Attachment A - Itemized Schedule of Values Cost Breakdown.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Y1DA--Renovate Old Dialysis 2H Richmond VA Medical Center
Solicitation number
36C24623B0024
Issued by

About this file

This document contains an itemized schedule of values cost breakdown template for a construction project to build an additional parking lot at a VA medical center in Hampton, Virginia. The template includes line items for labor and material costs across 34 construction divisions and calculations for overhead, profit, and bond percentages to apply to the total base offer cost and alternative offer cost. It relates to Federal Contract Opportunity number 36C24623B0024 to renovate old dialysis facilities at the Richmond VA Medical Center in Virginia under the Department of Veterans Affairs Veterans Health Administration VISN 6. The template requires bidders to provide pricing details according to the specified construction divisions to calculate their total proposed costs for the base scope of work and any alternative.

View the file

Other files

File Type Posted
BID OPENING Abstract 36C24623B0024.pdf PDF
BID OPENING Attendance Log 36C24623B0024.pdf PDF
SITE VISIT Attendance Log 36C24623B0024.pdf PDF
36C24623B0024 0006.docx DOCX document
36C24623B0024 0005.docx DOCX document
36C24623B0024 0004.docx DOCX document
36C24623B0024 0003.docx DOCX document
36C24623B0024 0002.docx DOCX document
36C24623B0024 0001.docx DOCX document
INSTRUCTIONS TO BIDDERS.pdf PDF
36C24623B0024_1.docx DOCX document
RVA1033004_Plumbing-revised.pdf PDF
RVA1033004_Life Safety Set.pdf PDF
RVA1033004_Architecture.pdf PDF
RVA1033004_Electrical.pdf PDF
RVA1033004_Telecom Set.pdf PDF
Specifications Vol 1.pdf PDF
Specifications Vol 2.pdf PDF
RVA1033004_Mechanical.pdf PDF
RVA1033.004_PL_Addendum_1_2023-03-24.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number: 590-20-103 Edward L Roy: VA assigned project #

Date:
Project TitleConstruct Additional Parking Lot

Edward L Roy: VA assigned Project Title

Project Location100 Emancipation Drive, Hampton, VA 23667
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Alternative 1

Alternative 1 Offer Cost Breakdown

Project Number: 590-20-103 Edward L Roy: VA assigned project #

Date:
Project TitleConstruct Additional Parking Lot

Edward L Roy: VA assigned Project Title

Project Location100 Emancipation Drive, Hampton, VA 23667
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Alt. 1 Offer Cost $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .