Attachment 3 -58331-4-100_26125.pdf
PDF 296 KB Posted
- Attached to
- LARC-936, 6R1 26-CMAV 13PKG
- Solicitation number
- 20260004125
About this file
This is a Test Memo prepared by the Naval Ship Repair Facility (SRF) at Sasebo for Ship Repair Facility Japan Regional Maintenance Center (SRF-JRMC) Det Sasebo, documenting the test and certification of propulsion shafting and rudder component replacement on vessel NBU-7/LARC-936 (a Lighter Amphibious Resupply Cargo, Five Ton vessel).
The test procedure certifies the satisfactory replacement of propulsion shafting and rudder components through two operational test phases. The AT LAND TEST (conducted with engine running) verifies that rudder linkages, tillers, rudders, and rudder cables operate correctly by confirming front wheels and rudders turn proportionally with steering wheel input and that rudder movement aligns with rudder angle indicator readings. The AT SEA TEST (conducted in sea mode) verifies propeller shafting U-joints, propeller shafting, and propellers by ensuring the propeller and shaft turn freely with no abnormal sounds, vibrations, or leakage. The document establishes general testing protocols requiring use of original pen and ink entries, dark water-insoluble ink for all signatures, current instrument calibration per NAVSHIPREPFACINST 4734.1, adherence to safety precautions in NAVSHIPREPFAC M-5100.8, and use of latest applicable technical manuals (F9YC0-AM-TMM-010, 020, 030). The test was prepared by A. Nakashima on March 23, 2026, reviewed by S. Iida and S. Phillips, and approved by S. Phillips. Upon completion, both LWC and S246 personnel are required to sign the test data sheet certifying test fulfillment.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
TEST#: ESR#:
WN#: SSP#:
WS#:
SRF-JRMC DET SASEBO TEST MEMO
TITLE
PROPULSION SHAFTING & RUDDER COMPONENT
TEST MEMO PREPARATION
PRINT NAME & SIGNATURE PHONE CODE DATE
PREPARED BY
REVIEWED BY
APPROVED BY
SHIP/HULL#
SCOPE
TEST COMPLETION
PRINT NAME & SIGNATURE ORGANIZATION BADGE/RANK DATE
LWC
S246
SRF-JRMC
DET SASEBO
POST-TEST TECHNICAL REVIEW
PRINT NAME & SIGNATURE PHONE CODE DATE
Evaluation: ACCEPTED REJECTED
Action necessary: REPAIR ITEMS RETEST EQUIPMENT RESUBMIT DATA
COMMENTS
SASN-26-S232-0004
SASN-003-26
252-8048
252-8049
252-8045
3/23/26
3/23/26
3/23/26
S246B
S246A
S246CTE
Replacement of propulsion shafting & rudder component.
243-11-001
58331-4-100_26125
57078-RS01-L012
A. NAKASHIMA
PHILLIPS.SHAUN.P
ARRY.1093485625
Digitally signed by
PHILLIPS.SHAUN.PARRY.1093485625
Date: 2026.03.23 13:21:15 +09'00'
S. IIDA
S. PHILLIPS
NAKASHIMA.ATSUS
HI.1274756299
Digitally signed by
NAKASHIMA.ATSUSHI.1274756299
Date: 2026.03.23 09:07:03 +09'00'
IIDA.SHUNICHI.127
4619127
Digitally signed by
IIDA.SHUNICHI.1274619127
Date: 2026.03.23 09:18:31 +09'00'
NBU-7 / LARC-936
TEST#: 58331-4-100_26125 ESR#: SASN-26-S232-0004
WN#: 57078-RS01-L012 SSP#: SASN-003-26
WS#: 243-11-001
TEST PROCEDURE GENERAL NOTES
1. TEST SEQUENCE: Unless otherwise specified in the test document, this test procedure (TP) shall be completed in provided order.
2. VERIFICATION: The person designated to sign for an action verifies, based on personal observation, objective evidence, or watch stander reports and certifies by signature that the action has been performed in accordance with the specified requirements.
3. USE ORIGINAL DOCUMENTS: All data attached to the Master TP shall have original pen and ink entries on the data sheets (unless otherwise specified in the test procedure.)
4. USE DARK INK: All signature and data shall be in dark, water insoluble ink.
5. CORRECTIONS: When an error was made, it shall be corrected by drawing a single line through the error, recording the correct entry, initialing, dating and printing the name of the person making the correction in accordance with JOINT FLEET MAINTENANCE MANUAL (JFMM), COMUSFLTFORCOMINST 4790.3, VOLUME
V, QUALITY MAINTENANCE.
6. LATEST APPLICABLE REVISION: Use the latest applicable revision of plans, instructions, technical manuals, and other reference materials cited in this test procedure.
7. INSTRUMENT CALIBRATION: All measuring equipment shall be in current calibration as required by
NAVSHIPREPFACINST 4734.1.
8. OPERATION OF COMPONENTS: Only authorized personnel shall operate ship’s permanently installed equipment.
The cognizant Shop shall control and operate their temporary test equipment. Ship’s Force shall operate temporary systems and equipment that are formally turned over to the ship.
9. SAFETY INSTRUCTION: The Test Director is responsible for the safe conduct of this test. The safety precautions of NAVSHIPREPFAC M-5100.8 shall be observed at all times.
10. TEST STOPPAGE: The Test Director shall stop the test once a problem has been found in the system or equipment being tested. S246 Testing Standard Operating Procedure (SOP) shall be used to determine course of action prior to resuming the test procedure.
11. ENERGIZED EQUIPMENT: NSTM 300, para 300-2.4 shall be followed when working on energized equipment.
12. DATA COLLECTION: The test documents may require collection of additional data for which there is no acceptance criteria, provided the data sheet identifies that data is for information only.
13. SUPPLEMENTATION: When supplementation is made, annotate the supplemental information on the page with ‘See Remarks’ followed by a sequential numbering system corresponding in the Remarks section.
14. USE ASTERISK (*): When supplementation, correction and/or signature is made but there is not enough space, annotate using an asterisk (*) followed by sequential number adjacent to the portion then clarify on the same page using the same annotation.
WN#: 57078-RS01-L012 SSP#: SASN-003-26
PROPULSION SHAFTING & RUDDER COMPONENT
1. PURPOSE
1-1 The purpose of this test is to certify the satisfactory replacement of propulsion shafting & rudder component.
2. REFERENCES
2-1 TECHNICAL MANUAL
2-1.1 F9YC0-AM-TMM-010, 020, 030; LIGHTER AMPHIBIOUS RESUPPLY CARGO, FIVE TON (LARC-V A1/A2)
2-2 JFMM-JOINT FLEET MAINTENANCE MANUAL
2-3 NAVSHIPREPFAC M-5100.8; SAFETY AND HEALTH PROGRAM MANUAL
3. TEST AND SUPPORT EQUIPMENT/MATERIAL
3-1 Craft Gauge
4. GENERAL PRECAUTIONS
4-1 Only those personnel actively engaged in performing or witnessing this test shall be permitted in the testing area.
All specified safety regulations shall be strictly observed.
4-2 To prevent injury or death, ensure that certified test equipment is used during testing.
4-3 Safeguarding of personnel and equipment shall be adhered to at all times.
4-4 Never open the cap on the engine coolant system when the engine is hot (greater than 120°F). The system may be pressurized and contain coolant at temperatures which will cause severe burns.
4-5 Do not move the craft until all ground personnel have cleared the immediate area. Personnel in the surrounding area may be injured or killed if struck by the craft.
4-6 Do not move the craft until all personnel are securely onboard or have cleared the immediate mooring area.
Personnel in the surrounding area may be injured or killed if struck by the craft.
4-7 Personnel onboard the craft should be notified that transition from the land to water is in progress and from water to land is in progress. This notification will allow personnel to prepare for turbulence and the abrupt speed reduction when the front wheels become grounded. Failure to provide notice may result in serious injury or death to onboard personnel.
WN#: 57078-RS01-L012 SSP#: SASN-003-26
5. OPERATIONAL TEST
5-1 PRETEST BRIEFING Conduct a pretest briefing (e.g. safety precaution, station assignments, testing steps) with all involved test personnel.
5-2 AT LAND TEST Conduct the AT LAND TEST under following test conditions. Record result in its corresponding
TEST DATA SHEET.
5-2.1 ENGINE RUNNING
(1) Rudder Linkages (Rudder Tiller), Rudders, Rudder Cables
a. Turn the steering wheel from full port to full starboard. Verify that front wheels and rudder turn proportionally with the steering wheel. Verify that the rudder moves as indicated by the rudder angle indicator.
Acceptance criteria: The front wheels and rudder turn proportionally with the steering wheel.
The rudder moves as indicated by the rudder angle indicator.
5-3 AT SEA TEST Conduct the AT SEA TEST under following test conditions. Record result in its corresponding
TEST DATA SHEET.
5-3.1 SEA MODE
(1) Propeller Shafting U-Joints, Propeller Shafting and Propellers
a. Operate the propeller. Ensure the propeller and the shaft turn freely, with no abnormal sounds, vibrations, or any leakage.
Acceptance criteria: The propeller and the shaft turn freely. There are no abnormal sounds, vibrations, or any leakage.
5-4 LWC and S246 shall sign on the last page of TEST DATA SHEET upon completion of the test.
5-5 Return system/equipment to readiness conditions, as required.
6. TEST PROCEDURE COMPLETION
6-1 Sign the test procedure coversheet to confirm that the test procedure has been fulfilled and completed and return it to S246 for review and approval.
WN#: 57078-RS01-L012 SSP#: SASN-003-26
7. REMARKS
WN#: 57078-RS01-L012 SSP#: SASN-003-26
TEST DATA SHEET
5-2 AT LAND TEST
TEST CONDITION STEP ACCEPTANCE CRITERIA RESULT
5-2.1
ENGINE RUNNING
(1) Rudder Linkages (Tiller), Rudders, Rudder Cables
The front wheels and rudder turn proportionally with the steering wheel. □ SAT / □ UNSAT
The rudder moves as indicated by the rudder angle indicator. □ SAT / □ UNSAT
5-3 AT SEA TEST
TEST CONDITION STEP ACCEPTANCE CRITERIA RESULT
5-3.1
SEA MODE
(1) Propeller Shafting U-Joints, Propeller Shafting and Propellers The propeller and the shaft turn freely.
There are no abnormal sounds, vibrations, or any leakage.
□ SAT / □ UNSAT
5-4 COMPLETION OF THE TEST
RESPONSIBILITY PRINT NAME, SIGN & DATE
LWC
S246
| 58331-4-100_26125 |
| 58331-4-100_26125_Propulsion Shafting & Rudder Component |