Attachment 5- NAVSEA Form 4340-2_GFI List.pdf

NAVSEA Form PDF 1 MB Posted

Attached to
Job Order Contract Construction NAVSEA PHD
Solicitation number
N6339423R0TBD-JOC
Issued by

View the file

Other versions and copies of NAVSEA Form 4340-2

File Revision Posted Attached to
Attachment J-03 - GFI_NAVSEA_Form_4340-2 20200124_0700.xlsx Jan 24, 2020 FY21-25 AN/SPY-6 Radar Hardware Production and Sustainment
N6449823R4013 - RFP Attachment 3 - Government Furnished Information (GFI) NAVSEA FORM 4340-2.pdf Revision not stated Land Based Engineering Site (LBES) Enterprise Industrial Installation and Outfitting Services
ATTACHMENT 2 Government Furnished Information (GFI) NAVSEA FORM 4340-2.pdf Revision not stated Hull, Mechanical and Electrical (HM&E) Machinery and Systems Services
NAVSEA Form 4340-2 GFI_Robot Riser.pdf Revision not stated Robot Arm Riser
Attachment 2 NAVSEA Form 4340-2_GFI List.pdf Revision not stated MK96 Mod 2, Cold Gas Fleet Exercise Section, Bag Assembly
NAVSEA Form 4340-2_GFI List.pdf Revision not stated MK96 Mod 2, Cold Gas Fleet Exercise Section, Bag Assembly; Request for Information
Attachment_5_Government_Furnished_Information_(NAVSEA_Form_4340-2).pdf Revision not stated N00253-18-R-0002 Amendment 0004
Attachment_5_Government_Furnished_Information_(NAVSEA_Form_4340-2).pdf Revision not stated N00253-18-R-0002 Amendment 0004
EASR_Att_J-03_GFI_NAVSEA_FORM_4340-2.pdf Revision not stated Enterprise Air Surveillance Radar (EASR) Engineering and Manufacturing Development
Attachment_2_-Government_Furnished_Information_NAVSEA_Form_4340-2.pdf Revision not stated Airborne Laser Mine Detection System
Attachment 2 -Government Furnished Information NAVSEA Form 4340-2.docx Revision not stated Airborne Laser Mine Detection System
Section_J_-_Attachment_4_-_Government_Furnished_Information_NAVSEA_Form_4340-2.doc Revision not stated TECHNOLOGY INSERTION HARDWARE (TIH 16/18)
Section J - Attachment 4 - Government Furnished Information NAVSEA Form 4340-2 DRAFT.doc Revision not stated Technology Insertion Hardware
Show all 13

Who attaches NAVSEA Form 4340-2

Other files

File Type Posted
N6339423R0009 AMENDMENT 0004.pdf PDF
N6339423R0009 AMENDMENT 0003.pdf PDF
Attachment 10- RFI Questions and Answers 2.xlsx XLSX spreadsheet
N6339423R0009 AMENDMENT 0002.pdf PDF
N6339423R0009 AMENDMENT 0001.pdf PDF
Attachment 8- RFI Questions and Answers.xlsx XLSX spreadsheet
Attachment 2- PTO 0001 Part 3 UPDATED.pdf PDF
Exhibit_M UPDATED.xlsx XLSX spreadsheet
Attachment 9 - Site Walk Contractors Attendees.pdf PDF
Attachment 3- PTO 0001 Part 6 UPDATED.pdf PDF
CDRLS_A011-A020.pdf PDF
Exhibit_E.doc DOC document
Exhibit_H.doc DOC document
Exhibit_A.docx DOCX document
CDRLS_A001-A010.pdf PDF
Exhibit_G.docx DOCX document
Exhibit_I.pdf PDF
Attachment 4- DD Form 254.pdf PDF
Exhibit_B.doc DOC document
Attachment 7- Base Access Form SECNAV5512.pdf PDF
Exhibit_C.doc DOC document
N6339423R0009 JOC RFP.pdf PDF
Exhibit_J.docx DOCX document
Exhibit_F.docx DOCX document
Attachment 6- QASP.pdf PDF
Attachment 1- PTO 0001 Part 2.pdf PDF
Exhibit_D.doc DOC document
Exhibit_M.xlsx XLSX spreadsheet
Exhibit_K.docx DOCX document
Attachment 2- PTO 0001 Part 3.pdf PDF
Attachment 3- PTO 0001 Part 6.pdf PDF
CDRLS_A021-A030.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVSEA 4340/2 (Rev. Mar 2018) Page 1 of 2

GOVERNMENT FURNISHED INFORMATION

ATTACHMENT # PR#

PROGRAM TITLE: CONTRACT NUMBER: DATE:

CODE:

(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE

NAVSEA 4340/2 (Rev. Mar 2018) Page 2 of 2

NAVSEA Form 4340/2 - Government Furnished Information Instructions

ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.

PR #: Enter Purchase Request (PR) number.

PROGRAM TITLE: Enter the title of the program.

CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.

DATE: Enter the calendar date that this form was prepared.

CODE: Enter the Program Office / Requiring Activity's office code.

NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.

DOCUMENT TITLE, Column (2): Enter Document Title for each item.

DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.

DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).

GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:

DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test

PAGE __ OF __: Assign page numbers sequentially.

NAVSEA 4340/2 (Rev. Mar 2018) Page of NAVSEA 4340/2 (Rev. Mar 2018) Page of

GOVERNMENT FURNISHED INFORMATION

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

NAVSEA Form 4340/2 - Government Furnished Information Instructions

ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.

PR #: Enter Purchase Request (PR) number.

PROGRAM TITLE: Enter the title of the program.

CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.

DATE: Enter the calendar date that this form was prepared.

CODE: Enter the Program Office / Requiring Activity's office code.

NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.

DOCUMENT TITLE, Column (2): Enter Document Title for each item.

DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.

DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).

GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:

DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test

PAGE __ OF __: Assign page numbers sequentially.

11.0.1.20130826.2.901444.899636

CurrentPage:
PageCount:
TextField1: 5
TextField2:
TextField7: JOB ORDER CONTRACT (JOC) CONSTRUCTION
TextField8: N6339423R0009
DateField1: 05 January, 2023
TextField3: 1022
DateField3: (7) DAC
DateField3: (7) DAC
DateField3: (7) DAC
DateField2:
TextField6:
TextField5: 1388_1_A
TextField5: PH 1388 Lead Report 071514
TextField5: PH 1388 Asbestos Survey 071514
TextField4: 1
TextField4: 3
TextField4: 2

File details come from the government source that posted it. Updated .