Attachment 4 - Itemized Cost Breakdown.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Z1DA--Project: 619-23-101 - Replace Roof Systems for Main Hospital, Building 1
Solicitation number
36C24725R0030
Issued by

About this file

This is a cost breakdown worksheet template (Attachment 4) associated with VA solicitation 36C24725R0015. The spreadsheet provides a detailed itemized breakdown structure for contractors to input costs across multiple construction divisions including General Requirements, Existing Conditions, Concrete, Metals, Wood/Plastic, Thermal/Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, and Communications.

The template requires costs to be broken down into four categories for each division: Material, Labor, Equipment, and Other. The worksheet auto-calculates division totals and includes sections at the bottom for Overhead, Profit, and Bonds/Insurance to arrive at a total proposal amount. This is a standard construction cost breakdown template with no pre-populated costs or pricing information included.

View the file

Other files

File Type Posted
36C24725R0030 0012.pdf PDF
Government Official Respose.pdf PDF
36C24725R0030 0011.pdf PDF
36C24725R0030 0010.docx DOCX document
Revised SOW.pdf PDF
36C24725R0030 0009.docx DOCX document
Revised_2.1 Price Offer Schedule.pdf PDF
36C24725R0030 0008.docx DOCX document
Attachment 3 - Revised Past Performance Questionnaire -PPQ.docx DOCX document
Core Info.pdf PDF
RIR-1903.pdf PDF
36C24725R0030 0007.docx DOCX document
Asbestos Containing Materials Report.pdf PDF
36C24725R0030 0006.docx DOCX document
Official Government Response_619-23-101_36C24725R0030.pdf PDF
36C24725R0030 0005.docx DOCX document
36C24725R0030 0004.docx DOCX document
36C24725R0030 0003.docx DOCX document
Roof Site Visit Sign In Sheet_1.pdf PDF
Roof Site Visit Sign In Sheet_2.pdf PDF
36C24725R0030 0002.docx DOCX document
Rooftop Solar Pannel Energy System.pdf PDF
36C24725R0030 0001.docx DOCX document
36C24725R0030_1.docx DOCX document
Attachment 6 - INVOICING.docx DOCX document
Attachment 5 - DBA Wage Rates_AL20240093 09 06 2024.pdf PDF
Attachment 7 - Replace Roof on Building 1_Final_ Specifications.pdf PDF
Attachment 8 - Replace Roof on Building 1 Construction Drawings.pdf PDF
Attachment 1 - Experience Modification Rate Form.pdf PDF
Attachment 3 - CONTRACTOR PAST PERFORMANCE FORM.docx DOCX document
Attachment 2 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING Jan 2023 Dev form.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Solicitation No. 36C24725R0015 Attachment – Cost/Price Breakdown Worksheet
DESCRIPTIONMATERIALLABOREQUIPMENTOTHERTOTAL
Division 01 - General Requirements
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 02 – Existing ConditionsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 03 – ConcreteMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 05 - MetalsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 06- Wood and PlasticMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 07- Thermal and Moisture ProtectionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 08- Openings (Doors and Windows)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 09- FinishesMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 10- SpecialtiesMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 11- EquipmentMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 12- FurnishingsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 13- Special ConstructionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 21- Fire SuppressionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 22- PlumbingMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 23- Heating, Ventilating, and Air conditioning (HVAC)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 26 ElectricalMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 27- CommunicationsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Other (If applicable)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Other Total$ - 0$ - 0$ - 0$ - 0$ - 0
MATERIALLABOREQUIPMENTOTHERTOTAL
SUB TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead$$$$$
Profit$$$$$
Bonds and Insurance$$$$$
Total Proposal$ - 0$ - 0$ - 0$ - 0$ - 0