Attachment 5-648-20-116 Drawings 67-97.pdf
PDF 5 MB Posted
- Solicitation number
- 36C26026R0040
About this file
These documents are electrical design plans for a Veterans Affairs (VA) construction project located in Vancouver, Washington. The comprehensive set of electrical drawings covers multiple buildings (Buildings 013, 014, 015, 016, 018, 019, 020, 021, 022, 023, 025, 027, T818, T819, T853, and multiple Rm buildings), detailing electrical systems across various levels including demolition, new installation, roof lightning protection, and enlarged electrical plans. The project appears to be a fully sprinklered facility with extensive electrical infrastructure including multiple electrical panels, transformers, switchboards, generators, telecommunications equipment, and surge protection devices. The plans are prepared by a consultant discipline for the VA's Office of Construction and Facilities Management, with detailed schematic layouts showing electrical raceway routes, panel locations, equipment placement, and specific electrical system configurations for different building zones such as medical facilities, offices, mechanical rooms, and support spaces.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ON FLOOR BELOW.
i. DEMOLISH EXISTING PAD MOUNT SWITCH "PMS-10" AND PAD MOUNT TRANSFORMER "PMT-10" SERVING BUILDING 1.
ii. DEMOLISH EXISTING SWITCHBOARD. ALL EXISTING FEEDER RACEWAYS AND CONDUCTORS SHALL BE PRESERVED FOR RE-TERMINATION.
iii. INSTALL REPLACEMENT PADMOUNT TRANSFORMER "PMT-10" AND ASSOCIATED VAULT "MH-10". EXTEND EXISTING MV RACEWAY AND CONDUCTORS AS REQUIRED FOR TRANSFORMER INSTALLATION.
v. PROVIDE RACEWAY INSTALLATION FROM MV TRANSFORMER TO SWITCHBOARD VIA VAULT "MH-10"; EXTEND EXISTING RACEWAYS AS REQUIRED.
iv. INSTALL REPLACEMENT SWITCHBOARD. PROVIDE AND TERMINATE CONDUCTORS TO SWITCHBOARD
E. PERFORM ALL ELECTRICAL TESTING AND INSPECTIONS PER SPECIFICATIONS. FULLY COMMISION AND ENERGIZE NEW EQUIPMENT.
EP504
J
J01-EELA-2
01-EELA-6
TYP.
J J
01-EELA-8
01-EELA-10
J
01-EELA-4
HEAT TRACE JUNCTION BOX. LOCATE PER MECHANICAL
DRAWINGS.
REPLACE BUILDING 1 CLC GENERATOR; INSTALLATION OF REPLACEMENT GENERATOR WILL REQUIRE A SHUTDOWN. SHUTDOWN WORK SHALL BE PERFORMED. WORK SHALL BE PERFORMED ONLY ON WEEKENDS; COORDINATE WITH VA FOR EXACT OUTAGE AND WORK PLANS. THE FOLLOWING PHASING STEPS MAY BE USED TO PERFORM THE WORK AS FOLLOWS:
CONTRACTOR SHALL PERFORM CIRCUIT TRACING TO
IDENTIFY UNKNOWN CIRCUIT BREAKER LOADS.
CONTRACTOR SHALL UPDATE CIRCUIT DIRECTORY WITH
IDENTIFIED LOAD. CIRCUIT DIRECTORY SHALL BE
TYPE-WRITTEN AND PRINTED, NOT HANDWRITTEN.
REFERENCE ASSOCIATED PANEL SCHEDULE FOR
ADDITIONAL INFORMATION.