Revised_2.1 Price Offer Schedule.pdf
PDF 604 KB Posted
- Attached to
- Z1DA--Project: 619-23-101 - Replace Roof Systems for Main Hospital, Building 1 Federal contract opportunity
- Solicitation number
- 36C24725R0030
About this file
This is a Price Offer Schedule (Section 2.1) for a roof systems replacement project at Building #1 of the Central Alabama Veterans Health Care System in Montgomery, AL. The document outlines the pricing structure for a single base bid item.
The scope requires the contractor to provide all management, engineering, supervision, labor, assemblies, transportation, equipment, and supplies for replacing roof systems, fall protection, lightning protection, and drainage system sealing. The work includes repairing interior walls damaged by water intrusion, replacing damaged/missing drain and vent covers, repairing/recovering/painting dormers, and removing/replacing several rooftop HVAC units. The period of performance is 365 calendar days, including submittal phase and punch list completion. Offerors must submit an itemized cost breakdown using Attachment 4 or a similar format. The contract will be awarded as a single award for the item pending fund availability. The pricing template includes spaces for unit price and total price, with a quantity of 1 job (JB).
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2.1 PRICE OFFER SCHEDULE
Description U/I QT Y
UNIT PRICE TOTAL
PRICE
A. ITEM 1, BASE BID: The Contractor shall furnish all management, engineering, supervision, labor, assemblies, transportation, equipment, and supplies needed to complete this project. This project will replace the roof systems of Building #1.
The roof system for the building is beyond its' useful life. Over the years, water intrusion has caused health issues with patients and staff. Water intrusion has caused damage to the interior and exterior walls. Interior walls will need to be repaired. The project will replace roof systems, fall protection, lightning protection, and the seal the drainage system. In addition, any damaged or missing drain covers, or vent covers shall be replaced. All dormers will be repaired, recovered, and painted. Several roof top HVAC equipment will need to be removed and replaced with new equipment.
Period of Performance: 365 Calendar Days
JB
A single award will be made online item for which funds are determined available.
The Period of Performance includes submittal phase and the completion of all punch list items.
ATTACH YOUR ITEMIZED COST BREAKDOWN
Offerors are to include a construction price/cost breakdown using Attachment 4 or provide a price/cost breakdown using a similar format including the same information.