This is a post-award allocation form template for an IRA (Inflation Reduction Act) project, specifically formatted for design-build performance contracts. The Excel spreadsheet includes sections for general project information, owner/contractor details, and a detailed cost breakdown using MasterFormat CSI divisions with special emphasis on low embodied carbon materials.
The form contains two main sections: a cost allocation worksheet and a bid tabulation form. The allocation worksheet breaks down costs across 48 divisions, with specific line items for sustainable elements like low embodied carbon concrete, steel, glass, and asphalt. The bid tabulation section shows sample pricing comparing an Independent Government Estimate against multiple contractors, though most fields are unpopulated. The sample data shows minor price variations between the IGE ($4,185.00) and Contractor B ($4,310.00) for the few populated line items, primarily in Divisions 00-08.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Information
POST AWARD ALLOCATION FORM IRA
| PROJECT NAME | ||||
| BUILDING NAME | ||||
| BUILDING ADDRESS | BUILDING NUMBER | |||
| ESTIMATED | ||||
| START DATE | PERIOD OF PERFORMANCE DAYS | |||
| SOLICITATION # | DELIVERY METHOD | Design Build - Performance |
| OWNER INFORMATION | CONTRACTOR INFORMATION | ||
| OWNER | |||
| COMPANY NAME | CONTRACTOR COMPANY NAME | ||
| OWNER | |||
| CONTACT NAME | CONTRACTOR CONTACT NAME | ||
| ADDRESS | ADDRESS | ||
| OWNER | |||
| PHONE | CONTRACTOR PHONE | ||
| OWNER | |||
| CONTRACTOR EMAIL |
| SCOPE OF WORK |
| TEXT |
| MATERIALS AND SERVICES NOT INCLUDED |
| TEXT |
| ASSUMPTIONS |
| TEXT |
| NET ZERO CONTRIBUTIONS |
| TEXT |
Masterformat CSI
PBS MASTERFORMAT CSI
| Masterformat | |||
| CSI | System Elements (Trade Work) | Self Performed/ | |
| Subcontracted? | Amount |
| Div. 00 | Design Services - for Design Build | |
| Div. 00A | High Performing Green Buildings | |
| Div. 00B | Emerging and Sustainable Technologies | |
| Div. 01 | General Requirements (Please Include Jobsite Overhead) | |
| Div. 02 | Existing Conditions | |
| Div. 03 | Concrete | 0 |
| Div. 03A | Low Embodied Carbon Concrete | |
| Div 03.B | Non LEC Concrete | |
| Div. 04 | Masonry | |
| Div. 05 | Metals | 0 |
| Div. 05A | Low Embodied Carbon Steel | |
| Div 05.B | Non LEC Metals | |
| Div. 06 | Wood, Plastics, Composites | |
| Div. 07 | Thermal and Moisture Protection | |
| Div. 08 | Openings | 0 |
| Div. 08A | Low Embodied Carbon Glass | |
| Div 05.B | Non LEC Openings | |
| Div. 09 | Finishes | |
| Div. 10 | Specialties | |
| Div. 11 | Equipment | |
| Div. 12 | Furnishings | |
| Div. 13 | Special Construction | |
| Div. 14 | Conveying Equipment | |
| Div. 21 | Fire Suppression | |
| Div. 22 | Plumbing | |
| Div. 23 | Heating, Ventilating, and Air Conditioning (HVAC) | |
| Div. 26.1 | Electrical | |
| Div. 26.2 | Lighting | |
| Div. 27 | Communications | |
| Div. 28.1 | Electronic Safety | |
| Div. 28.2 | Electronic Security (TI - Non-BSAC) | |
| Div. 31 | Earthwork | |
| Div. 32 | Exterior Improvements | 0 |
| Div. 32.A | LEC Asphalt | |
| Div. 32.B | Rest of Exterior Improvements | |
| Div. 33 | Utilities | |
| Div. 34 | Transportation | |
| Div. 35 | Waterway and Marine Construction | |
| Div. 40 | Process Integration | |
| Div. 41 | Material Processing and Handling Equipment | |
| Div. 42 | Process Heating, Cooling and Drying Equipment | |
| Div. 43 | Process Gas and Liquid Handling, Purification and Storage Equipment | |
| Div. 44 | Pollution and Waste Control Equipment | |
| Div. 45 | Industry Specific Manufacturing Equipment | |
| Div. 46 | Water and Wastewater Equipment | |
| Div. 48 | Electrical Power Generation | |
| Subtotal | Trade Cost | $0.00 |
| General Conditions | ||
| Insurances (General Liability, Subcontractor Performance, Builders Risk Program) | ||
| Payment and Performance Bond |
| Subtotal | Estimated Cost of Work | $0.00 |
| Overhead | ||
| Profit | ||
| Design Build Bid Price | $0.00 |
Bid Tabulation
| PBS BID TABULATION FORM | |||||
| Company Name: | Project No.: | ||||
| Project Name: | |||||
| Location: | |||||
| Architect: | Independent Government Estimate (IGE) | CONTRATOR B | CONTRACTOR C | CONTRACTOR D |
| Bid Date: | |||||||||||||
| BID QUANTITIES | UNIT AMOUNT | BID | UNIT AMOUNT | BID | UNIT AMOUNT | BID | UNIT AMOUNT | BID | UNIT AMOUNT | BID | |||
| Ref # | Item Description | Qty. | UNIT | ||||||||||
| Div. 00 | Design Services - for Design Build | 500 | $500.00 | 500 | $500.00 | $ - | $ - | $ - | |||||
| Div. 01 | General Requirements (Please Include Jobsite Overhead) | 900 | $900.00 | 1000 | $1,000.00 | $ - | $ - | $ - | |||||
| Div. 02 | Existing Conditions | 600 | $600.00 | 600 | $600.00 | $ - | $ - | $ - | |||||
| Div. 03 | Concrete | 210 | $210.00 | 200 | $200.00 | $ - | $ - | $ - | |||||
| Div. 03A | Low Embodied Carbon Concrete | 200 | $200.00 | 200 | $200.00 | $ - | $ - | $ - | |||||
| Div 03.B | Non LEC Concrete | 4.5 | $45.00 | 5 | $50.00 | $ - | $ - | $ - | |||||
| Div. 04 | Masonry | 5 | $50.00 | 6 | $60.00 | $ - | $ - | $ - | |||||
| Div. 05 | Metals | 6 | $60.00 | 5 | $50.00 | $ - | $ - | $ - | |||||
| Div. 05A | Low Embodied Carbon Steel | 1.4 | $280.00 | 1.5 | $300.00 | $ - | $ - | $ - | |||||
| Div 05.B | Non LEC Metals | 500 | $500.00 | 500 | $500.00 | $ - | $ - | $ - | |||||
| Div. 06 | Wood, Plastics, Composites | 1.25 | $250.00 | 1.25 | $250.00 | $ - | $ - | $ - | |||||
| Div. 07 | Thermal and Moisture Protection | 590 | $590.00 | 600 | $600.00 | $ - | $ - | $ - | |||||
| Div. 08 | Openings | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 05A | Low Embodied Carbon Glass | $ - | $ - | $ - | $ - | $ - | |||||||
| Div 05.B | Non LEC Openings | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 09 | Finishes | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 10 | Specialties | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 11 | Equipment | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 12 | Furnishings | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 13 | Special Construction | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 14 | Conveying Equipment | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 21 | Fire Suppression | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 22 | Plumbing | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 23 | Heating, Ventilating, and Air Conditioning (HVAC) | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 26.1 | Electrical | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 26.2 | Lighting | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 27 | Communications | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 28.1 | Electronic Safety | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 28.2 | Electronic Security (TI - Non-BSAC) | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 31 | Earthwork | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 32 | Exterior Improvements | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 32.A | LEC Asphalt | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 32.B | Rest of Exterior Improvements | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 33 | Utilities | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 34 | Transportation | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 35 | Waterway and Marine Construction | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 40 | Process Integration | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 41 | Material Processing and Handling Equipment | $ - | $ - | ||||||||||
| Div. 42 | Process Heating, Cooling and Drying Equipment | $ - | $ - | $ - | $ - | $ - | |||||||
| Div. 43 | Process Gas and Liquid Handling, Purification and Storage Equipment | $ - | $ - | ||||||||||
| Div. 44 | Pollution and Waste Control Equipment | $ - | $ - | ||||||||||
| Div. 45 | Industry Specific Manufacturing Equipment | $ - | $ - | ||||||||||
| Div. 46 | Water and Wastewater Equipment | $ - | $ - | ||||||||||
| Div. 48 | Electrical Power Generation | $ - | $ - | ||||||||||
| $4,185.00 | $4,310.00 | ||||||||||||
| $426.69 | $426.69 | ||||||||||||
| $4,611.69 | $4,736.69 |