Revised_2.1 Price Offer Schedule.pdf

PDF 604 KB Posted

Attached to
Z1DA--Project: 619-23-101 - Replace Roof Systems for Main Hospital, Building 1 Federal contract opportunity
Solicitation number
36C24725R0030
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7

About this file

This is a Price Offer Schedule (Section 2.1) for a roof systems replacement project at Building #1 of the Central Alabama Veterans Health Care System in Montgomery, AL. The document outlines the pricing structure for a single base bid item.

The scope requires the contractor to provide all management, engineering, supervision, labor, assemblies, transportation, equipment, and supplies for replacing roof systems, fall protection, lightning protection, and drainage system sealing. The work includes repairing interior walls damaged by water intrusion, replacing damaged/missing drain and vent covers, repairing/recovering/painting dormers, and removing/replacing several rooftop HVAC units. The period of performance is 365 calendar days, including submittal phase and punch list completion. Offerors must submit an itemized cost breakdown using Attachment 4 or a similar format. The contract will be awarded as a single award for the item pending fund availability. The pricing template includes spaces for unit price and total price, with a quantity of 1 job (JB).

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Project: 619-23-101 - Replace Roof Systems for Main Hospital, Building 1, newest first.
File Type Posted
Government Official Respose.pdf PDF
36C24725R0030 0012.pdf PDF
36C24725R0030 0011.pdf PDF
36C24725R0030 0010.docx DOCX document
Revised SOW.pdf PDF
36C24725R0030 0009.docx DOCX document
Attachment 3 - Revised Past Performance Questionnaire -PPQ.docx DOCX document
36C24725R0030 0008.docx DOCX document
36C24725R0030 0007.docx DOCX document
RIR-1903.pdf PDF
Asbestos Containing Materials Report.pdf PDF
Core Info.pdf PDF
36C24725R0030 0006.docx DOCX document
Official Government Response_619-23-101_36C24725R0030.pdf PDF
36C24725R0030 0005.docx DOCX document
36C24725R0030 0004.docx DOCX document
36C24725R0030 0003.docx DOCX document
Roof Site Visit Sign In Sheet_2.pdf PDF
Roof Site Visit Sign In Sheet_1.pdf PDF
Rooftop Solar Pannel Energy System.pdf PDF
36C24725R0030 0002.docx DOCX document
36C24725R0030 0001.docx DOCX document
Attachment 6 - INVOICING.docx DOCX document
Attachment 3 - CONTRACTOR PAST PERFORMANCE FORM.docx DOCX document
36C24725R0030_1.docx DOCX document
Attachment 2 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING Jan 2023 Dev form.pdf PDF
Attachment 8 - Replace Roof on Building 1 Construction Drawings.pdf PDF
Attachment 7 - Replace Roof on Building 1_Final_ Specifications.pdf PDF
Attachment 4 - Itemized Cost Breakdown.xlsx XLSX spreadsheet
Attachment 1 - Experience Modification Rate Form.pdf PDF
Attachment 5 - DBA Wage Rates_AL20240093 09 06 2024.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2.1 PRICE OFFER SCHEDULE

Description U/I QT Y

UNIT PRICE TOTAL

PRICE

A. ITEM 1, BASE BID: The Contractor shall furnish all management, engineering, supervision, labor, assemblies, transportation, equipment, and supplies needed to complete this project. This project will replace the roof systems of Building #1.

The roof system for the building is beyond its' useful life. Over the years, water intrusion has caused health issues with patients and staff. Water intrusion has caused damage to the interior and exterior walls. Interior walls will need to be repaired. The project will replace roof systems, fall protection, lightning protection, and the seal the drainage system. In addition, any damaged or missing drain covers, or vent covers shall be replaced. All dormers will be repaired, recovered, and painted. Several roof top HVAC equipment will need to be removed and replaced with new equipment.

Period of Performance: 365 Calendar Days

JB

A single award will be made online item for which funds are determined available.

The Period of Performance includes submittal phase and the completion of all punch list items.

ATTACH YOUR ITEMIZED COST BREAKDOWN

Offerors are to include a construction price/cost breakdown using Attachment 4 or provide a price/cost breakdown using a similar format including the same information.

File details come from the government source that posted it. Updated .