This is a Test Memo documenting the procedures and results for certifying the satisfactory replacement of bilge system components on a LARC-V (Lighter Amphibious Resupply Cargo, Five Ton) vessel, specifically hull NBU-7/LARC-936, conducted at SRF-JRMC DET SASEBO.

The test was prepared by A. Nakashima on March 23, 2026, reviewed by S. Iida and S. Phillips on March 23-24, 2026, and approved by S. Phillips on March 24, 2026. The memo establishes comprehensive test procedures and general notes that govern execution, including requirements for test sequencing, verification by personal observation or objective evidence, use of original pen and ink documentation in dark insoluble ink, proper error corrections with single-line strikethrough, use of latest applicable revisions of reference materials, instrument calibration compliance per NAVSHIPREPFACINST 4734.1, authorized personnel operation of equipment, and safety protocols per NAVSHIPREPFAC M-5100.8. The test procedures reference technical manuals F9YC0-AM-TMM-010, 020, and 030 for the LARC-V A1/A2, the Joint Fleet Maintenance Manual (JFMM), and safety regulations. Test operations include an at-land test verifying 12 and 24 VDC power activation, alarm display on the IQAN screen, and bilge alarm light illumination for three pumps (forward, port, and starboard), followed by engine-running tests confirming proper bilge pump discharge without leakage. The test data sheet requires documentation of satisfactory (SAT) or unsatisfactory (UNSAT) results for each pump under both test conditions, with sign-off required from LWC and S246 personnel upon completion.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

TEST#: ESR#:

WN#: SSP#:

WS#:

SRF-JRMC DET SASEBO TEST MEMO

TITLE

BILGE SYSTEM COMPONENT

TEST MEMO PREPARATION

PRINT NAME & SIGNATURE PHONE CODE DATE

PREPARED BY

REVIEWED BY

APPROVED BY

SHIP/HULL#

SCOPE

TEST COMPLETION

PRINT NAME & SIGNATURE ORGANIZATION BADGE/RANK DATE

LWC

S246

SRF-JRMC

DET SASEBO

POST-TEST TECHNICAL REVIEW

PRINT NAME & SIGNATURE PHONE CODE DATE

Evaluation: ACCEPTED REJECTED

Action necessary: REPAIR ITEMS RETEST EQUIPMENT RESUBMIT DATA

COMMENTS

SASN-26-S232-0008

SASN-003-26

252-8048

252-8049

252-8045

3/23/26

3/24/26

3/23/26

S246B

S246A

S246CTE

Replacement of bilge system component.

864-42-001

58331-4-100_26131

57078-RS01-L014

A. NAKASHIMA

PHILLIPS.SHAUN.P

ARRY.1093485625

Digitally signed by

PHILLIPS.SHAUN.PARRY.1093485625

Date: 2026.03.24 09:22:26 +09'00'

S. IIDA

S. PHILLIPS

NAKASHIMA.ATSUS

HI.1274756299

Digitally signed by

NAKASHIMA.ATSUSHI.1274756299

Date: 2026.03.23 09:10:03 +09'00'

IIDA.SHUNICHI.127

4619127

Digitally signed by

IIDA.SHUNICHI.1274619127

Date: 2026.03.23 12:50:39 +09'00'

NBU-7 / LARC-936

TEST#: 58331-4-100_26131 ESR#: SASN-26-S232-0008

WN#: 57078-RS01-L014 SSP#: SASN-003-26

WS#: 864-42-001

TEST PROCEDURE GENERAL NOTES

1. TEST SEQUENCE: Unless otherwise specified in the test document, this test procedure (TP) shall be completed in provided order.

2. VERIFICATION: The person designated to sign for an action verifies, based on personal observation, objective evidence, or watch stander reports and certifies by signature that the action has been performed in accordance with the specified requirements.

3. USE ORIGINAL DOCUMENTS: All data attached to the Master TP shall have original pen and ink entries on the data sheets (unless otherwise specified in the test procedure.)

4. USE DARK INK: All signature and data shall be in dark, water insoluble ink.

5. CORRECTIONS: When an error was made, it shall be corrected by drawing a single line through the error, recording the correct entry, initialing, dating and printing the name of the person making the correction in accordance with JOINT FLEET MAINTENANCE MANUAL (JFMM), COMUSFLTFORCOMINST 4790.3, VOLUME

V, QUALITY MAINTENANCE.

6. LATEST APPLICABLE REVISION: Use the latest applicable revision of plans, instructions, technical manuals, and other reference materials cited in this test procedure.

7. INSTRUMENT CALIBRATION: All measuring equipment shall be in current calibration as required by

NAVSHIPREPFACINST 4734.1.

8. OPERATION OF COMPONENTS: Only authorized personnel shall operate ship’s permanently installed equipment.

The cognizant Shop shall control and operate their temporary test equipment. Ship’s Force shall operate temporary systems and equipment that are formally turned over to the ship.

9. SAFETY INSTRUCTION: The Test Director is responsible for the safe conduct of this test. The safety precautions of NAVSHIPREPFAC M-5100.8 shall be observed at all times.

10. TEST STOPPAGE: The Test Director shall stop the test once a problem has been found in the system or equipment being tested. S246 Testing Standard Operating Procedure (SOP) shall be used to determine course of action prior to resuming the test procedure.

11. ENERGIZED EQUIPMENT: NSTM 300, para 300-2.4 shall be followed when working on energized equipment.

12. DATA COLLECTION: The test documents may require collection of additional data for which there is no acceptance criteria, provided the data sheet identifies that data is for information only.

13. SUPPLEMENTATION: When supplementation is made, annotate the supplemental information on the page with ‘See Remarks’ followed by a sequential numbering system corresponding in the Remarks section.

14. USE ASTERISK (*): When supplementation, correction and/or signature is made but there is not enough space, annotate using an asterisk (*) followed by sequential number adjacent to the portion then clarify on the same page using the same annotation.

WN#: 57078-RS01-L014 SSP#: SASN-003-26

BILGE SYSTEM COMPONENT

1. PURPOSE

1-1 The purpose of this test is to certify the satisfactory replacement of bilge system components.

2. REFERENCES

2-1 TECHNICAL MANUAL

2-1.1 F9YC0-AM-TMM-010, 020, 030; LIGHTER AMPHIBIOUS RESUPPLY CARGO, FIVE TON (LARC-V A1/A2)

2-2 JFMM-JOINT FLEET MAINTENANCE MANUAL

2-3 NAVSHIPREPFAC M-5100.8; SAFETY AND HEALTH PROGRAM MANUAL

3. TEST AND SUPPORT EQUIPMENT/MATERIAL

3-1 Small piece of wire (For float switch)

3-2 Equipment for the bilge pump discharge test (Water, Bucket, etc.)

4. GENERAL PRECAUTIONS

4-1 Only those personnel actively engaged in performing or witnessing this test shall be permitted in the testing area.

All specified safety regulations shall be strictly observed.

4-2 To prevent injury or death, ensure that certified test equipment is used during testing.

4-3 Safeguarding of personnel and equipment shall be adhered to at all times.

4-4 Never open the cap on the engine coolant system when the engine is hot (greater than 120°F). The system may be pressurized and contain coolant at temperatures which will cause severe burns.

4-5 Do not move the craft until all ground personnel have cleared the immediate area. Personnel in the surrounding area may be injured or killed if struck by the craft.

4-6 Do not move the craft until all personnel are securely onboard or have cleared the immediate mooring area.

Personnel in the surrounding area may be injured or killed if struck by the craft.

4-7 Personnel onboard the craft should be notified that transition from the land to water is in progress and from water to land is in progress. This notification will allow personnel to prepare for turbulence and the abrupt speed reduction when the front wheels become grounded. Failure to provide notice may result in serious injury or death to onboard personnel.

WN#: 57078-RS01-L014 SSP#: SASN-003-26

5. OPERATIONAL TEST

5-1 PRETEST BRIEFING Conduct a pretest briefing (e.g. safety precaution, station assignments, testing steps) with all involved test personnel.

5-2 AT LAND TEST Conduct the AT LAND TEST under following test conditions. Record result in its corresponding

TEST DATA SHEET

5-2.1 12 & 24 VDC ON (Figure-5-1)

(1) Place the 12VDC and 24VDC battery disconnect power switches to the ON position.

(2) Using a small piece of wire, raise the float in the bilge pump float switch. Verify that the alarm message appears on the IQAN display and the bilge alarm light is illuminated.

Acceptance criteria: Alarm messages shall appear on the IQAN screen, and the bilge alarm light shall illuminate.

(3) Repeat above step (2) for remaining bilge pumps.

Figure 5-1

NOTE

ENSURE THAT THE OVERBOARD DISCHARGE CAN BE CONTAINED IN ORDER NOT TO CREATE A

HAZMAT SPILL.

5-2.2 ENGINE RUNNING

(1) Flood the bilge area for the pump to be tested until water reaches the bilge pump inlet.

(2) Press the manual side of the bilge pump switch.

Acceptance criteria: The bilge pump shall be discharged properly without any leakage.

(3) Repeat above step (1) and (2) for remaining bilge pumps.

WN#: 57078-RS01-L014 SSP#: SASN-003-26

5-3 LWC and S246 shall sign on the last page of TEST DATA SHEET upon completion of the test.

5-4 Return system/equipment to readiness conditions, as required.

6. TEST PROCEDURE COMPLETION

6-1 Sign the test procedure coversheet to confirm that the test procedure has been fulfilled and completed and return it to S246 for review and approval.

7. REMARKS

WN#: 57078-RS01-L014 SSP#: SASN-003-26

TEST DATA SHEET

5-2 AT LAND TEST

TEST CONDITION STEP ACCEPTANCE CRITERIA RESULT

5-2.1 12 & 24 VDC ON (2) Alarm messages shall appear on the IQAN screen, and the bilge alarm light shall illuminate.

FWD Pump: □ SAT / □ UNSAT

PORT Pump: □ SAT / □ UNSAT

STBD Pump: □ SAT / □ UNSAT

5-2.2 ENGINE RUNNING (2) The bilge pump shall be discharged properly without any leakage.

FWD Pump: □ SAT / □ UNSAT

PORT Pump: □ SAT / □ UNSAT

STBD Pump: □ SAT / □ UNSAT

5-3 COMPLETION OF THE TEST

RESPONSIBILITY PRINT NAME, SIGN & DATE

LWC

S246

58331-4-100_26131
58331-4-100_26131_Bilge System Component