These documents are electrical engineering design drawings for a VA (Veterans Affairs) facility renovation project in Vancouver, Washington, focusing on electrical system upgrades across multiple buildings. The comprehensive set of drawings includes detailed one-line electrical diagrams, demolition plans, and electrical distribution system layouts for Buildings 01, 02, 03, 04, 05, 06, and 11. The project involves replacing existing transformers, switchboards, panel boards, and electrical infrastructure, with specific objectives to upgrade medium voltage systems, replace MV equipment, and modify electrical distribution networks while minimizing operational disruptions.

Key technical details include phased replacement of pad-mounted transformers (PMT), switchboards (MSB), and electrical panels across various buildings, with work to be performed primarily on weekends to reduce facility downtime. The drawings specify the installation of new electrical equipment like active harmonic filters, generators, and electrical distribution components, along with detailed grounding and lightning protection systems. The project involves careful coordination of power transfers, temporary generator setups, and maintaining emergency power continuity during the renovation process.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING METER ENCLOSURE SHALL BE REMOVED AND

REINSTALLED TO REPLACEMENT PANELBOARD "DP9A/1".

REFERENCE DETAIL 2 ON THIS SHEET FOR ADDITIONAL

INFORMATION.

PROVIDE ACTIVE HARMONIC FILTER AS INDICATED.

REFERENCE ONE-LINE DIAGRAM ON SHEET EP602 FOR

ADDITIONAL INFORMATION.

. WORK SHALL BE PERFORMED ONLY ON WEEKENDS; COORDINATE WITH VA FOR EXACT OUTAGE AND WORK PLANS. THE FOLLOWING PHASING STEPS MAY BE USED TO PERFORM THE WORK AS FOLLOWS:

J

PROVIDE (1) 2" RACEWAY AND (1) 24"Wx24"Hx10D JUNCTION

BOX FOR FUTURE POWER MONITORING DATA CABLING

FROM "09-AHF-9" AND NEARBY POWER METERS TO

BUILDING 3, CONTROL ROOM 102. RACEWAY SHALL BE

PROVIDED WITH 200-LBS PULL STRING. PROVIDE ALL

MOUNTING HARDWARE AND STAINLESS STEEL FASTENERS

AS REQUIRED. COORDINATE WITH EXISTING CONDITIONS

AND VA FOR EXACT INSTALLATION LOCATION.

PROVIDE (1) 1" CONDUIT WITH 200-LBS PULL STRING.

. WORK SHALL BE PERFORMED ONLY ON WEEKENDS; COORDINATE WITH VA FOR EXACT OUTAGE AND WORK PLANS. THE FOLLOWING PHASING STEPS MAY BE USED TO PERFORM THE WORK AS FOLLOWS:

PFCC PFCC-PMP02

012-P-01

012-P-02

PROVIDE REPLACEMENT CAPACITOR WITH ALL REQUIRED

MOUNTING HARDWARE AND SUPPORTS.

CONTRACTOR SHALL FIELD VERIFY PRIOR TO SUBMITTAL THAT

THEIR PROPOSED EQUIPMENT SELECTION (I.E. PANELBOARD,

GENERATOR, ETC.) WILL FIT WITH ALL REQUIRED ELECTRICAL

CLEARANCES. CONTRACTOR SHALL PROVIDE STATEMENT

CONFIRMING THAT EQUIPMENT WILL FIT IN ALLOCATED SPACE ON

SUBMITTAL.

2.

EXISTING METERING ENCLOSURE MOUNTED TO SIDE OF

SWITCHBOARD ENCLOSURE. PROVIDE STAINLESS STEEL

MOUNTING HARDWARE AND SEALANT AS REQUIRED.

CONTRACTOR SHALL FIELD VERIFY PRIOR TO SUBMITTAL

THAT THEIR PROPOSED EQUIPMENT SELECTION (I.E.

PANELBOARD, GENERATOR, ETC.) WILL FIT WITH ALL

REQUIRED ELECTRICAL CLEARANCES. CONTRACTOR SHALL

PROVIDE STATEMENT CONFIRMING THAT EQUIPMENT WILL FIT

IN ALLOCATED SPACE ON SUBMITTAL.

2.

SPDSSPD

CONTRACTOR SHALL FIELD VERIFY PRIOR TO SUBMITTAL

THAT THEIR PROPOSED EQUIPMENT SELECTION (I.E.

PANELBOARD, GENERATOR, ETC.) WILL FIT WITH ALL

REQUIRED ELECTRICAL CLEARANCES. CONTRACTOR SHALL

PROVIDE STATEMENT CONFIRMING THAT EQUIPMENT WILL FIT

IN ALLOCATED SPACE ON SUBMITTAL.

2.

SPDSPD

PROVIDE ALL MOUNTING AND FASTENING HARWARE

REQUIRED. HARDWARE SHALL BE STAINLESS STEEL.

6 6 6

02-

SHEET 024ED601