Attachment 6 - GSA SD 3rd Party Abatement Clearance Requirements.pdf

PDF 409 KB Posted

Attached to
Sioux Falls Courthouse Window Replacement
Solicitation number
47PJ0025R0028
Issued by

About this file

This is a Statement of Work attachment detailing GSA's requirements for asbestos abatement third-party clearance testing in South Dakota. The document specifies requirements for visual inspection and air sampling to be conducted by a qualified industrial hygienist from an asbestos consulting firm independent from the abatement contractor.

The technical requirements include conducting visual inspections per EPA and ASTM standards, collecting five aggressive air clearance samples per containment area using NIOSH 7400 PCM methodology, and achieving clearance levels below 0.01 fibers per cubic centimeter. Key specifications include using 0.8-micron MCE filter cassettes, flow rates of 10L/minute, minimum sample volumes of 1,200L, and analysis by NIOSH 582 trained microscopists or accredited laboratories. Deliverables must include a detailed written report with sampling data, certifications, daily logs, containment configuration diagrams, and photographic documentation. The contractor must comply with all applicable federal, state and local regulations, including OSHA, EPA, DOT and South Dakota state requirements for asbestos work.

View the file

Other files

File Type Posted
The Solicitation- 47PJ0025R0028 AM0004.pdf PDF
SF-30 47PJ0025R0028_AM0004.pdf PDF
SF-30 47PJ0025R0028_AM0002.pdf PDF
RFI Responses Dated 02 14 2025 (AM0002).pdf PDF
47PJ0025R0028 Solicitation (AM0002).pdf PDF
47PJ0025R0028 Solicitation AM0001.pdf PDF
SF-30 47PJ0025R0028_AM0001 2025 01 23.pdf PDF
WD 20250028 01 03 2025.pdf PDF
47PJ0025R0028 CONSTRUCTION SET DRAWINGS SD.pdf PDF
47PJ0025R0028 CONSTRUCTION SET SPECIFICATIONS SD.pdf PDF
Attachment 11 - 23535 Sioux Falls Courthouse IRA Window Replacement Submittal_ Reporting Form.xlsx XLSX spreadsheet
Attachment 10 - Glass - GSA IRA Low Embodied Carbon Requirements.pdf PDF
Attachment 12 - Post Award Allocation Form IRA .xlsx XLSX spreadsheet
Attachment 5 - GSA Rapid City USMS Asbestos Abatement Requirements.pdf PDF
Attachment 4 - GSA Lead Pre-Alteration Assessment SOW.pdf PDF
Offeror Representations and Certifications.pdf PDF
Agreement 47PJ0025R0028.pdf PDF
47PJ0025R0028 Form 1442.pdf PDF
47PJ0025R0028 CONSTRUCTION SET SPECIFICATIONS.pdf PDF
Attachment 15 - 2014 Asbestos Inspection.pdf PDF
Attachment 13 -IRA Project Submittal Form and Data Dictionary.pdf PDF
Attachment 8 - P100 2024 Final.pdf PDF
Attachment 7 - GSA Base Lead Management Requirements.pdf PDF
Attachment 2 - Vendor Manual September 2023.pdf PDF
25R0028 IRA Sustainability Factor Table.xlsx XLSX spreadsheet
47PJ0025R0028 CONSTRUCTION SET DRAWINGS.pdf PDF
Attachment 14 - Fire Protection MOP and Firewatch Log Example.pdf PDF
Attachment 9 - Supplemental Pricing and Invoicing Instructions IRA.pdf PDF
Attachment 3 - GSA SD Asbestos Pre-alt Inspection SOW.pdf PDF
Attachment 1 - USR_v4 - 3-1-2024 - SF Window Replacement.pdf PDF
SOW - Sioux Falls Courthouse IRA Window Replacement_15 Jan 25.pdf PDF
25R0028 Bid Sheet .xlsx XLSX spreadsheet
Solicitation 47PJ0025R0028.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

47PJ0025R0028 SOW Attachment 6

U.S. General Services Administration

Rocky Mountain Region 8 Public Buildings Service Office of Facilities Management - Industrial Hygiene Group

One Denver Federal Center, Building 41 Denver, CO 80225

GSA Region 8 PBS SD Asbestos Abatement Clearance Requirements Version 1.0, May 2022 Page 1

GSA ASBESTOS ABATEMENT THIRD PARTY CLEARANCE TESTING

REQUIREMENTS

STATE OF SOUTH DAKOTA

1. PROJECT OBJECTIVES

1.1. The Contractor shall provide labor, materials, and equipment necessary to perform the onsite clearance testing of the asbestos abatement activities, to include visual inspection and air sampling.

1.2. All work shall be conducted by a qualified industrial hygienist from an asbestos consulting firm that is independent of the asbestos abatement contractor.

2. PERMITTING/REGULATIONS/CODES

2.1. Contractor shall be responsible for obtaining all necessary local, state, and federal permits and licenses and payment of related fees.

2.2. Contractor shall comply with all applicable federal, state, and local regulations, guidance documents and standards including but not limited to:

2.2.1. Occupational Safety & Health Administration (OSHA) Asbestos in Construction Standard - 29 CFR 1926.1101

2.2.2. OSHA Asbestos in General Industry Standard – 29 CFR 1910.1001

2.2.3. OSHA Respiratory Protection Standard - 29 CFR 1910.134

2.2.4. U.S. Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAP) - 40 CFR 61 Subpart M

2.2.5. EPA Asbestos Hazard Emergency Response Act (AHERA) - 40 CFR 763

2.2.6. Federal Management Regulation, Real Property, Safety and Environmental Management, Asbestos - 41 CFR 102-80.15

2.2.7. U.S. Department of Transportation Hazardous Material Transportation Regulations – 49 CFR 171 and 172

2.2.8. South Dakota Emission Standards for Asbestos Air Pollutants - Administrative Rules of South Dakota (ARSD) 74:36:08:02

2.2.9. South Dakota Asbestos Control Program - ARSD Article 74:31

2.2.10. ASTM Standard E1368-14 – Standard Practice for Visual Inspection of Asbestos Abatement Projects

2.2.11. EPA Guidance Document – Guidance for Controlling Asbestos-Containing Materials (EPA 560/5-85-024)

2.2.12. National Institute for Occupational Safety and Health (NIOSH) Method 7400 – Asbestos and Other Fibers by Phase Contrast Microscopy (PCM), Current Issue.

Office of Facilities Management - Industrial Hygiene Group

Version 1.0, May 2022 Page 2

2.3. All work shall comply with codes and standards applicable to each type of work through the course of this project. The contractor shall also comply with the requirements of GSA BuildGreen standards, and PBS P- 100.

3. VISUAL CLEARANCE INSPECTION REQUIREMENTS

3.1. Visual inspections of the work area(s) shall be conducted in accordance with Section 6.4.1 of the EPA Guidance for Controlling Asbestos-Containing Materials (EPA 560/5-85-024) and the Completeness of Removal inspection in ASTM Standard E1368-14 Standard Practice for Visual Inspection of Asbestos Abatement Projects.

3.2. Final visual inspections shall be completed upon conclusion of the asbestos abatement activities to ensure the effectiveness of the controls, confirm job completeness, to ensure that the work area is visibly clean of debris, and to ensure the abatement work methods complied with applicable regulations and GSA protocols.

3.3. Final visual inspections shall include the entire work area(s) including all surfaces, ceilings, walls, flooring, decontamination units, remaining plastic sheeting / critical barriers, etc. looking for debris from any source, residue on surfaces, dust, or other matter.

3.4. If the area does not pass visual inspection, the abatement contractor shall be directed to re-clean the area at no additional cost, and the process will be repeated until clearance is achieved.

4. FINAL AIR MONITORING CLEARANCE REQUIREMENTS

4.1. Where feasible, five (5) aggressive air clearance samples per containment / regulated area shall be collected. For smaller work areas and multiple glove bags in a single functional space, please consult with the GSA OFM Industrial Hygiene Group for clearance sample requirements.

4.2. Air samples collection methodology shall be in accordance with the NIOSH 7400 PCM method.

4.3. Air samples shall be collected on open-faced, 0.8-micron, 25-millimeter (mm), mixed cellulose ester (MCE) filter air sampling cassettes using electric high-volume sampling pumps.

4.4. Air sampling cassettes shall be placed on a sampling stand to achieve cassette heights between 3 to 5 feet above floor level and with the cassette opening orientated downward at a 45° angle.

4.5. Each air sampling pump shall be calibrated with the cassette in-line with a rotameter before and after air sampling; adjusting the flow as necessary to obtain the desired flow rate. Rotameters shall be properly calibrated against a primary standard.

4.6. Sample flow rates shall be approximately 10 liters (L) per minute.

4.7. A minimum sample volume of 1,200 liters (L) per sample shall be collected.

Office of Facilities Management - Industrial Hygiene Group

Version 1.0, May 2022 Page 3

4.8. An appropriate number of field blanks shall be used pursuant with the NIOSH Method 7400.

4.9. Asbestos air sample analysis shall be conducted either onsite by a NIOSH 582 trained microscopist participating in the American Industrial Hygiene Association Proficiency Analytical Testing (PAT) Program for PCM or performed by an American Industrial Hygiene Association (AIHA) and/or National Institute of Standards and Technology (NIST) National Voluntary Laboratory Accreditation Program (NVLAP) -accredited analytical laboratory.

4.10. Final clearance sample results shall be compared to the AHERA PCM clearance criteria threshold of

0.01 fibers per cubic centimeter (f/cc).

4.11. Work area shall not be cleared or abatement contractor released until all final air clearance samples collected are less than the clearance criteria. If clearance samples fail, please contact GSA Project Manager and Regional Industrial Hygienist for direction. The regulated area may have to be re-cleaned or re-cleared or samples reanalyzed by TEM.

5. DELIVERABLE REQUIREMENTS

5.1.1. The third-party IH shall provide a written letter report including the following at a minimum.

5.1.2. Written report narrative

5.1.2.1. A summary of the abatement activity including the building, location within the building, type of asbestos material, quantity removed, and number and types of containments / regulated work areas.

5.1.2.2. A description of sample collection, including number and types of samples collected, and samples analysis methodologies.

5.1.2.3. Observations, findings, and conclusions.

5.1.3. Table of final air clearance results

5.1.3.1. A table including sample identification, location, and result compared to clearance thresholds at a minimum.

5.1.4. Attachments

5.1.4.1. Air sample collection data sheets or laboratory analytical data, with chain-of-custody documentation and lab accreditation

5.1.4.2. Copies of firm/personnel certifications

5.1.4.3. Daily logs, clearance checklists, and all other field paperwork

5.1.4.4. Figure depicting containment configuration (i.e., critical barriers, NAM, exhaust, decon/waste loadout) and air sample locations)

Office of Facilities Management - Industrial Hygiene Group

Version 1.0, May 2022 Page 4

5.1.4.5. Photographic log