Attachment 8 - Replace Roof on Building 1 Construction Drawings.pdf
PDF 15 MB Posted
- Attached to
- Z1DA--Project: 619-23-101 - Replace Roof Systems for Main Hospital, Building 1 Federal contract opportunity
- Solicitation number
- 36C24725R0030
About this file
This is a set of 32 architectural, mechanical, plumbing, and electrical construction drawings for replacing the roof systems on Building 1 at the Central Alabama Veterans Health Care System facility in Montgomery, AL. The drawings detail plans for replacing existing slate and thermoplastic polyolefin (TPO) roof systems, installing new fall protection systems, lightning protection, repairing dormers and flashing, replacing drainage systems, and reinstalling rooftop equipment including HVAC units and a solar array system.
The drawings include detailed site plans, demolition plans, new work plans, and various technical details for all major building systems affected by the roof replacement. Key specifications include R30 minimum insulation requirements, 60 mil TPO membrane installation, new copper flashing and gutters, secondary roof drains with exterior wall discharge, and comprehensive lightning protection system upgrades that must meet NFPA-780 standards. The plans indicate phased construction to maintain building operations, with work on certain roofs (X, T, O, P) restricted to weekends only. Operating rooms are limited to one shutdown at a time with scheduling approval required. Work areas must maintain infection control measures and temporary protection of existing equipment and building elements.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOT TO SCALE
PROJECT SITE
N
NOT TO SCALE
N
VICINITY MAP
PAGE
SHEET
TITLE
00-GENERAL
1 GI001 TITLE SHEET X
2 GI002 PROJECT INFORMATION SHEET
01-ARCHITECTURAL
A100 COORDINATION & MANAGEMENT PLAN
A101
SHEET INDEX
25%
SUBMISSION
50%
SUBMISSION
75%
SUBMISSION
DEMOLITION ROOF PLAN
X
A102 NEW ROOF PLAN
A501 ROOF DETAILS
A502 ROOF DETAILS
XMH001 MECHANICAL NOTES, LEGENDS & ABBREVIATIONS
MD101 MECHANICAL DEMOLITION PLAN - ROOFS U AND V
MH101 MECHANICAL PLAN - ROOFS "B,F,H,I, M,U"
XMH501 MECHANICAL DETAILS
X
E001 GENERAL NOTES & LEGEND
LPD101 LIGHTNING PROTECTION DEMOLITION PLAN
100%
SUBMISSION
CONSTRUCTION
DOCUMENTS
02-MECHANICAL
03-ELECTRICAL
03-LIGHTNING PROTECTION
X
X
X
X
X
X
X
XED101 ELECTRICAL DEMOLITION PLAN
XEP101 ELECTRICAL NEW WORK PLAN
X
A503 ROOF DETAILS
A504 ROOF DETAILS
X
X
XA104 LIFE SAFETY & FALL PROTECTION PLAN
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
MD102 MECHANICAL DEMOLITION PLAN - ROOFS B,F,H,I,M
X
A103 NEW ROOF DRAINAGE PLAN
X
X
X
X
3 GI003
4 GI004
FALL PROTECTION DURING CONSTRUCTION
SHEDDING PLAN
A105 DORMERS AND FLASHING X
X
X
X
X
X
X
X
X
X
PL001 PLUMBING NOTES, LEGENDS AND ABBREVIATIONS
PL101 - ROOF U,V
PL103 PLUMBING PLAN - ROOF B,I,F,H
PL501 PLUMBING DETAILS AND SCHEDULES
03-PLUMBING
PL102 PLUMBING PLAN - ROOF, M,U
X
X
X
X
X
X
X
X
X
X
X
X
X
X
LP101 LIGHTNING PROTECTION PLAN
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
A505
A506
SLATE ROOF DETAILS
SLATE ROOF DETAILS
LP501 LIGHTNING PROTECTION DETAILS X X32
GI001
SD JL
REPLACE ROOF ON BUILDING 1
CONTRACT NO.: 36C24723C0077
PROJECT NO.: 619-23-101
PROJECT SITE
o n e e i g h t h i n c o e f o t t h r e e i n c h e s o t o n e a d a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
A
B
C
D
E
F
Drawing Title Project Title
Checked
Building Number
Drawn
Revisions: Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
MONTGOMERY, ALABAMA
Date
2024.09.17
619-23-101
REPLACE ROOF ON BUILDING 1
D a t e
P l o t t e d
Rev. No.:
INCORPORATED
ENGINEERS
ARCHITECTS
CONSTRUCTORS
E
F
TITLE SHEET
S T
A
TE OF A LA BA
M A
R E
G
ISTERED A RCHIT
E C
T
PLUMBING PLAN
JSN
9' - 0"
DRAFTING SYMBOLS LEGEND
A
1F157B
AE201
AE201
AE211
0'-0" = 93.25
FIRST FLOOR
P-01
SCOPE INDICATORS
DRAWING TITLE
DETAIL CALLOUT
DETAIL INDICATOR FOR SMALL CONDITIONS
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR,
INTERIOR, MULTIPLE VIEW
BUILDING SECTION INDICATOR
SPACE IDENTIFICATION
OPENING INDICATOR
WINDOW INDICATOR
EQUIPMENT INDICATOR
SHEET NOTES
PARTITION TYPE INDICATOR
NORTH ARROW
INDICATES TRUE NORTH
EXISTING
INDICATES COLUMN
LINE DESIGNATION
COLUMN LINE INDICATORS
DRAWING REVISION INDICATOR
EXISTING CONSTRUCTION TO
REMAIN
EXISTING CONSTRUCTION TO BE
REMOVED
NEW CONSTRUCTION
VV ITEM - GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
VC ITEM - GOVERNMENT FURNISHED /
CONTRACTOR INSTALLED
ELEVATION INDICATOR
WALL FINISH INDICATOR
CC ITEM - CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
N
1/8" = 1'-0"
View Name
BA3034
CASEWORK TAG
SECOND PAIR INDICATES COUNTERTOP
HEIGHT (I.E. 34").
FIRST PAIR OF NUMBERS INDICATES UNIT
WIDTH (I.E. 30").
LETTER PAIR INDICATES CASEWORK
FAMILY: SEE CASEWORK DETAILS.
TOILET ACCESSORY TAG
XXXX
A
NEW
INDICATES COLUMN
LINE DESIGNATION
CEILING HEIGHT INDICATOR
ROOM NAME
1A105
AE201
WALL SECTION INDICATOR
AE201
WALL DETAIL INDICATOR
AE501
AE501
D #1
DEDUCTIVE ALTERNATE INDICATOR
A_4A
CC CONTRACTOR FURNISHED, CONTRACTOR INSTALL
VC GOVERNMENT FURNISHED, CONTRACTOR INSTALLED
VV GOVERNMENT FURNISHED, GOVERNMENT INSTALLED
A.C. AIR CONDITIONED
A.H.U. AIR HANDLING UNIT
ALT. ALTERNATIVE
ALUM. ALUMINUM
A.O. ACCESS OPENING
APPROX. APPROXIMATELY
ARCH. ARCHITECTURAL
ACMU ARCHITECTURAL CONC. MASONRY UNIT
ACT ACOUSTIC CEILING TILE
AV AUDIO VISUAL
BD. BOARD
BLDG. BUILDING
BM. BEAM
BOT. BOTTOM
BRG. BEARING
CABT. CABINET
CAP. CAPACITY
CCTV CLOSED CIRCUIT TV
C.A. CEILING DIFFUSER
C.A.P. CEILING ACCESS PANEL
CEM. CEMENT
CIRC. CIRCULATING
C.J. CONTROL JOINT
CLG. CEILING
C.M.U. CONCRETE MASONRY UNIT
C.O. CLEAN OUT
COL. COLUMN
CONC. CONCRETE
CONN. CONNECTION
CONST. CONSTRUCTION
CONT. CONTINUOUS
C.T. CERAMIC TILE
C.T.B. CERAMIC TILE BASE
DET. DETAIL
DIA. DIAMETER
DIFF. DIFFUSER
DIM. DIMENSION
DN. DOWN
DR. DRAIN
D.S. DOWN SPOUT
DWG.(S) DRAWINGS(S)
EA. EACH
E.F. EXHAUST FAN
ELEV. ELEVATION
ELEC. ELECTRICAL
EQUIP. EQUIPMENT
E.W.C. ELECTRIC WATER COOLER
EL. EXHAUST
EXP. JT. EXPANSION JOINT
EXT. EXTERIOR
EXIST. EXISTING
STANDARD ABBREVIATIONS
NOT ALL ABBREVIATIONS USED
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
OH. OVERHEAD
OPNG. OPENING
PART. PARTITION
PEMB PRE-ENGINEERED
PL. PLATE
PLBG. PLUMBING
PLYW'D PLYWOOD
PNL. PANEL
PRESS. PRESSURE
PSF POUNDS/SQUARE FOOT
PSI POUNDS/SQUARE INCH
P.T. PRESSURE TREATED
QTR. QUARTER
R.A. RETURN AIR
RAD. RADIUS
RCP REFLECTED CEILING PLAN
RD. ROUND
REC'D RECESSED
RECP. RECEPTACLE
REINF. REINFORCING
REQ. REQUIRED
RM. ROOM
SAB SOUND ATTENUATION
S.A. SUPPLY AIR
SCHD. SCHEDULE
S.D. SOAP DISPENSER
SECT. SECTION
SHT. SHEET
S.J. SLIP JOINT
SPEC. SPECIFICATIONS
SQ. FT. SQUARE FEET
STL. STEEL
STOR. STORAGE
STRUCT. STRUCTURAL
SUSP. SUSPENDED
T., TLT. TOILET
U. TELEPHONE
THD. THRESHOLD
TOIL. TOILET
TYP. TYPICAL
U.N.O. UNLESS NOTED
V.C.T. VINYL TILE
VENT. VENTILATION
VERT. VERTICAL
W/ WITH
WD. WOOD
F.A. FIRE ALARM
F.D. FLOOR DRAIN
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
FIN. FINISH
FL. FLOOR
F.O. FACE OF
FR. FRAME
FT. FOOT, FEET
FTG. FOOTING
GA. GAGE
GAL. GALLON
GALV. GALVANIZED
GL. GLASS
GND. GROUND
GOV'T GOVERNMENT
G.P.H. GALLONS/HOUR
G.P.M. GALLONS/MINUTE
GR. GRILLE
G.B. GYPSUM BOARD
H.B. HOSE BIBB
H.C. HOLLOW CORE
HEWC HANDICAPPED ELECTRICAL
HT. HEIGHT
H.M. HOLLOW METAL
HR. HOUR
HTG. HEATING
HTR. HEATER
HW. HARDWARE
IN. INCHES
INSUL. INSULATION
INT. INTERIOR
J.B. JUNCTION BOX
JCT. JUNCTION
JT. JOINT
LB., # POUND
L.P. LIGHTING PANEL
LTG. LIGHTING
MAINT. MAINTENANCE
MAX. MAXIMUM
MECH. MECHANICAL
MTL. METAL
MIN. MINIMUM
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
M.T. METAL THRESHOLD
MTD. MOUNTED
MTG. MOUNTING
N.A. NOT APPLICABLE
N.I.C. NOT IN CONTACT
NO. NUMBER
WATER COOLER
OTHERWISE
BLANKET
MANUF. BUILDING
SEISMIC
1. CONTRACTOR SHALL PROVIDE EVERYTHING NEEDED FOR INFECTIOUS CONTAINMENT/CONTROL SYSTEM. SOME ITEMS MAY INCLUDE, BUT NOT LIMITED TO, CONSTRUCTION ZONE
SIGNS, HEPA FILTERS, AIR SCRUBBERS, ETC. CONTACT RESIDENT ENGINEER, FACILITY INFECTIOUS CONTROL RISK ASSESSMENT TEAM (ICRA) FOR FULL PROCEDURE
REQUIREMENTS.
2. IT IS RECOMMENDED THAT THE CONTRACTOR UTILIZE MOVEABLE CONTAINMENT SYSTEM, CONSTRUCTED OF A MINIMUM 6MIL POLY OR PREFABRICATED ZIP WALL THAT CAN BE
SEALED TO WORK AREAS. THE INTEGRITY OF THE BARRIER WALLS MUST ASSURE A COMPLETE SEAL OF THE CONSTRUCTION AREA FROM ADJACENT AREAS.
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT CONTAINMENT/CONTROL SYSTEM PLAN TO COR FOR APPROVAL, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT
TO THE VA RESIDENT ENGINEER AND FACILITY ICRA TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION
SHALL BE EDUCATED AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER AND SHALL FOLLOW INFECTION CONTROL PROCEDURES.
4. IN EACH CONSTRUCTION AREA, THE CONTRACTOR SHALL UTILIZE A 120V HEPA FILTER EQUIPPED AIR SCRUBBER MACHINE.
5. DO NOT REMOVE CONSTRUCTION BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS SIGNED OFF BY COR AND VA'S INFECTION CONTROL DEPARTMENT.
6. PROVIDE DUST "STICKY" MAT AT ENTRANCE/EXIT OF CONSTRUCTION AREA AND REPLACE OR CLEAN WHEN NO LONGER EFFECTIVE.
7. ALL FURNITURE AND EQUIPMENT SHALL BE PROTECTED DURING DEMOLITION AND CONSTRUCTION.
INFECTIOUS CONTROL NOTES
INFECTIOUS CONTROL PROCEDURES
1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE, INCLUDING SHARPS CONTAINERS, FROM AREAS TO BE RENOVATED, PRIOR TO THE START OF THE
PROJECT.
2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF IMMEDIATELY IF UNEXPECTED MEDICAL WASTE IS ENCOUNTERED.
MEDICAL WASTE
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS TO BE DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES, WITH NO DISRUPTION OF THE AIR SYSTEMS OF THE ADJACENT AREAS. INSTALL HEPA (HIGH EFFICIENCY PARTICULATE
ACCUMULATOR) FILTER VACUUM SYSTEM RATED AT 95% CAPTURE OF 0.3 MICRONS INCLUDING (EFFECTIVE FOR POLLEN, MOLD SPORES AND DUST PARTICLES). THERE SHALL BE NO
RE-CIRCULATION OF AIR, AND VENTILATION FILTERS SHALL BE CHANGED AS NEEDED. CONTRACTOR SHALL ALSO ENSURE THAT CONSTRUCTION EXHAUST TO THE OUTSIDE OF THE
BUILDING IS NOT RE-ENTERING THE MEDICAL CENTER THROUGH INTAKE VENTS, OR BUILDING OPENINGS. CONTRACTOR SHALL PROVIDE HEPA FILTRATION WHERE THE EXHAUST
DUST MAY RE-ENTER THE BREATHING ZONE. HEPA FILTERS SHALL HAVE ASHRAE 85 OR OTHER PRE-FILTER TO EXTEND THE USEFUL LIFE OF THE HEPA.
3. PROVIDE, BOTH, PRIMARY AND SECONDARY FILTRATION UNITS. EXHAUST HOSES SHALL BE HEAVY DUTY, FLEXIBLE STEEL REINFORCED AND EXHAUSTED SO THAT DUST IS NOT
RE-INTRODUCED TO THE MEDICAL CENTER.
4. EXISTING VENTILATION EQUIPMENT SHALL BE PROTECTED WITH FILTER MEDIA. AN AUXILIARY AIR FILTRATION SYSTEM SHALL BE USED ALONG WITH HEPA FILTERS TO PROTECT
INDOOR AIR QUALITY.
5. SEE MECH. SHEETS FOR PROTECTION OF THE AIR INTAKE LOCATIONS, TO PREVENT HAZARDOUS AIR FROM ENTERING THE BUILDING.
ENVIRONMENTAL CONTROL
1. DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE COORDINATED WITH THE VA (IN CONJUNCTION WITH ANY NECESSARY INTERIM LIFE SAFETY MEASURES) FOR THE PROJECT.
2. ALL EGRESS PATHWAYS SHALL BE FREE OF DEBRIS.
3. UNAUTHORIZED PERSONNEL SHALL NOT BE ALLOWED TO ENTER THE CONSTRUCTION ZONE.
4. ONLY DESIGNATED ELEVATORS SHALL BE USED FOR CONSTRUCTION ACTIVITIES DURING SCHEDULED TIMES.
5. WHEN USING DEMOLITION CHUTES, CHUTE OPENINGS SHALL BE SEALED WHEN NOT IN USE. THE CHUTE AND DAMPER SHALL BE SPRAYED WITH WATER, AS NECESSARY, TO
MAINTAIN DUST CONTROL.
6. ANY CEILING ACCESS PANELS OPENED FOR INVESTIGATION BEYOND SEALED AREAS SHALL BE CLOSED IMMEDIATELY WHEN UNATTENDED.
TRAFFIC CONTROL
1. THE CONSTRUCTION ZONE AND ADJACENT AREAS SHALL BE MAINTAINED IN A CLEAN AND SANITARY MANNER BY THE CONTRACTORS AND SHALL BE SWEPT AND MOPPED DAILY OR
MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION.
2. ALL EQUIPMENT, TOOLS, MATERIAL, ETC. TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WIPE DOWN. USING A
HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILE PRIOR TO REPLACEMENT. ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED MEDICAL
CENTER SHALL BE VACUUMED AND WET MOPED AT THE END OF EACH WORKDAY.
3. ALL DEBRIS SHALL BE REMOVED AS IT IS GENERATED, DURING LOW TRAFFIC HOURS OR AFTER HOURS IN A CLEAN, COVERED, SEALED CART; APPROVED BY THE COR. NO DEBRIS
SHALL BE HAULED THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR AND THE MEDICAL CENTER. WHEN, APPROVED, DEBRIS SHALL BE HAULED IN
ENCLOSED DUST PROOF, TIGHTLY FITTED CONTAINERS, USING SPECIFIC TRAFFIC PATTERNS DAILY. PROJECT SUPERINTENDENT SHALL OVERSEE THIS AFTER APPROVAL FROM
RESIDENT ENGINEER.
CLEANING
1. CLOTHING SHALL BE FREE OF DUST AND DEBRIS PRIOR TO EXITING THE CONSTRUCTION ZONE:
2. PERSONAL PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELD, GLOVES, AND N95 RESPIRATORS SHALL BE UTILIZED AS APPROPRIATE.
3. ALL CONSTRUCTION PERSONNEL ENTERING STERILE/INVASIVE PROCEDURE AREAS, SHALL WEAR A DISPOSABLE JUMP SUITE, HEAD COVERING AND SHOE COVERINGS WHICH MUST
BE REMOVED PRIOR TO EXITING THE WORK AREA. CONTACT COR FOR SPECIFIC INSTRUCTIONS.
PERSONAL REQUIREMENTS
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
3. WET MOP WORK AREA WITH DISINFECTANT.
4. REMOVE ISOLATION OF HVAC SYSTEMS IN AREAS WHERE WORK IS BEING PERFORMED.
PROJECT COMPLETION
1. CONTRACTOR IS TO REVIEW INFECTIOUS CONTROL PROCEDURES, PROVIDED BY THE VA'S INFECTION CONTROL DEPARTMENT, INCLUDING LOCATION AND DETAILS OF BARRIERS
PRIOR TO START OF PROJECT.
2. CONTRACTOR SHALL SUBMIT PRODUCT DATA FOR REVIEW.
SUBMITTALS
1. CONSTRUCTION BARRIERS SHALL CONSIST OF 6 MILL. THICK FIRE RETARDANT PLASTIC SHEETS, OR PREFABRICATED ZIP WALLS WITH 120V HEPA FILTER EQUIPED AIR SCRUBBER.
2. DISINFECTANT AS APPROVED BY VA HOSPITAL.
PRODUCTS AND MATERIALS
NOT ALL SYMBOLS USED
NTS NOT TO SCALE
A.F.F. ABOVE FINISHED FLOOR
E.J.C. EXPANSION JOINT COVER
MONTGOMERY, AL SEISMIC ZONE A -B
ELEMENTS OF STRUCTURES, NONSTRUCTURAL COMPONENTS, AND EQUIPMENT SUPPORTED BY STRUCTURES FOR CRITICAL AND ESSENTIAL FACILITIES
1. IN STRUCTURES ASSIGNED TO SEISMIC DESIGN CATEGORY C, D, E, OR F, PERMANENT EQUIPMENT AND NONSTRUCTURAL COMPONENTS AND THEIR
ATTACHMENTS, AND THE STRUCTURE-SUPPORTED ATTACHMENTS OF PERMANENT EQUIPMENT SHALL BE DESIGNED TO RESIST TOTAL DESIGN FORCES
PRESCRIBED IN ASCE 7, CHAPTER 13 AS MODIFIED BY THIS DOCUMENT.
EXCEPTIONS: SEISMIC RESTRAINT MAY BE OMITTED FOR THE FOLLOWING INSTALLATIONS:
A. GAS AND MEDICAL PIPING LESS THAN ONE INCH INSIDE DIAMETER;
B. ALL OTHER PIPING LESS THAN 2 ½ INCH INSIDE DIAMETER EXCEPT FOR AUTOMATIC FIRE SUPPRESSION SYSTEMS;
C. ALL ELECTRICAL CONDUITS, LESS THAN 2 ½ INCH INSIDE DIAMETER;
D. ALL RECTANGULAR AIR HANDLING DUCTS LESS THAN SIX SQUARE FEET IN CROSS SECTIONAL AREA;
E. ALL ROUND AIR HANDLING DUCTS LESS THAN 28 INCHES IN DIAMETER;
F. EQUIPMENT WEIGHING LESS THAN 400 LBS, SUPPORTED AND ATTACHED DIRECTLY ON THE FLOOR; AND
G. EQUIPMENT WEIGHING LESS THAN 20 LBS SUSPENDED FROM THE ROOF OR FLOOR OR HUNG FROM THE WALL.
2. IN STRUCTURES ASSIGNED TO SEISMIC DESIGN CATEGORY C, D, E, OR F, PERMANENT EQUIPMENT AND COMPONENTS ARE TO HAVE SPECIAL SEISMIC
CERTIFICATION IN ACCORDANCE WITH REQUIREMENTS OF SECTION 13.2.2 OF ASCE 7 EXCEPT FOR EQUIPMENT AND COMPONENTS THAT ARE CONSIDERED
RUGGED AS LISTED IN SECTION 2.2 OF OSHPD CODE APPLICATION NOTICE CAN NO. 2-1708A.5, AND SHALL COMPLY WITH SECTION 13.2.6 OF ASCE 7.
6. THE WORK PERFORMED ABOVE OPERATING ROOMS SHALL BE PERFORMED ON WEEKENDS, A PROPOSED SCHEDULE SHALL BE APPROVED BY
THE VA CO OR COR.
7. THE CONTRACTOR SHALL PROVIDE A DETAILED PHASING PLAN FOR REVIEW AND APPROVAL BY THE CONTRACTING OFFICER. THE PLAN SHALL
INCLUDE AS A MINIMUM:
A. FOR EACH PHASE, THE FOLLOWING:
1) DATE OF COMMENCEMENT AND COMPLETION.
2) PLAN SHOWING LIMITS OF WORK, TEMPORARY BARRIERS, ACCESS POINTS AND ALTERATIONS TO EGRESS FOR OCCUPIED PORTIONS OF
THE FACILITY AS MAY BE REQUIRED.
B. FOR THE ENTIRE PROJECT:
1) LIMITS OF WORK FOR EACH PHASE.
2) THE PROPOSED LAY-DOWN AND STORAGE AREAS, CONTRACTOR PARKING AND TEMPORARY OFFICE TRAILER FOR EACH PHASE.
8. WORK ON ROOFS X,T,O AND P SHALL BE PERFORMED ON WEEKENDS.
9. ALL SCAFFOLDING AND FALL PROTECTION BRIDGING FOR ALL ROOFS SHALL BE COORCINATED WITH THE VA COR PRIOR TO PLACEMENT AND SHALL
NOT DISRUPT ACCESS/EGRESS TO THE AREAS BELOW THESE ROOFS.
PHASING PLAN
1. THE WORK OF THE PROJECT SHALL BE PERFORMED IN THE INCREMENTS OF WORK HEREINAFTER REFERRED TO AS PHASES. EACH PHASE SHALL CONSIST OF
DEMOLITION, TEMPORARY SERVICES IF NECESSARY AND OTHER WORK AS REQUIRED TO COMPLETE AND TURN OVER THAT PORTION OF THE FACILITY FOR
OCCUPANCY BY THE GOVERNMENT.
2. LIMITED ACCESS WILL BE ALLOWED DURING THE CONSTRUCTION PHASE AND SHALL BE ACCOMPLISHED IN A MANNER THAT WILL PROVIDE THE LEAST
INTERFERENCE WITH OPERATIONS AND SAFETY. THE CONTRACTOR SHALL SCHEDULE WORK IN LIMITED ACCESS AREAS AT THE GOVERNMENTS CONVENIENCE AND
PROVIDE NOTIFICATION FOR WORK IN LIMITED ACCESS AREAS IN ACCORDANCE WITH SPECIFICATIONS. EXAMPLES OF LIMITED ACCESS AREAS INCLUDE ELECTRICAL
TRANSITIONS AND CONNECTIONS TO THE ELECTRIC GRID.
3. THE CONTRACTOR SHALL PROVIDE FULL CAPACITY, TEMPORARY SERVICES FOR ANY UTILITY SERVICE INTERRUPTED DURING THE LIFE OF THE CONTRACT AT
NO ADDITIONAL COST TO THE GOVERNMENT, INCLUDING ELECTRICAL SYSTEMS FOR POWER AND LIGHTING, ALL LIFE SUPPORT AND SECURITY SYSTEMS AND OTHER
SYSTEMS AS NECESSARY TO MAINTAIN OCCUPANCY. THERE SHALL BE NO DISRUPTIONS OF SERVICES EXCEPT AS REQUIRED FOR APPROVED CUTOVERS. UTILITY
USAGE COSTS ARE THE RESPONSIBILITY OF THE GOVERNMENT.
4. THE BUILDING IS TO BE PHASED TO MINIMIZE DISRUPTION OF DAILY OPERATION AND TO MAINTAIN THE INTEGRITY OF THE BUILDING ENVELOPE. PHASING SHALL
BE CAREFULLY PLANNED AND COORDINATED WITH THE VA. ONLY ONE ROOF SHALL BE UNDER CONSTRUCTION AT ANY GIVEN TIME, COMPLETED AND APPROVED BY
THE ARCHITECT AND VA, BEFORE STARTING ANOTHER ROOF. THE CONTRACTOR SHALL PROVIDE PHASING PLANS INDICATING THE SEQUENCE OF ROOF
REPLACEMENT, AND INFECTIOUS CONTROL PLANS, (SEE INFECTIOUS CONTROL NOTES THIS SHEET), TO BE SUBMITTED AND APPROVED BY THE VA. INTERIOR WORK
SHALL BE SHALL BE COORDINATED WITH THE VA AND REQUIRES SEVEN DAYS ADVANCED NOTICE, AND SHALL ONLY BE PERFORMED AFTER HOURS AND ON
WEEKENDS. INTERIOR SPACES SHALL BE CLEAN, IN ORDER AND READY FOR OCCUPANCY FOLLOWING ANY WORK BY THE CONTRACTOR.
5. THE VA WILL ONLY ALLOW ONE OPERATING ROOM TO BE SHUTDOWN AT A TIME. CONTRACTOR SHALL PROVIDE A PROPOSED SCHEDULE TO BE APPROVED BY
THE VA.
LEAD BASED PAINT GENERAL NOTES
LEAD BASED PAINT WITHIN THIS BUILDINGS, IN AREAS ASSOCIATED WITH THIS
SCOPE OF WORK IS ASSUMED TO BE PRESENT.
PROPER MEASURES SHALL BE TAKEN FOR REMOVAL AND DISPOSAL OF SUBJECT
MATERIALS OR FOR ENCAPSULATION OF LEAD PAINT AFFECTED BY THE RENOVATION
AND DEMOLITION ACTIVITIES IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL
REQUIREMENTS.
THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY IF ANY
SUSPECT MATERIALS ARE DISCOVERED BY THIS CONTRACTOR DURING
CONSTRUCTION. DO NOT PROCEED IN UNCERTAINTY.
SEE SPECIFICATION SECTION 02 83 33.13
LEAD-BASED PAINT REMOVAL AND DISPOSAL FOR INFORMATION.
ASBESTOS GENERAL NOTES
1. TESTING FOR ASBESTOS CONTAINING MATERIALS WAS CONDUCTED FOR THIS
PROJECT. THE REPORT INDICATES THE PRESENCE OF ACM'S WITHIN THE BUILDING.
2. CONTRACTOR SHALL TAKE MEASURES TO PROPERLY REMOVE AND DISPOSE
OF ALL FRIABLE AND NON-FRIABLE ACMs AFFECTED BY THE RENOVATION AND
DEMOLITION ACTIVITIES IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL
REQUIREMENTS.
3. SEE REPORT TITLED: "HAZARDOUS MATERIALS SURVEY REPORT OF BUILDING
X", PREPARED BY KAMAU MCABEE. Environmental Health Consultants, LLC 701 E. Pratt
Street, Baltimore, Maryland 21202
4. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY IF
ANY SUSPECT MATERIALS ARE DISCOVERED BY THE CONTRACTOR DURING
CONSTRUCTION. DO NOT PROCEED IN UNCERTAINTY.
5. CONTRACTOR SHALL HAVE AN ASBESTOS COMPETENT PERSON ON SITE FOR
ALL DEMOLITION ACTIVITIES NOT JUST THE ABATEMENT ACTIONS. THIS IS TO BE
ABLE TO IDENTIFY SUSPECT MATERIALS NOT IDENTIFIED IN THE HAZARD
ASSESSMENT DUE TO INACCESSIBILITY.
RISK ASSESSMENT AND PHASING NOTES
A. THE IMPACT OF DISRUPTING ESSENTIAL SERVICES TO PATIENTS AND EMPLOYEES.
B. PATIENT PLACEMENT OR RELOCATION.
C. PLACEMENT OF EFFECTIVE BARRIERS TO PROTECT SUSCEPTIBLE PATIENTS FROM
AIRBORNE CONTAMINANTS SUCH AS ASPERGILLUS SP.
D. AIR HANDLING AND VENTILATION NEEDS IN SURGICAL SERVICES, AIRBORNE INFECTION
ISOLATION AND PROTECTIVE ENVIRONMENT ROOMS, LABORATORIES, LOCAL
EXHAUST SYSTEMS FOR HAZARDOUS AGENTS, AND OTHER SPECIAL AREAS.
E. DETERMINATION OF ADDITIONAL NUMBERS OF AIRBORNE INFECTION ISOLATION OR
PROTECTIVE ENVIRONMENT ROOM REQUIREMENTS.
F. CONSIDERATION OF THE DOMESTIC WATER SYSTEM TO LIMIT LEGIONELLA SP. AND
WATERBORNE OPPORTUNISTIC PATHOGENS.
G. PATIENT PROTECTION FROM DEMOLITION, VENTILATION, AND WATER MANAGEMENT
FOLLOWING PLANNED OR UNPLANNED POWER OUTAGES, MOVEMENT OF DEBRIS,
TRAFFIC FLOW, CLEANUP, AND CERTIFICATION.
THE OWNER SHALL PROVIDE AN INFECTION CONTROL RISK ASSESSMENT (ICRA). AN ICRA
IS A DETERMINATION OF THE POTENTIAL RISK OF TRANSMISSION OF VARIOUS AGENTS IN
THE FACILITY. THIS CONTINUOUS PROCESS IS AN ESSENTIAL COMPONENT OF A FACILITY
FUNCTIONAL OR MASTER PROGRAM TO PROVIDE A SAFE ENVIRONMENT OF CARE. THE
ICRA SHALL BE CONDUCTED BY A PANEL WITH EXPERTISE IN INFECTION CONTROL, RISK
MANAGEMENT, FACILITY DESIGN, CONSTRUCTION, VENTILATION, SAFETY, AND
EPIDEMIOLOGY. THE PANEL SHALL PROVIDE UPDATED DOCUMENTATION OF THE RISK
ASSESSMENT THROUGHOUT CONSTRUCTION. THE ICRA SHALL ONLY ADDRESS BUILDING
AREAS ANTICIPATED TO BE AFFECTED BY CONSTRUCTION. THE ICRA SHALL ADDRESS, BUT
NOT BE LIMITED TO THE FOLLOWING ISSUES:
PROJECT INFORMATION SHEET
GI002
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
A
B
C
D
E
F
Drawing Title Project Title
Checked
Building Number
Drawn
Revisions: Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
MONTGOMERY, ALABAMA
Date
2024.09.17
619-23-101
REPLACE ROOF ON BUILDING 1
D a
P l o t t e d
Rev. No.:
INCORPORATED
ENGINEERS
ARCHITECTS
CONSTRUCTORS
E
F
RP SD
ROOF
'0'
ROOF
'T'
ROOF
'X'
ROOF
'L'
ROOF
'M'
ROOF
'R'
ROOF
'P'
ROOF
'Q'
ROOF
'S'
ROOF
'W'
V
V o n e e i g h t h i n c e f o o t t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
A
B
C
D
E
F
Drawing Title Project Title
Checked
Building Number
Drawn
Revisions: Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
MONTGOMERY, ALABAMA
Date
2024.09.17
619-23-101
REPLACE ROOF ON BUILDING 1
D a t e
P l o t t e d
Rev. No.:
INCORPORATED
ENGINEERS
ARCHITECTS
CONSTRUCTORS
E
F
GI003
RP SD
FALL PROTECTION DURING
CONSTRUCTION
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
ROOF
'V'
ROOF
'U'
ROOF
'0'
ROOF
'T'
ROOF
'X'
ROOF
'N'
ROOF
'L'
ROOF
'M'
ROOF
'K'
ROOF
'J'
ROOF
'I'
ROOF
'H'
ROOF
'G'
ROOF
'E'
ROOF
'D'
ROOF
'B'
ROOF
'A'
ROOF
'C'
ROOF
'R'
ROOF
'F'
ROOF
'P'
ROOF
'Q'
ROOF
'S'
ROOF
'W'
KEY PLAN
S T
A
TE OF A LA BA
M A
R E
G
ISTERED A RCHIT
E C e e i g h t h i n c e f o o t t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
A
B
C
D
E
F
Drawing Title Project Title
Checked
Building Number
Drawn
Revisions: Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
MONTGOMERY, ALABAMA
Date
2024.09.17
619-23-101
REPLACE ROOF ON BUILDING 1
D a t e
P l o t t e d
Rev. No.:
INCORPORATED
ENGINEERS
ARCHITECTS
CONSTRUCTORS
E
F
GI004
RP SD
SHEDDING PLAN
S T
A
TE OF A LA BA
M A
R E
G
ISTERED A RCHIT
E
DRAWING SHEET NOTES
LOCATION OF STAGING AREA. (AT GRADE LEVEL)
CONTRACTOR SHALL PROVIDE TEMPORARY BRIDGES, LADDERS &
WALKWAYS AS REQUIRED FOR REMOVAL OF DEMOLISHED MATERIALS
AND DELIVERY OF NEW MATERIALS. PROTECT EXISTING BUILDING, ANY
DAMAGE SHALL BE REPLACED/REPAIRED TO THE SATISFACTION OF THE
VA/ARCHITECT. CONTRACTOR SHALL PROPOSE ROUTES TO
TRANSPORT EQUIPMENT AND MATERIALS FOR APPROVAL BY THE VA.
(TYPICAL ALL ROOFS)
CONTRACTOR SHALL PROVIDE TRASH CHUTES NEAR ROOFS UNDER
CONSTRUCTION. COORDINATE LOCATIONS WITH THE VA. (TYPICAL ALL
ROOFS)
KEEP AREA CLEAR AT ALL TIMES FOR EMERGENCY MEDICAL SERVICES.
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A CLEAR PATH
FOR EMS TO ACCESS EMERGENCY ENTRANCE FROM ROAD.
X
GENERAL SITE NOTES
1. EXISTING SITE: THE MONTGOMERY VAMC CONSISTS OF A COMPLEX OF
CONNECTED BUILDINGS TAKING UP A LARGE PORTION OF THE SITE, COUPLED
WITH ASSOCIATED PARKING AREAS, AND BOUND BY STREETS ON ALL FOUR
SIDES. THERE ARE ALSO PARKING AREAS ACROSS ADJACENT STREETS.
CONTRACTOR PARKING IS NOT PERMITTED ON CAMPUS UNLESS PREVIOUSLY
APPROVED BY VA'S CO OR COR.
2. CONSTRUCTION STAGING AREAS, MATERIALS LAY-DOWN AREAS, AND
STORAGE AREAS ARE BASED ON PROXIMITY TO THE ROOFS IN THE SCOPE OF
WORK. A VERY LIMITED AREA (POSSIBLY ONLY 300 SQ.FT.), WITHIN THE
HATCHED AREAS SHOWN ON THE PLAN SHALL BE AVAILABLE FOR STAGING
AND STORAGE, PER THE VA INSTRUCTIONS. SAFE ACCESS THROUGH THESE
AREAS FOR PUBLIC AND STAFF SHALL BE MAINTAINED AND COORDINATED
WITH THE VA. ALL STAGING LOCATIONS (AND SIZES) SHALL BE CLOSELY
COORDINATED WITH THE VA PRIOR TO COMMENCEMENT. STORAGE SHALL
NOT OCCUR ON ANY ROOFS.
3. CONTRACTOR SHALL MAINTAIN PATIENT, VISITOR AND PERSONNEL ACCESS
AT ALL TIMES, ALONG WITH KEEPING ACCESS TO THE EMERGENCY ROOM FOR
AMBULANCE APPROACH AND PATIENT ACCESS.
4. THE CONTRACTOR SHALL PROPOSE LOCATIONS FOR ALL STAGING AND
STORAGE AREAS FOR THE APPROVAL OF THE VA PRIOR TO COMMENCEMENT.
5. THE CONTRACTOR SHALL COORDINATE CONTRACTOR PARKING AREAS WITH
THE VA PRIOR TO COMMENCEMENT.
6. THE CONTRACTOR SHALL WORK CLOSELY WITH THE VA TO MAKE SURE ANY
INCONVENIENCE IS MINIMIZED.
7. THE ROOF AREA NUMBERS AND PROPOSED STAGING AND STORAGE AREAS
ARE IDENTIFIED ON THE AERIAL PHOTOGRAPH ENTITLED COORDINATION AND
MANAGEMENT PLAN.
ROOF
'V'
ROOF
'U'
ROOF
'0'
ROOF
'T'
ROOF
'X'
ROOF
'N'
ROOF
'L'
ROOF
'M'
ROOF
'K'
ROOF
'J'
ROOF
'I'
ROOF
'H'
ROOF
'G'
ROOF
'E'
ROOF
'D'
ROOF
'B'
ROOF
'A'
ROOF
'C'
ROOF
'R'
ROOF
'F'
ROOF
'P'
ROOF
'Q'
ROOF
'S'
ROOF
'W'
ROOF
'Y'
ROOF
'Z'
NTS
COORDINATION & MANAGEMENT PLAN
A100
COORDINATION &
MANAGEMENT PLAN
RP DjH o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
A
B
C
D
E
F
Drawing Title Project Title
Checked
Building Number
Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
MONTGOMERY, ALABAMA
2024.09.17
619-23-101
REPLACE ROOF ON BUILDING 1
D a o t t e d
Rev. No.:
INCORPORATED
ENGINEERS
ARCHITECTS
CONSTRUCTORS
E
F
S T
A
TE OF A LA BA
M A
R E
G
ISTERED A RCHIT
E
'V'
ROOF
'U'
ROOF
'0'
ROOF
'T'
ROOF
'X'
ROOF
'N'
ROOF
'L'
ROOF
'M'
ROOF
'K'
ROOF
'J'
ROOF
'I'
ROOF
'H'
ROOF
'G'
ROOF
'E'
ROOF
'D'
ROOF
'B'
ROOF
'A'
ROOF
'C'
ROOF
'R'
ROOF
'F'
ROOF
'P'
ROOF
'Q'
ROOF
'S'
ROOF
'W'
ROOF
'Y'
ROOF
'Z'
GENERAL DEMOLITION NOTES
1. EXISTING CONDITIONS: CONTRACTOR SHALL VISIT SITE, INSPECT ALL
ROOFS AND VERIFY ALL EXISTING CONDITIONS PRIOR TO BIDDING.
CONTRACTOR SHALL NOTIFY THE VA AND ARCHITECT IMMEDIATELY IF ANY
DISCREPANCIES BETWEEN THE EXISTING CONDITIONS, DRAWINGS AND
SPECIFICATIONS ARE DISCOVERED DURING SITE VERIFICATION,
DEMOLITION AND NEW CONSTRUCTION.
2. DAILY CLEAN UP: CONTRACTOR SHALL KEEP JOB SITE CLEAN ON A DAILY
BASIS.
3. PROTECT FACILITIES: PROTECT EXISTING FACILITIES, AND EQUIPMENT TO
REMAIN, FROM DAMAGE DURING CONSTRUCTION. CONTRACTOR SHALL BE
RESPONSIBLE FOR REPAIRING OR REPLACING ANY DAMAGED ITEMS, AT NO
COST AND TO THE SATISFACTION OF THE VA AND ARCHITECT.
SCOPE OF WORK: ALL ROOF SURFACES INDICATED IN THIS PLAN.
4. EXISTING ROOF SYSTEMS (ERS): THE COMPOSITION OF THE EXISTING ROOF
SYSTEMS IS TPO (THERMOPLASTIC POLYOLEFIN). IT IS A SINGLY-PLY
ROOFING MEMBRANE COMPOSED OF 3 LAYERS, A TPO POLYMER BASE, A
POLYESTER-REINFORCED SCRIM, AND A TPO COMPOUNDED TOP PLY.
5. DEMOLITION: THE EXISTING ROOF SYSTEM SHALL BE TORN-OFF ENTIRELY
DOWN TO THE EXISTING VAPOR BARRIER, WHICH SHALL REMAIN. ALL
RAILINGS SHALL BE REMOVED. ALL ABANDONED PENETRATIONS, ROOF
DRAINS, VTR, CURBS, ETC. SHALL BE REMOVED AND INFILLED AT THE DECK
LEVEL. ALL WOODEN LEGS, CURBS, ETC. SHALL BE REMOVED & REPLACED
WITH METAL. ALL MECHANICAL EQUIPMENT AND APPURTENANCES SHALL
BE REMOVED AS REQUIRED FOR REMOVAL OF EXISTING ROOF AND
REPLACED AFTER INSTALLATION FOR NEW ROOF. ALL LOOSE DEBRIS SHALL
BE REMOVED. THE SURFACE SHALL BE CLEAN AND FREE OF DUST & DEBRIS
PRIOR TO INSTALLING NEW ROOFING MATERIALS. DEMOLISHED MATERIALS
WILL BE CAREFULLY MANAGED AND REMOVED FROM THE SITE IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS AND PER LOCAL, STATE
AND FEDERAL GUIDELINES.
LEGEND
EXISTING ROOF DRAIN (ERD)
PRIMARY ROOF DRAIN (PRD) / SECONDARY ROOF
DRAIN (SRD)
EXISTING VENT THROUGH ROOF (VTR)
DEMOLISH EXISTING THERMOPLASTIC POLYOLEFIN (TPO) ROOF DOWN TO
EXISTING SUBSTRATE.
DEMOLISH EXISTING SLATE ROOF DOWN TO EXISTING SUBSTRATE.
INSPECT EXISTING SUBSTRATE FOR ROT AND REPLACE AS NECESSARY.
DEMOLISH EXISTING GENERATOR EXHAUST COMPLETE. EXISTING
GENERATOR SHALL BE RELOCATED UNDER A SEPARATE CONTRACT PRIOR
TO DEMOLITION.
ROOF NOT IN CONTRACT.
DEMOLISH EXISTING WALKWAY PADS COMPLETE.
DEMOLITION NOTES
1" = 20'-0"
DEMOLITION ROOF PLAN
A101
DEMOLITION ROOF PLAN
RP SD
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
A
B
C
D
E
F
Drawing Title Project Title
Checked
Building Number
Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
MONTGOMERY, ALABAMA
2024.09.17
619-23-101
REPLACE ROOF ON BUILDING 1
D a o t t e d
Rev. No.:
INCORPORATED
ENGINEERS
ARCHITECTS
CONSTRUCTORS
E
F
ROOF
'V'
ROOF
'U'
ROOF
'0'
ROOF
'T'
ROOF
'X'
ROOF
'N'
ROOF
'L'
ROOF
'M'
ROOF
'K'
ROOF
'J'
ROOF
'I'
ROOF
'H'
ROOF
'G'
ROOF
'E'
ROOF
'D'
ROOF
'B'
ROOF
'A'
ROOF
'C'
ROOF
'R'
ROOF
'F'
ROOF
'P'
ROOF
'Q'
ROOF
'S'
ROOF
'W'
KEY PLAN
SCALE: 1" = 20'-0"
0 10' 20' 40'
AREA OF CONCERN FOR SUBSTRATE DAMAGE
S T
A
TE OF A LA BA
M A
R E
G
ISTERED A RCHIT
E
ROOF
'U'
ROOF
'0'
ROOF
'T'
ROOF
'X'
ROOF
'N'
ROOF
'L'
ROOF
'M'
ROOF
'K'
ROOF
'J'
ROOF
'I'
ROOF
'H'
ROOF
'G'
ROOF
'E'
ROOF
'D'
ROOF
'B'
ROOF
'A'
ROOF
'C'
ROOF
'R'
ROOF
'F'
ROOF
'P'
ROOF
'Q'
ROOF
'S'
ROOF
'W'
ROOF
'Y'
ROOF
'Z'
4 4
GENERAL NEW WORK NOTES
1. DAILY CLEAN UP: CONTRACTOR SHALL KEEP JOB SITE CLEAN ON A DAILY BASIS.
2. PROTECT FACILITIES: CONTRACTOR SHALL PROTECT EXISTING FACILITIES, AND EQUIPMENT TO REMAIN, FROM DAMAGE DURING
CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR REPLACING ANY DAMAGED ITEMS, AT NO COST AND TO THE
SATISFACTION OF THE VA AND ARCHITECT.
3. DAILY TEAR-OFF: REFER TO SPECIFICATION FOR REQUIREMENTS REGARDING HOW MUCH ROOFING CAN BE TORN OFF PER DAY. ONLY TEAR
OFF AN AMOUNT THAT CAN BE REPLACED WITH NEW ROOFING WITHIN THE SAME DAY. TEMPORARY ROOFING SHALL NOT BE ALLOWED.
4. ROOF ACCESS ROUTE: THE ROOF IS SURROUNDED BY ADJACENT ROOF STRUCTURES AND WILL REQUIRE THE CONTRACTOR TO PROVIDE
TEMPORARY BRIDGES AND STAIRS FOR TRANSFERENCE OF DEMOLISHED MATERIALS AND NEW MATERIALS. CONTRACTOR TO PROVIDE
TEMPORARY PLYWOOD WALKBOARDS ACROSS EXISTING ROOFS TO REMAIN DURING CONSTRUCTION TO PROTECT EXISTING ROOF
SURFACES.
5. ROOFTOP CURBS: CONTRACTOR SHALL RAISE CURBS AS REQUIRED TO ACHIEVE A MINIMUM OF 8” FLASHING ABOVE ROOF SURFACE.
6. ROOFTOP EQUIPMENT: CONTRACTOR SHALL RAISE ALL PIPING, CONDUIT, DUCTWORK AS REQUIRED FOR NEW ROOF ONLY AT LOCATIONS
WHERE ROOF IS BEING REPLACED. ELBOW UP (OR DOWN) TO CONNECT TO ADJACENT ROOF PIPING, CONDUIT, ETC.. AS REQUIRED.
7. PROVIDE NOISE CONTROL OF CONSTRUCTION ACTIVITIES INVOLVING CORING OF THE CONCRETE ROOF DECKS. DUE TO NOISE LEVEL, THIS
WILL NEED TO BE PERFORMED AFTER BUSINESS HOURS. COORDINATE IN ADVANCE WITH VA.
8. MECHANICAL, PLUMBING & ELECTRICAL (MPE): CONTRACTOR SHALL SEE ALL OTHER SHEETS TO COORDINATE WITH ALL OTHER
DISCIPLINES. FOR EACH ROOF AREA TO UNDERGO ROOF REPLACEMENT, THE MECHANICAL UNITS, DUCTWORK, PLUMBING PIPING AND
ELECTRICAL CONDUITS AND ELECTRICAL CONNECTIONS TO HVAC UNITS SHALL BE REMOVED AS REQUIRED FOR REMOVAL OF EXISTING
ROOF, REINSTALLED AND RAISED TO ACCOMMODATE THE NEW THICKNESS OF ROOF INSULATION AND RECEIVE A MINIMUM OF 8" FLASHING, TO QUALIFY FOR THE WARRANTY. CONTRACTOR SHALL BE RESPONSIBLE FOR QUANTITIES OF NEW VTR FLASHING KITS. CONTRACTOR
SHALL REPORT ANY DISCREPANCIES TO THE VA AND ARCHITECT WHERE OTHER FLASHING SOLUTIONS MIGHT BE
REQUIRED/RECOMMENDED. CONTRACTOR IS RESPONSIBLE FOR DETERMINING SUCH LOCATIONS AND SHALL PROVIDE PRE-APPROVAL FROM
THE MANUFACTURER FOR APPROVAL FROM THE VA AND ARCHITECT.
9. ROOF DRAINS AND OVERFLOW SCUPPERS: THE EXISTING ROOFS GENERALLY SLOPE FROM THE RAISED PERIMETER TO EXISTING INTERIOR
ROOF DRAINS. THERE ARE NO EXISTING SECONDARY DRAINS. NEW SECONDARY DRAINS SHALL BE PROVIDED NEXT TO EXISTING (OR NEW)
PRIMARY DRAINS. THE NEW ROOF SYSTEM WILL HAVE AN INCREASED INSULATION THICKNESS, AND A CONSISTENT 1/4“ PER FOOT SLOPE TO
THE PRIMARY AND SECONDARY DRAINS; 1/2" PER FOOT FOR CRICKETS. THE PERIMETER GRAVEL GUARD WILL BE REWORKED AS REQUIRED
TO ACCOMMODATE THE NEW THICKNESS OF INSULATION. NEW UNDER DECK PLUMBING DRAIN LINES WILL BE REQUIRED AT ALL FOUR
ROOFS. THE FOUR ROOFS IN THIS SCOPE WILL ALL BE DRAINED BY ROOF DRAINS, NOT SCUPPERS, EXCEPT THAT SECONDARY DRAINS
SHALL BE PIPED BELOW THE ROOF DECK AND OUT TO THE NEAREST EXTERIOR WALL WHERE A DOWNSPOUT NOZZLE DISCHARGE WILL BE
LOCATED. LOCATION OF NOZZLES SHALL NOT BE OVER WINDOWS OR ENTRIES. SEE PLUMBING DRAWINGS.
10. DISSIMILAR METALS SHALL BE SEPARATED FROM EACH OTHER AND FROM TREATED WOOD BLOCKING WITH ROOFING FELT.
11. ALL PENETRATES THROUGH EXTERIOR WALLS SHALL BE PATCHED, REPAIRED & SEALED WEATHER TIGHT IMMEDIATELY, TO MATCH EXISTING
CONDITIONS & TO THE SATISFACTION OF THE VA AND ARCHITECT. NO OPENINGS SHALL BE LEFT UNATTENDED.
12. DO NOT USE SLOPE OVER 1:12 (ONE INCH PR 12 INCHES). PROVIDE 1:50 (1/4 INCH PER FOOT) MINIMUM TO DRAINS WITHOUT ANY "GUTTERS"
(NO SLOPES BETWEEN DRAINS). NO EXCEPTION TO MINIMUM SLOPE. SLOPE CRICKETS 1:50 (1 INCH PER FOOT).
13. COORDINATE WITH PLUMBING REQUIREMENTS FOR ROOF DRAINS AND DRAIN LOCATIONS AT LOW POINTS AND MID SPAN WHERE MAXIMUM
DEFLECTION OCCURS. DO NOT PUT DRAINS AT COLUMN OR ON SLOPES. COORDINATE WITH INSULATION TO PROVIDE SUMPS AT DRAINS.
14. COORDINATE DETAILS AND SYSTEMS USED TO PROVIDE CODE REQUIRED FIRE RATED ROOFING.
15. DO NOT USE POLYSTYRENE, URETHANE, OR WOOD FIBERBOARD INSULATION UNDER MEMBRANE.
16. DO NOT USE OVER BITUMINOUS MATERIALS WHERE DIRECT CONTACT OCCURS, INCLUDING GREASE, OIL OR OTHER SUBSTANCES NOT
COMPATIBLE WITH TPO. USE A THIN LAYER OF INSULATION, SLIP SHEET OR SEPARATOR SHEET DEPENDING ON METHOD OF ATTACHMENT.
17. TERMINATE BASE FLASHINGS MINIMUM 8 INCHES ABOVE ROOF SURFACE, INCLUDING CURB FOR BUILDING EXPANSION JOINTS.
18. DO NOT PUT EXPANSION JOINTS AT ROOF SURFACE LEVEL.
19. DO NOT USE "PITCH POCKETS" OR "SEALANT POCKETS" IN LIEU OF BASE FLASHINGS AND CAP FLASHINGS.
20. INSPECT ALL EXISTING ROOF HATCHES AND REPLACE AS NECESSARY.
21. SEE DETAILS ON SHEETS A501-A506 FOR ADDITIONAL INFORMATION.
22. ANY DAMAGE TO EXISTING MASONRY DURING CONSTRUCTION SHALL BE REPAIRED TO MATCH EXISTING CONDITIONS & TO THE
SATISFACTION OF THE VA AND ARCHITECT.
PROVIDE NEW THERMOPLASTIC POLYOLEFIN (TPO) ROOF AND WALKWAYS.
ROOF SHALL HAVE R30 MINIMUM INSULATION SYSTEM, 1/2" GYPSUM COVER
BOARD, 60 MIL TPO MEMBRANE SET IN CONTINUOUS ADHESIVE @ 1.75
GAL/SQ.
REPAIR DAMAGED ARES OF EXISTING DECK AS NECESSARY.
PROVIDE TPO MEMBRANE TURNED UP 3" ONTO ALL PARAPET WALL
SURFACES AND TERMINATED WITH SCREWS WITH 2" PLATES @ 12" OC.
INSTALL 1PLY TPO VERTICAL FLASHING MEMBRANE SET IN CONTINUOUS
ADHESIVE @ 1.75 GAL/SQ., TOP FASTENED @ 8" OC. AND TURNED OVER
TOP OF WALL.
PROVIDE NEW EXTERIOR GRADE 3/4" PLYWOOD ATOP WALLS. PROVIDE
NEW CONTINUOUS, SELF-ADHERING MEMBRANE OVER PLYWOOD. PROVIDE
NEW 22 GA CONTINUOUS COPPER CLEAT. PROVIDE NEW 24 GA COPPER
COPING ENGAGED TO CLEAT AND FASTENED ALONG INSIDE FACE.
PROVIDE NEW SYNTHETIC SLATE ROOFING WITH 50-YEAR LABOR AND
MATERIAL WARRANTY. PROVIDE NEW FIRE RESISTANT, SELF-ADHERING
BASE SHEET ON THE EXISTING DECK. INSTALL NEW 9" WIDE STARTER
ROLLS AT ALL EAVES, RAKES AND JAMBS. PROVIDE HIP AND RIDGE
VENTING WHERE REQUIRED BY MANUFACTURER.
APPROXIMATELY 12,780 SF OF TPO ROOF HAS BEEN IDENTIFIED AS AREAS
WITH HIGH MOISTURE CONTENT BY THE "INFRARED THERMOGRAPHIC
ROOF MOISTURE SURVEY ", DATED MAY 30, 2023. THESE AREAS POSSIBLY
HAVE SUBSTRATE DAMAGE HAVE BEEN MARKED WITH PAINT ON THE ROOF
AND RECORDED IN THE REPORT. CONTRACTOR SHALL REPAIR OR
REPLACE DAMAGED SUBSTRATES AREAS AS NECESSARY WITH LIKE
MATERIALS AND METHODS.
NEW WORK NOTES
A102
NEW ROOF PLAN
RP SD
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
A
B
C
D
E
F
Drawing Title Project Title
Checked
Building Number
Drawn
Revisions: Date
Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
MONTGOMERY, ALABAMA
2024.09.17
619-23-101
REPLACE ROOF ON BUILDING 1
D a o t t e d
Rev. No.:
INCORPORATED
ENGINEERS
ARCHITECTS
CONSTRUCTORS
E
F
ROOF
'V'
ROOF
'U'
ROOF
'0'
ROOF
'T'
ROOF
'X'
ROOF
'N'
ROOF
'L'
ROOF
'M'
ROOF
'K'
ROOF
'J'
ROOF
'I'
ROOF
'H'
ROOF
'G'
ROOF
'E'
ROOF
'D'
ROOF
'B'
ROOF
'A'
ROOF
'C'
ROOF
'R'
ROOF
'F'
ROOF
'P'
ROOF
'Q'
ROOF
'S'
ROOF
'W'
KEY PLAN
SCALE: 1" = 20'-0"
0 10' 20' 40'
S T
A
TE OF A LA BA
M A
R E
G
ISTERED A RCHIT
E
ROOF
'U'
ROOF
'0'
ROOF
'T'
ROOF
'X'
ROOF
'N'
ROOF
'L'
ROOF
'M'
ROOF
'K'
ROOF
'J'
ROOF
'I'
ROOF
'H'
ROOF
'G'
ROOF
'E'
ROOF
'D'
ROOF
'B'
ROOF
'A'
ROOF
'C'
ROOF
'R'
ROOF
'F'
ROOF
'P'
ROOF
'Q'
ROOF
'S'
ROOF
'W'
V
V 2"
GND
V 2"
V V
V 3"
V 3"
V 2"
RD
RD
V 3"
V
V
V
V
V
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.50"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.50"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.50"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.50"/FT.
F
T
F
T
0.50"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.50"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.50"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
F
T
F
T
0.50"/FT.
F
T
F
T
0.25"/FT.
F
T
0.50"/FT.0.50"/FT.
F
T
F
T
0.25"/FT.0.25"/FT.
0.25"/FT.0.25"/FT.
0.25"/FT.
F
T
F
T
0.50"/FT.0.50"/FT.
F
T
F
T
F
T
F
T
F
T
F
T
0.25"/FT.
0.25"/FT.
GENERAL NEW WORK NOTES
1. DAILY CLEAN UP: CONTRACTOR SHALL KEEP JOB SITE CLEAN ON A DAILY BASIS.
2. PROTECT FACILITIES: CONTRACTOR SHALL PROTECT EXISTING FACILITIES, AND EQUIPMENT TO REMAIN, FROM DAMAGE DURING
CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR REPLACING ANY DAMAGED ITEMS, AT NO COST AND TO THE
SATISFACTION OF THE VA AND ARCHITECT.
3. DAILY TEAR-OFF: REFER TO SPECIFICATION FOR REQUIREMENTS REGARDING HOW MUCH ROOFING CAN BE TORN OFF PER DAY. ONLY TEAR
OFF AN AMOUNT THAT CAN BE REPLACED WITH NEW ROOFING WITHIN THE SAME DAY. TEMPORARY ROOFING SHALL NOT BE ALLOWED.
4. ROOF ACCESS ROUTE: THE ROOF IS SURROUNDED BY ADJACENT ROOF STRUCTURES AND WILL REQUIRE THE CONTRACTOR TO PROVIDE
TEMPORARY BRIDGES AND STAIRS FOR TRANSFERENCE OF DEMOLISHED MATERIALS AND NEW MATERIALS. CONTRACTOR TO PROVIDE
TEMPORARY PLYWOOD WALKBOARDS ACROSS EXISTING ROOFS TO REMAIN DURING CONSTRUCTION TO PROTECT EXISTING ROOF
SURFACES.
5. ROOFTOP CURBS: CONTRACTOR SHALL RAISE CURBS AS REQUIRED TO ACHIEVE A MINIMUM OF 8” FLASHING ABOVE ROOF SURFACE.
6. ROOFTOP EQUIPMENT: CONTRACTOR SHALL RAISE ALL PIPING, CONDUIT, DUCTWORK AS REQUIRED FOR NEW ROOF ONLY AT LOCATIONS
WHERE ROOF IS BEING REPLACED. ELBOW UP (OR DOWN) TO CONNECT TO ADJACENT ROOF PIPING, CONDUIT, ETC.. AS REQUIRED.
7. PROVIDE NOISE CONTROL OF CONSTRUCTION ACTIVITIES INVOLVING CORING OF THE CONCRETE ROOF DECKS. DUE TO NOISE LEVEL, THIS
WILL NEED TO BE PERFORMED AFTER BUSINESS HOURS. COORDINATE IN ADVANCE WITH VA.
8. MECHANICAL, PLUMBING & ELECTRICAL (MPE): CONTRACTOR SHALL SEE ALL OTHER SHEETS TO COORDINATE WITH ALL OTHER
DISCIPLINES. FOR EACH ROOF AREA TO UNDERGO ROOF REPLACEMENT, THE MECHANICAL UNITS, DUCTWORK, PLUMBING PIPING AND
ELECTRICAL CONDUITS AND ELECTRICAL CONNECTIONS TO HVAC UNITS SHALL BE REMOVED AS REQUIRED FOR REMOVAL OF EXISTING
ROOF, REINSTALLED AND RAISED TO ACCOMMODATE THE NEW THICKNESS OF ROOF INSULATION AND RECEIVE A MINIMUM OF 8" FLASHING, TO QUALIFY FOR THE WARRANTY. CONTRACTOR SHALL BE RESPONSIBLE FOR QUANTITIES OF NEW VTR FLASHING KITS. CONTRACTOR
SHALL REPORT ANY DISCREPANCIES TO THE VA AND ARCHITECT WHERE OTHER FLASHING SOLUTIONS MIGHT BE
REQUIRED/RECOMMENDED. CONTRACTOR IS RESPONSIBLE FOR DETERMINING SUCH LOCATIONS AND SHALL PROVIDE PRE-APPROVAL FROM
THE MANUFACTURER FOR APPROVAL FROM THE VA AND ARCHITECT.
9. ROOF DRAINS AND OVERFLOW SCUPPERS: THE EXISTING ROOFS GENERALLY SLOPE FROM THE RAISED PERIMETER TO EXISTING INTERIOR
ROOF DRAINS. THERE ARE NO EXISTING SECONDARY DRAINS. NEW SECONDARY DRAINS SHALL BE PROVIDED NEXT TO EXISTING (OR NEW)
PRIMARY DRAINS. THE NEW ROOF SYSTEM WILL HAVE AN INCREASED INSULATION THICKNESS, AND A CONSISTENT 1/4“ PER FOOT SLOPE TO
THE PRIMARY AND SECONDARY DRAINS; 1/2" PER FOOT FOR CRICKETS. THE PERIMETER GRAVEL GUARD WILL BE REWORKED AS REQUIRED
TO ACCOMMODATE THE NEW THICKNESS OF INSULATION. NEW UNDER DECK PLUMBING DRAIN LINES WILL BE REQUIRED AT ALL FOUR
ROOFS. THE FOUR ROOFS IN THIS SCOPE WILL ALL BE DRAINED BY ROOF DRAINS, NOT SCUPPERS, EXCEPT THAT SECONDARY DRAINS
SHALL BE PIPED BELOW THE ROOF DECK AND OUT TO THE NEAREST EXTERIOR WALL WHERE A DOWNSPOUT NOZZLE DISCHARGE WILL BE
LOCATED. LOCATION OF NOZZLES SHALL NOT BE OVER WINDOWS OR ENTRIES. SEE PLUMBING DRAWINGS.
10. DISSIMILAR METALS SHALL BE SEPARATED FROM EACH OTHER AND FROM TREATED WOOD BLOCKING WITH ROOFING FELT.
11. ALL PENETRATES THROUGH EXTERIOR WALLS SHALL BE PATCHED, REPAIRED & SEALED WEATHER TIGHT IMMEDIATELY, TO MATCH EXISTING
CONDITIONS & TO THE SATISFACTION OF THE VA AND ARCHITECT. NO OPENINGS SHALL BE LEFT UNATTENDED.
12. DO NOT USE SLOPE OVER 1:12 (ONE INCH PR 12 INCHES). PROVIDE 1:50 (1/4 INCH PER FOOT) MINIMUM TO DRAINS WITHOUT ANY "GUTTERS"
(NO SLOPES BETWEEN DRAINS). NO EXCEPTION TO MINIMUM SLOPE. SLOPE CRICKETS 1:50 (1 INCH PER FOOT).
13. COORDINATE WITH PLUMBING REQUIREMENTS FOR ROOF DRAINS AND DRAIN LOCATIONS AT LOW POINTS AND MID SPAN WHERE MAXIMUM
DEFLECTION OCCURS. DO NOT PUT DRAINS AT COLUMN OR ON SLOPES. COORDINATE WITH INSULATION TO PROVIDE SUMPS AT DRAINS.
14. COORDINATE DETAILS AND SYSTEMS USED TO PROVIDE CODE REQUIRED FIRE RATED ROOFING.
15. DO NOT USE POLYSTYRENE, URETHANE, OR WOOD FIBERBOARD INSULATION UNDER MEMBRANE.
16. DO NOT USE OVER BITUMINOUS MATERIALS WHERE DIRECT CONTACT OCCURS, INCLUDING GREASE, OIL OR OTHER SUBSTANCES NOT
COMPATIBLE WITH TPO. USE A THIN LAYER OF INSULATION, SLIP SHEET OR SEPARATOR SHEET DEPENDING ON METHOD OF ATTACHMENT.
17. TERMINATE BASE FLASHINGS MINIMUM 8 INCHES ABOVE ROOF SURFACE, INCLUDING CURB FOR BUILDING EXPANSION JOINTS.
18. DO NOT PUT EXPANSION JOINTS AT ROOF SURFACE LEVEL.
19. DO NOT USE "PITCH POCKETS" OR "SEALANT POCKETS" IN LIEU OF BASE FLASHINGS AND CAP FLASHINGS.
21. SEE DETAILS ON SHEETS A501-A506 FOR ADDITIONAL INFORMATION.
PROVIDE NEW THERMOPLASTIC POLYOLEFIN (TPO) ROOF WITH R33
MINIMUM INSULATION.
PROVIDE NEW ECO STAR MAJESTIC SLATE ROOF OR EQUAL.
NEW WORK NOTES
A103
NEW ROOF DRAINAGE PLAN
RP SD
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
A
B
C
D
E
F
Drawing Title Project Title
Checked
Building Number
Drawn
Revisions: Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
MONTGOMERY, ALABAMA
Date
2024.09.17
619-23-101
REPLACE ROOF ON BUILDING 1
D a o t t e d
Rev. No.:
INCORPORATED
ENGINEERS
ARCHITECTS
CONSTRUCTORS
E
F
ROOF
'V'
ROOF
'U'
ROOF
'0'
ROOF
'T'
ROOF
'X'
ROOF
'N'
ROOF
'L'
ROOF
'M'
ROOF
'K'
ROOF
'J'
ROOF
'I'
ROOF
'H'
ROOF
'G'
ROOF
'E'
ROOF
'D'
ROOF
'B'
ROOF
'A'
ROOF
'C'
ROOF
'R'
ROOF
'F'
ROOF
'P'
ROOF
'Q'
ROOF
'S'
ROOF
'W'
KEY PLAN
SCALE: 1" = 20'-0"
0 10' 20' 40'
S T
A
TE OF A LA BA
M A
R E
G
ISTERED A RCHIT
E
GENERAL NOTES
1. WHENEVER MECHANICAL-ELECTRICAL (SOLAR FARM) EQUIPMENT
REQUIRING PERIODIC MAINTENANCE IS INSTALLED ON A ROOF MORE THAN 6
M (20 FT.) ABOVE THE GROUND, PROVIDE GUARDRAILS OR FENCES
BETWEEN THE ROOF EDGE AND ANY EQUIPMENT OR WALKWAYS LESS THAN
3 M (10 FT.) FROM THE EDGE. THE GUARDRAILS 1,050 MM (42 IN.) HIGH AND IN
ACCORDANCE WITH OSHA REQUIREMENTS FOR STANDARD GUARDRAILS.
SEE DETAIL 5 THIS SHEET.
2. SIGNAGE: PROVIDE SIGNAGE AT 30’ MIN. SPACING, ATTACHED TO THE
RALINGS, TO INDICATE THAT “RAILINGS ARE NOT TO BE USED AS TIE DOWNS.”
3. TIE-DOWNS: PROVIDE A MINIMUM OF (4) PER HVAC EQUIPMENT OR CLUSTER
OF FANS/EQUIPMENT, FOR SAFETY, AT UNITS THAT REQUIRE MAINTENANCE.
COORDINATE WITH THE COR AND ARCHITECT FOR EXACT LOCATIONS.
1. WALKWAY PATHS: CONTRACTOR TO PROVIDE NEW ROOF WALKWAY PADS
TO PROTECT THE NEW ROOF SURFACE. THESE WALKWAY PADS WILL BE
PLACED STRATEGICALLY FROM ROOF ACCESS LOCATIONS TO ROOFTOP
EQUIPMENT. THE WALKWAY PROTECTION WILL CONSIST OF A STANDARD
ROLL WIDTH OF ROOFING CAP MEMBRANE
MATERIAL (APPROXIMATELY 32” WIDE) BY 60”, SPOT
ADHERED, LEAVING 6” CLEAR BETWEEN EACH PAD. SPECIFIC WALKWAY
ROUTES ARE SHOWN ON THE ARCHITECTURAL PLANS.
WALKWAY PATHS
5'-0" MAX.
EQ
UA
L
EQ
UA
L
3'- 6"
M
IN
2" O.D. GALVANIZED STEEL PIPE RAIL
AND SUPPORTS, TO MATCH EXIST.
(4) 3/8"Ø THREAEDED RODS WITH HILTI HIT
RE-500 EPOXY WITH 1 3/4" EMBED MIN.
3/16
EXISTING CONCRETE DECK
INSULATION
COVERBOARD
LIQUID APPLIED
REINFORCED FLASHING.
8" MIN.
TYP.
1 1/2"
TYP.
SEAL AROUND PENETRATION
WITH COMPATIBLE SEALANT
1/2" GALVANIZED SQUARE PLATE
ROOF
'V'
ROOF
'U'
ROOF
'0'
ROOF
'T'
ROOF
'X'
ROOF
'N'
ROOF
'L'
ROOF
'M'
ROOF
'K'
ROOF
'J'
ROOF
'I'
ROOF
'H'
ROOF
'G'
ROOF
'E'
ROOF
'D'
ROOF
'B'
ROOF
'A'
ROOF
'C'
ROOF
'R'
ROOF
'F'
ROOF
'P'
ROOF
'Q'
ROOF
'S'
ROOF
'W'
V
V 2"
GND
V 2"
V V
V 3"
V 3"
V 2"
RD
RD
V 3"
V
V
V
V
V
NEW GUARD RAIL
SEE DTL. 5/A-106
TYP.
NEW WALKWAY PADS
AS SHOWN
NEW WALKWAY PADS
AS SHOWN
NEW WALKWAY PADS
AS SHOWN
NEW WALKWAY PADS
AS SHOWN
NEW WALKWAY PADS
AS SHOWN
NEW WALKWAY PADS
AS SHOWN
NEW GUARD RAIL
SEE DTL. 5/A-106
TYP.
NEW GUARD RAIL
SEE DTL. 5/A-106
TYP.
NEW GUARD RAIL
SEE DTL. 5/A-106
TYP.
NEW GUARD RAIL
SEE DTL. 5/A-106
TYP.
NEW GUARD RAIL
SEE DTL. 5/A-106
TYP.
NEW GUARD RAIL
SEE DTL. 5/A-106
TYP.
NEW GUARD RAIL
SEE DTL. 5/A-106
TYP.
NEW GUARD RAIL
SEE DTL. 5/A-106
TYP.
NEW GUARD RAIL
SEE DTL. 5/A-106
TYP.
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
A104
LIFE SAFETY AND FALL
PROTECTION PLAN
RP SD
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
A
B
C
D
E
F
Drawing Title Project Title
Checked
Building Number
Drawn
Revisions: Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
MONTGOMERY, ALABAMA
Date
2024.09.17
619-23-101
REPLACE ROOF ON BUILDING 1
D a o t t e d
Rev. No.:
INCORPORATED
ENGINEERS
ARCHITECTS
CONSTRUCTORS
E
F
NTS
TYPICAL PIPE RAIL
1/8" = 1' 0"
LIFE SAFETY AND FALL PROTECTION PLAN
ROOF
'V'
ROOF
'U'
ROOF
'0'
ROOF
'T'
ROOF
'X'
ROOF
'N'
ROOF
'L'
ROOF
'M'
ROOF
'K'
ROOF
'J'
ROOF
'I'
ROOF
'H'
ROOF
'G'
ROOF
'E'
ROOF
'D'
ROOF
'B'
ROOF
'A'
ROOF
'C'
ROOF
'R'
ROOF
'F'
ROOF
'P'
ROOF
'Q'
ROOF
'S'
ROOF
'W'
KEY PLAN
S T
A
TE OF A LA BA
M A
R E
G
ISTERED A RCHIT
E
KEY NOTES
1. REPLACE ALL EXISTING FLASHING WITH NEW COPPER FLASHING FOR ALL
SLATE, AND COPPER ROOFS.
2. ALL NEW FLASHING NECESSARY FOR NEW CONSTRUCTION SHALL BE
COPPER.
3. CLEAN, SAND, PREP AND PAINT ALL DORMER LOUVER VENTS AND FACE
FLASHING TO MATCH EXISTING COLOR.
4. CLEAN, SAND, PREP AND PAINT ALL VENTS TO MATCH NEW SLATE ROOF.
5. CLEAN AND SEAL ALL EXISTING GUTTERS, INCLUDING BUT NOT LIMITED TO
COPPER.
6. REPLACE EXISTING COOPER SHED ROOFS "Y" AND "Z" WITH NEW COPPER
SHED ROOF.
7. ROOF ACCESS TO REMAIN, PROTECT/REINSTALL DURING NEW WORK.
ROOF
'V'
ROOF
'U'
ROOF
'0'
ROOF
'T'
ROOF
'X'
ROOF
'N'
ROOF
'L'
ROOF
'M'
ROOF
'K'
ROOF
'J'
ROOF
'I'
ROOF
'H'
ROOF
'G'
ROOF
'E'
ROOF
'D'
ROOF
'B'
ROOF
'A'
ROOF
'C'
ROOF
'R'
ROOF
'F'
ROOF
'P'
ROOF
'Q'
ROOF
'S'
ROOF
'W'
V
V 2"
GND
V 2"
V V
V 3"
V 3"
V 2"
RD
RD
V 3"
V
V
V
V
V
EXISTING METAL SHEET
FLASHING TO REPLACE
WITH COPPER
EXISTING METAL SHEET
FLASHING TO REPLACE
WITH COPPER
EXISTING METAL SHEET
FLASHING TO REPLACE
WITH COPPER
EXISTING METAL SHEET
FLASHING TO REPLACE
WITH COPPER
EXISTING METAL SHEET
FLASHING TO REPLACE
WITH COPPER. TYP
EXISTING CONCRETE SILL
TO REMAIN.
EXISTING METAL SHEET
FLASHING TO REPLACE
WITH COPPER. TYP
EXISTING CONCRETE SILL
TO REMAIN.
ROOF…
This is the start of the file's text. The full file is on GovTribe.