Attachment 11 - 23535 Sioux Falls Courthouse IRA Window Replacement Submittal_ Reporting Form.xlsx

XLSX spreadsheet 5 MB Posted

Attached to
Sioux Falls Courthouse Window Replacement
Solicitation number
47PJ0025R0028
Issued by

About this file

This file is an Excel spreadsheet template for tracking sustainability impacts of Inflation Reduction Act (IRA)-funded projects at GSA-owned buildings, specifically focused on low embodied carbon materials, emerging technologies, and high-performance green building work items. The template requires input of project-specific data including building IDs, work item numbers, accounting strings, material quantities, environmental product declarations (EPDs), global warming potential values, and energy/water conservation measures.

The spreadsheet contains multiple tabs for different types of data entry, with fields highlighted in gold requiring user input and blue fields auto-populating based on entered data. Key requirements include quarterly updates on project milestones through completion, input of material specifications and quantities, tracking of energy/water savings, and documentation of emerging technologies implemented. The template is designed to help GSA monitor sustainability metrics and compliance with IRA requirements, with initial submittals due by July 12, 2024 or project authorization signing, followed by quarterly updates thereafter. The file appears to be specifically associated with a Sioux Falls Courthouse window replacement project (#23535) but contains generic tracking templates applicable to various IRA-funded building projects.

View the file

Other files

File Type Posted
The Solicitation- 47PJ0025R0028 AM0004.pdf PDF
SF-30 47PJ0025R0028_AM0004.pdf PDF
SF-30 47PJ0025R0028_AM0002.pdf PDF
RFI Responses Dated 02 14 2025 (AM0002).pdf PDF
47PJ0025R0028 Solicitation (AM0002).pdf PDF
47PJ0025R0028 Solicitation AM0001.pdf PDF
SF-30 47PJ0025R0028_AM0001 2025 01 23.pdf PDF
WD 20250028 01 03 2025.pdf PDF
47PJ0025R0028 CONSTRUCTION SET DRAWINGS SD.pdf PDF
47PJ0025R0028 CONSTRUCTION SET SPECIFICATIONS SD.pdf PDF
47PJ0025R0028 CONSTRUCTION SET SPECIFICATIONS.pdf PDF
Attachment 15 - 2014 Asbestos Inspection.pdf PDF
Attachment 13 -IRA Project Submittal Form and Data Dictionary.pdf PDF
Attachment 8 - P100 2024 Final.pdf PDF
Attachment 7 - GSA Base Lead Management Requirements.pdf PDF
Attachment 2 - Vendor Manual September 2023.pdf PDF
25R0028 IRA Sustainability Factor Table.xlsx XLSX spreadsheet
Attachment 10 - Glass - GSA IRA Low Embodied Carbon Requirements.pdf PDF
Attachment 12 - Post Award Allocation Form IRA .xlsx XLSX spreadsheet
Attachment 6 - GSA SD 3rd Party Abatement Clearance Requirements.pdf PDF
Attachment 5 - GSA Rapid City USMS Asbestos Abatement Requirements.pdf PDF
Attachment 4 - GSA Lead Pre-Alteration Assessment SOW.pdf PDF
Offeror Representations and Certifications.pdf PDF
Agreement 47PJ0025R0028.pdf PDF
47PJ0025R0028 Form 1442.pdf PDF
47PJ0025R0028 CONSTRUCTION SET DRAWINGS.pdf PDF
Attachment 14 - Fire Protection MOP and Firewatch Log Example.pdf PDF
Attachment 9 - Supplemental Pricing and Invoicing Instructions IRA.pdf PDF
Attachment 3 - GSA SD Asbestos Pre-alt Inspection SOW.pdf PDF
Attachment 1 - USR_v4 - 3-1-2024 - SF Window Replacement.pdf PDF
SOW - Sioux Falls Courthouse IRA Window Replacement_15 Jan 25.pdf PDF
25R0028 Bid Sheet .xlsx XLSX spreadsheet
Solicitation 47PJ0025R0028.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

User Workflow

Click Here for User Workflow Chart https://docs.google.com/drawings/d/1oaECGj2-wo5r56G18gN6DX_vNrEJccTXl9yWmAqIlkI/edit LEC Instructions

LEC Instructions
Purpose of the Project Submittal/Reporting Form:
This workbook is used to track sustainability impacts of Inflation Reduction Act (IRA)-funded low embodied carbon (LEC) materials,
emerging and sustainable technologies (E&ST), and high performance green building (HPGB) work items in GSA-owned buildings.
All data is captured at the work-item level (as reported in IRIS), and should be identified by a Kahua project ID, building ID,
accounting string ID (ASID), and Work Item (WI) number. Data should be updated when each line-item reaches the milestone, as defined
in Kahua, that matches the submittals listed in the tables below. Milestones are specific to the project type (Energy Savings Performance
Contract (ESPC) or non-ESPC.
If your team has information to share at a Kahua milestone that does not align with the defined submittals, you may select an alternative
milestone from the dropdown list. If a work item is cancelled or deferred, please select that as a milestone.
Please inform our team if you need a specific milestone added to the dropdown options.
Frequency of Project Submittal Updates (Milestones):
Project teams should refer to the guidance in the current version of the solicitation desk guide regarding submittal frequency
*LEC Milestone Guidance is currently in development. Below is the proposed guidance.*
Proposed LEC Submittal Frequency
Submittal NumberSubmittal NameKahua Milestone NumberTimeframe
1Initial SubmittalN/ABy July 12th, 2024, or signing of project authorization
2Submittal Update #1N/A1 quarter (3 months) after Initial Submittal
3Submittal Update #2N/A1 quarter (3 months) after Submittal Update #1
4Submittal Update #3N/A1 quarter (3 months) after Submittal Update #2
5Submittal Update #4N/A1 quarter (3 months) after Submittal Update #3
6Submittal Update #5N/A1 quarter (3 months) after Submittal Update #4
7Submittal Update #6N/A1 quarter (3 months) after Submittal Update #5
............
LEC Submittals should be updated quarterly, thorugh project completion, OR when any major changes in the project (i.e procurement of LEC material) occurs
Instructions:
Each workbook is project-specific and will remain the same for the duration of the project. Please use your project specific link.
If you are unable to locate your region specific workbook please email IRASustainabilitySubmittals@gsa.gov.
Within this workbook, you will see tabs across the bottom of the screen, please navigate to and review both the Low Embodied
Carbon Materials and Emerging & Sustainable Tech and HPGB tabs.
Color Coding:
Please take note of the following cell colors throughout the form:

Cells highlighted in gold require user input. Once data is inserted, the color will transition from gold to white.

Enter Work Item Information Below:
Enter your email addressMilestone StatusBuilding Number
sample@gsa.govSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w Customer
sample@gsa.gov
The cells in blue will auto-populate based on your data. Please do not fill items in blue in yourself. For example, once you select a building ID,
the building name will populate from our backend.
Enter Work Item Information Below:
Enter your email addressMilestone StatusBuilding NumberBuilding Name
sample@gsa.govSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w CustomerCT0053ZZAA RIBICOFF FB&CTHS
sample@gsa.gov
If a project has been either canceled or deferred, the corresponding row will automatically change to a grey color, indicating no further
information is required to be filled out.
Enter Work Item Information Below:
Enter your email addressMilestone StatusBuilding NumberBuilding Name
sample@gsa.govDeferred
sample@gsa.gov
sample@gsa.govCancelled
Red fill indicates that there are duplicate work items entered. All line items must be represented by a UNIQUE IDENTIFIER
to track their progress over the lifecycle of a project. Line Item Identifiers are composed of the following columns:
Project # (Kahua), Building Number, ASID, Work Item, and LEC Identifier. If multiple line items have the same work item number,
enter a UNIQUE IDENTIFER into the LEC Identifier column to resolve the error.

Sample Duplicate Error:

Enter your email addressMilestone StatusBuilding NumberBuilding NameProject # (Kahua)Accounting String ID (ASID)Work Item (WI) #LEC Identifier
example@gsa.govSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w CustomerMI00097ZZFEDERAL BLDG & US COURTHOUSE6577J7654446065
example@gsa.govSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w CustomerMI00097ZZFEDERAL BLDG & US COURTHOUSE6577J7654446065
Resolution: Add a unique identifier (can be any format- i.e. a number, text etc.).
This allows various line items with the same work item ID to be uniquely identified and tracked over the project life cycle.
Enter your email addressMilestone StatusBuilding NumberBuilding NameProject # (Kahua)Accounting String ID (ASID)Work Item (WI) #LEC Identifier
example@gsa.govSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w CustomerMI00097ZZFEDERAL BLDG & US COURTHOUSE6577J7654446065Glass 1
example@gsa.govSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w CustomerMI00097ZZFEDERAL BLDG & US COURTHOUSE6577J7654446065Glass 2
Updating and Adding LEC Data
The following will highlight key instructions for completing the IRA LEC data. For a more comprehensive guide with detailed instructions,
please consult the IRA Input Database SOP linked with other further resources at the bottom of this instruction manual.
This will serve as a reference guide, offering detailed descriptions and definitions for the elements or attributes present in this sheet.

The categories below are the minimum data requirements for initial project submissions:

These categories allow for identifying your unique project. LEC Identifier is required only if one work item is represented on multiple rows:
Enter your email addressMilestone StatusBuilding NumberProject # (Kahua)Accounting String ID (ASID)Work Item (WI) #LEC Identifier
The categories below are needed to perform database calculations. We recognize not all projects have EPDs
available or exact quantities in early phases. Until you have an EPD please provide your best estimate for quantity and a reported threshold target.
LEC Material CategoryLEC Material SubcategoryReported Threshold TargetDescription of Material InstalledQuantity

The following should be entered as soon as project teams have the data available

Once project teams have an EPD please provide the following information
Provide link for Material EPDProduct Specific GWPProduct Category Rule (PCR)Upstream Plant's ENERGY STAR Energy Performance ScoreYear of plant's ENERGY STAR Energy Performance Score

Project teams should also ensure all other fields remain up to date as the project progresses.

1.) Start by entering data into the cells highlighted in gold. Begin with the gold boxes located at the top of the tracker as illustrated in the image below.
Click through them and input the required information.
RegionContractor NameProject Manager Name
Project Number (in Kahua)Contractor Email AddressProject Manager Email Address
Project Type (non-ESPC or ESPC?)Project Manager Approval Date
2.) Each row of data should uniquely correspond to a SINGLE work item, that is, each line has a unique LEC material and subcategory. For example,
asphalt and concrete should be represented as two separate work items; as shown below.
Budget Activity CodeLEC IdentifierLEC Material CategoryLEC Material Subcategory
PG21Concrete (and cement or CMUs)6000
PG21Concrete (and cement or CMUs)4000
Additionally, if LEC materials of the same material and subcategory have different EPDs
(and different global warming potentials (GWPs)), they must go on their own line.
3.) When you encounter the 'quantity' column, in this section you will specify how much of each material was acquired.
Quantities may change throughout your project. At that point you will be allowed to edit the live view of your form.
Note: Ensure that the declared units align with the quantity reporting units.
LEC Material CategoryLEC Material SubcategoryDeclared UnitGWP Limit Specified in the ContractQuantityQuantity Reporting Unit
Concrete (and cement or CMUs)4000metric ton284 kg CO2e/Declared UnitU.S. ton
4.) After completing the form, carefully review all your responses to ensure there are no duplicates, errors, or misreported information.
Once you have verified the accuracy of your answers, kindly proceed to close the form to ensure proper recording of your responses.
If this is your initial submittal, please email IRAsustainabilitysubmittals@gsa.gov to initiate Climate and Infrastructure Program Management Office
(CIPMO) project review.

CIPMO Reviews do NOT need to be conducted for project sheet updates, but our team will be monitoring for data quality concerns.

Further Resources
IRA Input Database SOP
IRA Project Submittal Form FAQ
IRA Project Submittal Data Dictionary

https://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/document/u/0/d/15LxjBYRIwx3KETSbu7u6tWa5RKNEi3ocKsBp7MqUzZw/edithttps://docs.google.com/document/u/0/d/1tC2sfYILb5lLwJbf80zE-MHwnbMYlMx4Sv0GWaefrQw/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edit E&ST and HPGB Instructions

E&ST and HPGB Instructions
Purpose of the Project Submittal/Reporting Form:
This workbook is used to track sustainability impacts of Inflation Reduction Act (IRA)-funded low embodied carbon (LEC) materials,
emerging and sustainable technologies (E&ST), and high performance green building (HPGB) work items in GSA-owned buildings.
All data is captured at the work-item level (as reported in IRIS), and should be identified by a Kahua project ID, building ID,
accounting string ID (ASID), and Work Item (WI) number. Data should be updated when each line-item reaches the milestone, as defined
in IRIS, that matches the submittals listed in the tables below. Milestones are specific to the project type (Energy Savings Performance
Contract (ESPC) or non-ESPC).
If your team has information to share at a Kahua milestone that does not align with the defined submittals, you may select an alternative
milestone from the dropdown list. If a work item is cancelled or deferred, please select that as a milestone.
Please inform our team if you need a specific milestone added to the dropdown options.

Frequency of Project Submittal Updates (Milestones):

*Milestone Guidance is currently in development. Any changes will be reflected in this guidance.*
Non-ESPC ProjectsESPC Projects
Submittal NumberSubmittal NameKahua Milestone NumberKahua Milestone NameSubmittal NumberSubmittal NameKahua Milestone NumberKahua Milestone Name
1Project Agreement3.091Initial Financial Agreement w Customer1Project Agreement10.071Preliminary Assessment (PA) Complete
2Commissioner’s Concept4.271Commissioner's Concept Design Approval235% DD10.091Investment Grade Audit (IGA) Start
335% DD4.251Design Start / NTP365% DD Review / 50% CD10.121Award Design & Construction
465% DD Review / 50% CD4.251Design Start / NTP490% CD10.121Award Design & Construction
590% CD4.361Design Complete5Hand-off/ Turnover10.181All ECMs 30 Day Proof of Performance Complete
6Hand-off/ Turnover4.691Substantial Completion6Final Performance Submittal10.221Performance Year 1 Commences
7Final Performance Submittal4.691Substantial Completion

Instructions:

Each workbook is project-specific and will remain the same for the duration of the project. Please use your project specific link.
If you are unable to locate your region specific workbook please email IRASustainabilitySubmittals@gsa.gov.
Within this workbook, you will see tabs across the bottom of the screen, please navigate to and review both the Low Embodied
Carbon Materials and Emerging & Sustainable Tech and HPGB tabs.
Color Coding:
Please take note of the following cell colors throughout the form:

Cells highlighted in gold require user input. Once data is inserted, the color will transition from gold to white.

Enter Work Item Information Below:
Enter your email addressMilestone StatusBuilding Number
sample@gsa.govSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w Customer
sample@gsa.gov
The cells in blue will auto-populate based on your data. Please do not fill items in blue in yourself. For example, once you select a building ID,
the building name will populate from our backend.
Enter Work Item Information Below:
Enter your email addressMilestone StatusBuilding NumberBuilding Name
sample@gsa.govSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w CustomerCT0053ZZAA RIBICOFF FB&CTHS
sample@gsa.gov
If a project has been either canceled or deferred, the corresponding row will automatically change to a grey color, indicating no further
information is required to be filled out.
Enter Work Item Information Below:
Enter your email addressMilestone StatusBuilding NumberBuilding Name
sample@gsa.govDeferred
sample@gsa.gov
sample@gsa.govCancelled
Red fill indicates that there are duplicate work items entered. All line items must be represented by a UNIQUE IDENTIFIER
to track their progress over the lifecycle of a project. Line Item Identifiers are composed of the following columns:
Project # (Kahua), Building Number, ASID, Work Item, and LEC Identifier. If multiple line items have the same work item number,
enter a UNIQUE IDENTIFER into the LEC Identifier column to resolve the error.

Sample Duplicate Error:

Enter your email addressMilestone StatusBuilding NumberBuilding NameProject # (Kahua)Accounting String ID (ASID)Work Item (WI) #Energy Conservation Measure /Water Conservation Measure (ECM/WCM) Identifier
example@gsa.govSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w CustomerMI00097ZZFEDERAL BLDG & US COURTHOUSE6577J7654446065
example@gsa.govSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w CustomerMI00097ZZFEDERAL BLDG & US COURTHOUSE6577J7654446065
Resolution: Add a unique identifier (can be any format- i.e. a number, text etc.).
This allows various line items with the same work item ID to be uniquely identified and tracked over the project life cycle.
Enter your email addressMilestone StatusBuilding NumberBuilding NameProject # (Kahua)Accounting String ID (ASID)Work Item (WI) #Energy Conservation Measure /Water Conservation Measure (ECM/WCM) Identifier
example@gsa.govSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w CustomerMI00097ZZFEDERAL BLDG & US COURTHOUSE6577J7654446065Boiler 1
example@gsa.govSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w CustomerMI00097ZZFEDERAL BLDG & US COURTHOUSE6577J7654446065Boiler 2
Updating and Adding E&ST and HPGB Data
The following will highlight key instructions for completing the IRA E&ST and HPGB data. For a more comprehensive guide with detailed instructions,
please consult the IRA Input Database SOP linked with other further resources at the bottom of this instruction manual.
This will serve as a reference guide, offering detailed descriptions and definitions for the elements or attributes present in this sheet.

The categories below are the minimum requirements for data submissions:

These categories allow for identifying your unique project. ECM/WCM Identifier is required only if one work item is represented on multiple rows:
Enter your email addressMilestone StatusBuilding NumberProject # (Kahua)Accounting String ID (ASID)Work Item (WI) #Energy Conservation Measure /Water Conservation Measure (ECM/WCM) Identifier
The categories below are needed to perform database calculations. We recognize not all projects have exact quantities in early phases.
Please provide the most accurate information available for your project, data can be updated after the initial submission to reflect new information and changes.

ECM/WCM Category ECM/WCM Technology Quantity Installed Initial ECM/WCM implementation cost ($)

For savings, fill in all fuel types relevant to your project.

Electric Savings (kWh/year) Natural Gas Savings (scf/year) Fuel Oil Savings (gal/year) Steam Savings (mmBtu/year) Chilled Water Savings (mmBtu/year) Propane Fuel Savings (mmBtu/year) Water Savings (gal/year)

The following should be entered as soon as project teams have the data available (if applicable).
Not all data elements will be applicable to all projects - i.e. not all ECMs use refrigerants, and not all ECMs will result in O&M cost changes.
Select the guiding principle for the material or technologyDeep Energy RetrofitAll Electric BuildingNet Zero EnergySustainable Building

Alternative ECM Design Life Primary Building Cooling Fuel Primary Building Heating Fuel Refrigerant Involved in ECM? Refrigerant Type Refrigerant Capacity (lbs) Estimated initial savings associated with ECM/WCM installation ($) Annual O&M Cost ($/year)

Project teams should also ensure all other fields remain up to date as the project progresses.

1.) Start by entering data into the cells highlighted in gold. Begin with the gold boxes located at the top of the tracker as illustrated in the image below.
Click through them and input the required information.
RegionContractor NameProject Manager Name
Project Number (in Kahua)Contractor Email AddressProject Manager Email Address
Project Type (non-ESPC or ESPC?)Project Manager Approval Date

2.) Each row of data should uniquely correspond to a unique energy conservation measure (ECM) or water conservation measure (WCM).

Project # (Kahua)Accounting String ID (ASID)Work Item (WI) #...Energy Conservation Measure /Water Conservation Measure (ECM/WCM) IdentifierECM/WCM CategoryECM/WCM Technology
1234123456780001...Chiller Plant ImprovementsInitial gas cooling
1234123456780002...Chiller Plant ImprovementsInstall floor insulation
Quantity should reflect the amount of each technology deployed within a building, i.e. if 300 meters are installed, enter 300.
If the project team has accurate quantity values please report them to increase the precision of IRA data. If not, enter a quantity of 1.
Please ensure that total costs, energy, and water savings are accurate and reflect that of the entire line item (i.e. totals for all 300 meters).
If multiple ECMs/WCMs are installed under one work item, please ensure that the ECM/WCM lifespans and specs are the same.
For example, if you are installing multiple boilers with different estimated lifespans, those entries would need to be split into two line items.
Energy Conservation Measure /Water Conservation Measure (ECM/WCM) IdentifierECM/WCM CategoryECM/WCM TechnologyQuantity Installed
Advanced Metering SystemsInstall advanced metering systems300
Boiler Plant ImprovementsReplace boiler3
Renewable Energy SystemsInstall photovoltaic system1
4.) After completing the form, carefully review all your responses to ensure there are no duplicates, errors, or misreported information.
Once you have verified the accuracy of your answers, kindly proceed to close the form to ensure proper recording of your responses.
If this is your initial submittal, please email IRAsustainabilitysubmittals@gsa.gov to initiate CIPMO project review.

CIPMO Reviews do NOT need to be conducted for project sheet updates, but our team will be monitoring for data quality concerns.

Further Resources
IRA Input Database SOP
IRA Project Submittal Form FAQ
IRA Project Data Submittal Dictionary

https://docs.google.com/document/u/0/d/15LxjBYRIwx3KETSbu7u6tWa5RKNEi3ocKsBp7MqUzZw/edithttps://docs.google.com/document/u/0/d/1tC2sfYILb5lLwJbf80zE-MHwnbMYlMx4Sv0GWaefrQw/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edit Low Embodied Carbon Materials

Region8Contractor NameTBDProject Manager NameJohn Riker
Project Number (in Kahua)23535Contractor Email AddressProject Manager Email Addressjohn.riker@gsa.gov
Project Type (non-ESPC or ESPC?)non-ESPCProject Manager Approval Date
Enter Work Item Information Below:Design-Build or Construction Team: Enter LEC Installation Information & OutcomesConstruction Manager as Advisor (CMa) or Commissioning Provider (CxP)

Certify information below:

Combined WI IDRow Has Any ValueMin Requirements MetRow NumberRegionFirst Column AddressDuplicate CheckContractor NameContractor Email AddressProject Manager NameProject Manager Email AddressEnter your email addressMilestone StatusBuilding Number
: Location Code (from REXUS)Building NameProject # (Kahua)Accounting String ID (ASID)
: (8-digit alphanumeric string)Work Item (WI) #
: 4 digit numeric stringBudget Activity Code
: PG Code for LEC projects: PG24LEC Identifier
: Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO ScheduleLEC Material CategoryLEC Material SubcategoryDeclared UnitGWP Limit Specified in the Contract
: Top 20% of Contract Limits by Material SubcategoryNew GWP Limit Specified in the Contract (if Different than Previous Column)Reported Threshold TargetCalculated Threshold AchievedProvide link for Material EPDDescription of Material Installed

: Brief description of what material was used for on the project, supplier, mix type etc.

: Location Code (from REXUS) : (8-digit alphanumeric string) : 4 digit numeric string : PG Code for LEC projects: PG24

: Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO ScheduleQuantityQuantity Reporting UnitProduct Category Rule (PCR)Product Specific GWPConversion Factor AConversion Factor A UnitsConversion Factor BEmbodied Carbon Reduction (Calculated)
Upstream Scope 3Upstream Plant's ENERGY STAR Energy Performance Score

: For glass, upstream cement plant, and steel from integrated mills, ask manufacturer to generate and report their ENERGY STAR Energy Performance Score per: http://www.energystar.gov/epis

Any cement, glass, or integrated steel plant based in the U.S. can use the free ENERGY STAR Energy Performance Indicator tool to generate a score, even if the plant is not ENERGY STAR certified.

: Top 20% of Contract Limits by Material SubcategoryYear of plant's ENERGY STAR Energy Performance ScoreCertify information for this row is accurateCertify the embodied carbon calculations
: Certify that the quantity is accurate, and reported product-specific GWP matches the identified EPDEmail of Certifier
||||FALSEFALSE68L6FALSEFALSEFALSE
23535|SD0021ZZ|RSD03146|1112|LEC 1TRUETRUE78L7FALSETBDJohn Rikerjohn.riker@gsa.govjohn.riker@gsa.gov4.421 - Construction or Design/Build or CMC RFP IssuedSD0021ZZU.S. COURTHOUSE - SIOUX FALLS23535RSD031461112PG24LEC 1GlassFlat Glassmetric ton1331.0 kg CO2e/Declared UnitTop 40%https://www.cardinalcorp.com/wp-content/uploads/2023/01/535.EPD_for_Cardinal_Glass_Industries_Flat_Glass.pdfLEC Flat Glass (link to the left is a placeholder until submittals are received)11.2metric tonGlass - NSF International / National Glass Association Flat Glass PCR (version 1.0 or later)1370.0 kg CO2e/Declared Unit1.000000000metric ton/metric ton0.0010 metric ton/kg0.3460 MTCO2eFALSEFALSE
||||FALSEFALSE88L8FALSEFALSEFALSE
||||FALSEFALSE98L9FALSEFALSEFALSE
||||FALSEFALSE108L10FALSEFALSEFALSE
||||FALSEFALSE118L11FALSEFALSEFALSE
||||FALSEFALSE128L12FALSEFALSEFALSE
||||FALSEFALSE138L13FALSEFALSEFALSE
||||FALSEFALSE148L14FALSEFALSEFALSE
||||FALSEFALSE158L15FALSEFALSEFALSE
||||FALSEFALSE168L16FALSEFALSEFALSE
||||FALSEFALSE178L17FALSEFALSEFALSE
||||FALSEFALSE188L18FALSEFALSEFALSE
||||FALSEFALSE198L19FALSEFALSEFALSE
||||FALSEFALSE208L20FALSEFALSEFALSE
||||FALSEFALSE218L21FALSEFALSEFALSE

https://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://www.cardinalcorp.com/wp-content/uploads/2023/01/535.EPD_for_Cardinal_Glass_Industries_Flat_Glass.pdfhttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edit EPD Compliance

Source:How to assess EPD compliance
**LEC Material Category**LEC Example **Select LEC Material Subcategory**Helper ColumnDeclared UnitQuantity Reporting UnitBetter Than Average Limit (kgCO2e/Declared Unit)Top 40% Limit (kgCO2e/Declared Unit)Top 20% Limit (kgCO2e/Declared Unit)Conversion Factors (To Metric)
Concrete (and cement or CMUs)**Select LEC Material Subcategory below**Concrete (and cement or CMUs)-**Select LEC Material Subcategory below**metric ton1
Concrete (and cement or CMUs)≤2499 PSIConcrete (and cement or CMUs)-≤2499 PSIcubic metercubic yard277261228cubic meter1
Concrete (and cement or CMUs)3000 PSIConcrete (and cement or CMUs)-3000 PSIcubic metercubic yard318291257U.S. ton0.907185
Concrete (and cement or CMUs)4000 PSIConcrete (and cement or CMUs)-4000 PSIcubic metercubic yard352326284cubic yard0.764555
Concrete (and cement or CMUs)5000 PSIConcrete (and cement or CMUs)-5000 PSIcubic metercubic yard382357305
Concrete (and cement or CMUs)6000 PSIConcrete (and cement or CMUs)-6000 PSIcubic metercubic yard407374319
Concrete (and cement or CMUs)≥7200 PSIConcrete (and cement or CMUs)-≥7200 PSIcubic metercubic yard402362321
Concrete (and cement or CMUs)HESC≤2499 PSI
: High early strength concrete should be avoided where possible. Is there a need for it in this project?Concrete (and cement or CMUs)-HESC≤2499 PSIcubic metercubic yard360.1339.3296.4
Concrete (and cement or CMUs)HESC3000 PSI
: HESC4000Concrete (and cement or CMUs)-HESC3000 PSIcubic metercubic yard413.4378.3334.1
Concrete (and cement or CMUs)HESC4000 PSI
: HESC4000Concrete (and cement or CMUs)-HESC4000 PSIcubic metercubic yard457.6423.8369.2
Concrete (and cement or CMUs)HESC5000 PSI
: HESC4000Concrete (and cement or CMUs)-HESC5000 PSIcubic metercubic yard496.6464.1396.5
Concrete (and cement or CMUs)HESC6000 PSI
: HESC4000Concrete (and cement or CMUs)-HESC6000 PSIcubic metercubic yard529.1486.2414.7
Concrete (and cement or CMUs)HESC≥7200 PSI
: HESC4000Concrete (and cement or CMUs)-HESC≥7200 PSIcubic metercubic yard522.6470.6417.3
Concrete (and cement or CMUs)Cement

: Cement may only be used where provision of qualifying concrete is impractical.

: High early strength concrete should be avoided where possible. Is there a need for it in this project?

: HESC4000

: HESC4000

: HESC4000

: HESC4000

: HESC4000Concrete (and cement or CMUs)-Cementmetric tonmetric ton858819751
Concrete (and cement or CMUs)Concrete Masonry UnitsConcrete (and cement or CMUs)-Concrete Masonry Unitscubic metercubic meter290256217
Asphalt**Select LEC Material Subcategory below**Asphalt-**Select LEC Material Subcategory below**
AsphaltAsphaltAsphalt-Asphaltmetric tonU.S. ton72.664.855.4
Steel**Select LEC Material Subcategory below**Steel-**Select LEC Material Subcategory below**
SteelRebar (fabricated)Steel-Rebar (fabricated)metric tonmetric ton850794728
SteelRebar (unfabricated)Steel-Rebar (unfabricated)metric tonmetric ton760716611
SteelHollow Structural Sections (fabricated)Steel-Hollow Structural Sections (fabricated)metric tonmetric ton1,89818541778
SteelHollow Structural Sections from Electric Arc Furnaces (unfabricated)Steel-Hollow Structural Sections from Electric Arc Furnaces (unfabricated)metric tonmetric ton1,65216201580
SteelHot-Rolled Sections (fabricated)Steel-Hot-Rolled Sections (fabricated)metric tonmetric ton1,16311281022
SteelHot-Rolled Sections (unfabricated)Steel-Hot-Rolled Sections (unfabricated)metric tonmetric ton869713686
SteelCold-Formed and Galvanized (stud, track, framing, etc.)Steel-Cold-Formed and Galvanized (stud, track, framing, etc.)metric tonmetric ton2,40823242228
SteelStructural Steel Plate from Electric Arc Furnaces (unfabricated)Steel-Structural Steel Plate from Electric Arc Furnaces (unfabricated)metric tonmetric ton1,1901152987
Glass**Select LEC Material Subcategory below**Glass-**Select LEC Material Subcategory below**
GlassFlat GlassGlass-Flat Glassmetric tonmetric ton1,40113701331

https://docs.google.com/presentation/d/10JM8-LF0kUJwtvaxAisV-IeyoZzLveKlUtMwCflCRQM/edit Emerging & Sustainable Tech and

Region8Contractor NameProject Manager Name
Project Number (in Kahua)23535Contractor Email AddressProject Manager Email Address
Project Type (non-ESPC or ESPC?)Project Manager Approval Date
Enter Work Item Information Below:Design-Build or Construction Team: Enter E&ST / HPGB Installation Information and OutcomesConstruction Manager as Advisor (CMa) or Commissioning Provider (CxP): Validate technology Installation
Combined WI IDRow Has Any ValueMin Requirements MetRow NumberRegionFirst Column AddressDuplicate CheckContractor NameContractor Email AddressProject Manager NameProject Manager Email AddressEnter your email addressMilestone StatusBuilding Number
: Location Code (from REXUS)Building NameProject # (Kahua)Accounting String ID (ASID)
: 8-digit alphanumeric stringWork Item (WI) #
: 4 digit numeric string as reported in IRISBudget Activity Code

: PG Code for HPGB Projects: PG21

PG Code for E&ST Projects: PG27IRA Program (E&ST, HPGB)Select the guiding principle for the material or technologyDeep Energy RetrofitAll Electric BuildingNet Zero EnergySustainable BuildingEnergy Conservation Measure /Water Conservation Measure (ECM/WCM) Identifier
: Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO ScheduleECM/WCM Category
: AoA DropdownECM/WCM Technology
: AoA DropdownQuantity InstalledTO Schedule Technology
: Auto populates based on ECM Category and Technology SelectedEmerging & Sustainable Technology
: Auto populates based on ECM Category and Technology SelectedECM/WCM Default Design Life
: In yearsAlternative ECM Design Life
: In years. If different than default. Max of 30 year design lifePrimary Building Cooling FuelPrimary Building Heating FuelRefrigerant Involved in ECM?Refrigerant TypeRefrigerant Capacity (lbs)Initial ECM/WCM implementation cost ($)Estimated initial savings associated with ECM/WCM installation ($)

: ESPC estimated year one savings e.g. If you install a new high efficiency chiller instead of spending $10,000 to repair the old one, enter $10,000 here. Annual O&M Cost ($/year) : (Enter cost if O&M contracts will change due to ECM Implementation)

Enter negative value if there will be confirmed O&M savingsElectric Savings (kWh/year)
: Enter negative value if there will be an increase in energy useNatural Gas Savings (scf/year)

: Enter negative value if there will be an increase in energy use

1 mmBtu = 974.66 scf Fuel Oil Savings (gal/year) : Enter negative value if there will be an increase in energy use

1 mmBtu = 7.246376812 gal Steam Savings (mmBtu/year) : Enter negative value if there will be an increase in energy use

: Location Code (from REXUS)Chilled Water Savings (mmBtu/year)
: Enter negative value if there will be an increase in energy usePropane Fuel Savings (mmBtu/year)
: Enter negative value if there will be an increase in energy useWater Savings (gal/year)

: Enter negative value if there will be an increase in energy use : 8-digit alphanumeric string : 4 digit numeric string as reported in IRIS : PG Code for HPGB Projects: PG21 PG Code for E&ST Projects: PG27 : Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO Schedule : AoA Dropdown

: AoA DropdownAdditional notes about ECM/WCMCertify technology is installed and working properlyEmail of Certifier
||||FALSEFALSE68L6FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE78L7FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE88L8FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE98L9FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE108L10FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE118L11FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE128L12FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE138L13FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE148L14FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE158L15FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE168L16FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE178L17FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE188L18FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE198L19FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE208L20FALSEFALSEFALSEFALSEFALSE
||||FALSEFALSE218L21FALSEFALSEFALSEFALSEFALSE

https://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edit E&ST_HPGB Dropdowns Region Picklist IRA Milestones non-ESPC Region Location Code Building Name Filtered Region Filtered Location Code Filtered Building Name Funding Stream ECM List : Import range from ECM Design life tab. Any updates to E&S / TO alignment can be made in that sheet (https://docs.google.com/spreadsheets/d/1a_41ZddtVfM_VrZU2vYW7gQQUAp5gPwEolsrFzwPUTQ/edit#gid=339106882)

ECM type/category list aligns with CTSECM TechnologyFiltered IRA Milestones
1Submittal 1 - Project AgreementPlanningPlanningPhase Start3.091Initial Financial Agreement w CustomerSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w Customernon-ESPC1CT0013ZZWILLIAM R. COTTER FB8CO0006ZZFB-CUPG21**ECM Type Category**ECM Example **Select ECM Type Category**Helper ColumnDesign LifeEmerging & Sustainable Technology AlignmentTO AlignmentSubmittal 7 - Final Performance Submittal - Milestone 4.691 - Substantial Completion
2Submittal 2 - Commissioner's Concept Design ApprovalPlanningPhase End4.271Commissioner's Concept Design ApprovalSubmittal 2 - Commissioner's Concept Design Approval - Milestone 4.271 - Commissioner's Concept Design Approvalnon-ESPC1CT0024ZZRichard C. Lee U S Courthouse8CO0009ZZBYRON WHITE US CRTHSPG27Boiler Plant Improvements**Select ECM Technology below**Boiler Plant Improvements-**Select ECM Technology below**Select ECM Category/TechnologySelect ECM Category/TechnologySubmittal 6 - Hand-off/Turnover - Milestone 4.691 - Substantial Completion
3PlanningPhase End4.101Design or Bridging RFP Issued4.101 - Design or Bridging RFP Issuednon-ESPC1CT0047ZZWATERBURY MAIN POST OFFICE8CO0018ZZWAYNE ASPINALL COURTHOUSEBoiler Plant ImprovementsAdd energy recoveryBoiler Plant Improvements-Add energy recovery25HVAC - Electric BoilersTC.1 - Boiler Plant ImprovementsSubmittal 5 - 90% CD - Milestone 4.361 - Design Complete
4PlanningPhase End4.421Construction or Design/Build or CMC RFP Issued4.421 - Construction or Design/Build or CMC RFP Issuednon-ESPC1CT0053ZZAA RIBICOFF FB&CTHS8CO0039ZZBYRON G.ROGERS FB-CTBoiler Plant ImprovementsDecentralize boilerBoiler Plant Improvements-Decentralize boiler25HVAC - Electric BoilersTC.1 - Boiler Plant ImprovementsSubmittal 4 - 65% DD Review/ 50% CD - Milestone 4.251 - Design Start / NTP
5Design ProcurementDesign ProcurementPhase Start4.101Design or Bridging RFP Issued4.101 - Design or Bridging RFP Issuednon-ESPC1CT0055ZZNew US Courthouse - Hartford8CO0046ZZFORT COLLINS FB POBoiler Plant ImprovementsInsulate boiler roomBoiler Plant Improvements-Insulate boiler room24HVAC - Electric BoilersTC.1 - Boiler Plant ImprovementsSubmittal 3 - 35% DD - Milestone 4.251 - Design Start / NTP
6Design ProcurementPhase End4.221Design or Bridging Award4.221 - Design or Bridging Awardnon-ESPC1CT0059ZZBRIEN MCMAHON USCH&FB8CO0050ZZCALIFORNIA ST FEDERAL GARAGEBoiler Plant ImprovementsConvert gas-fired unit to boiler loopBoiler Plant Improvements-Convert gas-fired unit to boiler loop25HVAC - Electric BoilersTC.1 - Boiler Plant ImprovementsSubmittal 2 - Commissioner's Concept Design Approval - Milestone 4.271 - Commissioner's Concept Design Approval
7Submittal 3 - 35% DDDesignDesignPhase Start4.251Design Start / NTPSubmittal 3 - 35% DD - Milestone 4.251 - Design Start / NTPnon-ESPC1CT0060ZZSSA - TORRINGTON8CO0051ZZWELTON ST FEDERAL GARAGEBoiler Plant ImprovementsClean and/or repairBoiler Plant Improvements-Clean and/or repair1HVAC - Electric BoilersTC.1 - Boiler Plant ImprovementsSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w Customer
8Submittal 5 - 90% CDDesignPhase End4.361Design CompleteSubmittal 5 - 90% CD - Milestone 4.361 - Design Completenon-ESPC1CT0061ZZROBERT N GIAIMO FB8CO0053ZZ22ND & STOUT ST SURFACE PARKING LOTBoiler Plant ImprovementsUpgrade operating protocols, calibration, and/or sequencingBoiler Plant Improvements-Upgrade operating protocols, calibration, and/or sequencing25HVAC - Sequence of OperationsTC.1 - Boiler Plant ImprovementsDeferred
9Construction ProcurementConstruction ProcurementPhase Start4.421Construction or Design/Build or CMC RFP Issued4.421 - Construction or Design/Build or CMC RFP Issuednon-ESPC1CT3316ZZ130 DARLIN STREET8CO0054ZZCESAR E. CHAVEZ MEMORIAL BUILDINGBoiler Plant ImprovementsReplace boilerBoiler Plant Improvements-Replace boiler25HVAC - Electric BoilersTC.1 - Boiler Plant ImprovementsCancelled
10Construction ProcurementPhase End4.491Construction or Design/Build Contract Award or CMc Award4.491 - Construction or Design/Build Contract Award or CMc Awardnon-ESPC1CT3319ZZTWO LANDMARK SQUARE8CO0055ZZDAVID SKAGGS RESEARCH CENTER (NOAA)Boiler Plant ImprovementsReplace burnerBoiler Plant Improvements-Replace burner18HVAC - Electric BoilersTC.1 - Boiler Plant ImprovementsAoA Submittal
11ConstructionConstructionPhase Start4.581Construction Start/NTP4.581 - Construction Start/NTPnon-ESPC1CT3322ZZ425 MAIN STREET8CO0061ZZALFRED A. ARRAJ COURTHOUSEBoiler Plant ImprovementsConvert system from steam to hot waterBoiler Plant Improvements-Convert system from steam to hot water22HVAC - Electric BoilersTC.1 - Boiler Plant Improvements6.011 - Project Closeout
Submittal 6 - Hand-off/TurnoverConstructionPhase End4.691Substantial CompletionSubmittal 6 - Hand-off/Turnover - Milestone 4.691 - Substantial Completionnon-ESPC1CT3323ZZCOMMERCE CENTER - EAST HARTFORD8CO0100AALAND AREA 1Boiler Plant ImprovementsImplement training and/or documentationBoiler Plant Improvements-Implement training and/or documentation5HVAC - Electric BoilersTC.1 - Boiler Plant Improvements4.581 - Construction Start/NTP
Submittal 7 - Final Performance SubmittalClose OutClose OutPhase Start4.691Substantial CompletionSubmittal 7 - Final Performance Submittal - Milestone 4.691 - Substantial Completionnon-ESPC1CT3331ZZCT FINANCIAL CENTER8CO0200AALAND AREA 2Boiler Plant ImprovementsConvert to cleaner fuelsBoiler Plant Improvements-Convert to cleaner fuels25HVAC - Electric BoilersTC.1 - Boiler Plant Improvements4.575 - CMc GMP Option Excercised
Close OutPhase End6.011Project Closeout6.011 - Project Closeoutnon-ESPC1CT3341ZZ265 CHURCH STREET8CO0300AALAND AREA 3Chiller Plant Improvements**Select ECM Technology below**Chiller Plant Improvements-**Select ECM Technology below**Select ECM Category/TechnologySelect ECM Category/Technology4.511 - CXa Award
OtherConstruction ProcurementAward4.511CXa Award4.511 - CXa Awardnon-ESPC1CT3354ZZMERIDEN EXECUTIVE PARK, BLDG 18CO0350AALAND AREA 5Chiller Plant ImprovementsAdd energy recoveryChiller Plant Improvements-Add energy recovery23HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements4.491 - Construction or Design/Build Contract Award or CMc Award
Construction ProcurementAward4.245CMa Award4.245 - CMa Awardnon-ESPC1CT3358ZZNO. 2 SHAW'S COVE8CO0400AALAND AREA 4Chiller Plant ImprovementsInstall VSD on electric centrifugal chillersChiller Plant Improvements-Install VSD on electric centrifugal chillers25HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements4.421 - Construction or Design/Build or CMC RFP Issued
Close OutAward4.575CMc GMP Option Excercised4.575 - CMc GMP Option Excercisednon-ESPC1CT3360ZZLAFAYETTE BLVD.8CO0450AALAND AREA 6Chiller Plant ImprovementsReplace chillerChiller Plant Improvements-Replace chiller23HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements4.421 - Construction or Design/Build or CMC RFP Issued
Submittal 4 - 65% DD Review/ 50% CDDesignSubmittal 4 - 65% DD Review/ 50% CD - Milestone 4.251 - Design Start / NTPnon-ESPC1CT3362ZZMIIDLESEX CORP. CTR.8CO0500AADFC ALL PARCELS - NO LANDChiller Plant ImprovementsInstall gas coolingChiller Plant Improvements-Install gas cooling23HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements4.245 - CMa Award
Cancellednon-ESPC1CT3369ZZCORPORATE CENTER - HARTFORD8CO0501AADFC BLDG 1Chiller Plant ImprovementsAdd or repair economizer cycleChiller Plant Improvements-Add or repair economizer cycle15HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements4.221 - Design or Bridging Award
AoA Submittalnon-ESPC1CT3373ZZ101 PITKIN STREET8CO0508AADFC BLDG 8Chiller Plant ImprovementsAdd or replace cooling towerChiller Plant Improvements-Add or replace cooling tower25HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements4.101 - Design or Bridging RFP Issued
Deferrednon-ESPC1CT3375ZZ600 STATE STREET8CO0511AADFC BLDG 20Chiller Plant ImprovementsClean and/or repairChiller Plant Improvements-Clean and/or repair1HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements4.101 - Design or Bridging RFP Issued
IRA MilestonesESPC1CT3376ZZ131 WEST STREET8CO0513AABldg 22Chiller Plant ImprovementsImplement training and/or documentationChiller Plant Improvements-Implement training and/or documentation5HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements