About this file

This document is a core information sheet detailing the roof system specifications for different sections of a building, likely related to a VA hospital roof replacement project. The document outlines seven distinct roof sections (F, H, I, P, R, and two U sections) with varying configurations of TPO (Thermoplastic Polyolefin) roofing, insulation, and deck materials.

Key specifications include sections with tapered insulation ranging from 5"-9" TPO (Section F), standard TPO installations with varying ISO thicknesses (2.5"-4"), and combinations of lightweight concrete and EPS insulation. The document distinguishes between sections with dry cores (Sections F, H, I, and U) and wet cores (Sections P and R), and notes different deck types including concrete and metal. Each section features specific layering configurations of materials including gypsum board (typically ½"), ISO insulation (ranging from 1.5" to 8"), and lightweight concrete (2-4" thickness).

View the file

Other files

File Type Posted
36C24725R0030 0012.pdf PDF
Government Official Respose.pdf PDF
36C24725R0030 0011.pdf PDF
36C24725R0030 0010.docx DOCX document
Revised SOW.pdf PDF
36C24725R0030 0009.docx DOCX document
Revised_2.1 Price Offer Schedule.pdf PDF
36C24725R0030 0008.docx DOCX document
Attachment 3 - Revised Past Performance Questionnaire -PPQ.docx DOCX document
RIR-1903.pdf PDF
36C24725R0030 0007.docx DOCX document
Asbestos Containing Materials Report.pdf PDF
36C24725R0030 0006.docx DOCX document
Official Government Response_619-23-101_36C24725R0030.pdf PDF
36C24725R0030 0005.docx DOCX document
36C24725R0030 0004.docx DOCX document
36C24725R0030 0003.docx DOCX document
Roof Site Visit Sign In Sheet_1.pdf PDF
Roof Site Visit Sign In Sheet_2.pdf PDF
36C24725R0030 0002.docx DOCX document
Rooftop Solar Pannel Energy System.pdf PDF
36C24725R0030 0001.docx DOCX document
36C24725R0030_1.docx DOCX document
Attachment 6 - INVOICING.docx DOCX document
Attachment 5 - DBA Wage Rates_AL20240093 09 06 2024.pdf PDF
Attachment 7 - Replace Roof on Building 1_Final_ Specifications.pdf PDF
Attachment 4 - Itemized Cost Breakdown.xlsx XLSX spreadsheet
Attachment 8 - Replace Roof on Building 1 Construction Drawings.pdf PDF
Attachment 1 - Experience Modification Rate Form.pdf PDF
Attachment 3 - CONTRACTOR PAST PERFORMANCE FORM.docx DOCX document
Attachment 2 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING Jan 2023 Dev form.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

www.CentiMark.com

Core Information:

• Section F= Tapered insulation. 5”-9” TPO, ½” gypsum, 1/4” asphalt, 4-8” ISO, concrete deck (Dry cores)

• Section H= TPO, ½” gypsum, 2.5” ISO, concrete deck (Dry cores)

• Section I= TPO, ½”, 4” ISO, concrete deck (Dry cores)

• Section P= Tapered insulation, TPO, 2” ISO, 1/4” gypsum, 3-4” lightweight concrete , metal deck (WET cores)

• Section R= Tapered insulation. TPO, 1.5” ISO, 2-3” lightweight concrete, 1-3” EPS insulation, concrete deck

(WET cores)

• Section U= Tapered insulation. TPO, ½” gypsum, 3-4” lightweight concrete, 2-3” EPS insulation, concrete deck

(dry cores)

• Section U= Tapered insulation. TPO, ½” gypsum, 2-3” lightweight concrete, 1-4” EPS insulation, concrete deck www.CentiMark.com

Core Information:

• Section F= Tapered insulation. 5”-9” TPO, ½” gypsum, 1/4” asphalt, 4-8” ISO, concrete deck (Dry cores)

• Section H= TPO, ½” gypsum, 2.5” ISO, concrete deck (Dry cores)

• Section I= TPO, ½”, 4” ISO, concrete deck (Dry cores)

• Section P= Tapered insulation, TPO, 2” ISO, 1/4” gypsum, 3-4” lightweight concrete , metal deck (WET cores)

• Section R= Tapered insulation. TPO, 1.5” ISO, 2-3” lightweight concrete, 1-3” EPS insulation, concrete deck

(WET cores)

• Section U= Tapered insulation. TPO, ½” gypsum, 3-4” lightweight concrete, 2-3” EPS insulation, concrete deck

• Section U= Tapered insulation. TPO, ½” gypsum, 2-3” lightweight concrete, 1-4” EPS insulation, concrete deck

File details come from the government source that posted it. Updated .