This is a price proposal bid sheet template for window replacement work at the Sioux Falls Courthouse. The spreadsheet includes line items for pricing various components of the project, including exterior enclosure work (facade repairs, scaffolding, aluminum windows with blast/ballistic glazing), selective demolition (window removal, opening preparation, paint removal, asbestos/lead abatement), and general contractor markup categories (general conditions, bonds, insurance, overhead, and profit).
The related solicitation (47PJ0025R0028) is issued by GSA Public Buildings Service Region 8 for the Sioux Falls Courthouse IRA Window Replacement project. A site visit is scheduled for January 29, 2025, at 10:00 AM CT at 400 S. Phillips Ave, Sioux Falls, with required pre-registration by January 23, 2025. Requests for Information are due by February 13, 2025, and proposals must be submitted by February 27, 2025. Points of contact include Justin Gartland and Chad Andrews for site visits, and Sarah Callies, Christine Allen, and Jalen Scandrett for RFIs.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment- Price Proposal Bid Sheet, Sioux Falls Window Replacement | ||||
| Offeror Company Name: | ||||
| Construction Cost | ||||
| Substructure: | Quantity | Unit | Unit Rate | Total |
| Exterior Enclosure | ||||
| Exterior Walls-- | ||||
| Allowance for façade repairs at window surrounds; including repointing | LF | $ - 0 | ||
| Scaffolding and Lifts | LS | $ - 0 | ||
| Exterior Windows-- | ||||
| Prefinished aluminum window; blast glazing | SF | $ - 0 | ||
| Prefinished aluminum window; ballistic glazing | SF | $ - 0 | ||
| Prefinished aluminum window; ballistic spandrel panel | SF | $ - 0 | ||
| Jamb anchor, HSS 2x3x1/4x12", including threaded stainless steel rod set in epoxy | EA | $ - 0 | ||
| Prefinished aluminum trim to jambs, headers and sills | LF | $ - 0 | ||
| Total Exterior Enclosure | $ - 0 | |||
| Selective Demolition | ||||
| Building Elements Demolition-- | ||||
| Demolition and removal of old windows | SF | $ - 0 | ||
| Prep openings for new windows | LF | $ - 0 | ||
| Extra for cutting out 14" section of existing wood window frame as required for installation of anchors | EA | $ - 0 | ||
| Remove paint from existing wood window elements and apply fluid applied air barrier | SF | $ - 0 | ||
| Remove and salvage existing window grilles | LS | $ - 0 | ||
| Remove, salvage and reinstall existing window treatments | SF | $ - 0 | ||
| Temporary protection of window openings while windows removed | SF | $ - 0 | ||
| Pre-alteration assessment | EA | $ - 0 | ||
| Asbestos abatement | LF | $ - 0 | ||
| Lead abatement | SF | $ - 0 | ||
| Selective Demolition Total | $ - 0 | |||
| GC Markup | ||||
| General Conditions | LS | |||
| Bonds | % | |||
| Insurance | % | |||
| Overhead | % | |||
| Profit | % | |||
| Subtotal GC Markup | $ - 0 | |||
| Total Construction Costs: | $ - 0 |