDF
ATTACHMENT F - SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD).docx DOCX document
AMENDMENT 0001.pdf PDF
ATTACHMENT D - Past Performance Questionnaire.doc DOC document
N40080-20-R-5270 SOLICITATION.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN & CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : FORMCHECKBOX

DES #1 FORMCHECKBOX

DES #2 FORMCHECKBOX

DES #3 FORMCHECKBOX

DES #4 FORMCHECKBOX

DES #5

FORMCHECKBOX

CON #1 FORMCHECKBOX

CON #2 FORMCHECKBOX

CON #3 FORMCHECKBOX

CON #4 FORMCHECKBOX

CON #5

1. Experience for: FORMCHECKBOX Offeror FORMCHECKBOX Joint-Venture FORMCHECKBOX Other (Explain) Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: FORMCHECKBOX Prime Contractor FORMCHECKBOX Sub Contractor FORMCHECKBOX Joint Venture FORMCHECKBOX Other (Explain) Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

FORMCHECKBOX

New Construction FORMCHECKBOX Renovation FORMCHECKBOX Repair FORMCHECKBOX Alteration FORMCHECKBOX Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

Firm-Fixed Price FORMCHECKBOX Cost/Time and Material FORMCHECKBOX

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

FORMCHECKBOX

Design-Build FORMCHECKBOX Design-Bid-Build FORMCHECKBOX Delivery/Task Order (IDIQ) FORMCHECKBOX

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

FORMCHECKBOX

Design-Build FORMCHECKBOX RFP Development FORMCHECKBOX Designer of Record FORMCHECKBOX Engineering Services FORMCHECKBOX Full Plans & Specs

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

11. Other Information: