Attachment 4 - Itemized Cost Breakdown.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Z1DA--Project: 619-23-101 - Replace Roof Systems for Main Hospital, Building 1 Federal contract opportunity
Solicitation number
36C24725R0030
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7

About this file

This is a cost breakdown worksheet template (Attachment 4) associated with VA solicitation 36C24725R0015. The spreadsheet provides a detailed itemized breakdown structure for contractors to input costs across multiple construction divisions including General Requirements, Existing Conditions, Concrete, Metals, Wood/Plastic, Thermal/Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, and Communications.

The template requires costs to be broken down into four categories for each division: Material, Labor, Equipment, and Other. The worksheet auto-calculates division totals and includes sections at the bottom for Overhead, Profit, and Bonds/Insurance to arrive at a total proposal amount. This is a standard construction cost breakdown template with no pre-populated costs or pricing information included.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Project: 619-23-101 - Replace Roof Systems for Main Hospital, Building 1, newest first.
File Type Posted
Government Official Respose.pdf PDF
36C24725R0030 0012.pdf PDF
36C24725R0030 0011.pdf PDF
36C24725R0030 0010.docx DOCX document
Revised_2.1 Price Offer Schedule.pdf PDF
36C24725R0030 0009.docx DOCX document
Revised SOW.pdf PDF
36C24725R0030 0008.docx DOCX document
Attachment 3 - Revised Past Performance Questionnaire -PPQ.docx DOCX document
36C24725R0030 0007.docx DOCX document
Asbestos Containing Materials Report.pdf PDF
Core Info.pdf PDF
RIR-1903.pdf PDF
36C24725R0030 0006.docx DOCX document
Official Government Response_619-23-101_36C24725R0030.pdf PDF
36C24725R0030 0005.docx DOCX document
36C24725R0030 0004.docx DOCX document
36C24725R0030 0003.docx DOCX document
Roof Site Visit Sign In Sheet_2.pdf PDF
Roof Site Visit Sign In Sheet_1.pdf PDF
36C24725R0030 0002.docx DOCX document
Rooftop Solar Pannel Energy System.pdf PDF
36C24725R0030 0001.docx DOCX document
Attachment 6 - INVOICING.docx DOCX document
Attachment 3 - CONTRACTOR PAST PERFORMANCE FORM.docx DOCX document
36C24725R0030_1.docx DOCX document
Attachment 2 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING Jan 2023 Dev form.pdf PDF
Attachment 5 - DBA Wage Rates_AL20240093 09 06 2024.pdf PDF
Attachment 8 - Replace Roof on Building 1 Construction Drawings.pdf PDF
Attachment 7 - Replace Roof on Building 1_Final_ Specifications.pdf PDF
Attachment 1 - Experience Modification Rate Form.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Solicitation No. 36C24725R0015 Attachment – Cost/Price Breakdown Worksheet
DESCRIPTIONMATERIALLABOREQUIPMENTOTHERTOTAL
Division 01 - General Requirements
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 02 – Existing ConditionsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 03 – ConcreteMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 05 - MetalsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 06- Wood and PlasticMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 07- Thermal and Moisture ProtectionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 08- Openings (Doors and Windows)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 09- FinishesMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 10- SpecialtiesMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 11- EquipmentMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 12- FurnishingsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 13- Special ConstructionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 21- Fire SuppressionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 22- PlumbingMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 23- Heating, Ventilating, and Air conditioning (HVAC)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 26 ElectricalMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 27- CommunicationsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Other (If applicable)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Other Total$ - 0$ - 0$ - 0$ - 0$ - 0
MATERIALLABOREQUIPMENTOTHERTOTAL
SUB TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead$$$$$
Profit$$$$$
Bonds and Insurance$$$$$
Total Proposal$ - 0$ - 0$ - 0$ - 0$ - 0