Attachment 6-648-20-116 Drawings 98-133.pdf
PDF 6 MB Posted
- Solicitation number
- 36C26026R0040
About this file
These documents are electrical engineering design drawings for a VA (Veterans Affairs) facility renovation project in Vancouver, Washington, focusing on electrical system upgrades across multiple buildings. The comprehensive set of drawings includes detailed one-line electrical diagrams, demolition plans, and electrical distribution system layouts for Buildings 01, 02, 03, 04, 05, 06, and 11. The project involves replacing existing transformers, switchboards, panel boards, and electrical infrastructure, with specific objectives to upgrade medium voltage systems, replace MV equipment, and modify electrical distribution networks while minimizing operational disruptions.
Key technical details include phased replacement of pad-mounted transformers (PMT), switchboards (MSB), and electrical panels across various buildings, with work to be performed primarily on weekends to reduce facility downtime. The drawings specify the installation of new electrical equipment like active harmonic filters, generators, and electrical distribution components, along with detailed grounding and lightning protection systems. The project involves careful coordination of power transfers, temporary generator setups, and maintaining emergency power continuity during the renovation process.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING METER ENCLOSURE SHALL BE REMOVED AND
REINSTALLED TO REPLACEMENT PANELBOARD "DP9A/1".
REFERENCE DETAIL 2 ON THIS SHEET FOR ADDITIONAL
INFORMATION.
PROVIDE ACTIVE HARMONIC FILTER AS INDICATED.
REFERENCE ONE-LINE DIAGRAM ON SHEET EP602 FOR
ADDITIONAL INFORMATION.
. WORK SHALL BE PERFORMED ONLY ON WEEKENDS; COORDINATE WITH VA FOR EXACT OUTAGE AND WORK PLANS. THE FOLLOWING PHASING STEPS MAY BE USED TO PERFORM THE WORK AS FOLLOWS:
J
PROVIDE (1) 2" RACEWAY AND (1) 24"Wx24"Hx10D JUNCTION
BOX FOR FUTURE POWER MONITORING DATA CABLING
FROM "09-AHF-9" AND NEARBY POWER METERS TO
BUILDING 3, CONTROL ROOM 102. RACEWAY SHALL BE
PROVIDED WITH 200-LBS PULL STRING. PROVIDE ALL
MOUNTING HARDWARE AND STAINLESS STEEL FASTENERS
AS REQUIRED. COORDINATE WITH EXISTING CONDITIONS
AND VA FOR EXACT INSTALLATION LOCATION.
PROVIDE (1) 1" CONDUIT WITH 200-LBS PULL STRING.
. WORK SHALL BE PERFORMED ONLY ON WEEKENDS; COORDINATE WITH VA FOR EXACT OUTAGE AND WORK PLANS. THE FOLLOWING PHASING STEPS MAY BE USED TO PERFORM THE WORK AS FOLLOWS:
PFCC PFCC-PMP02
012-P-01
012-P-02
PROVIDE REPLACEMENT CAPACITOR WITH ALL REQUIRED
MOUNTING HARDWARE AND SUPPORTS.
CONTRACTOR SHALL FIELD VERIFY PRIOR TO SUBMITTAL THAT
THEIR PROPOSED EQUIPMENT SELECTION (I.E. PANELBOARD,
GENERATOR, ETC.) WILL FIT WITH ALL REQUIRED ELECTRICAL
CLEARANCES. CONTRACTOR SHALL PROVIDE STATEMENT
CONFIRMING THAT EQUIPMENT WILL FIT IN ALLOCATED SPACE ON
SUBMITTAL.
2.
EXISTING METERING ENCLOSURE MOUNTED TO SIDE OF
SWITCHBOARD ENCLOSURE. PROVIDE STAINLESS STEEL
MOUNTING HARDWARE AND SEALANT AS REQUIRED.
CONTRACTOR SHALL FIELD VERIFY PRIOR TO SUBMITTAL
THAT THEIR PROPOSED EQUIPMENT SELECTION (I.E.
PANELBOARD, GENERATOR, ETC.) WILL FIT WITH ALL
REQUIRED ELECTRICAL CLEARANCES. CONTRACTOR SHALL
PROVIDE STATEMENT CONFIRMING THAT EQUIPMENT WILL FIT
IN ALLOCATED SPACE ON SUBMITTAL.
2.
SPDSSPD
CONTRACTOR SHALL FIELD VERIFY PRIOR TO SUBMITTAL
THAT THEIR PROPOSED EQUIPMENT SELECTION (I.E.
PANELBOARD, GENERATOR, ETC.) WILL FIT WITH ALL
REQUIRED ELECTRICAL CLEARANCES. CONTRACTOR SHALL
PROVIDE STATEMENT CONFIRMING THAT EQUIPMENT WILL FIT
IN ALLOCATED SPACE ON SUBMITTAL.
2.
SPDSPD
PROVIDE ALL MOUNTING AND FASTENING HARWARE
REQUIRED. HARDWARE SHALL BE STAINLESS STEEL.
6 6 6
02-
SHEET 024ED601
File details come from the government source that posted it. Updated .