This is a Statement of Work (SOW) for asbestos pre-alteration assessment services required by GSA Region 8 Public Buildings Service in South Dakota. The SOW outlines requirements for conducting asbestos assessments before any demolition or renovation activities that may impact suspect building materials.

The assessment must be performed by a South Dakota Certified Asbestos Building Inspector in accordance with ASTM E2356-14 standards and multiple federal/state regulations. Key requirements include destructive sampling of materials to be disturbed, analysis via polarized light microscopy (PLM) by NVLAP-accredited laboratories, and delivery of a comprehensive report containing sample results, material conditions, locations, quantities, and recommendations. The report must include detailed documentation such as site location figures, sample location diagrams, photographic logs, field notes, chain of custody records, and certification documentation. Specific sampling protocols require a minimum of two samples per homogeneous area for miscellaneous materials, with requirements for point count analysis when asbestos content is estimated between 0-1%.

View the file

Other files

File Type Posted
The Solicitation- 47PJ0025R0028 AM0004.pdf PDF
SF-30 47PJ0025R0028_AM0004.pdf PDF
SF-30 47PJ0025R0028_AM0002.pdf PDF
RFI Responses Dated 02 14 2025 (AM0002).pdf PDF
47PJ0025R0028 Solicitation (AM0002).pdf PDF
SF-30 47PJ0025R0028_AM0001 2025 01 23.pdf PDF
47PJ0025R0028 Solicitation AM0001.pdf PDF
WD 20250028 01 03 2025.pdf PDF
47PJ0025R0028 CONSTRUCTION SET DRAWINGS SD.pdf PDF
47PJ0025R0028 CONSTRUCTION SET SPECIFICATIONS SD.pdf PDF
Attachment 11 - 23535 Sioux Falls Courthouse IRA Window Replacement Submittal_ Reporting Form.xlsx XLSX spreadsheet
Attachment 10 - Glass - GSA IRA Low Embodied Carbon Requirements.pdf PDF
Attachment 12 - Post Award Allocation Form IRA .xlsx XLSX spreadsheet
Attachment 6 - GSA SD 3rd Party Abatement Clearance Requirements.pdf PDF
Attachment 5 - GSA Rapid City USMS Asbestos Abatement Requirements.pdf PDF
Attachment 4 - GSA Lead Pre-Alteration Assessment SOW.pdf PDF
Offeror Representations and Certifications.pdf PDF
Agreement 47PJ0025R0028.pdf PDF
47PJ0025R0028 Form 1442.pdf PDF
47PJ0025R0028 CONSTRUCTION SET DRAWINGS.pdf PDF
Attachment 14 - Fire Protection MOP and Firewatch Log Example.pdf PDF
Attachment 9 - Supplemental Pricing and Invoicing Instructions IRA.pdf PDF
Attachment 1 - USR_v4 - 3-1-2024 - SF Window Replacement.pdf PDF
SOW - Sioux Falls Courthouse IRA Window Replacement_15 Jan 25.pdf PDF
25R0028 Bid Sheet .xlsx XLSX spreadsheet
Solicitation 47PJ0025R0028.pdf PDF
47PJ0025R0028 CONSTRUCTION SET SPECIFICATIONS.pdf PDF
Attachment 15 - 2014 Asbestos Inspection.pdf PDF
Attachment 13 -IRA Project Submittal Form and Data Dictionary.pdf PDF
Attachment 8 - P100 2024 Final.pdf PDF
Attachment 7 - GSA Base Lead Management Requirements.pdf PDF
Attachment 2 - Vendor Manual September 2023.pdf PDF
25R0028 IRA Sustainability Factor Table.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

47PJ0025R0028 SOW Attachment 3

U.S. GENERAL SERVICES ADMINISTRATION

REGION 8 PUBLIC BUILDINGS SERVICE

SOUTH DAKOTA

ASBESTOS PRE-ALTERATION ASSESSMENT

STATEMENT OF WORK

GSA Region 8 PBS South Dakota Asbestos Pre-Alteration Assessment SOW Version 1.2, August 2020 Page 1

In order to comply with 40 CFR 61.145(a), 41 CFR 102-80.15(c), Administrative Rules of South Dakota 74:36:08:02 and Section 1.7.4.1.2 of the GSA PBS-P100, a pre-alteration asbestos assessment will be required before any demolition or renovation activity that impacts suspect building materials. A state certified asbestos building inspector must inspect and assess all areas within this scope and test all suspect materials for asbestos content that may be disturbed by the proposed renovation or demolition activity. GSA will provide construction scopes of work, specification, and drawings related to the proposed demolition/renovation activity. The following must be adhered to.

Permitting/Regulations/Codes

The assessment shall be conducted in accordance with the "Pre-Construction Survey" requirements of ASTM E2356 - 14 Standard Practice for Comprehensive Building Asbestos Surveys

The assessment shall be conduct pursuant with applicable federal, state, and local asbestos regulations as well as GSA policy including but not limited to:

1. U.S. Environmental Protection Agency (EPA) National Emission Standards for

Hazardous Air Pollutants (NESHAP) - 40 CFR 61 Subpart M

2. EPA Asbestos Hazard Emergency Response Act (AHERA) and Asbestos School

Hazard Abatement Reauthorization Act (ASHARA), as well as associated implemented regulations under the Toxic Substance Control Act regulations codified at 40 CFR 763

3. Occupational Safety and Health Administration (OSHA) General Industry Asbestos Standard – 29 CFR 1910.1001

4. OSHA Construction Industry Asbestos Standard - 29 CFR 1926.1101

5. Federal Management Regulation, Real Property, Safety and Environmental

Management, Asbestos – 41 CFR 102-80.15

6. Administrative Rules of South Dakota 74:36:08:02

7. Administrative Rules of South Dakota Article 74:31

8. GSA PBS-P100 Facilities Standards for the Public Building Service. Latest Issue

All work shall comply with codes and standards applicable to each type of work through the course of this project. The contractor shall also comply with the requirements of GSA BuildGreen standards, and PBS P-100.

Asbestos Pre-Alteration Inspection and Assessment Asbestos pre-alteration inspection and assessment shall be completed by a State of

South Dakota Certified Asbestos Building Inspector.

The assessment shall include any and all materials to be impacted by the proposed GSA repair, alteration or demolition project including the exterior and interior of the building.

Destructive sampling of materials that will be disturbed as a result of the proposed project is required and authorized. Sample holes shall be temporarily patched or covered with puddy, tape, etc., as appropriate.

SOUTH DAKOTA

Version 1.2, August 2020 Page 2

Follow sampling protocols per ASTM E2356 – 14 and AHERA sampling protocols at 40 CFR

763.86. Please note the following:

1. For Miscellaneous Materials, collect a minimum of two (2) samples per each Homogeneous Area.

Asbestos Sample Analysis

Bulk samples shall not be composited for analysis and shall be analyzed by polarized light microscopy (PLM) via Method EPA/600/R-93/116.

All separable layers within a bulk sample must be analyzed individually. Drywall system samples shall also be analyzed as a composite for EPA/SD DANR compliance.

Progressive sampling (positive stop) for each HA is allowed.

If a sample is estimated to be 1% asbestos or less, but greater than 0% by EPA/600/R-

93/116, the sample shall be re-analyzed by EPA/600/R-93/116 with a 400 Point Count. If a result obtained by point count is different from a result obtained by visual estimation, the point count result must be used.

Asbestos bulk sample analysis shall be performed by a laboratory that participates in the National Institute of Standards and Technology (NIST), National Voluntary Laboratory Accreditation Program (NVLAP) for asbestos bulk sample analysis.

Inspection Report Deliverable Requirements

Contractor shall provide a written report including the following at a minimum:

1. The name and address of the building, structure of facility that was inspected. If less than the entire building, structure, or facility was inspection, the exact location of the area or component(s) inspected shall be listed.

2. The South Dakota certified asbestos building inspector’s name, signature, contact information, and individual certification number.

3. The date(s) the inspection/assessment was performed.

4. General description of building and its physical components, dates of construction and any known renovations, description of mechanical systems such as HVAC and plumbing systems.

5. Description of the proposed repair, alteration, or demolition activities

6. Description of assessment protocols, sample collection and analytical procedures

7. Summary of findings and a table including:

o Homogenous area/material designation o Detailed material description o Sample numbers o Description of sample locations o Sample results / asbestos percentage o Estimated quantity o Friability o Material condition assessment

SOUTH DAKOTA

Version 1.2, August 2020 Page 3

8. Summary of determined or assumed ACM materials that would be disturbed by proposed project activities and recommendations. Contractor shall also denote any non- ACM materials that would still be OSHA regulated (1% asbestos or less).

9. Figures o Site location figure o Sample location figure(s) o Extent of each HA determined or assumed ACM and OSHA regulated materials figure(s)

10. Photographic log with representative photos of each HA determined or assumed to be

ACM or OSHA regulated.

11. Field notes

12. COC / laboratory data packages / lab accreditations

13. Inspector and firm certifications.

File details come from the government source that posted it. Updated .