Attachment 10-648-20-116 Drawings 200-211.pdf
PDF 14 MB Posted
- Solicitation number
- 36C26026R0040
About this file
This document is a set of electrical schedule drawings for the U.S. Department of Veterans Affairs (VA) Office of Construction and Facilities Management, specifically detailing electrical panel and switchboard configurations for Buildings 5 and 11. The drawings provide comprehensive technical specifications for multiple electrical panels, including location details, voltage ratings, bus ratings, circuit breaker configurations, and load calculations. Key locations include Room 107 in Building 5 and Rooms D155, D320, and E143 in Building 11, with voltage specifications ranging from 208/120V to 480/277V, and bus ratings from 50A to 2000A. The documents appear to be part of a renovation or replacement project for existing electrical infrastructure, with detailed notes indicating replacement of existing panelboards and switchboards with updated equipment.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Location: BLDG 5, RM 107 Volts: 208/120 Wye A.I.C Rating: 22k Supply From: "04-B17A" Phases: 3 Bus Rating: 225 A
Mounting: Surface Wires 4 Main Circuit Breaker: 225 A Enclosure: Type 1
CKT Trip Poles Poles Trip 1 20 A 1 0 0 1 20 A 2 3 20 A 1 0 0 1 20 A 4 5 20 A 1 0 0 1 20 A 6 7 20 A 1 0 0 1 20 A 8 9 20 A 1 0 0 3 100 A 10 11 30 A 2 0 0 " " 12 13 " " 0 0 " " 14 15 20 A 2 0 0 2 20 A 16 17 " " 0 0 " " 18 19 20 A 1 0 0 3 70 A 20 21 - - 0 0 " " 22 23 20 A 1 0 0 " " 24 25 20 A 2 0 0 2 30 A 26 27 " " 0 0 " " 28 29 20 A 1 0 0 1 20 A 30 31 20 A 3 0 0 1 20 A 32 33 " " 0 0 1 20 A 34 35 " " 0 0 1 20 A 36 37 30 A 3 0 0 3 30 A 38 39 " " 0 0 " " 40 41 " " 0 0 " 42 43 - - 0 0 1 20 A 44 45 - - 0 0 1 20 A 46 47 - - 0 0 1 20 A 48 49 - - 0 100 3 30 A 50 51 - - 0 100 " " 52 53 - - 0 100 " " 54
PANELBOARD: 05-C18A (REPLACEMENT)
VA PER PHASE
CIRCUIT DESCRIPTION A B C
LIGHTING - STORAGE + EF-1 RM 103 FRIDGE RECEP
LIGHTING - STORAGE + EF-2 SUB-PANEL "05-C18A/1"
UH-1 (CHIM STOR) "
CIRCUIT DESCRIPTION
LIGHTING OFFICE RM 103 & BATH FANS / LIGHTS RECEPTACLES - MAINT
LIGHTING - MAINT SHOP RECEPTACLES - MAINT
LIGHTING - STORAGE RECEPTACLES - MAINT
RM 103 SOUTH/SW WALL RECEPTACLES UH-3
SPACE "
RM 103 N/NW WALL RECEPTACLES "
UH-4 (TOOLING) RM 103 HEATER
HOIST SPARE
" SPARE
" SPARE
WHEEL BALANCER WATER HEATER
FIRE COMP + ALARM GAS PUMP & DROPLIGHT + FRONT REC.
SPACE SPARE
SPACE SPARE
SPACE SPARE
AIR COMPRESSOR HEATER MAINT
SPACE SPD
SPACE "
SPACE "
Location: BLDG 11, RM D155 Volts: 480/277 Wye A.I.C Rating: 35k Supply From: "11-UPS-OUT" Phases: 3 Bus Rating: 600 A
Mounting: Surface Wires 4 Main Circuit Breaker: 1200AF / 600AT Enclosure: Type 1
CKT Trip Poles Poles Trip CKT
1 100 A 3 0 0 3 600 A 2 3 " " 0 0 " " 4 5 " " 0 0 " " 6 7 100 A 3 0 0 3 250 A 8 9 " " 0 0 " " 10 11 " " 0 0 " " 12 13 100 A 3 0 0 3 250 A 14 15 " " 0 0 " " 16 17 " " 0 0 " " 18 19 100 A 3 0 0 3 400 A 20 21 " " 0 0 " " 22 23 " " 0 0 " " 24 25 20 A 1 0 0 1 20 A 26 27 20 A 1 0 0 1 20 A 28 29 20 A 1 0 0 1 20 A 30 31 20 A 1 0 0 1 20 A 32 33 20 A 1 0 0 1 20 A 34 35 20 A 1 0 0 1 20 A 36 37 20 A 1 0 0 1 20 A 38 39 20 A 1 0 0 1 20 A 40 41 20 A 1 0 0 1 20 A 42 43 20 A 1 0 0 1 20 A 44 45 20 A 1 0 0 1 20 A 46 47 20 A 1 0 0 1 20 A 48 49 20 A 1 0 0 1 20 A 50 51 20 A 1 0 0 1 20 A 52 53 20 A 1 0 0 1 20 A 54
Total Load:
Total Amps:
LOAD TYPE
Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%
0 100.00%
Notes:
Telecom Rack 0
0 Total Est. Power Demand:
0 Total Conn. Amperage:
0 Total Est. Amperage Demand:
0 0 0
Connected Load (VA) Demand Factor Estimated Demand (VA)
Panel Totals 0 Total Conn. Power Load:
0 0
SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
ATS 13 ATS 5
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE
PANELBOARD: 11-EH1 (REPLACEMENT)
VA PER PHASE
CIRCUIT DESCRIPTION A B C
CIRCUIT DESCRIPTION
ATS 1 ATS 2
ATS 3 SHUNT TRIP "11-ACRCU-1"
ATS 7 ATS 6
Location: BLDG 11, RM D155 Volts: 480/277 Wye A.I.C Rating: 48k Supply From: "11-MSB" Phases: 3 Bus Rating: 225 A
Mounting: Surface Wires 4 Main Circuit Breaker: - Enclosure: Type 1
CKT Trip Poles Poles Trip CKT
1 90 A 3 0 0 3 50 A 2 3 " " 0 0 " " 4 5 " " 0 0 " " 6 7 50A 3 0 0 3 50 A 8 9 " " 0 0 " " 10
11 " " 0 0 " " 12 13 50 A 3 0 0 - - 14 15 " " 0 0 - - 16 17 " " 0 0 - - 18 19 - - 0 0 - - 20 21 - - 0 0 - - 22 23 - - 0 0 - - 24 25 - - 0 0 - - 26 27 - - 0 0 - - 28 29 - - 0 0 - - 30 31 - - 0 0 - - 32 33 - - 0 0 - - 34 35 - - 0 0 - - 36 37 - - 0 0 - - 38 39 - - 0 0 - - 40 41 - - 0 0 - - 42
Total Load:
Total Amps:
LOAD TYPE
Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%
0 100.00%
Notes:
PANELBOARD: 11-EHC (REVISED)
VA PER PHASE
CIRCUIT DESCRIPTION A B C
PANEL "EHC2" PANEL "EHC4"
CIRCUIT DESCRIPTION
PANEL "EHC1" PANEL "EHC3"
SPACE SPACE
SPACE SPACE
SPACE SPACE
PANEL "CL2A" SPACE
" SPACE
" SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:
200 200 200
2 2 2
Telecom Rack 0
0 Total Est. Power Demand:
0 Total Conn. Amperage:
0 Total Est. Amperage Demand:
Location: BLDG 11, RM E143 Volts: 480/277 Wye A.I.C Rating: 10k Supply From: "11-EHC" Phases: 3 Bus Rating: 50 A
Mounting: Surface Wires 4 Main Circuit Breaker: - Enclosure: Type 1
CKT Trip Poles Poles Trip CKT 1 20 A 1 0 0 3 50 A 2 3 20 A 1 0 0 " " 4 5 20 A 1 0 0 " " 6 7 20 A 1 0 0 1 20 A 8 9 20 A 1 0 0 1 20 A 10
11 20 A 1 0 0 1 20 A 12 13 - - 0 0 - - 14 15 - - 0 0 - - 16 17 - - 0 0 - - 18
Total Load:
Total Amps:
LOAD TYPE
Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%
0 100.00%
Notes:
PANELBOARD: 11-EHC3 (REVISED)
VA PER PHASE
CIRCUIT DESCRIPTION A B C
LTG B200 SPARE
SPARE SPARE
SPARE SPARE
CIRCUIT DESCRIPTION
LTG B143, 139 PANEL "ELC3"
LTG B153, 154
LTG C1-10, B121, B123
SPACE SPACE
SPACE SPACE
SPACE SPACE
Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:
0 0 0 0 0 0
Telecom Rack 0
0 Total Est. Power Demand:
0 Total Conn. Amperage:
0 Total Est. Amperage Demand:
VOLTAGE: 480/277V, 3P, 4W LOCATION BLDG 11, RM D155
BUS AMPS: 2000A SUPPLY FROM: "PMT-11"
AIC: 65KAIC MOUNTING: SURFACE
MAIN: 2000 A MCB ENCLOSURE: TYPE 1
A B C
1 800AF/600AT / 3 ATS-2 0 0 0 1
2 400AF/400AT / 3 ATS-5 0 0 0 1
3 400AF/350AT / 3 XFMR T1 0 0 0 1
4 250AF/200AT / 3 PANEL "H3" 0 0 0 1
5 250AF/200AT / 3 PANEL "H1" 0 0 0 1
6 225AF/110AT / 3 ATS-4 0 0 0 1
7 250AF/250AT / 3 ATS-6 0 0 0 1
8 125AF/125AT / 3 ATS-3 0 0 0 1
9 400AF/400AT / 3 11ACRCU2 0 0 0 1
10 250AF/200AT / 3 PANEL "H4" 0 0 0 1
11 250AF/200AT / 3 PANEL "NHN2" 0 0 0 1
12 250AF/100AT / 3 ATS-7 0 0 0 1
13 250AF/200AT / 3 PANEL "H2" 0 0 0 1
14 225AF/100AT / 3 ATS-1 0 0 0 1
15 250AF/200AT / 3 PANEL "H5" 0 0 0 1
16 250AF/200AT / 3 PANEL "H6" 0 0 0 1
17 -- SPACE 0 0 0
18 400AF/400AT / 3 ACRCU-1 0 0 0 1
19 60A / 3P SURGE PROTECTION DEVICE 0 0 0
20 30A / 3P DIGITAL POWER METER 0 0 0
0 0 0 0 0 0
CONNECTED LOAD (VA) DEMAND FACTOR ESTIMATED
DEMAND (VA) TOTALS
125.00% 0 CONN. POWER
LOAD (VA) 0
100.00% 0 CONN. AMP (A) 0
100.00% 0 EST. POWER
DEMAND (VA) 0
125.00% 0 EST. AMP DEMAND
(A) 0
100.00% 0
OTHER
SWITCHBOARD "11-MSB" (REPLACEMENT)
CKT # CB / POLE CIRCUIT DESCRIPTION
VA LOAD
NOTES
TOTAL CONNECTED VA BY PHASE
TOTAL CONNECTED AMPS BY PHASE
LOAD TYPE
LARGEST MOTOR
RECEPTACLE
LIGHTING
TR RACK DATA LOADING
NOTE 1: EXISTING LOAD TO BE RECIRCUITED TO REPLACEMENT EQUIPMENT.
Location: BLDG 11, RM D320 Volts: 480/277V Wye A.I.C Rating: 22k Supply From: "11-EHE" Phases: 3 Bus Rating: 400 A
Mounting: Surface Wires 4 Main Circuit Breaker: 400 A Enclosure: Type 1
CKT Trip Poles Poles Trip CKT
1 125 A 3 0 0 3 175 A 2 3 " " 0 0 " " 4 5 " " 0 0 " " 6 7 125 A 3 0 0 3 175 A 8 9 " " 0 0 " " 10
11 " " 0 0 " " 12 13 30 A 3 0 0 1 20 A 14 15 " " 0 0 1 20 A 16 17 " " 0 0 1 20 A 18 19 20 A 1 0 0 1 20 A 20 21 20 A 1 0 0 1 20 A 22 23 20 A 1 0 0 1 20 A 24 25 20 A 1 0 0 1 20 A 26 27 20 A 1 0 0 1 20 A 28 29 20 A 1 0 0 1 20 A 30 31 20 A 1 0 0 1 20 A 32 33 20 A 1 0 0 1 20 A 34 35 20 A 1 0 0 1 20 A 36 37 20 A 1 0 0 1 20 A 38 39 20 A 1 0 0 1 20 A 40 41 20 A 1 0 0 1 20 A 42 43 20 A 1 0 0 1 20 A 44 45 20 A 1 0 0 1 20 A 46 47 20 A 1 0 0 1 20 A 48 49 20 A 1 0 0 1 20 A 50 51 20 A 1 0 0 1 20 A 52 53 20 A 1 0 0 1 20 A 54
Total Load:
Total Amps:
LOAD TYPE
Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%
0 100.00%
Notes:
PANELBOARD: 11-EHE2 (REPLACEMENT)
VA PER PHASE
CIRCUIT DESCRIPTION A B C
UPS CABINET UPS 2
CIRCUIT DESCRIPTION
UPS CABINET UPS 1
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
" SPARE
" SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
SPARE SPARE
Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:
0 0 0
0 0 0
Telecom Rack 0
0 Total Est. Power Demand:
0 Total Conn. Amperage:
0 Total Est. Amperage Demand:
Location: BLDG 11, RM D155 Volts: 480/277V Wye A.I.C Rating: 22k Supply From: "11-MSB" Phases: 3 Bus Rating: 600 A
Mounting: Surface Wires 4 Main Circuit Breaker: - Enclosure: Type 1
CKT Trip Poles Poles Trip CKT 1 150 A 3 0 0 3 125A 2 3 '' '' 0 0 '' '' 4 5 '' '' 0 0 '' '' 6 7 50 A 3 0 0 3 200 A 8 9 '' '' 0 0 '' '' 10
11 '' '' 0 0 '' '' 12 13 20 A 3 0 0 3 200 A 14 15 '' '' 0 0 '' '' 16 17 '' '' 0 0 '' '' 18 19 100 A 3 0 0 3 400 A 20 21 '' '' 0 0 '' '' 22 23 '' '' 0 0 '' '' 24 25 60 A 3 0 0 3 20 A 26 27 '' '' 0 0 '' '' 28 29 '' '' 0 0 '' '' 30 31 - - 0 0 - - 32 33 - - 0 0 - - 34 35 - - 0 0 - - 36 37 - - 0 0 - - 38 39 - - 0 0 - - 40 41 - - 0 0 - - 42 43 - - 0 0 - - 44 45 - - 0 0 - - 46 47 - - 0 0 - - 48 49 - - 0 0 - - 50 51 - - 0 0 - - 52 53 - - 0 0 - - 54
Total Amps:
LOAD TYPE
Largest Motor 0 125.00% 0 VA Other 0 100.00% 0 VA Receptacle 0 100.00% 0 A Lighting 0 125.00% 0 A All other Motor 0 100.00%
0 100.00%
Notes:
PANELBOARD: 11-EHE (REVISED)
VA PER PHASE
CIRCUIT DESCRIPTION A B C
ELE 2 ELEV P1/P2
CIRCUIT DESCRIPTION
MCCE 3 (3/500 & 1/2) ELEV S1 (4-1/0 & 1/6)
MCC E4 (3/500 & 1/6) EHE 2 (4/500 & 1/6)
XFMR T5 (3/12 & 1/12) MCCE 1 (3/250 & 1/2)
SPACE SPACE
SPACE SPACE
SPACE SPACE
BUILDING 20 PANEL E1HA-EQ ELECTRICAL METERING
SPACE SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
SPACE SPACE
Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals 0 Total Conn. Power Load:
0 0 0 0 0 0
Telecom Rack 0
0 Total Est. Power Demand:
0 Total Conn. Amperage:
0 Total Est. Amperage Demand:
File details come from the government source that posted it. Updated .