Attachment 3-648-20-116 Drawings 1-43.pdf
PDF 14 MB Posted
- Solicitation number
- 36C26026R0040
About this file
This is a set of construction drawings for a VA Medical Center electrical infrastructure upgrade project located in Vancouver, Washington. The project involves correcting electrical deficiencies across multiple buildings on the campus, with a comprehensive scope that includes replacing and modifying existing electrical power distribution equipment, installing new electrical systems, upgrading protective devices, performing ground resistance testing, and conducting arc flash hazard assessments.
The project documents cover detailed electrical site plans, building floor plans, mechanical yard modifications, and electrical distribution upgrades for Building 01, with specific focus on replacing building switchgear, generators, electrical panels, conducting facility-wide electrical infrastructure improvements, and ensuring compliance with VA design directives and safety standards. The project number is 648-20-116, and the design is fully sprinklered, with multiple buildings and areas being renovated to improve electrical infrastructure and safety systems across the VA Portland Healthcare System's Vancouver campus.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET # SHEET NAME
1 OF 238 G001 COVER SHEET
2 OF 238 G002 INDEX
3 OF 238 C-001 CIVIL SHEET INDEX AND GENERAL NOTES
4 OF 238 C-002 GENERAL NOTES AND LEGEND
5 OF 238 CS100 OVERALL CIVIL SITE PLAN
6 OF 238 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS
7 OF 238 A-002 APPLICABLE CODES/STANDARDS, ARCHITECTURAL GENERAL NOTES
8 OF 238 AS101 ICRA TYPICAL DETAILS
9 OF 238 AS102 ICRA STANDARDS
10 OF 238 AS103 PCRA STANDARDS
11 OF 238 AS200 ARCHITECTURAL SITE PLAN
12 OF 238 001A-100 BLDG 01 LVL 01 -OVERALL PLAN
13 OF 238 001A-401 BLDG 01 -LVL 01 -ENLARGED MECH YARD DEMO PLAN
14 OF 238 001A-402 BLDG 01 -LVL 01 -ENLARGED MECH YARD PROPOSED PLAN
15 OF 238 006A-101 BLDG 006 LVL 01 -OVERALL PLAN
16 OF 238 006A-401 BLDG 06 LVL 01 -ENLARGED PLANS AND ELEVATIONS
17 OF 238 011A-101 BLDG 011 LVL 01 -OVERALL FLOOR PLAN
18 OF 238 011A-102 BLDG 011 LVL 02 -OVERALL FLOOR PLAN
19 OF 238 011A-103 BLDG 011 LVL 03 -OVERALL FLOOR PLAN
20 OF 238 011A-401 BLDG 011 LVL 01 -ENLARGED ELEC ROOM DETAILS
21 OF 238 A-601 TYPICAL DETAILS
22 OF 238 S-001 STRUCTURAL GENERAL NOTES
23 OF 238 S-002 STRUCTURAL GENERAL NOTES
24 OF 238 S-101 OVERALL FOUNDATION PLAN
25 OF 238 S-102 DETAIL PLANS
26 OF 238 S-103 BRACE MODIFICATION - EXISTING SHED
27 OF 238 S-501 TYPICAL CONCRETE DETAILS
28 OF 238 S-531 TYPICAL CMU WALL DETAILS
29 OF 238 M-001 MECHANICAL GENERAL NOTES
30 OF 238 M-002 MECHANICAL ABBREVIATIONS & LEGENDS
31 OF 238 001M-101 BLDG -001 -LVL -01 -OVERALL PLAN
32 OF 238 001M-401 BLDG -001 -LVL -01 -ENLARGED MECH DEMOLITION PLAN
33 OF 238 001M-402 BLDG -001 -LVL -01 -ENLARGED MECH PLAN
34 OF 238 011M-101 BLDG -011 -LVL -01 -OVERALL PLAN
35 OF 238 011M-401 BLDG -011 -LVL -01 -MECH -DEMOLITION, FLOOR PLANS & RCPS
36 OF 238 M-501 MECHANICAL DETAILS I
37 OF 238 M-601 MECHANICAL SCHEDULES I
38 OF 238 M-701 MECHANICAL CONTROLS I
39 OF 238 M-702 MECHANICAL CONTROLS II
40 OF 238 EG001 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
41 OF 238 EG002 ELECTRICAL LEGENDS
42 OF 238 ES001 OVERALL ELECTRICAL SITE PLAN
43 OF 238 001EP100 BLDG 001 - LEVEL 00 - ELECTRICAL PLAN
44 OF 238 001EP101a BLDG 001 - LEVEL 01 - AREA A - ELECTRICAL PLAN 45 OF 238 001EP101b BLDG 001 - LEVEL 01 - AREA B - ELECTRICAL PLAN 46 OF 238 001EP101c BLDG 001 - LEVEL 01 - AREA C - ELECTRICAL PLAN
47 OF 238 001EP102 BLDG 001 - ROOF - LIGHTNING PROTECTION PLAN
48 OF 238 002EP101 BLDG 002 - LEVEL 01 - ELECTRICAL PLAN
49 OF 238 002EP102 BLDG 002 - ROOF - LIGHTNING PROTECTION PLAN
50 OF 238 003EP101 BLDG 003 - LEVEL 01 - ELECTRICAL PLAN
51 OF 238 003EP102 BLDG 003 - LEVEL 02 - ELECTRICAL PLAN
52 OF 238 004EP101 BLDG 004 - LEVEL 01 - ELECTRICAL PLAN
53 OF 238 004EP102 BLDG 004 - MEZZANINE - ELECTRICAL PLAN
MECHANICAL
ELECTRICAL
PAGE #
DRAWING INDEX
GENERAL
CIVIL
ARCHITECTURE
STRUCTURAL
54 OF 238 005EP101 BLDG 005 - LEVEL 01 - ELECTRICAL PLAN
55 OF 238 006EP101 BLDG 006 - LEVEL 01 - ELECTRICAL PLAN
56 OF 238 007EP101 BLDG 007 - LEVEL 01 - ELECTRICAL PLAN
57 OF 238 011EP101a BLDG 011 - LEVEL 01 - AREA A - ELECTRICAL PLAN 58 OF 238 011EP101b BLDG 011 - LEVEL 01 - AREA B - ELECTRICAL PLAN 59 OF 238 011EP101c BLDG 011 - LEVEL 01 - AREA C - ELECTRICAL PLAN 60 OF 238 011EP101d BLDG 011 - LEVEL 01 - AREA D - ELECTRICAL PLAN
61 OF 238 011EP102 BLDG 011 - LEVEL 02 - ELECTRICAL PLAN
62 OF 238 011EP103 BLDG 011 - LEVEL 03 - ELECTRICAL PLAN
63 OF 238 011EP104 BLDG 011 - LEVEL 04 - ELECTRICAL PLAN
64 OF 238 011EP105 BLDG 011 - ROOF - LIGHTNING PROTECTION PLAN
65 OF 238 012EP101 BLDG 012 - LEVEL 01 - ELECTRICAL PLAN
66 OF 238 012EP102 BLDG 012 - ROOF - LIGHTNING PROTECTION PLAN
67 OF 238 013EP101 BLDG 013 - LEVEL 01 - ELECTRICAL PLAN
68 OF 238 013EP102 BLDG 013 - ROOF - LIGHTNING PROTECTION PLAN
69 OF 238 014EP101 BLDG 014 - LEVEL 01 - ELECTRICAL PLAN
70 OF 238 014EP102 BLDG 014 - LEVEL 02 - ELECTRICAL PLAN
71 OF 238 015EP101 BLDG 015 - LEVEL 01 - ELECTRICAL PLAN
72 OF 238 015EP102 BLDG 015 - LEVEL 02 - ELECTRICAL PLAN
73 OF 238 015EP103 BLDG 015 - ROOF - LIGHTNING PROTECTION PLAN
74 OF 238 016EP101 BLDG 016 - LEVEL 01 - ELECTRICAL PLAN
75 OF 238 018EP101 BLDG 018 - LEVEL 01 - ELECTRICAL PLAN
76 OF 238 018EP102 BLDG 018 - ROOF - LIGHTNING PROTECTION PLAN
77 OF 238 019EP101 BLDG 019 - LEVEL 01 - ELECTRICAL PLAN
78 OF 238 020EP101 BLDG 020 - LEVEL 01 - ELECTRICAL PLAN
79 OF 238 020EP102 BLDG 020 - LEVEL 02 - ELECTRICAL PLAN
80 OF 238 021EP101 BLDG 021 - LEVEL 01 - ELECTRICAL PLAN
81 OF 238 022EP101 BLDG 022 - LEVEL 01 - ELECTRICAL PLAN
82 OF 238 023EP101 BLDG 023 - LEVEL 01 - ELECTRICAL PLAN
83 OF 238 024EP101 BLDG 024 - LEVEL 01 - ELECTRICAL PLAN
84 OF 238 025EP101 BLDG 025 - LEVEL 01 - ELECTRICAL PLAN
85 OF 238 025EP102 BLDG 025 - LEVEL 02 - ELECTRICAL PLAN
86 OF 238 025EP103 BLDG 25 - ROOF - LIGHTNING PROTECTION PLAN
87 OF 238 027EP102 BLDG 027 - ROOF - ELECTRICAL PLAN
88 OF 238 T1819EP101 BLDG T1819 - LEVEL 01 - ELECTRICAL PLAN
89 OF 238 TR3EP101 BLDG TR3 - LEVEL 01 - ELECTRICAL PLAN
90 OF 238 EP401 LOT 19 - ENLARGED ELECTRICAL PLANS
91 OF 238 001EP401a BLDG 001 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 92 OF 238 001EP401b BLDG 001 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 93 OF 238 001EP401c BLDG 001 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
94 OF 238 001EP402 BLDG 001 - LEVEL 02 - ENLARGED ELECTRICAL PLANS
95 OF 238 002EP401 BLDG 002 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
96 OF 238 002EP402 BLDG 002 - ROOF - ENLARGED ELECTRICAL PLANS
97 OF 238 003EP401 BLDG 003 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
98 OF 238 004EP401 BLDG 004 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
99 OF 238 011EP401a BLDG 011 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 100 OF 238 011EP401b BLDG 011 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 101 OF 238 011EP402a BLDG 011 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 102 OF 238 011EP402b BLDG 011 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 103 OF 238 011EP402c BLDG 011 - LEVEL 02 - ENLARGED ELECTRICAL PLANS
104 OF 238 011EP403 BLDG 011 - LEVEL 03 - ENLARGED ELECTRICAL PLANS
105 OF 238 012EP401 BLDG 012 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
106 OF 238 015EP401 BLDG 015 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
107 OF 238 018EP401 BLDG 018 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
108 OF 238 EP501 ELECTRICAL DETAILS
109 OF 238 EP502 ELECTRICAL DETAILS
110 OF 238 EP503 ELECTRICAL DETAILS
111 OF 238 EP504 ELECTRICAL DETAILS
112 OF 238 EP505 ELECTRICAL DETAILS
113 OF 238 EP506 ELECTRICAL DETAILS
114 OF 238 EP507 ELECTRICAL DETAILS
115 OF 238 EP508 ELECTRICAL DETAILS
116 OF 238 ED601 MEDIUM VOLTAGE ONE-LINE DIAGRAM - PART 1 OF 3 - EXISTING
117 OF 238 ED602 MEDIUM VOLTAGE ONE-LINE DIAGRAM - PART 2 OF 3 - EXISTING
118 OF 238 ED603 MEDIUM VOLTAGE ONE-LINE DIAGRAM - PART 3 OF 3 - EXISTING
119 OF 238 001ED601 BLDG 001 - ONE-LINE DIAGRAM - PART 1 OF 3 -EXISTING
120 OF 238 001ED602 BLDG 001 - ONE-LINE DIAGRAM - PART 2 OF 3 -EXISTING
121 OF 238 001ED603 BLDG 001 - ONE-LINE DIAGRAM - PART 3 OF 3 -EXISTING
122 OF 238 002ED601 BLDG 002 - ONE-LINE DIAGRAM - PART 1 OF 2 -EXISTING
123 OF 238 002ED602 BLDG 002 - ONE-LINE DIAGRAM - PART 2 OF 2 -EXISTING
124 OF 238 003ED601 BLDG 003 - ONE-LINE DIAGRAM - PART 1 OF 2 -EXISTING
125 OF 238 003ED602 BLDG 003 - ONE-LINE DIAGRAM - PART 2 OF 2 -EXISTING
126 OF 238 004ED601 BLDG 004 - ONE-LINE DIAGRAM - EXISTING
127 OF 238 005ED601 BLDG 005 - ONE-LINE DIAGRAM - EXISTING
128 OF 238 006ED601 BLDG 006 - ONE-LINE DIAGRAM - EXISTING
129 OF 238 007ED601 BLDG 007 - ONE-LINE DIAGRAM - EXISTING
130 OF 238 011ED601 BLDG 011 - ONE-LINE DIAGRAM - PART 1 OF 4 -EXISTING
131 OF 238 011ED602 BLDG 011 - ONE-LINE DIAGRAM - PART 2 OF 4 -EXISTING
132 OF 238 011ED603 BLDG 011 - ONE-LINE DIAGRAM - PART 3 OF 4 -EXISTING
133 OF 238 011ED604 BLDG 011 - ONE-LINE DIAGRAM - PART 4 OF 4 -EXISTING
134 OF 238 012ED601 BLDG 012 - ONE-LINE DIAGRAM - EXISTING
135 OF 238 013ED601 BLDG 013 - ONE-LINE DIAGRAM - EXISTING
136 OF 238 014ED601 BLDG 014 - ONE-LINE DIAGRAM - EXISTING
137 OF 238 015ED601 BLDG 015 - ONE-LINE DIAGRAM - PART 1 OF 2 -EXISTING
138 OF 238 015ED602 BLDG 015 - ONE-LINE DIAGRAM - PART 2 OF 2 -EXISTING
139 OF 238 016ED601 BLDG 016 - ONE-LINE DIAGRAM - EXISTING
140 OF 238 018ED601 BLDG 018 - ONE-LINE DIAGRAM - EXISTING
141 OF 238 019ED601 BLDG 019 - ONE-LINE DIAGRAM - EXISTING
142 OF 238 020ED601 BLDG 020 - ONE-LINE DIAGRAM - EXISTING
143 OF 238 021ED601 BLDG 021 - ONE-LINE DIAGRAM - EXISTING
144 OF 238 022ED601 BLDG 022 - ONE-LINE DIAGRAM - EXISTING
145 OF 238 023ED601 BLDG 023 - ONE-LINE DIAGRAM - EXISTING
146 OF 238 025ED601 BLDG 025 - ONE-LINE DIAGRAM - EXISTING
147 OF 238 T1819ED601 BLDG T1819 - ONE-LINE DIAGRAM - EXISTING
148 OF 238 TR3ED601 BLDG TR3 - ONE-LINE DIAGRAM - EXISTING
149 OF 238 EP601 MEDIUM VOLTAGE ONE-LINE DIAGRAM - PART 1 OF 3 - REVISED
150 OF 238 EP602 MEDIUM VOLTAGE ONE-LINE DIAGRAM - PART 2 OF 3 - REVISED
151 OF 238 EP603 MEDIUM VOLTAGE ONE-LINE DIAGRAM - PART 3 OF 3 - REVISED
152 OF 238 001EP601 BLDG 001 - ONE-LINE DIAGRAM - PART 1 OF 3 -REVISED
153 OF 238 001EP602 BLDG 001 - ONE-LINE DIAGRAM - PART 2 OF 3 -REVISED
154 OF 238 001EP603 BLDG 001 - ONE-LINE DIAGRAM - PART 3 OF 3 -REVISED
155 OF 238 002EP601 BLDG 002 - ONE-LINE DIAGRAM - PART 1 OF 2 -REVISED
156 OF 238 002EP602 BLDG 002 - ONE-LINE DIAGRAM - PART 2 OF 2 -REVISED
157 OF 238 003EP601 BLDG 003 - ONE-LINE DIAGRAM - PART 1 OF 2 -REVISED
158 OF 238 003EP602 BLDG 003 - ONE-LINE DIAGRAM - PART 2 OF 2 -REVISED
159 OF 238 004EP601 BLDG 004 - ONE-LINE DIAGRAM - REVISED
160 OF 238 005EP601 BLDG 005 - ONE-LINE DIAGRAM - REVISED
161 OF 238 006EP601 BLDG 006 - ONE-LINE DIAGRAM - REVISED
162 OF 238 007EP601 BLDG 007 - ONE-LINE DIAGRAM - REVISED
163 OF 238 011EP601 BLDG 011 - ONE-LINE DIAGRAM - PART 1 OF 4 -REVISED
164 OF 238 011EP602 BLDG 011 - ONE-LINE DIAGRAM - PART 2 OF 4 -REVISED
165 OF 238 011EP603 BLDG 011 - ONE-LINE DIAGRAM - PART 3 OF 4 -REVISED
166 OF 238 011EP604 BLDG 011 - ONE-LINE DIAGRAM - PART 4 OF 4 -REVISED
167 OF 238 012EP601 BLDG 012 - ONE-LINE DIAGRAM - REVISED
168 OF 238 013EP601 BLDG 013 - ONE-LINE DIAGRAM - REVISED
169 OF 238 014EP601 BLDG 014 - ONE-LINE DIAGRAM - REVISED
170 OF 238 015EP601 BLDG 015 - ONE-LINE DIAGRAM - PART 1 OF 2 -REVISED
171 OF 238 015EP602 BLDG 015 - ONE-LINE DIAGRAM - PART 2 OF 2 -REVISED
172 OF 238 016EP601 BLDG 016 - ONE-LINE DIAGRAM - REVISED
173 OF 238 018EP601 BLDG 018 - ONE-LINE DIAGRAM - REVISED
174 OF 238 019EP601 BLDG 019 - ONE-LINE DIAGRAM - REVISED
175 OF 238 020EP601 BLDG 020 - ONE-LINE DIAGRAM - REVISED
176 OF 238 021EP601 BLDG 021 - ONE-LINE DIAGRAM - REVISED
177 OF 238 022EP601 BLDG 022 - ONE-LINE DIAGRAM - REVISED
178 OF 238 023EP601 BLDG 023 - ONE-LINE DIAGRAM - REVISED
179 OF 238 024EP601 BLDG 024 - ONE-LINE DIAGRAM - REVISED
180 OF 238 025EP601 BLDG 025 - ONE-LINE DIAGRAM - REVISED
181 OF 238 T1819EP601 BLDG T1819 - ONE-LINE DIAGRAM - REVISED
182 OF 238 TR3EP601 BLDG TR3 - ONE-LINE DIAGRAM - REVISED
183 OF 238 E-701 ELECTRICAL SCHEDULES
184 OF 238 E-702 ELECTRICAL SCHEDULES
185 OF 238 001EP701 BLDG 001 - ELECTRICAL SCHEDULES
186 OF 238 001EP702 BLDG 001 - ELECTRICAL SCHEDULES
187 OF 238 001EP703 BLDG 001 - ELECTRICAL SCHEDULES
188 OF 238 001EP704 BLDG 001 - ELECTRICAL SCHEDULES
189 OF 238 001EP705 BLDG 001 - ELECTRICAL SCHEDULES
190 OF 238 001EP706 BLDG 001 - ELECTRICAL SCHEDULES
191 OF 238 002EP701 BLDG 002 - ELECTRICAL SCHEDULES
192 OF 238 002EP702 BLDG 002 - ELECTRICAL SCHEDULES
193 OF 238 002EP703 BLDG 002 - ELECTRICAL SCHEDULES
194 OF 238 002EP704 BLDG 002 - ELECTRICAL SCHEDULES
195 OF 238 003EP701 BLDG 003 - ELECTRICAL SCHEDULES
196 OF 238 003EP702 BLDG 003 - ELECTRICAL SCHEDULES
197 OF 238 004EP701 BLDG 004 - ELECTRICAL SCHEDULES
198 OF 238 004EP702 BLDG 004 - ELECTRICAL SCHEDULES
199 OF 238 005EP701 BLDG 005 - ELECTRICAL SCHEDULES
200 OF 238 006EP701 BLDG 006 - ELECTRICAL SCHEDULES
201 OF 238 007EP701 BLDG 007 - ELECTRICAL SCHEDULES
202 OF 238 011EP701 BLDG 011 - ELECTRICAL SCHEDULES
203 OF 238 011EP702 BLDG 011 - ELECTRICAL SCHEDULES
204 OF 238 011EP703 BLDG 011 - ELECTRICAL SCHEDULES
205 OF 238 011EP704 BLDG 011 - ELECTRICAL SCHEDULES
206 OF 238 011EP705 BLDG 011 - ELECTRICAL SCHEDULES
207 OF 238 011EP706 BLDG 011 - ELECTRICAL SCHEDULES
208 OF 238 011EP707 BLDG 011 - ELECTRICAL SCHEDULES
209 OF 238 011EP708 BLDG 011 - ELECTRICAL SCHEDULES
210 OF 238 011EP709 BLDG 011 - ELECTRICAL SCHEDULES
211 OF 238 011EP710 BLDG 011 - ELECTRICAL SCHEDULES
212 OF 238 012EP701 BLDG 012 - ELECTRICAL SCHEDULES
213 OF 238 012EP702 BLDG 012 - ELECTRICAL SCHEDULES
214 OF 238 013EP701 BLDG 013 - ELECTRICAL SCHEDULES
215 OF 238 013EP702 BLDG 013 - ELECTRICAL SCHEDULES
216 OF 238 013EP703 BLDG 013 - ELECTRICAL SCHEDULES
217 OF 238 014EP701 BLDG 014 - ELECTRICAL SCHEDULES
218 OF 238 015EP701 BLDG 015 - ELECTRICAL SCHEDULES
219 OF 238 015EP702 BLDG 015 - ELECTRICAL SCHEDULES
220 OF 238 015EP703 BLDG 015 - ELECTRICAL SCHEDULES
221 OF 238 015EP704 BLDG 015 - ELECTRICAL SCHEDULES
222 OF 238 016EP701 BLDG 016 - ELECTRICAL SCHEDULES
223 OF 238 018EP701 BLDG 018 - ELECTRICAL SCHEDULES
224 OF 238 018EP702 BLDG 018 - ELECTRICAL SCHEDULES
225 OF 238 018EP703 BLDG 018 - ELECTRICAL SCHEDULES
226 OF 238 019EP701 BLDG 019 - ELECTRICAL SCHEDULES
227 OF 238 020EP701 BLDG 020 - ELECTRICAL SCHEDULES
228 OF 238 020EP702 BLDG 020 - ELECTRICAL SCHEDULES
229 OF 238 020EP703 BLDG 020 - ELECTRICAL SCHEDULES
230 OF 238 021EP701 BLDG 021 - ELECTRICAL SCHEDULES
231 OF 238 022EP701 BLDG 022 - ELECTRICAL SCHEDULES
232 OF 238 023EP701 BLDG 023 - ELECTRICAL SCHEDULES
233 OF 238 024EP701 BLDG 024 - ELECTRICAL SCHEDULES
234 OF 238 024EP702 BLDG 024 - ELECTRICAL SCHEDULES
235 OF 238 025EP701 BLDG 025 - ELECTRICAL SCHEDULES
236 OF 238 027EP701 BLDG 027 - ELECTRICAL SCHEDULES
237 OF 238 T1819EP701 BLDG T1819 - ELECTRICAL SCHEDULES
238 OF 238 TR3EP701 BLDG TR3 - ELECTRICAL SCHEDULES
ABBREVIATIONS
AAF AIR ASSISTED FIBER
ABAN ABANDONED
APROX APPROXIMATELY
APWA AMERICAN PUBLIC WORKS
ASSOCIATION
ASPH ASPHALT CONCRETE
AVE AVENUE
AWWA AMERICAN WATER WORKS
ASSOCIATION
BLDG BUILDING
BMP BEST MANAGEMENT
PRACTICES
BOT BOTTOM
BVC BEGIN VERTICAL CURVE
CL or ℄ CENTERLINE
CDF CONTROLLED DENSITY FILL
CFS CUBIC FEET PER SECOND
CLR CLEAR
CM CENTIMETER
CMP CORRUGATED METAL PIPE
COMM COMMUNICATION(S)
CONC PORTLAND CONCRETE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CPEP CORRUGATED
POLYETHELENE PIPE (N-12)
CSBC CRUSHED SURFACING BASE
COURSE
CSTC CRUSHED SURFACING TOP
COURSE
CTR CENTER
CY CUBIC YARDS
DDCV DOUBLE DETECTOR CHECK
VALVE
DI DUCTILE IRON
DIA or Ø DIAMETER
DWG DRAWING
E EAST
EA EACH
EG EXISTING GROUND
ELEC ELECTRICAL
ELEV ELEVATION
EP EDGE OF PAVEMENT
ESMT EASEMENT
EVC END VERTICAL CURVE
EXIST EXISTING
FG FINISH GRADE
FL FLANGE
FM FORCE MAIN
FT FEET
HDPE HIGH DENSITY
POLYETHYLENE PIPE
HP HIGH POINT
HMA HOT MIX ASPHALT
HORIZ HORIZONTAL
HWY HIGHWAY
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCH(ES)
ISP INTERNET SERVICE
PROVIDER
LBS POUNDS
LF LINEAR FEET
LT LEFT
LP LOW POINT
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
N NORTH
NAD NORTH AMERICAN DATUM
NAVD NORTH AMERICAN
VERTICAL DATUM
NE NORTHEAST
NOM NOMINAL
NTS NOT TO SCALE
NW NORTHWEST
OC ON CENTER
OD OUTSIDE DIAMETER
OSP OUTSIDE PLANT
OS1 OPTICAL SINGLEMODE
FIBER (LEGACY STANDARD)
OS2 OPTICAL SINGLEMODE
FIBER (LATEST STANDARD)
OVHD OVERHEAD
PC POINT OF CURVATURE
PE PROJECT ENGINEER
PI POINT OF HORIZONTAL
INTERSECTION
PHH PHYSICAL HAND HOLE
POC POINT ON CURVE
POB POINT OF BEGINNING
POP POINT OF PRESENCE
PPM PARTS PER MILLION
PROP PROPOSED
PT POINT OR POINT OF
TANGENCY
PVC POLYVINYL CHLORIDE PIPE
PVI POINT OF VERTICAL
INTERSECTION
R RADIUS
RJ RESTRAINED JOINT
RT RIGHT
S SOUTH
SD STORM DRAIN
SDCB STORM DRAIN CATCH BASIN
SDCO STORM DRAIN CLEANOUT
SDMH STORM DRAIN MANHOLE
SE SOUTHEAST
SEC SECTION
SF SQUARE FOOT
SMFO SINGLE MODE FIBER
OPTICS
SPEC SPECIFICATION
SS SANITARY SEWER
SSFM SANITARY SEWER FORCE
MAIN
SSMH SANITARY SEWER MANHOLE
ST STREET
STA STATION
STD STANDARD
SW SOUTHWEST
SWPPP STORMWATER POLLUTION
PREVENTION PLAN
TAN TANGENT POINT
TDR TELECOMMUNICATIONS
DISTRIBUTION ROOM
TDU TUBE CABLE DISTRIBUTION
UNIT
TESC TEMPORARY EROSION &
SEDIMENT CONTROL
TOC TOP OF CURB
TR TELECOMMUNICATIONS
ROOM
TYP TYPICAL
UFC UNIFIED FACILITIES
CRITERIA
UG UNDERGROUND
VC VERTICAL CURVE
VERT VERTICAL
W WEST or WATER
WM WATER METER
WSEL WATER SURFACE
ELEVATION
W/ WITH
GENERAL NOTES:
1. CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL LAWS PERTINENT TO THE
WORK, AND AS DESCRIBED IN THE SPECIFICATIONS AND ON THESE DESIGN DRAWINGS. ALL
WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS RESPONSIBLE FOR BECOMING FAMILIARIZED WITH THE EXISTING
CONDITIONS AND VERIFYING CONSISTENCY WITH DESIGN DRAWINGS AND SPECIFICATIONS. THE
CONTRACTOR SHALL REPORT ANY DISCREPANCY TO THE CONTRACTING OFFICER IMMEDIATELY
AND AWAIT FURTHER INSTRUCTIONS.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL APPLICABLE PERMITS, LICENSES
AND CERTIFICATES, AND MAKE ALL REQUIRED AGENCY NOTIFICATIONS TO COMPLETE THE
PROJECT. COMPLIANCE SHALL BE AT ALL LEVELS: FEDERAL, STATE, AND LOCAL RELATING TO THE
PERFORMANCE OF THE WORK.
4. PRIOR TO BEGINNING WORK AND PROCURING MATERIALS THAT COULD BE IMPACTED,
CONTRACTOR SHALL INSPECT AND CONFIRM ALL POINTS OF CONNECTIONS TO EXISTING
UTILITIES OR SYSTEMS. POTHOLE WHERE NECESSARY TO VERIFY THE DRAWINGS AGAINST ALL
APPLICABLE EXISTING CONDITIONS. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY UPON
DISCOVERY OF UNFORESEEN SITE CONDITIONS OR DISCREPANCIES.
5. CALL THE UNDERGROUND LOCATE LINE (811) A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATIONS, AND HIRE PRIVATE UTILITY LOCATE COMPANY TO CONFIRM PRESENCE OF
EXISTING BURIED UTILITIES PRIOR TO EXCAVATION. LOCATIONS OF EXISTING UTILITIES SHOWN
HEREIN HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS
AND SHOULD BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT
SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THESE PLANS.
6. UTILITY SYSTEMS SHALL BE CONSTRUCTED ACCORDING TO APPROVED PLANS. ANY DEVIATION
FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CONTRACTING
OFFICER.
7. CONTRACTOR SHALL PREPARE CONSTRUCTION STORM WATER POLLUTION PREVENTION PLAN
(SWPPP) IN ACCORDANCE WITH ALL APPLICABLE FEDERAL AND STATE REQUIREMENTS AND
OBTAIN PERMIT FOR PROPOSED WORK. CONTRACTOR SHALL MAINTAIN AND UPDATE SWPPP AS
REQUIRED THROUGHOUT CONSTRUCTION. A COPY OF THE APPROVED CONSTRUCTION SWPPP
SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
8. CONTRACTOR SHALL TAKE ALL POSSIBLE CARE TO PROTECT PERSONAL AND ADJACENT
PROPERTY AND TO ENSURE THE SAFETY OF THOSE INVOLVED DIRECTLY OR INDIRECTLY WITH
THE WORK.
9. THE CONTRACTOR SHALL PERFORM ANY AND ALL CUTTING, PATCHING, REPAIRING, RESTORING
AND THE LIKE NECESSARY TO RETURN ALL SURFACES AFFECTED BY THE WORK TO THEIR
ORIGINAL CONDITION.
10. DEMOLITION SHALL BE TO THE LIMITS SHOWN ON THE PLANS. THE DEMOLITION LIMITS DEPICTED IN THE PLANS ARE BASED ON THE AVAILABLE INFORMATION OR SURVEY. DEMOLITION LIMITS MAY
VARY DEPENDING ON CHANGED SITE CONDITIONS AT THE TIME OF CONSTRUCTION.
11. EXISTING PAVEMENT, LANDSCAPING, SURFACE OR SUBSURFACE FACILITIES, WITHIN OR
ADJACENT TO THE CONTRACTOR'S WORK AREA OR INDICATED ON THE PLANS TO REMAIN SHALL
BE PROTECTED FROM DAMAGE. ANY FACILITIES DAMAGED BY THE CONTRACTOR'S ACTIVITIES
SHALL BE IMMEDIATELY REPAIRED TO MATCH ITS ORIGINAL CONDITION AND THE SATISFACTION
OF THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT.
12. ALL MATERIALS SHALL BE NEW MATERIALS AND PURCHASED IN ACCORDANCE WITH THE BUY
AMERICAN ACT.
13. WRITTEN DIMENSIONS IN SCHEDULES AND DRAWINGS TAKE PRECEDENCE OVER SCALED
DRAWINGS. DO NOT SCALE DRAWINGS, AND BRING ALL DISCREPANCIES TO THE ATTENTION OF
THE CONTRACTING OFFICER AND AWAIT FURTHER INSTRUCTIONS.
14. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE CONSTRUCTION PHASING AND
STAGING. NO ADDITIONAL COST TO THE OWNER WILL BE PERMITTED FOR THE RELOCATION OF
TRAILERS, STORED MATERIAL, REMOVAL AND REINSTALLATION OF BARRICADES, FENCING, OR
ANY OTHER INCIDENTAL ITEMS THAT ARE REQUIRED AND NECESSARY TO ACCOMPLISH THE
WORK UNDER THIS CONTRACT. COMPLETE RESTORATION BETWEEN CONSTRUCTION PHASES IS
REQUIRED, UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.
15. THE CONTRACTOR SHALL NOTIFY THE COR (CONTRACTING OFFICER'S REPRESENTATIVE) OF ANY
WORK TO BE PERFORMED IN CONFINED SPACE. CONTRACTOR SHALL CREATE AND SUBMIT
INDIVIDUAL CONFINED SPACE WORK PLAN. CONTRACTOR SHALL RECEIVE APPROVAL FROM VA
PRIOR TO BEGINNING WORK.
16. ANY U.S.G.S. OR CAMPUS SURVEY MONUMENTS WITHIN THE LIMITS OF DEMOLITION OR
CONSTRUCTION SHALL BE PROTECTED. IF A MONUMENT IS IN DANGER OF BEING DESTROYED
AND HAS NOT BEEN PROPERLY REFERENCED IN THE PLANS, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER. CONTRACTOR SHALL REPAIR ANY DAMAGED
BENCH MARKS IN ACCORDANCE WITH N.O.A.A. NATIONAL GEODETIC SURVEY GUIDELINES, AND TO
THE SATISFACTION OF THE FACILITY'S G.I.S. BENCHMARK REPRESENTATIVE.
17. CONTRACTOR SHALL PROVIDE AND MAINTAIN ACCESS, AT ALL TIMES DURING CONSTRUCTION, TO ALL EXISTING FACILITIES AND THOSE THAT MAY BE UNDER CONSTRUCTION IN THE IMMEDIATE
VICINITY. FIRE TRUCK AND EMERGENCY VEHICLE ACCESS SHALL NOT BE BLOCKED.
18. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DETERMINING THE ADEQUACY OF
EXISTING STRUCTURES AND UTILITIES TO SUPPORT CONSTRUCTION EQUIPMENT AND LOADS.
19. ALL DEVIATIONS FROM THESE PLANS SHALL BE RECORDED ON A SET OF "AS-BUILT" OR RECORD
REDLINE DRAWINGS. THE CONTRACTOR SHALL SUBMIT "AS-BUILT" REDLINE DRAWINGS TO THE
CONTRACTING OFFICER.
20. ALL DEMOLITION MATERIAL, INCLUDING PAVEMENT AND EXCESS SOIL, EXCEPT AS NOTED IN THE CONTRACT DRAWINGS / SPECIFICATIONS AND / OR SPECIFIED BY THE CONTRACTING OFFICER, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND BE COMPLETELY REMOVED FROM VA
CAMPUS AND DISPOSED OF BY THE CONTRACTOR.
21. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN
SHORING AND BRACING NECESSARY TO PROTECT WORKERS, UTILITIES AND OTHER
IMPROVEMENTS AND EXCAVATIONS PER STATE AND FEDERAL REGULATIONS. THE CONTRACTOR
SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF TEMPORARY SHORING AND BRACING.
EXISTING DATA NOTES:
1. THE EXISTING INFORMATION SHOWN ON THESE DRAWINGS HAVE BEEN PREPARED BASED UPON
INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, GOVERNMENT CANNOT ENSURE ACCURACY AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY
OF THAT INFORMATION OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN
INCORPORATED INTO THESE DRAWINGS AS A RESULT.
2. THE ENGINEER ASSUMES NO LIABILITY FOR DAMAGES TO ANY UTILITIES DURING CONSTRUCTION.
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO REPAIR ANY DAMAGES THAT MAY OCCUR
DURING CONSTRUCTION.
3. THE CONTRACTOR MAY CONDUCT TEST PITS (POTHOLE) TO VERIFY EXISTING CONDITIONS. THE
CONTRACTOR SHALL COORDINATE ALL TEST PITS WITH THE COR.
RESTORATION NOTES:
1. RESTORATION SHALL BE IN ACCORDANCE WITH VA AND UFC REQUIREMENTS.
2. RESTORE ALL DISTURBED AREAS AS SHOWN ON PLANS OR AS DIRECTED BY THE CONTRACTING
OFFICER.
3. REPAIR ALL UTILITIES DAMAGED BY CONSTRUCTION IN ACCORDANCE WITH CONTRACTING
OFFICER'S REQUIREMENTS.
4. CONTRACTOR SHALL RESTORE THE SITE AND ALL OTHER PHYSICAL FEATURES TO MATCH
EXISTING CONDITIONS WHERE CONSTRUCTION WORK IS PERFORMED.
5. CONTRACTOR TO RETURN DISTURBED SOIL AND LANDSCAPING TO ITS ORIGINAL CONDITION.
DEMOLITION NOTES:
1. PERFORM DEMOLITION IN SUCH MANNER AS TO ELIMINATE HAZARDS TO PERSONS AND
PROPERTY; TO MINIMIZE INTERFERENCE WITH USE OF ADJACENT AREAS, UTILITIES AND
STRUCTURES OR INTERRUPTION OF USE OF SUCH UTILITIES; AND TO PROVIDE FREE PASSAGE
TO AND FROM SUCH ADJACENT AREAS OR STRUCTURES.
2. PROVIDE SAFEGUARDS, INCLUDING WARNING SIGNS, BARRICADES, TEMPORARY FENCES,
WARNING LIGHTS, AND OTHER SIMILAR ITEMS THAT ARE REQUIRED FOR PROTECTION OF ALL
PERSONNEL DURING DEMOLITION AND REMOVAL OPERATIONS.
3. MAINTAIN FENCES, BARRICADES, LIGHTS AND OTHER SIMILAR ITEMS AROUND EXPOSED
EXCAVATIONS UNTIL SUCH EXCAVATIONS HAVE BEEN COMPLETELY FILLED.
4. PREVENT SPREAD OF FLYING PARTICLES AND DUST. SPRINKLE RUBBISH AND DEBRIS WITH
WATER TO KEEP DUST TO A MINIMUM. DO NOT USE WATER IF IT RESULTS IN HAZARDOUS OR
OBJECTIONABLE CONDITIONS SUCH AS, BUT NOT LIMITED TO; ICE, FLOODING OR POLLUTION.
VACUUM, SWEEP, AND DUST THE WORK AREA DAILY. COMPLY WITH ICRA.
5. BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE AND
EXAMINE THE DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK.
THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID DAMAGES TO EXISTING
ITEMS TO REMAIN IN PLACE, TO BE REUSED, OR TO REMAIN THE PROPERTY OF THE MEDICAL
CENTER; AND DAMAGED ITEMS SHALL BE REPAIRED OR REPLACED AS APPROVED BY THE
CONTRACTING OFFICER REPRESENTATIVE (COR). THE CONTRACTOR SHALL COORDINATE THE
WORK WITH ALL OTHER WORK AND SHALL CONSTRUCT AND MAINTAIN SHORING, BRACING,
AND SUPPORTS AS REQUIRED. THE CONTRACTOR SHALL ENSURE THAT STRUCTURAL
ELEMENTS ARE NOT OVERLOADED AND SHALL BE RESPONSIBLE FOR INCREASING
STRUCTURAL SUPPORTS OR ADDING NEW SUPPORTS AS MAY BE REQUIRED AS A RESULT OF
ANY CUTTING, REMOVAL, OR DEMOLITION WORK PERFORMED.
6. DEMOLISH AND REMOVE OUTSIDE UTILITY SERVICE LINES SHOWN TO BE REMOVED.
7. REMOVE ABANDONED OUTSIDE UTILITY LINES THAT WOULD INTERFERE WITH INSTALLATION
OF NEW UTILITY LINES AND NEW CONSTRUCTION.
8. COMPLETELY DEMOLISH AND REMOVE BUILDINGS AND STRUCTURES, INCLUDING ALL
APPURTENANCES RELATED OR CONNECTED THERETO, AS NOTED BELOW:
8.A. AS REQUIRED FOR INSTALLATION OF NEW UTILITY SERVICE LINES.
8.B. TO FULL DEPTH WITHIN AN AREA DEFINED BY HYPOTHETICAL LINES LOCATED 5 FT (1500
MM) OUTSIDE BUILDING LINES OF NEW STRUCTURES.
9. ALL WASTE DEBRIS, UNSUITABLE, AND EXCESS MATERIAL SHALL BE REMOVED FROM THE SITE
AND LAWFULLY DISPOSED OF. DEBRIS, INCLUDING BRICK, CONCRETE STONE, METALS AND
SIMILAR MATERIALS SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE
DISPOSED OF BY THE CONTRACTOR DAILY, OFF THE MEDICAL CENTER TO AVOID
ACCUMULATION AT THE DEMOLITION SITE. MATERIALS THAT CANNOT BE REMOVED DAILY
SHALL BE STORED IN AREAS SPECIFIED BY THE CONTRACTING OFFICERS REPRESENTATIVE.
CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF MATERIALS UNCOVERED DURING
ANY PART OF THE WORK APPEAR TO BE CONTAMINATED. ALL LOCAL, STATE AND FEDERAL
LAWS SHALL PREVAIL IN THE EVENT OF CONTAMINATED MATERIALS.
10. BREAK UP CONCRETE SLABS BELOW GRADE THAT DO NOT REQUIRE REMOVAL FROM
PRESENT LOCATION INTO PIECES NOT EXCEEDING 24 INCHES (600 MM) SQUARE TO PERMIT
DRAINAGE. CONTRACTOR SHALL DISPOSE OF DEBRIS IN COMPLIANCE WITH APPLICABLE
FEDERAL, STATE AND LOCAL PERMITS, RULES AND/OR REGULATIONS.
TRAFFIC MANAGEMENT NOTES:
1. ALL ROADWAYS SHALL REMAIN OPEN DURING CONSTRUCTION, UNLESS OTHERWISE APPROVED
BY THE CONTRACTING OFFICER. ROADWAY CLOSURE DURING CONSTRUCTION REQUIRES THE
CONTRACTOR SUBMIT A TRAFFIC CONTROL PLAN FOR REVIEW AND APPROVAL IN ADVANCE. IF
REQUIRED, ALL TEMPORARY TRAFFIC CONTROL DEVICES SHALL BE IN ACCORDANCE WITH THE
MOST CURRENT EDITION OF "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS
AND HIGHWAYS".
2. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF ONE MOVING LANE ALONG ROADWAYS AT
ALL TIMES, EXCEPT WHERE GIVEN PERMISSION BY THE VAMC AND CONTRACTING OFFICERS
REPRESENTATIVE.
3. THE CONTRACTOR SHALL PROVIDE ALL SIGNAGE, BARRICADES, CAUTION TAPE, CONES AND
BARRELS REQUIRED TO FACILITATE A SAFE LANE OR SIDEWALK CLOSURE.
4. PEDESTRIAN ACCESS SHALL BE MAINTAINED AND MANAGED DURING SIDEWALK AND
CROSSWALK CLOSURES.
5. ACCESS TO ALL ROADWAYS, DRIVEWAYS AND LOADING RAMPS SHALL BE MAINTAINED DAILY
AFTER CONSTRUCTION ACTIVITIES HAVE CONCLUDED.
6. THE CONTRACTOR SHALL COORDINATE ANY ROADWAY, DRIVEWAY, LOADING RAMP AND/OR
SIDEWALK CLOSURES WITH THE COR PRIOR TO PERFORMING WORK.
7. ALL ROAD CLOSURES SHALL BE OUTSIDE NORMAL WORKING HOURS OF 8:00 AM TO 5:00 PM
MONDAY THROUGH FRIDAY. ROAD CLOSURES AND TRAFFIC CONTROL PLAN SHALL BE
APPROVED BY COR PRIOR TO CONSTRUCTION.
GENERAL UTILITY NOTES:
1. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL VERTICALLY AND
HORIZONTALLY FIELD LOCATE BY POTHOLING AND SURVEY ALL PROPOSED UTILITY CONFLICTS
AND CROSSINGS. IF THE EXISTING UTILITY LOCATION DIFFERS FROM WHAT IS SHOWN ON THE
PLANS, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND/OR CONTRACTING
OFFICER'S REPRESENTATIVE IMMEDIATELY AND AWAIT FURTHER INSTRUCTIONS.
2. THE CONTRACTOR IS ADVISED THAT ALL EXISTING UNDERGROUND UTILITIES, CABLES, DUCTS, MANHOLES, ETC. (UNDERGROUND FACILITIES) SHOWN ON PLANS WERE LOCATED USING THE
BEST INFORMATION AVAILABLE. INFORMATION SHOWN ON THE DRAWING CONCERNING TYPE, SIZE
AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR
ALL-INCLUSIVE, AND IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR LOCATING AND PROTECTING ALL UTILITIES. CONTRACTOR SHALL BE
RESPONSIBLE FOR CONTACTING GOVERNMENT UTILITY OWNERS TO IDENTIFY UNDERGROUND
UTILITIES AND/OR CABLES WITHIN THE PROJECT LIMITS AND STAGING AREAS. THE CONTRACTOR
SHALL ASSIST UTILITY OWNERS IN EFFORTS TO FIELD VERIFY UNDERGROUND UTILITIES.
CONTRACTOR SHALL ALSO REVIEW ALL UTILITIES WITH THE CAMPUS MAINTENANCE STAFF PRIOR
TO BEGINNING WORK. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, THE
CONTRACTOR SHALL CONDUCT A FIELD UTILITY LOCATION SURVEY USING ELECTRONIC,
MAGNETIC OR OTHER UNDERGROUND UTILITY LOCATING PRACTICES. UTILITY OWNERS SHALL BE
NOTIFIED AND SHALL HAVE THE OPTION TO ACCOMPANY THIS FIELD INVESTIGATION.
EXPLORATORY EXCAVATIONS IN THE VICINITY OF EXISTING UNDERGROUND UTILITIES,
PARTICULARLY THOSE ASSOCIATED WITH OPERATING NAVIGATIONAL AIDS, SHALL BE CARRIED
OUT WITH HAND TOOLS UNTIL THE EXACT CHARACTER AND LOCATION OF SUCH FACILITIES ARE DETERMINED. ALL INFORMATION SO OBTAINED FROM THIS UTILITY LOCATION SURVEY SHALL BE
FURNISHED TO THE CONTRACTING OFFICER AND CONTRACTING OFFICER'S REPRESENTATIVE
AND THE A/E PRIOR TO CONSTRUCTION.
3. ALL UNDERGROUND CABLE, UTILITIES, AND ASSOCIATED STRUCTURES SHALL BE PROTECTED
FROM DAMAGE BY THE CONTRACTOR. ANY DAMAGE TO EXISTING UNDERGROUND CABLES
AND/OR UTILITIES CAUSED BY THE CONTRACTOR (REGARDLESS OF WHETHER THEY WERE
LOCATED OR NOT BY THE CAMPUS, UTILITY COMPANY, ETC.) SHALL BE REPAIRED BY THE
CONTRACTOR AT THE CONTRACTOR'S OWN EXPENSE AND TO THE SATISFACTION OF THE UTILITY OWNER'S AUTHORIZED REPRESENTATIVES. ALL EXISTING UTILITIES, CABLE, DUCTS, EQUIPMENT, DEVICES, ETC. OUTSIDE THE AREA OF DEMOLITION OR CONSTRUCTION LIMITS WHICH ARE
DAMAGED OR DISRUPTED AS A RESULT OF THE CONTRACTOR'S OPERATIONS, SHALL BE
IMMEDIATELY REPAIRED AT THE EXPENSE OF THE CONTRACTOR AND TO THE SATISFACTION OF
THE UTILITY OWNER'S AUTHORIZED REPRESENTATIVE.
4. ALL UTILITY OUTAGES SHALL BE SCHEDULED AND APPROVED THROUGH THE COR PER THE
APPLICABLE OUTAGE NOTIFICATION REQUIREMENTS.
5. UNLESS ALREADY SPECIFIED IN THE CONTRACT DRAWINGS, CONTRACTOR SHALL RETROFIT ALL EXISTING UTILITY ACCESS POINTS TO BRING FLUSH WITH FINISHED SURFACE WITHIN AREAS OF
WORK IN WHICH THE EXISTING GRADE IS MODIFIED BY CONSTRUCTION. THIS WORK IS
CONSIDERED PART OF THE CONTRACTED SCOPE, AND APPLIES TO EXISTING UTILITIES THAT ARE
NOT TO BE DEMOLISHED OR ABANDONED WITHIN THE PROJECT LIMITS.
6. ALL MATERIALS, WORKMANSHIP, AND TESTING SHALL BE IN ACCORDANCE WITH THE
REQUIREMENTS OF THE CONTRACT SPECIFICATIONS.
7. FIELD VERIFY LOCATION (INCLUDING POT HOLING FOR VERTICAL DEPTH) OF EXISTING UTILITIES
AND INVERT ELEVATIONS OF THE POINT OF CONNECTION PRIOR TO CONSTRUCTION.
8. COMPRESSIBLE MATERIALS:
FOR USE IN AREAS ABOVE BURIED PIPES WHERE OTHER PIPES ARE CROSSING WITH LESS THAN
1'-0" VERTICAL SEPARATION OR WHERE CALLED OUT ON DRAWINGS: POLYETHYLENE PLASTIC
FOAM IN ACCORDANCE WITH FEDERAL SPECIFICATION PPP-C-1752C, TYPE 1, CLASS 2, SUCH AS "ETHAFOAM". AT PIPE CROSSINGS, MATERIAL SHALL BE A MIN OF 2-INCH THK, 2-FT WIDE, AND 4-FT LONG, BUT SHALL BE A MINIMUM OF 6-IN WIDER THAT OUTSIDE DIAMETER OF PIPE ON EACH SIDE.
9. GATE VALVES INSTALLED UNDER PAVEMENT SHALL HAVE A 2-INCH OPERATING NUT AND VALVE BOX W/ COVER FLUSH WITH ASPHALT SURFACE. GATE VALVES INSTALLED IN AREAS WHERE THE SURFACE IS OTHER THAN ASPHALT OR CONCRETE, TOP OF VALVE BOX SHALL BE EMBEDDED IN A CAST-IN-PLACE COLLAR THAT IS 3'-0" MIN SQUARE BY 8-INCHES THICK PLACED ON 4-INCH THICK
(MIN) COMPACTED BASE COURSE WITH SURFACE FLUSH WITH EXISTING GRADE
10. TESTING OF ALL INSTALLED UTILITY LINES AND STRUCTURES SHALL BE IN ACCORDANCE WITH
CONTRACT SPECIFICATIONS.
11. ANY REVISIONS TO THESE PLANS, ONCE APPROVED BY THE ENGINEER OF RECORD, SHALL BE
REVIEWED AND RE-APPROVED BY THE CONTRACTING OFFICER.
12. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR UTILITY TRENCH SAFETY INCLUDING SHORING
(IF REQUIRED) DESIGNED BY A REGISTERED ENGINEER AND WORKER SAFETY WHILE WORKING
WITHIN THE TRENCH.
GRADING & BACKFILL NOTES:
1. BACKFILL MATERIAL SHALL NOT CONTAIN PETROLEUM PRODUCTS, OR SUBSTANCES WHICH ARE
HAZARDOUS, DANGEROUS, TOXIC, OR WHICH OTHERWISE VIOLATE ANY STATE, FEDERAL. OR
LOCAL LAW, ORDINANCE, CODE, REGULATION, RULE, ORDER, OR STANDARD.
2. GENERAL SITE BACKFILL MATERIAL SHALL MEET THE VA REQUIREMENTS FOR EARTHWORK.
3. SLOPE FINISH GRADE SURFACES UNIFORMLY BETWEEN ELEVATIONS SHOWN ON DRAWINGS
UNLESS SPECIFIED OTHERWISE. GRADE AREAS TO ELIMINATE LOW SPOTS AND MAINTAIN
POSITIVE DRAINAGE AWAY FROM BUILDING AND STRUCTURES.
SECURITY:
1. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE VA SECURITY PROGRAM.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR BRIEFING ALL CONTRACTOR'S PERSONNEL OF
THE VA SECURITY REQUIREMENTS. ALL NEW CONTRACTOR EMPLOYEES SHALL BE BRIEFED ON
THESE REQUIREMENTS PRIOR TO WORKING IN THE CONSTRUCTION AREA.
3. CONTRACTOR IS SOLELY RESPONSIBLE FOR SECURING JOBSITE AT ALL TIMES THROUGHOUT
CONSTRUCTION.
CIVIL SHEET INDEX:
La st
S av ed b y:
U sc b0 o n:
O ct
9, 3:
P M
F ile : C
:\U se rs \u sc b0
5\ W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
0\
N ew
S pe es p ro je ct s\
VA
V an co uv er
W A
El ec tri ca l D ef ic ie nc ie s\
VA
V an co uv er
C iv il.
dw g
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
A/E:CIVIL ENGINEER:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Solutions Inc.
1201 Pacific Avenue Suite 550 Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
PB CMB
CIVIL SHEET INDEX AND GENERAL NOTES
C-001
100% CONSTRUCTION
DOCUMENTS
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
648-20-116
10/30/2025 3 of 238
SD
PROPOSED LEGEND
UNDERGROUND POWER PATHWAY
UNDERGROUND POWER HANDHOLE
WATER LINE
WATER LINE BEND
FIRE DEPARTMENT CONNECTION (FDC)
POST INDICATOR VALVE (PIV)
FIRE SUPPRESSION LINE
CHILLED WATER LINE
SANITARY SEWER LINE
STORM DRAIN LINE
STORM DRAIN INLET
STORM DRAIN MANHOLE
STORM DRAIN CLEANOUT
STORM DRAIN SWALE FLOWPATH
CONTOUR
FENCE
ASPHALT PAVEMENT
CONCRETE PAVEMENT
W
F
SAN
E
E
COMM
SAN
W
G
F
T
E
T
E
W
S
SD
G
EXISTING LEGEND
COMMUNICATION LINE
COMMUNICATION MANHOLE / HANDHOLE
POWER LINE
POWER MANHOLE / HANDHOLE
WATER LINE
WATER METER / VALVE
FIRE SUPPRESSION LINE
FIRE HYDRANT
SANITARY SEWER LINE
SANITARY SEWER MANHOLE
STORM DRAIN LINE
STORM DRAIN INLET
STORM DRAIN MANHOLE
GAS LINE
GAS METER
CONTOUR
FENCE
ASPHALT PAVEMENT
CONCRETE PAVEMENT
X
X
CHWS
GENERAL NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE
IN ACCORDANCE WITH OSHA STANDARDS, STATE AND LOCAL REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE FENCING OR BARRIERS WHEN CONSTRUCTION IS BEING PERFORMED ADJACENT TO BUILDING ENTRANCES/WALKWAYS.
2. THE CONTRACTOR SHALL NOT COMMENCE CONSTRUCTION NOR CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS AND/OR
FIRE HYDRANTS WITHOUT APPROPRIATE PERMITS AND/OR PERMISSIONS.
3. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK THAT BECOME DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
4. VEGETATED AREAS DISTURBED DURING CONSTRUCTION SHALL RECEIVE A MINIMUM OF FOUR (4) INCHES OF TOPSOIL.
THESE ARES SHALL BE IMMEDIATELY SEEDED AND STABILIZED.
5. DAMAGE TO SURFACE FEATURES, SUBSURFACE FEATURES AND SUBSURFACE INFRASTRUCTURE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
6. THE CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OFF-SITE AREAS, AND SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY, AT NO COST TO OWNER.
7. THE CONTRACTOR IS REQUIRED TO BACKFILL TRENCHES OR SECURE WITH METAL PLATES OR CONSTRUCTION FENCE DAILY. NO OPEN TRENCHES SHALL BE LEFT UNATTENDED. IF TRENCHES REMAIN OPEN FOR MORE THAN 24 HOURS IN
ASPHALT, COLD PATCH WILL BE USED UNTIL PAVEMENT IS REPLACED.
8. THE CONTRACTOR IS RESPONSIBLE FOR ALL FIELD MEASUREMENTS. THE GOVERNMENT WILL NOT BE HELD RESPONSIBLE FOR BIDDING ERRORS MADE OR FOR THE FAILURE TO ADEQUATELY INSPECT THE JOB SITE FOR EXISTING
CONDITIONS, DIMENSIONS, AND GRADES.
9. THE CONTRACTOR SHALL VERIFY THE PROPOSED LAYOUT WITH ITS RELATIONSHIP TO THE EXISTING SITE. THE CONTRACTOR SHALL ALSO VERIFY ALL DIMENSIONS, SITE CONDITIONS, AND MATERIAL SPECIFICATIONS AND SHALL NOTIFY THE OWNER AND ENGINEER OF ANY DISCREPANCIES BEFORE COMMENCING OR PROCEEDING WITH WORK.
10. THE CONTRACTOR SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATION AT LEAST TWO WORKING DAYS, BUT NOT MORE THAN TEN WORKING DAYS, PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. ALL WATER, GAS, SEWER, ELECTRIC AND OTHER UTILITIES SHALL BE
MAINTAINED AT ALL TIMES DURING CONSTRUCTION.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, WITH MATCHING MATERIALS, ANY PAVEMENT, WALKS, CURBS, ETC. THAT SHALL BE CUT OR THAT ARE DAMAGED DURING CONSTRUCTION.
12. CONSTRUCTION ACTIVITIES SHALL NOT CONFLICT WITH THE VAMC OPERATIONS AND EMPLOYEE/PATIENT PARKING. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE COR. WORK AFFECTING BUILDING ENTRANCES, WALKWAYS, LOADING AREAS, PARKING, ETC. SHALL BE COORDINATED AND SCHEDULED WITH THE COR.
13. THE CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES ("AS-BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ENGINEER UPON COMPLETION OF CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS. RECORD DOCUMENTS SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK, PRODUCTS AND/OR SYSTEMS VARY FROM THE DESIGN INTENT EXPRESSED/SPECIFIED IN THE CONTRACTOR DOCUMENTS. **NO
EXCEPTION ALLOWED**
14. ANY EXISTING PROPERTY LINE MONUMENTATION DISTURBED DURING CONSTRUCTION SHALL BE RESET BY A
PROFESSIONAL LICENSED SURVEYOR AT THE CONTRACTOR'S EXPENSE.
15. THE CONTRACTOR SHALL PROTECT THE VA PROPERTY FROM DUST AND DAMAGE AT ALL TIMES. ANY RESULTING DAMAGE TO THE VA PROPERTY SHALL BE IMMEDIATELY CORRECTED BY THE CONTRACTOR AT THE CONTRACTOR'S
EXPENSE.
CONTRACTORS ACCESS & STORAGE AREAS:
1. THE CONTRACTOR SHALL COORDINATE WITH THE COR FOR EXACT LOCATION OF STAGING AREA(S) TO BE USED DURING CONSTRUCTION FOR STORAGE / STOCKPILING OF MATERIALS. CONTRACTOR SHALL NOTIFY THE COR PRIOR TO OCCUPYING STAGING AREA. THE CONTRACTOR SHALL VERIFY WITH THE CONTRACTING OFFICER'S REPRESENTATIVE ANY CHANGES IN STAGING / LAYDOWN AREAS THAT MAY HAVE OCCURRED AFTER PLANS WERE ISSUED.
2. UPON COMPLETION OF THE WORK, THE STAGING AREAS SHALL BE CLEANED AND RESTORED TO THEIR ORIGINAL
CONDITION.
3. CONTRACTOR SHALL PROVIDE TEMPORARY SECURITY FENCING AROUND THE CONSTRUCTION STAGING AREAS WHERE REQUIRED BY COR. CONTRACTOR TO COORDINATE PRIVACY FABRIC REQUIREMENTS WITH COR. CONTRACTOR SHALL BE AWARE OF THE VERTICAL HEIGHTS OF OBJECTS NEAR FENCE LINES; NO EQUIPMENT OR MATERIAL SHALL BE PLACED NEAR FENCE LINES THAT WOULD ALLOW THE FENCE TO BE SCALED. MAINTAIN A 10 FOOT MINIMUM SEPARATION FROM ALL FENCES FROM STOCKPILES, PARKED VEHICLES, OR OTHER MATERIALS WHICH COULD BE CLIMBED. POST A
METALLIC SIGN DISPLAYING THE CONTRACTOR'S 24 HOUR EMERGENCY CONTACT NUMBER.
4. ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY TO THE SITE SHALL USE THE ACCESS POINT AS DETERMINED BY THE COR. ALL ASSOCIATED FEES AND COSTS SHALL BE PAID BY CONTRACTOR AND ARE CONSIDERED INCIDENTAL TO
THE VARIOUS BID ITEMS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL TO AND FROM THE CONSTRUCTION AND STAGING AREAS.
THE TRAFFIC CONTROL MEASURES SHALL BE DIRECTED AND APPROVED BY THE CONTRACTING OFFICER AND/OR
CONTRACTING OFFICER'S REPRESENTATIVE.
6. CONTRACTOR SHALL COORDINATE LOCATION(S) OF SOIL STOCKPILE AREAS WITH THE CONTRACTING OFFICER IN ADVANCE OF CONSTRUCTION START. AT A MINIMUM, SOIL STOCKPILES WILL CONSIST OF CLEAN IMPORTED FILL, AND EXCAVATED SOILS WAITING FOR REUSE OR OFF-SITE DISPOSAL, AND STOCKPILES SHALL BE ADEQUATELY SEPARATED
FROM EACH OTHER WITHIN THE STOCKPILE AREA(S).
CONTRACTOR'S VEHICLES:
1. CONTRACTOR'S VEHICLES SHALL BE IN GOOD WORKING ORDER. CONTRACTOR'S PERSONNEL SHALL PARK WITHIN THE
CONTRACTOR'S STAGING AREA OR AREAS APPROVED BY THE COR.
2. ALL TRUCKS AND/OR ASSOCIATED VEHICLE HAULING TOOLS, LABOR, EQUIPMENT, MATERIAL OR DEBRIS ON THE VA CAMPUS SHALL BE EQUIPPED AND PREPARED TO PREVENT SPILLAGE OF DEBRIS DURING TRANSPORTATION. TRUCK BEDS SHALL BE SWEPT CLEAN BEFORE LEAVING THE WORK AREA. SIDEBOARDS SHALL BE KEPT IN GOOD REPAIR.
UNDER NO CIRCUMSTANCES SHALL A VEHICLE BE LOADED BEYOND ITS LEGAL LIMITS OR HIGHER THAN THE
SIDEBOARDS.
La st
S av ed b y:
U sc b0 o n:
O ct
9, 3:
: C
:\U se rs \u sc b0
5\ W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
0\
N ew
S pe es p ro je ct s\
VA
V an co uv er
W A
El ec tri ca l D ef ic ie nc ie s\
VA
V an co uv er
C iv il.
dw g
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
A/E:CIVIL ENGINEER:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Solutions Inc.
1201 Pacific Avenue Suite 550 Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
PB CMB
GENERAL NOTES AND LEGEND
C-002
100% CONSTRUCTION
DOCUMENTS
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
648-20-116
10/30/2025 4 of 238
LOT #19
TRANSPLANT
LODGER (18)
RRTP
(12)
LAUNDRY /
WAREHOUSE
(2)
BOILER
PLANT (3)
MAINTENANCE
SHOPS (4)
GROUNDS (5)
TELE
(13)
STORAGE
(16)
FITNESS
CENTER
(14)
SRO
CLARK
COUNTY
CENTER FOR
COMMUNITY
HEALTH
("CCH") (17)
MUSEUM
(T1819)
SNaP LAB (21)
STORAGE
(22)
WELL
(7)
EM.GEN
(6)
PRIMARY CARE
SUPPORT
BUILDING (15)
SPECIALTY
CARE
CLINICS
(20)
PRIMARY
CARE (24)
FISHER
HOUSE (25)
FREEDOMS
PATH (26)
WELL
(23)
TR3
BARNES
REHABILITATION
UNIT (11)
COMMUNITY
LIVING
CENTER (1)
NEW
IMAGING
(27)
LOT #10
LO
T
#5
B WINGC WING
E WING
F WING
D WING
STORAGE
BLDG.
(19)
LOT #11
LOT #18
LOT #13
LOT #15
LOT #9
LOT #8
LOT #6
LOT #3
LOT #17
LOT #1
LOT #14
LO
T #1
LOT #14
AR
M
Y
AV
EN
U
E
ARMY AVENUE
AIR
FO
R C
E W
AY
AIR FORCE W
AY
NATIONAL GUARD STREET
NAVY LANE
MARINE CORPS DRIVE
PO
W
M
IA
R
O
AD
COAST GUARD STREET
POW / MIA ROAD
PO
W
M
IA
R
O
AD
POW / MIA ROAD
MARINE CORPS DRIVE
E FOURTH PLAIN BLVD
FO
RT
V
AN
CO
UV
ER
W
AY
LO
T #2
LOT #2
LOT #12
LO
T
#7
LOT #21
LOT #4
GREEN
HOUSE
GARDEN
SHED
O
VE
R H
EA
D
R O
W
GAZEBO
C O
M M
C O
M M
COMM
CO
COMM
SAN
E
E
E
E
E
E E
E
E E E
E E E E
E E
E
E E E E
EE
E
E
COMM
W W
W
W W
E
E E
E
E E E E
E E E
E E E E
EE
E
E
COMM
W W
W
W W
La st
S av ed b y:
U sc b0 o n:
O ct
9, 3:
: C
:\U se rs \u sc b0
5\ W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
0\
N ew
S pe es p ro je ct s\
VA
V an co uv er
W A
El ec tri ca l D ef ic ie nc ie s\
VA
V an co uv er
C iv il.
dw g
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
A/E:CIVIL ENGINEER:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Solutions Inc.
1201 Pacific Avenue Suite 550 Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
PB CMB
OVERALL CIVIL SITE PLAN
CS100
100% CONSTRUCTION
DOCUMENTS
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
648-20-116
10/30/2025
BLOWUP DETAIL A
SCALE: 1" = 10'
BLOWUP DETAIL B - SITE PLAN
SCALE: 1" = 10'
1" = 100' scale feet
2001000100
SITE KEYNOTES
ELECTRICAL DUCTBANK, SEE ELECTRICAL
ELECTRICAL VAULT, SEE ELECTRICAL2
ELECTRICAL TRANSFORMER, SEE ELECTRICAL3
EXISTING ELECTRICAL CABINET, CONTRACTOR TO PROTECT IN PLACE
EXISTING FIRE HYDRANT, CONTRACTOR TO PROTECT IN PLACE
GUARD POST. SEE DETAIL E9 ON THIS SHEET.
PEDESTRIAN PATH STRIPING
BLOWUP DETAIL B - DEMOLITION PLAN
SCALE: 1" = 10'
DEMOLISH EXISTING CMU WALL AND FOUNDATION, PER STRUCTURAL
CONCRETE SIDEWALK
CMU WALL AND FOUNDATION, PER STRUCTURAL
DEMOLISH CONCRETE SIDEWALK AND CURB
OVERALL SITE PLAN1
SCALE: 1" = 100'
STEEL PIPE, 6"NOM, SCH 80,
FILLED WITH CONC. PAINT
FEDERAL SAFETY YELLOW.
2,500 PSI CONC
SLOPE
CONCRETE
FOR DRAINAGE
1' -6
2' -0
3'
-0
CL
1'-6"
6"
10/30/25
EXIST MASONRY WALL
PIPE SLEEVE
PIPE INSULATION
PIPE
MINERAL WOOL
INSIDEOUTSIDE
CAULK (TYP)
PIPE INSULATION
WITH JACKET
PIPE THRU WALL DETAIL 2
CAULK (TYP)
SCALE: NTS
DUCT THRU WALL DETAIL
SCALE: NTS
EXIST. WALL
MIN. 1" THICKNESS MINERAL
WOOL PACKING. (TYP)
CAULK (TYP)
1" CAULK (TYP)
STEEL DUCT.
STEEL SLEEVE. (TYP) 1" MAX.
ANNULAR SPACE
AIRFLOW
AIR VENT, 1/4" BALL VALVE.
INSTALL IN HIGH POINT OF
HEADER OR RETURN PIPE
TO ALLOW COMPLETE VENTING
OR AIR FROM COIL
CAPPED DRAIN, 3/4" BALL
VALVE. INSTALL IN
LOW POINT OF HEADER OR SUPPLY
DRAIN DOWN OF COIL
UNION IN OFFSET
FOR COIL REMOVAL
(TYP.)
P/T TEST PLUG (TYP.)
ISOLATION VALVE (TYP.)
FLOW CONTROL
DEVICE
TWO WAY ELECTRONIC TEMPERATURE
CONTROL VALVE
2-WAY WATER COIL3
SCALE: NTS
1/ 2'
'-0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8'
'-0
1/
'-0
1/ 4'
'-0
1' 2'
1' 1/
2' 2'
1/ 2'
1'
'-0
3'
'-0
1' m m
M
M
M
M
M
M
M m m
M m m
M
0.
5M
M 0.
5M 0.
M m m
M m m
M
.2
5M 0.
M
0.
M 0.
M m m
M
M
0.
5M m m
M
3/ 8'
'-0
1'
2' 4'
0.
M 0.
M m m
M
1/
2'
'-0
''0 2'
1/ 2'
1' 3' m m
M
0.
M 0.
M
6'
'-0
1/
4" 1/
2"
M
M
7.
m m
M
3/
'-0
8'
4' 4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
17/09/2025 6:35:53 am
M-501
MECHANICAL DETAILS I
MGH/JW AP/CY/RQ
100% CONSTRUCTION
DOCUMENTS
10/30/2025
648-20-116CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VA
VANCOUVER, WA
VHAPORHCS, VANCOUVER CAMPUS
1601 E 4TH PLAIN BLVD, VANCOUVER, WA 98661
Revisions: Date:
GRILLE AND DIFFUSER SCHEDULE
EQUIPMENT TAG BASIS OF DESIGN MANUFACTURER BASIS OF
DESIGN MODEL AIR PATTERN COLOR REMARKS
SD-1 PRICE AMCD 1-WAY COORDINATE W/ ARCHITECTURAL -
RG-1 PRICE RCG - COORDINATE W/ ARCHITECTURAL -
DIESEL FUEL DAY TANK
EQUIPMENT TAG BASIS OF DESIGN MANUFACTURER BASIS OF DESIGN
MODEL TYPE FUEL CAPACITY (GALLONS) WALL TYPE REMARKS
01-FDT-01 CAT NOTE 1 SUB BASE 960 DOUBLE WALLED 1,2,3,4
REMARKS:
1. SUB BASE TANK SHALL BE PROVIDED WITH GENERATOR SET.
2. PROVIDE WITH BASE TANK FUEL CONTROLLER.
3. PROVIDE WITH MANUFACTURER RECOMMENDED 1 KW TANK HEATER OR BASIS OF DESIGN DUREX BRAND NAME OR EQUAL 1 KW, 240 V, 3PH L-SHAPED IMMERSION HEATER. SEE SPECIFICATION 23 50 11 - BOILER PLANT MECHANICAL EQUIPMENT FOR ADDITIONAL REQUIREMENTS.
4. TANK TO BE UL142 RATED.
FUEL OIL PUMP SKID SCHEDULE
EQUIPMENT TAG BASIS OF DESIGN MANUFACTURER BASIS OF DESIGN
MODEL SERVICE TYPE
OPERATING POINT
PRESSURE RATING (PSI)
ELECTRICAL
WEIGHT (LBS) REMARKS
FLOW (GPH) MINIMUM PRIMING HEAD
(IN HG)
POWER
(HP) V PH HZ FLA DISCONNECT
FURNISHED BY
STARTER
FURNISHED BY
01-FOPS-01 PREFERRED UTILITIES ATPFS-100-1808 FUEL TANK STORAGE SKID MOUNTED DUPLEX 54 15 50 1/3 120 1 60 6 MC MC 450 1,2,3,4,5
REMARKS:
1. PROVIDE WITH SUCTION DIFFUSER AND STRAINER.
2. PROVIDE WITH MANUFACTURER RECOMMENDED NEMA RATED ENCLOSURE.
3. PROVIDE WITH SINGLE POINT POWER CONNECTION.
4. FUEL OIL SKID PROVIDED WITH FACTORY SUPPLIED DISCONNECTS AND STARTERS FOR BOTH PUMPS.
5. SEE SPECIFICATION 23 50 11 - BOILER PLANT MECHANICAL EQUIPMENT FOR ADDITIONAL REQUIREMENTS.
FUEL POLISHING SYSTEM SCHEDULE
EQUIPMENT TAG BASIS OF DESIGN MANUFACTURER BASIS OF DESIGN MODEL LOCATION MOUNTING PUMP TYPE PUMP FLOW RATE (GPH) WATER REMOVAL (%)
ELECTRICAL
REMARKS
MOTOR SIZE (HP) VOLT PH HZ FLA
01-FPS-01 PREFERRED UTILITIES PF-503 GENERATOR YARD SKID MOUNTED POSITIVE GEAR DISPLACMEENT 480 99.5 1/2 115 1 60 - 1
REMARK:
1. PROVIDE WITH A SINGLE POINT POWER CONNECTION.
HEAT TRACE SCHEDULE
EQUIPMENT TAG LOCATION BASIS OF DESIGN
MANUFACTURER
BASIS OF DESIGN
MODEL
EQUIPMENT ASSOCIATED WITH PIPING TO
BE PROTECTED
TEMPERATURE ELECTRICAL DATA
REMARKSMIN OUTDOOR TEMP
(°F) DESIGN TEMP (°F) DESIGN LENGTH
(FT) W/FT V HZ PH MOP
01-HT-01 FUEL STORAGE RAYCHEM 3BTV1-CT 01-FOPS-01 18 40 90 3 120 60 1 15 1,2,3
01-HT-02 FUEL STORAGE RAYCHEM 3BTV1-CT 01-FOPS-01 18 40 25 3 120 60 1 15 1,2,3
01-HT-03 FUEL STORAGE RAYCHEM 3BTV1-CT 01-FT-01 18 40 60 3 120 60 1 15 1,2,3
01-HT-04 FUEL STORAGE RAYCHEM 3BTV1-CT 01-FDT-01 18 40 10 3 120 60 1 15 1,2,3
01-HT-05 FUEL STORAGE RAYCHEM 3BTV1-CT 01-FDT-01 18 40 10 3 120 60 1 15 1,2,3
REMARKS:
1. DESIGN LENGTH IS AN ESTIMATE OF LENGTH OF PIPING TO BE PROTECTED BY HEAT TRACE FOR BIDDING PURPOSES. CONTRACTOR TO PROVIDE HEAT TRACE AS REQUIRED TO PROTECT ALL EXTERIOR PIPING ASSOCIATED WITH EQUPMENT TO BE PROTECTED.
2. MECHANICAL CONTRACTOR TO COORDINATE WITH ELECTRICAL CONTRACTOR TO ENSURE THAT APPROPRIATE ELECTRICAL CIRCUIT IS USED IF LENGTH AND WATTAGE EXCEEDS THAT SHOWN ON THIS SCHEDULE.
3. INSTALL IN COMPLIANCE WITH MANUFACTURER REQUIREMNTS AND RECOMMENDATIONS TO PROTECT PIPING.
DIESEL FUEL TANK
EQUIPMENT TAG BASIS OF DESIGN MANUFACTURER BASIS OF DESIGN
MODEL TYPE FUEL CAPACITY (GALLONS) WALL TYPE REMARKS
01-FT-01 GREER F921 RECTANGULAR 3,000 DOUBLE WALLED 1,2,3,4,5,6,7
REMARKS:
1. PROVIDE WITH BASIS OF DESIGN OMNTEC PROTEUS AUTOMATIC TANK GAUGING AND LEAK DETECTION SYSTEM MODEL NUMBER 0EL8000111-B BRAND NAME OR EQUAL.
2. PROVIDE WITH BASIS OF DESIGN OMNTEC MAGNETOSTRICTIVE TANK GAUGING PROBE MODEL NUMBER MTG BRAND NAME OR EQUAL.
3. PROVIDE WITH BASIS OF DESIGN OMNTEC BRIGHT EYE SENSORS MODEL NUMBER BX-LS BRAND NAME OR EQUAL.
4. PROVIDE WITH BASIS OF DESIGN REMOTE ANNUNICATORS MODEL NUMBER RAS-1 BRAND NAME OR EQUAL.
5. PROVIDE WITH BASIS OF DESIGN MODBUS TO BACNET CONVERTER BRAND NAME OR EQUAL.
6. PROVIDE WITH MANUFACTURER RECOMMENDED 2 KW TANK HEATER OR BASIS OF DESIGN DUREX BRAND NAME OR EQUAL 2 KW, 240 V, 3PH L-SHAPED IMMERSION HEATER. SEE SPECIFICATION 23 50 11 - BOILER PLANT MECHANICAL EQUIPMENT FOR ADDITIONAL REQUIREMENTS.
7. TANK TO BE UL2085 RATED.
VAV TERMINAL UNIT SCHEDULE
EQUIPMENT
TAG
BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN
MODEL
AREA SERVED TYPE UNIT
SIZE
MINIMUM
AIRFLOW (CFM)
MAXIMUM AIRFLOW
(CFM)
HOT WATER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .