About this file
This appears to be a PDF cover page showing the Adobe PDF logo and instructing users to open the portfolio using Adobe Acrobat X or Adobe Reader X or later versions for the best experience. It includes a "Get Adobe Reader Now!" button.
This file appears to be a technical appendix (Attachment 7 - QAPs_C and_E.pdf) related to a major DLA Energy bulk fuel procurement solicitation (SPE602-25-R-0705) for the Rocky Mountain/West Coast/Offshore region. However, since only the PDF cover page is visible, I cannot provide details about the specific quality assurance provisions or requirements that would be contained within the actual QAP document.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
DEFENSE LOGISTICS AGENCY ENERGY
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR, VIRGINIA 22060-6222
DISTRIBUTION STATEMENT – A: APPROVED FOR PUBLIC RELEASE. DISTRIBUTION IS UNLIMITED
C16.23 FUEL, NAVAL DISTILLATE (F-76) (DLA ENERGY FEBRUARY 2024)
NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE DLA ENERGY PRODUCT CODE
9140-00-273-2377 Fuel, Naval Distillate F76
For supplies delivered under this contract, the Contractor shall conform to all International, Federal, State, and local environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. The Contractor shall also comply with all applicable International Agreements, Treaties, Conventions, and the like to which the United States is a signatory or with whose terms the receiving activity has otherwise agreed to comply, including but not limited to, the requirements of MARPOL 73/78 Annex VI Regulations 14 and 18. The Contractor shall be responsible for determining the existence of all such requirements prior to the time deliveries are made. This includes delivery of fuel and documentation in a manner consistent with any existing or after-imposed Title V (Clean Air Act) Permits. The list of such requirements contained in this contract is not intended to be a complete list, and the Contractor shall be responsible for determining the existence of all such requirements. In the event that an International, Federal, State, and/or local environmental requirement, as identified above, is more stringent than a requirement contained in this contract, the Contractor shall deliver product(s) that complies with the more stringent requirement. Product(s) that fails to meet the more stringent requirement will be considered nonconforming supply. Product(s) to be supplied shall fully meet the requirements of the applicable specification(s). In the event that compliance with the more stringent requirement causes the contractor to incur additional costs, the contractor may request an equitable adjustment.
Unless otherwise indicated by the Contractor in writing, prior to award, the product offered shall be required to fully meet all applicable specifications. The supplier shall provide to the receiving vessel a “Statutory Sample” of at least 400 mL in volume, taken from the receiving vessel’s inlet bunker manifold, together with a Bunker Delivery Note (BDN). This sample will be sealed and carry a sample tag that provides the documentation required per MARPOL 73/78, Annex VI Regulation 18.
a) Naval Distillate Fuel (F-76) shall conform to the requirements of Military specification MIL-DTL-16884P dated 26 Sept 2017.
Nomenclature for Naval Distillate Fuel (F-76) is shown above.
b) SPECIFICATION MODIFICATIONS:
1) Flash Point: All batches of F-76 that are presented for Government acceptance at origin shall meet a minimum flash point requirement of 62.5 degrees Celsius (°C).
2) F-76 offered from a location other than where refined (excludes synthesized material as defined in section 3.2.2 and 3.2.3 of MIL- DTL-16884P) requires testing for FAME content by test method ASTM D7963, BS EN 14078, or IP 579. ASTM D7963 is considered to be the referee test method.
3) In Australia, all deliveries of F-76 shall have a minimum Flash Point of 62.5°C at the custody transfer point.
4) Ash, mass%: All batches of F-76 shall not exceed 0.010% Ash by ASTM D482.
c) MATERIALS: The F-76 supplied under this contract shall not contain un-hydrotreated light cycle oils or contain any stabilizer additives, or any other additive or material not explicitly allowed per section 3.2 of MIL-DTL-16884P.
For F-76 containing a synthetic component, the synthetic component shall be certified to Tables A-I and A-II of MIL-DTL-16884P; for synthesized iso-paraffins, the synthetic component shall be certified to Tables B-I and B-II of MIL-DTL-16884P. It is not necessary to analyze each batch of the synthetic component for compliance with Table A-II (or Table B-II, as applicable) once it is demonstrated that the process scheme is adequately controlled and if no significant changes to existing production operations have been made, such as a turnaround event on a refinery unit used to produce the synthetic component or a change in feedstock material. The signed F-76 synthetic component certification page shall be supplied for each shipment which includes synthetic paraffinic materials, attesting that no changes to the production process have been made, and certifying that the last certificate of analysis, dated and including Table A-II (or Table B-II, as applicable) results, is still valid.
d) ADDITIVES:
1) Lubricity Improver Additive (LIA) – Lubricity additives are allowed in F-76. The LIA additive(s) used shall conform to MIL-PRF- 32490A, Performance Specification, Additive, Lubricity Improver, Distillate Fuel, dated 24 May 2019 and found in ASSIST and shall be listed in the electronic Qualified Products List (QPL)-32490, located in the Qualified Products Database (QPD) found at https://assist.dla.mil/ (or http://quicksearch.dla.mil) . Instructions on how to use ASSIST are located in QAP C1.02. Either Grade A.
Grade B, or Grade C material is suitable for treatment of de-sulfurized F-76. Additive concentration shall not exceed the maximum allowable concentration applicable to the specific additive selected for inclusion in finished F-76.
2) Information pertaining to qualification of additives not currently listed on QPL-32490 may be obtained from Commander, Naval Sea Systems Command, ATTN: SEA 05S, 1333 Isaac Hull Avenue, SE, Stop 5160, Washington Navy Yard, DC 20376-5160, USA, or by e-mailing CommandStandards@navy.mil.
3) Dyes and Markers - Red dye required in off-highway diesel fuel in accordance with 40 CFR Part 80 as modified by the Environmental Protection Agency's interim final rule published in the Federal Register dated July 14, 1994 shall not be added to F-
76. The finished product shall show no visual evidence of red dye. This F-76 product is for military, off-highway use only and must be segregated at all times from any diesel fuel used on-highway. NOTE: Red dye does not apply to Atlantic/Europe/Mediterranean or Western Pacific Overseas Bulk purchase programs unless offering refinery is located in the United States or one of its possessions.
e) ADDITIONAL SAMPLING: The government may request a sample of F-76 during each quarter of contract performance not to exceed 5 gallons. Samples shall be shipped in a 5-gallon epoxy lined can (preferred) or five 1-gallon epoxy lined cans. (NOTE: These samples are in addition to those required in accordance with Quality Assurance Provision (QAP) E1). The sample shall be shipped to:
Naval Air Station HAZMART 5-gallon TEST SAMPLE 22680 Hammond Road Bldg. 2385 Patuxent River, MD 20670 Attn: Terrence Dickerson, AB44100 Fuels & Lubricants Phone: (301) 757-0447; Email: terrence.w.dickerson.civ@us.navy.mil
The paperwork provided with these samples shall include the following information:
Contract Number Contractor’s Name Product Refinery Location Quantity of Tank/Batch Full-Specification Test Report
f) BATCH SAMPLING: The Contractor shall provide one 20 mL sample per each individual tank in a procurement batch.
For each 20 mL sample provided by the Contractor, the Contractor shall also submit a Refinery Certificate of Quality (RCQ), or Certificate of Analysis (CoA), as applicable, with the F-76 sample when submitting to the US Naval Research Laboratory.
The RCQ or CoA for each individual tank shall be representative of Level A testing for the F-76 product.
NOTE: This sample is in addition to those required in accordance with Quality Assurance Provision (QAP) E1
QUANTITY OF SAMPLE WHEN SAMPLED SUBMISSION PERIOD
20 mL Upon completion of each individual procurement batch
Shipped within 30 days of delivery of procurement batch
“Batch” Definition in accordance with MIL-STD-3004-1A, 3.1.9: A specific quantity of product that is processed or utilized as a single unit and tested to meet test criteria and specifications.
The sample from each tank/batch shall be either an all-level sample or a composite of upper, middle, and lower samples. A copy of the full-specification test report shall accompany each sample. The sample container will be any 20 mL amber borosilicate vial with a polytetrafluoroethylene (PTFE) lined screw cap. A tracking number for the samples shall be provided to: Terrence Dickerson at terrence.w.dickerson.civ@us.navy.mil or (301) 757-0447. Samples shall be shipped to:
mailto:CommandStandards@navy.mil mailto:terrence.w.dickerson.civ@us.navy.mil
Naval Air Station HAZMART 20mL TEST SAMPLE 22680 Hammond Road Bldg. 2385 Patuxent River, MD 20670
Contract Number Contractor’s Name Product Refinery Location Quantity of Tank/Batch
For samples containing synthetic components, include the following additional information:
Manufacturer of synthetic component Batch Number Date of Test Report Quantity of Tank/Batch Percent Composition Production Process of Synthetic Component Feedstock
g) TRACEABILITY:
1) F-76 fuel supplied under this contract shall maintain traceability with respect to additives and materials, which is defined as the ability to trace the individual batch of fuel back to the original point of manufacture through documentation.
2) All traceability documentation shall be sufficient to guarantee that at no point have any unauthorized materials or additives been blended into the final product or any of its associated blend components per section 3.2 Material of MIL-DTL-16884P.
3) For all F-76 supplied, the traceability documentation shall consist of statement(s) attesting to the materials composition, which includes materials derived from non-petroleum sources, additives and their concentration levels. Additives and concentrations to be reported include LIAs outlined in section d.1 above and any trace additives resulting from existing tank heels, product trail-back in a multiproduct system, all product blending operations, etc.
4) If F-76 is produced by means of blending, the traceability requirement and documentation for additives and materials shall apply to each blending component used from the point of manufacture through the blend operation. Materials composition, additives and their concentration levels shall be included. The requirement and intent of traceability for blend components is not to obtain full certificates of analysis of each individual blend component, but for certification that no unapproved additives or materials are present in blend components used.
5) The form titled: “F-76 Traceability Signature Page” (attached below) shall be used to document conformance with the provisions of this traceability paragraph. The offeror/supplier shall comply with this requirement utilizing one of the three options below and notification shall be provided to both the contracting office and QT@dla.mil during the pre-award phase which option was chosen for compliance. Documents provided in conjunction with individual shipments shall be uploaded into Wide Area Work Flow as attachments under the quality tab.
i) OPTION 1 – As part of the offeror submission package the offeror shall provide the traceability signature page from each entity in the supply chain providing and/or handling F-76 product and/or blending components all the way back to the point of manufacture. For each individual shipment, the supplier will submit a traceability page signed only by the awardee.
ii) OPTION 2 – As part of the offer submission package the offeror shall provide the traceability signature page, signed only by the offeror. Upon award and prior to the first shipment the awardee shall provide the signed traceability signature page from each entity in the supply chain providing and/or handling F-76 product and/or blending components all the way back to the point of manufacture. For each individual shipment, the supplier will submit a traceability page signed only by the awardee.
iii) OPTION 3 – As part of the offeror submission package, the offeror shall provide the traceability signature page, signed only by the offeror. For each individual shipment, the awardee shall provide the signed traceability signature page from each entity mailto:QT@dla.mil in the supply chain providing and/or handling F-76 product and/or blending components all the way back to the point of manufacture.
Regardless of the option chosen, the traceability sheet signed by offeror shall be submitted to both the contracting office and to QT@dla.mil during pre-award phase.
For OPTION 1 or OPTION 2, the purpose of the awardee submitting a signed traceability page with each shipment is to confirm that the initial traceability certification is still valid at the time of F-76 product shipment.
6) If at any point during the contract period the traceability information provided under OPTION 1 or OPTION 2 becomes invalid (i.e.
the supply chain is altered or the source of F-76 product or a blending component changes), the supplier shall notify both the contracting office and QT@dla.mil and updated documentation shall be provided.
Signature
Prepared by:
Quality Technical Directorate Approval:
Contracting Approval:
F-76 Traceability Signature Page
Contract or Solicitation Number:
CLIN:
Order Number:
Shipment Number:
Traceability OPTION selected per paragraph g.5 (circle or otherwise indicate which one of the three options is chosen):
OPTION 1 OPTION 2 OPTION 3
F-76 fuel supplied under the above contract, CLIN, order number and shipment number maintains traceability with respect the materials composition, additives and their concentration levels. This signed statement certifies that at no point have any unauthorized un- hydrotreated light cycle oils, other unauthorized materials, or additives been blended into the final product or any of its associated blend components per the most recent revision of MIL-DTL-16884 at date of contract award. All materials and additives are listed below. The percentage of each material as defined in sections 3.2, 3.2.2, and 3.2.3 (i.e. refined hydrocarbon distillate fuel, Fischer-Tropsch, Hydroprocessed Renewable Diesel, etc.) and the concentration level for each additive are also shown. For the purposes of the offeror submission this signed statement attests that no unapproved additives or materials will be added to batches or components of batches of F-76 for delivery under government contracts.
Signature:
Printed Name:
Title:
Company Name:
Date:
Material Percent
Additive Concentration Responsible Party for Injection
F-76 Synthetic Component Certification
Contract or Solicitation Number:
CLIN:
Order Number:
Shipment Number:
Synthetic paraffinic materials supplied as indicated with the above contract, CLIN, order number, and shipment number is derived from either Fischer-Tropsch (FT) or Hydroprocessed Renewable Diesel (HRD) methods. This signed statement certifies that since the last certificate of analysis (COA), including table A-II or B-II results of MIL-DTL-16884P, Appendix A or B, no changes, including feedstock material, production location, or production processes have been made. In addition, no turnaround events have been executed on any units utilized to produce the synthetic paraffinic materials since the last COA, including table A-II or B-II, properties were tested. Please supply the date of the most recent COA and an identifying number for that report in the space provided below.
DATE OF COA: _
LAB REPORT ID NUMBER
Signature:
Printed Name:
Title:
Company Name:
Date:
b) SPECIFICATION MODIFICATIONS:
d) ADDITIVES:
For each 20 mL sample provided by the Contractor, the Contractor shall also submit a Refinery Certificate of Quality (RCQ), or Certificate of Analysis (CoA), as applicable, with the F-76 sample when submitting to the US Naval Research Laboratory. The ...
g) TRACEABILITY:
F-76 Traceability Signature Page
F-76 Synthetic Component Certification
2024-02-20T08:39:55-0500
YEN.CHENG.H.1539446041
2024-02-20T09:56:10-0700
BANISZEWSKI.DANIEL.J.1287388698
2024-02-26T14:01:15-0500
SCHIEFER.CANDIS.H.1260810134
MACLANE.SKYLLAR.
BRYANNA.1252141827
Digitally signed by
MACLANE.SKYLLAR.BRYANNA.1252141827
Date: 2025.01.16 14:16:03 -05'00'
BANISZEWSKI.DANIE
L.J.1287388698
BANISZEWSKI.DANIEL.J.1287388698
Date: 2025.01.23 14:04:11 -07'00'
CATLIN.JOSHUA.D.127
6289540
CATLIN.JOSHUA.D.1276289540
Date: 2025.01.23 09:25:42 -05'00'
DISTRIBUTION STATEMENT-A: APPROVED FOR PUBLIC RELEASE:DISTRIBUTION IS UNLIMITED
C16.01 TURBINE FUEL, AVIATION (JP5) (DLA ENERGY JAN 2025)
NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE DLA ENERGY PRODUCT
9130-00-273-2379 Turbine Fuel, Aviation, JP-5 JP5 9130-01-499-9521 Turbine Fuel, Aviation, JP-5 (Bunker fuel overseas locations only)
JP5
Product shall meet MIL-DTL-5624X, Turbine Fuel, Aviation, Grade JP-5, dated February 12, 2024.
(a) SPECIFICATION MODIFICATION: The requirements of Table I in the specification are modified as follows:
(1) FILTRATION TIME TESTING. Round upwards when reporting the filtration time, in minutes. For example, a filtration time of 4 minutes, 22 seconds, would be reported as 5 minutes.
(2) FLASH POINT TESTING. The referee procedure for performing flash point testing of JP-5 shall be the manual method of the latest revision of ASTM D93, as opposed to the automated version of ASTM D93.
(3) FLASH POINT.
(i) All batches of JP-5 that are presented for Government acceptance at origin and for subsequent shipment through a multiproduct pipeline, shall meet a minimum flash point requirement of 62.5°C. This requirement is meant to address multiproduct commercial pipelines and does not apply to multiproduct systems within a facility.
(ii) In the U.S. all JP-5 deliveries in California, Oregon, Washington, and Alaska shall have a minimum Flash Point of 62.5 oC at the custody transfer point.
(iii) In Australia all JP-5 deliveries shall have a minimum Flash Point of 61.5°C at the custody transfer point.
(4) ACID NUMBER. For JP-5 delivered to Kodiak Island, Alaska, the maximum total acid number shall be 0.020 mg KOH/g.
(5) MICRO-SEPAROMETER (MSEP) REQUIREMENTS.
(i) Prior to initial production under this contract, the Contractor shall elect, on a one-time basis, which MSEP limit to meet for the balance of the contract. If the Contractor introduces Fuel System Icing Inhibitor (FSII) and/or Corrosion Inhibitor/Lubricity Improver (CI/LI) after verification of product conformance with the MSEP requirement, the product is not required to meet a fixed limit on subsequent MSEP tests.
(ii) If the Contractor elects to verify conformance with the MSEP requirement on a sample of product that does not contain
FSII and CI/LI, an additional MSEP test shall be performed on a hand blend containing jet fuel, FSII, CI/LI, and Antioxidant (only if required). The FSII shall be added to this hand blend at a concentration range between 0.08 volume percent minimum and 0.11 volume percent maximum. The amount of the CI/LI added to this hand blend shall be within the concentration range specified in QPL-25017.
(6) ADDITIONAL REQUIREMENT APPLICABLE TO DEEP FREEZE PROGRAM ONLY. The Deep Freeze Program is for Antarctic operations of the Department of Defense and other federal agencies; whereby JP-5 sulfur content shall not exceed 0.0015 mass-percent (15 ppm).
(b) ADDITIVES.
(1) Additives are required for deliveries of JP-5, per MIL-DTL-5624X, dated February 12, 2024, unless addition is excluded by specific solicitation line item, applicable contract clause, or another contractual requirement. FSII included in jet fuel shall conform to MIL- DTL- 85470C, Inhibitor, Icing, Fuel System, High Flash, dated March 5, 2024.
(2) The CI/LI additive(s) used shall conform to MIL-PRF-25017H Inhibitor, Corrosion/Lubricity Improver, Fuel Soluble, w/Amendment
1, dated August 4, 2011, and revalidated May 25, 2021,
(3) Line injection of additives (FSII and CI/LI) from shipping tank to delivery conveyance or other free on board (FOB) point is permitted under the following conditions:
(i) Additives must be proportionately injected throughout the entire loading process to ensure the additive is homogeneously blended into the jet fuel. The Contractor shall maintain records evidencing the homogeneous blending of all line injected additives. Such methods may include meter or tank gauge readings or test results taken at intervals to provide confidence in the injection process.
(ii) When FSII is required, additive concentration must be verified based on a representative sample from each shipping conveyance.
(c) Conformance to specification requirements at the custody transfer point is required, however, prior to shipment, a laboratory hand blend of JP-5 fuel with all additives required by this contract shall be tested to verify compliance with the required specification (except for MSEP). MSEP analysis shall be performed per the Contractor’s election in MIL-DTL-5624X, dated February 12, 2024.
(d) SYNTHETIC BLEND COMPONENT (SBC) and CO-HYDROPROCESSED SYNTHESIZED KEROSENE
(1) If a fuel containing an SBC or a co-hydroprocessed synthesized kerosene is being offered, notification shall be made to the contracting point of contact with submission of relevant details regarding the blend percentage and which Annex of ASTM D7566 for the synthetic blend component used, and which feedstocks and co-processing percentage for co-hydroprocessed synthesized kerosene. Only synthetic blend components approved in ASTM D7566, MIL-DTL-83133, and MIL-DTL-5624 and co-hydroprocessed synthesized kerosene produced from approved feedstock and percentage in ASTM D1655, MIL-DTL-83133, and MIL-DTL-5624 shall be acceptable to the government
(e) ADDITIONAL SAMPLING: The government may request a sample of JP5 during each quarter of contract performance not to exceed 5 gallons. Samples shall be shipped in a 5-gallon epoxy lined can (preferred) or five 1-gallon epoxy lined cans. (NOTE: These samples are in addition to those required in accordance with Quality Assurance Provision (QAP) E1). The sample shall be shipped to
Naval Air Station HAZMART 5-Gallon TEST SAMPLE 22680 Hammond Road Bldg. 2385 Patuxent River, MD 20670
Phone: (301) 757-0447; Email: terrence.w.dickerson.civ@us.navy.mil
Contract Number Contractor’s Name Product Refinery Location Quantity of Tank/Batch
(f) BATCH SAMPLING: The Contractor shall provide one 20 mL sample per each individual tank in a procurement batch.
For each 20 mL sample provided by the Contractor, the Contractor shall also submit a Refinery Certificate of Quality (RCQ), or
Certificate of Analysis (CoA), as applicable, with the JP-5 sample when submitting to the US Naval Research Laboratory. The RCQ or CoA for each individual tank shall be representative of Level A testing for the JP-5 product.
NOTE: This sample is in addition to those required in accordance with Quality Assurance Provision (QAP) E1
QUANTITY OF SAMPLE WHEN SAMPLED SUBMISSION PERIOD
20 mL Upon completion of each individual procurement batch Shipped within 30 days of procurement batch delivery
“Batch” Definition in accordance with MIL-STD-3004-1 latest edition, A specific quantity of product that is processed or utilized as a single unit and tested to meet test criteria and specifications.
The sample from each tank/batch shall be either an all-level sample or a composite of upper, middle, and lower samples. A copy of the batch’s full-specification test report shall accompany each sample. The sample container shall be any 20 mL amber borosilicate vial with a polytetrafluoroethylene (PTFE) lined screw cap. A tracking number for the samples shall be provided to: Terrence Dickerson at terrence.w.dickerson.civ@us.navy.mil or (301) 757-0447. Samples shall be shipped to:
Naval Air Station HAZMART 20mL TEST SAMPLE 22680 Hammond Road Bldg. 2385 Patuxent River, MD 20670
• Contract Number
• Contractor’s Name
• Product
• Refinery Location
• Quantity of Tank/Batch
• Full-Specification Test Report
For samples containing synthetic components, include the following additional information:
• Manufacturer of synthetic component
• Batch Number
• Date of Test Report
• Quantity of Tank/Batch
• Percent Composition
• Production Process of Synthetic Component
• Feedstock
• Full-Specification Test Report
ENERGY QAP C16.01 Turbine Fuel Aviation (JP5)(JAN 2025).pdf
C16.01 TURBINE FUEL, AVIATION (JP5) (DLA ENERGY JAN 2025)
(3) FLASH POINT.
(b) ADDITIVES.
For each 20 mL sample provided by the Contractor, the Contractor shall also submit a Refinery Certificate of Quality (RCQ), or Certificate of Analysis (CoA), as applicable, with the JP-5 sample when submitting to the US Naval Research Laboratory. The ...
Date: 2025.01.23 14:12:33 -07'00'
Date: 2025.01.23 09:29:20 -05'00'
Date: 2025.01.16 14:19:52 -05'00'
C16.08-1 TURBINE FUEL, AVIATION (JET A) (DLA ENERGY JAN 2025)
NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE PRODUCT CODE
9130-00-359-2026 Turbine Fuel, Aviation, Jet A JAA
Supplies delivered under this contract shall conform to all Federal, State, and local environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. This includes delivery of fuel and documentation in a manner consistent with any existing or after-imposed Title V (Clean Air Act) Permits.
(a) PRODUCT REQUIREMENTS. Jet A shall conform to the requirements of the latest version of ASTM D 1655, Standard Specification for Aviation Turbine Fuels, except as modified below, at the custody transfer point.
(b) SPECIFICATION MODIFICATIONS
(1) Microseparometer (MSEP).
(i) The following MSEP ratings apply in the presence of the additives listed below. Values apply at point of manufacture:
Jet-A Additive MSEP Rating, min.
Fuel System Icing Inhibitor (FSII) 85
Corrosion Inhibitor/Lubricity Improver (CI/LI) 80 Fuel System Icing Inhibitor (FSII) and Corrosion
Inhibitor/Lubricity Improver (CI/LI)
(ii) MSEP shall be performed on unadditized Jet A that has a custody transfer point on the distribution system using, D7224 or D8073. If either method is not available testing may be conducted with D3948. Passing results (min 85) for D3948 will be considered acceptable. Test failures using D3948 shall be retested using D7224 or D8073. If fuel passes D7224 with a minimum limit of 85 or D8073 with a limit of 88, the fuel is acceptable with no further action.
(2) Fatty Acid Methyl Ester (FAME)
(i) For offerors that will be offering Jet A FOB Destination and/or Origin TT, which involves staging jet fuel at a terminal via a multi-product pipeline, a Certificate of Quality of the issue tank must include testing for FAME for Acceptance of the fuel. The Test method to be used is either IP 585, IP 583, IP 590, IP 599, or ASTM D 7797. The Referee Method is IP 585.
Current ASTM D1655 Jet A specification allows no more than 50 parts per million of FAME in jet fuel.
(c) ADDITIVES.
(1) Additives shall not be premixed with other additives before injection into the fuel.
(2) FUEL SYSTEM ICING INHIBITOR (FSII). When required by contract line item-
(i) FSII shall be added to the fuel and shall be Diethylene Glycol Monomethyl Ether (DIEGME) conforming to the latest version of ASTM D4171, Standard Specification for FSIIs, Type III or MIL-DTL-85470C, dated March 5, 2024, Inhibitor, Icing, Fuel System, High Flash, NATO Code Number S-1745.
(ii) FSII shall be added to the fuel so that the resulting concentration in the final blend is between 0.07% and 0.10% by volume.
(iii) When using the 20-ounce aerosol can to introduce FSII during over the wing refueling, determine the fuel quantity and calculate the amount of required additive. This additive shall be added gradually during filling to permit proper blending in the fuel. One can of aerosol additive will inhibit 180 gallons of fuel to 0.087 percent by volume. The use of aerosol FSII is not permitted for U.S. Navy aircraft refueling.
(3) CORROSION INHIBITOR/LUBRICITY IMPROVER (CI/LI). When required by contract line item-
(i) The additive must conform to MIL-PRF-25017H with Amendment 1, dated August 4, 2011, revalidated May 25, 2021, Inhibitor, Corrosion/Lubricity Improver, Fuel Soluble (NATO S-1747), found in ASSIST and shall be listed in the electronic Qualified Products List (QPL)-25017, located in the Qualified Products Database (QPD) found at https://qpldocs.dla.mil/. The concentration of CI/LI added to the fuel must be between the minimum effective concentration and the maximum allowable concentration as listed for the CI/LI in QPL-25017.
(4) STATIC DISSIPATER ADDITIVE (SDA). When required by contract line item-
(i) SDA shall be added to the fuel and the conductivity limits of 50 to 600 picosiemens per meter (pS/m) at ambient temperature or 29.4oC (85oF), whichever is lower, unless otherwise directed by the procuring activity.
(5) METAL DEACTIVATOR (MDA). MDA shall not be used unless the supplier has obtained PRIOR written consent from the procuring activity.
(6) Product shall be homogeneously mixed. Until all aviation turbine fuel tanks are coated, it is acceptable to perform stratification tests in lieu of circulating tanks to achieve homogeneity.
(1) If a fuel containing an SBC or a co-hydroprocessed synthesized kerosene is being offered, notification shall be made to the contracting point of contact with submission of relevant details regarding the blend percentage and which Annex of ASTM D7566 for the synthetic blend component used, and which feedstocks and co-processing percentage for co-hydroprocessed synthesized kerosene. Only synthetic blend components approved in ASTM D7566, MIL-DTL-83133, and MIL-DTL-5624 and co-hydroprocessed synthesized kerosene produced from approved feedstock and percentage in ASTM D1655, MIL-DTL-83133, and MIL-DTL-5624 shall be acceptable to the government
(e) REPORTS. Refer to the MATERIAL INSPECTION AND RECEIVING REPORT (QAP E40.01) contract provision for reporting requirements.
https://assistdocs.com/ https://qpldocs.dla.mil/
ENERGY QAP C16.08-1 Turbine Fuel Aviation (JAA) (JAN 2025).pdf
Supplies delivered under this contract shall conform to all Federal, State, and local environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. This includes delivery of fuel and documentation ...
(b) SPECIFICATION MODIFICATIONS
(ii) MSEP shall be performed on unadditized Jet A that has a custody transfer point on the distribution system using, D7224 or D8073. If either method is not available testing may be conducted with D3948. Passing results (min 85) for D3948 will be con...
(c) ADDITIVES.
Date: 2025.01.23 14:08:16 -07'00'
Date: 2025.01.23 09:31:39 -05'00'
Date: 2025.01.16 14:18:25 -05'00'
C16.09 TURBINE FUEL, AVIATION (JET Al) (DLA ENERGY JAN 2025)
NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE PRODUCT CODE
9130-00-753-5026 Turbine Fuel, Aviation, Jet A1 JAl
Supplies delivered under this contract shall conform to all Federal, State, and local environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. This includes delivery of fuel and documentation in a manner consistent with any existing or after-imposed Title V (Clean Air Act) Permits. The list of such requirements contained in this contract is not intended to be a complete list, and the Contractor shall be responsible for determining the existence of all such requirements. Selected regional environmental requirements are highlighted in the SPECIFICATIONS (CONT'D) clause. In the event that a Federal, State, or local environmental requirement is more stringent than a fuel specification contained in this contract, the Contractor shall deliver product that complies with the more stringent fuel specification. Product that fails to meet the more stringent fuel specification will be considered to be a nonconforming supply. Product(s) to be supplied shall fully meet the requirements of the applicable specification(s) as cited above. In the event that compliance with the more stringent fuel specification causes the contractor to incur additional costs, the contractor may request an equitable adjustment.
(a) PRODUCT REQUIREMENTS. Product shall conform to the latest version of ASTM Dl655: Standard Specification for Aviation Turbine Fuels with the following modifications. For European, Middle Eastern, and Asian Locations Only: product shall conform to the latest revision of Defence Standard 91-091.
(b) SPECIFICATION MODIFICATIONS.
(1) Microseparometer (MSEP).
(i) The following MSEP ratings apply in the presence of the additives listed below. Values apply at point of manufacture:
Jet A1 Additive MSEP Rating, min.
Fuel System Icing Inhibitor (FSII) 85 Corrosion Inhibitor/Lubricity Improver (CI/LI) 80
Fuel System Icing Inhibitor (FSII) and Corrosion Inhibitor/Lubricity Improver (CI/LI)
(A) MSEP shall be performed on unadditized Jet A that has a custody transfer point on the distribution system using, D7224 or D8073. If either method is not available testing may be conducted with D3948. Passing results (min 85) for D3948 will be considered acceptable. Test failures using D3948 shall be retested using D7224 or D8073. If fuel passes D7224 with a minimum limit of 85 or D8073 with a limit of 88, the fuel is acceptable with no further action.
(c) ADDITIVES: Additives shall not be premixed with other additives before injection into the fuel.
(1) FUEL SYSTEM ICING INHIBITOR (FSII). When FSII is required by contract line item-
(i) The fuel shall contain 0.07 to 0.10 percent by volume FSII.
(ii) FSII shall be added to the fuel and shall be Diethylene Glycol Monomethyl Ether (DIEGME) conforming to the latest version of ASTM D4171, Standard Specification for FSIIs, Type III or MIL-DTL-85470C, dated March 5, 2024, Inhibitor, Icing, Fuel System, High Flash, NATO Code Number S-1745.
(iii) When using the 20-ounce aerosol can to introduce FSII during over the wing refueling, determine the fuel quantity and calculate the amount of required additive. This additive shall be added gradually during filling to permit proper blending in the fuel. One can of aerosol additive will inhibit 180 gallons of fuel to 0.087 percent by volume. The use of aerosol FSII is not permitted for U.S. Navy aircraft refueling.
(2) CORROSION INHIBITOR/LUBRICITY IMPROVER (CI/LI). When CI/LI is required by contract line item the additive shall conform to the latest revision of MIL-PRF-25017H with amendment 1 dated August 4,2011, revalidated May 25, 2021, and be listed in Qualified Products List (QPL)-25017. In order to obtain dosage data for QPL-25017 additives, access the Qualified Products Database (QPD)at https://qpldocs.dla.mil/. Do a search for QPL number 25017, and click the MIL-PRF-25017 Category 1 link. The dosage information is located in the "source notes" for each qualified additive as minimum effective and maximum allowable concentrations in grams per cubic meter (g/m3).
https://qpldocs.dla.mil/
(3) STATIC DISSIPATER ADDITIVE (SDA). When required by contract line item, SDA shall be added to the fuel and the conductivity limits of 50-600 picosiemens per meter (pS/m) at ambient temperature or 29.4˚C (85˚F), whichever is lower, unless otherwise directed by the procuring activity.
(4) METAL DEACTIVATOR ADDITIVE (MDA). MDA shall not be used unless the supplier has obtained written consent from the procuring activity and user.
(i) Product shall be homogeneously mixed. Until all aviation turbine fuel tanks are coated, it is acceptable to perform stratification test in lieu of circulating tanks to homogeneity.
(1) If a fuel containing an SBC or a co-hydroprocessed synthesized kerosene is being offered, notification shall be made to the contracting point of contact with submission of relevant details regarding the blend percentage and which Annex of ASTM D7566 for the synthetic blend component used, and which feedstocks and co-processing percentage for co-hydroprocessed synthesized kerosene. Only synthetic blend components approved in ASTM D7566, MIL-DTL-83133, and MIL-DTL-5624 and co-hydroprocessed synthesized kerosene produced from approved feedstock and percentage in ASTM D1655, MIL-DTL-83133, and MIL-DTL-5624 shall be acceptable to the government
ENERGY QAP C16.09 Turbine Fuel Aviation (Jet A1) (JAN 2025) .pdf
C16.09 TURBINE FUEL, AVIATION (JET Al) (DLA ENERGY JAN 2025)
(b) SPECIFICATION MODIFICATIONS.
KNAPP.RICHARD.BRU
CE.1027134021
KNAPP.RICHARD.BRUCE.1027134021
Date: 2024.04.11 12:46:02 -04'00'
MACLEAN.SARAH.A.1
400398441
MACLEAN.SARAH.A.1400398441
Date: 2024.04.11 12:22:48 -04'00'
KARRAS.JASON.EARL
E.1129188177
KARRAS.JASON.EARLE.1129188177
Date: 2024.04.11 12:28:51 -04'00'
TABLE I, Sample Retention1
LOCATION MINIMUM QUANTITY RETENTION PERIOD 1
Bulk Tank Cars/Tank Truck/Intermodal Container
Fuels 1 gallon (4 liters) 2 15 days for fuels Lubricating Oils 0.25 gallons (1 liter) 2 45 days for lubricating oils
Drums4 2 gallons (8 liter) (multi-drum composite) 3 45 days
Shipping Tank(s)
2 gallons (8 liters) for Aviation Turbine Fuels 1 gallon (4 liters) for all other Fuels, Lubricating Oils, and Additives
45 days
Tanker/Barge/Pipeline (Composite Line at Custody Transfer Point)
5 gallon (20 liters) for all fuel types 45 days
Tanker/Barge (Composite)
F.O.B. Origin 2 gallons (8 liters) for Aviation Turbine Fuels 1 gallon (4 liters) for all other fuels
45 days
F.O.B. Destination 2 gallons (8 liters) Until shore tests on-specification Tanker/Barge (Each Compartment)
F.O.B. Origin 0.25 gallon (1 liter) 45 days F.O.B. Destination 0.25 gallon (1 liter) Until shore test on-specification
NOTES:
1. Unless otherwise noted in this document or applicable contract, the retention period shall be for the stated number of days after the sample has been taken from the location indicated.
2. If the conveyance is compartmentalized, a proportional sample shall be taken from each compartment.
3. An 8-liter composite sample of each product lot shall be taken from a predetermined number of randomly selected drums IAW Table III of API MPSM, Chapter 8.1 (ASTM D 4057).
4. Applies to DLA Energy managed procurements of products shipped in drums. Does not apply to DLA Aviation managed procurements for packaged products.
TABLE II, Minimum Sampling and Testing Requirements for Petroleum Products Series 1, tankers and barges1
ITEM WHEN TO SAMPLE LOCATION OF SAMPLE TYPE OF SAMPLE2 TEST REQUIRED3
1.a
Prior to Loading
Before acceptance of new materiel and after establishment of new batch4 Each shore storage tank Single Tank Composite or All
Levels A5, 15
1.b After line pack but prior to loading As close to the custody transfer point as possible Line Sample C7,14 Dedicated System B-1 Non-Dedicated System
1.c D uring
Loading
Immediately after start of loading/shipment point as possible Line Sample C7
1.d After first in Vessel cargo compartment(s) Spot C7,14
1.e During loading point as possible Line Sample Hourly Visual6,8, Retain10
1.f
A fter Loading
After loading
Each vessel cargo compartment All Level (Combine All Levels into one Volumetric Composite Sample13)
C 6, 8, 11,14
Remainder of B-112
(Retain fuel for B-1 referee testing)
1. Additional requirements to include retain samples may be required. See Quality Assurance Provisions (C or E-QAP) for further details.
2. Refer to ASTM International D4057 for sampling procedures.
3. Test results shall be compared against the quality release certificate. Any discrepancies shall be identified, investigated, and resolved.
4. Upon procurement at refineries, blending installations, etc. and at main installations including national depots & ocean importing points on establishment of new batches.
5. Prior to performing A-level testing, the homogeneity of each batch shall be determined. Refer to paragraph (b)(1)(iii)(C) of this document for additional details.
6. Test for FSII and SDA only if line injected.
7. If sample fails appearance, perform particulate matter using approved methods as outlined in the applicable specification.
8. Lubricity also required for F-76 only if line injected, or determine LIA concentration by volumetric measurement/calculation.
9. First in shall be done after one (1) meter or after line displacement whichever is the greater.
10. For all tanker and barge, a flow-proportional sample taken in accordance with MPMS Chapter 8, Section 2, is preferred at the custody transfer point. However, manual samples taken in accordance with MPMS Chapter 8, Section 1 are acceptable if they are taken hourly throughout the shipment and that the quantity of the composite sample meets the requirements in Table I
11. Best practice is for B-1 test completion for FOB Origin Procurements (or Type A level testing when specified in contract for FOB Destination Procurements) prior to vessel release. Based on QAR decision, vessel may sail after C Tests to meet schedule requirements including to avoid predicted weather; remainder of B-1 tests to be completed before arrival at next load or discharge port. Test report will be provided to designated discharge port.
12. Type A level testing required for FOB Destination Procurements (unless otherwise specified by contract).
13. As defined by API MPMS Chapter 8-1, section 3.22.
14. For product verification purposes. Results of C-test must fall within reproducibility of source tank A-level results.
15. New cargo from same batch, within 30 days, will only require B-1 testing to verify previous A-level test results. B-1 level verification test results should fall withing reproducibility of source tank A-level results.
Series 2, pipeline, tank trucks, tank cars, iso-containers1,7
ITEM WHEN TO SAMPLE LOCATION OF SAMPLE TYPE OF SAMPLE 2 TEST REQUIRED3
2.a Prior to Shipm ent
Before acceptance of new materiel and after establishment of new batch4
Each Shipment Storage Tank Single Tank Composite or All Levels A9, 11
2.b After line pack but prior to loading/shipment
As close to the custody transfer point as possible Line Sample C5,6 Dedicated System
B-1 Non-Dedicated System
2.c D uring Shipm ent
Immediately after start of loading/shipment possible and downstream of the filter separator (if equipped)
Line Sample C5, 13
2.d Pipeline Only:
Hourly after start of loading or shipment10 possible and downstream of the filter separator (if equipped) Line Sample
Apperance5, 12
(Retain fuel for B-1 referee testing)
2.e
Daily on first fill and anytime a new tank is placed on issue (after line displacement) TT, TC, ISO, Refuelers or other over the road transportation modes only possible (Loading Rack or Fill Point) and downstream of the filter separator (if equipped)
Line Sample Color (by visual method) and Appearance5.
If visual fails perform C6
2.f fter Loading
Daily for each conveyance mode (Not required for pipeline operations)
Each Cargo Compartment or another point that provides a representative sample All Level
Appearance on each compartment
C on composite 5,6,8
2.g Drums Sample of each lot of product shall be taken from a predetermined number of randomly selected drums14
Multi-drum Composite C13
1. Additional contractual requirements to include retain samples may be required. See Contract Quality Assurance Plans (C or E-QAPs) for further details.
2. Refer to ASTM International D4057 for sampling procedures.
3. Test results shall be compared against the quality release certificate. Any discrepancies shall be identified, investigated, and resolved.
4. Upon procurement at refineries, blending installations, etc., and at main installations including national depots & ocean importing points on establishment of new batches.
5. Test for FSII and SDA only if line injected.
6. If sample fails appearance, perform particulate matter using approved methods as outlined in the applicable specification.
7. Type A level testing required for FOB Destination Procurements (unless otherwise specified by contract).
8. If the conveyance is compartmentalized, a proportional sample shall be taken from each compartment such that a total of one liter is collected from the conveyance.
9. Filtration time testing is required for JP-5 & JP-8 and shall meet contract requirement.
10. For pipeline shipments, a flow-proportional sample taken in accordance with MPMS Chapter 8, Section 2, is preferred at the custody transfer point. However, manual samples taken in accordance with MPMS Chapter 8, Section 1 are acceptable if they are taken hourly throughout the shipment and that the quantity of the composite sample meets the requirements in Table I.
11. Prior to performing A-level testing, the homogeneity of each batch shall be determined. Refer to paragraph (b)(1)(iii)(C) of this document for additional details.
12. Lubricity also required for F-76 only if line injected or determine LIA concentration by volumetric measurement/calculation.
13. For product verification purposes. Results of C-test must fall within reproducibility of source tank results.
14. A composite sample of 2 gallons (8 liters) for Aviation Turbine Fuels and 1 gallon (4 liters) for all other fuels for each lot of product shall be taken from a predetermined number of randomly selected drums. The total number of drums sampled per lot shall, at a minimum, be that cited in Table III of API MPMS chapter 8.1 (ASTM d 4057), but may be increased at the government's option.
Series 3, product receipt and discharges for tankers and barges (FOB Destination)
ITEM WHEN TO SAMPLE LOCATION OF SAMPLE TYPE OF SAMPLE TEST REQUIRED
3.a
Prior to D ischarge
Prior to discharge
From each vessel cargo compartment All Level Appearance and Density1
3.b From each vessel cargo compartment
All Level (Combine All Levels into one Volumetric Composite
Sample)
3.d
D
Within 30 minutes after start and each hour after until completion
Dock/Discharge Manifold Header Line Sample / Retain Perform Appearance test2,3 and then retain fuel for Referee testing
3.e fter
If remainder of fuel will be shipped to another DFSP
Each vessel compartment with fuel remaining on board All Level Retain until discharged at destination
1. Test for flash point on high flash cargo tanks if low and high flash cargoes are carried together aboard the same vessel without segregated venting systems.
2. For aviation fuel delivery, FSII and SDA shall be tested only if line injected. This requires an additional quart sample.
3. Test for additives if line injected downstream of the injector. (If line injecting LIA into F-76, test for lubricity.)
Series 4, product receipt from pipeline (FOB Destination)1
ITEM WHEN TO SAMPLE LOCATION OF SAMPLE TYPE OF SAMPLE TEST REQUIRED
4.c D
R eceipt
During pipeline receipt Custody transfer point Line Sample/Retain 5 Gallon Minimum2
4.d During pipeline receipt, immediately after start, Midpoint and 1 hour prior to completion3 possible Line C
4.g fter
R eceipt
After receipt of fuel Each receipt tank All level A
1. Refer to ASTM International D4057 for sampling procedures.
2. Retain for referee testing in the event a failure occurs on receipt tank. Retain sample for 45 days. Sampling is IAW API MPMS Chapter 8
3. Fuel from a new batch will be considered a new receipt for quality control purposes.
TABLE III, Definitions of Test Series
I. TYPE A: Includes all specification quality conformance tests plus any additional contractual requirements.
II. TYPE B-1 & C: As shown in the table below for each product. Properties and test methods will be in accordance with the product specification for each grade identified in the solicitation/contract.
AVGAS
AVIATION
TURBINE
MOGAS
DIESEL/
KEROSENE/
NAVAL DISTILLATE
LUBE OIL
TEST PROPERTIES B-1 C B-1 C B-1 C B-1 C B-1 C
Appearance/ workmanship
Particulate content * *8 *1 *8 Filtration Time * Color (visual) * * * * * * * * * Density/API Gravity/ Specific Gravity
Distillation * * * * Corrosion, Copper Strip * * Existent Gum * * Carbon Residue *1 Vapor Pressure * * Lead Content * *3 Freeze Point * Flash Point * * * * * FSII Content *
MSEP (JP-8, F-24, F-27,
Jet A & Jet A-1)
Conductivity (JP-5 & JP- 8, F-24, F-27 & Jet A-1)
*4
Thermal stability (B-1 requirement applies to JPTS and marine/multi-product mode receipt tank sample)
Sediment & Water Total Sediment aged Viscosity *7 Water Content * *8 *2 Emulsion *2 Foam Test * Knock Rating (RON / MON) *6 Lubricity *1
FAME *5 *1
Solid Contaminants *2
* The procedure to be used for conducting these tests will be as stated in the appropriate product specification and/or contract. For any products not covered under this table, contact Quality Assurance Representative for guidance.
NOTES:
1. F76 only.
2. Only if the specification has this requirement.
3. If contamination with leaded fuels is suspected.
4. If fuel contains conductivity additive, wait approximately 2 minutes after obtaining sample for charges in the fuel to dissipate before performing CU testing.
5. Only for product transported through multi-product systems, including marine transport.
6. Perform only if Lead Content is performed and fails and/or contamination with another product is suspected. In the case of pipeline, this test shall be performed when considered necessary.
7. For MIL-PRF-17331 and MIL-PRF-9000 viscosity is not required unless the tank has been in long term storage for 3 months.
8. Visual check.
TABLE IV, Conversion chart for tank trucks (TT) tank cars (TC), tank wagons (TW), tank & trailer (TRR), and intermodal containers (IMC)1, 2
Last Product Carried
PRODUCT TO BE LOADED5
Gasolines: MUR, MUM, MUP, EFM, E85, 100, 130, JAB
Aviation Turbine Fuels: JAA/A1, JP-8, F-24, JP-5, TS1, KS1/R/N, Aviation Turbine
Fuel3: JPTS
RP1/RP2 JP-10/PF1 Diesel Fuel: F-76 FSII Lubricating Oils
Diesel Fuels:
DF1, DF2,
DS1, DS2,
DSS, DSW,
BDI, MGO
Gasolines4 MUR, MUM, MUP, EFM, E85, 100, 130, JAB
Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry
Aviation Turbine Fuels4, 9
JAA/A1, JP-8, F-24,
JP-5, TS1, KS1/R/N,
Drain/Empty
Drain/Empty
Steam/Dry
Aviation Turbine Fuel3 JPTS Drain/Empty Drain/Empty Drain/Empty Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam Dry Steam/Dry
RP1/RP2 Steam/Dry Steam/Dry Steam/Dry Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry J10/PF-1 Steam Dry Steam/Dry Steam/Dry Steam Dry Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Petroleum Solvent or Paint Thinner Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry
Diesel Fuel: F-76 Steam/Dry Steam/Dry…