Exhibit_K.docx

DOCX document 21 KB Posted

Attached to
Job Order Contract Construction NAVSEA PHD
Solicitation number
N6339423R0TBD-JOC
Issued by

View the file

Other files

File Type Posted
N6339423R0009 AMENDMENT 0004.pdf PDF
N6339423R0009 AMENDMENT 0003.pdf PDF
Attachment 10- RFI Questions and Answers 2.xlsx XLSX spreadsheet
N6339423R0009 AMENDMENT 0002.pdf PDF
N6339423R0009 AMENDMENT 0001.pdf PDF
Attachment 8- RFI Questions and Answers.xlsx XLSX spreadsheet
Attachment 2- PTO 0001 Part 3 UPDATED.pdf PDF
Exhibit_M UPDATED.xlsx XLSX spreadsheet
Attachment 9 - Site Walk Contractors Attendees.pdf PDF
Attachment 3- PTO 0001 Part 6 UPDATED.pdf PDF
CDRLS_A011-A020.pdf PDF
Exhibit_E.doc DOC document
Exhibit_H.doc DOC document
Exhibit_A.docx DOCX document
CDRLS_A001-A010.pdf PDF
Exhibit_G.docx DOCX document
Exhibit_I.pdf PDF
Attachment 4- DD Form 254.pdf PDF
Exhibit_B.doc DOC document
Attachment 7- Base Access Form SECNAV5512.pdf PDF
Exhibit_C.doc DOC document
N6339423R0009 JOC RFP.pdf PDF
Exhibit_J.docx DOCX document
Exhibit_F.docx DOCX document
Attachment 6- QASP.pdf PDF
Attachment 1- PTO 0001 Part 2.pdf PDF
Exhibit_D.doc DOC document
Exhibit_M.xlsx XLSX spreadsheet
Attachment 5- NAVSEA Form 4340-2_GFI List.pdf PDF
Attachment 2- PTO 0001 Part 3.pdf PDF
Attachment 3- PTO 0001 Part 6.pdf PDF
CDRLS_A021-A030.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT K – COEFFICIENT BREAKDOWN FORM

PRE-PRICED COSTS
MATERIALS
LABOR
EQUIPMENT
AMOUNT
RS MEANS BARE COST (PRESUMED ANNUAL AMOUNT)
$ 2,520,000.00
$ 1,400,000.00
$ 80,000.00
$ 4,000,000.00

WORKER'S COMP INSURANCE

15%

$ 210,000.00

AVERAGE FIXED LABOR OVERHEAD

16%

$ 224,000.00

PROJECT OVERHEAD PRE-PRICED

8%

$ 112,000.00

MATERIAL MARKUP
5%

$ 126,000.00

EQUIPMENT MARKUP

5%
$ 4,000.00
SUBTOTAL
$ 676,000.00

GENERAL AND ADMINISTRATIVE

8%

$ 112,000.00

PROFIT
5%
5%
5%
$ 200,000.00
TOTAL
$ 988,000.00

COEFFICIENT FACTOR (TOTAL DIVIDED BY PRESUMED ANNUAL AMOUNT)

0.247

RS MEANS BARE COST ADJUSTMENT (PRODUCTION/DISCOUNT - FACTOR)

0.900

PRE-PRICED COEFFICIENT

1.147

NON PRE-PRICED BARE COSTS (PRESUMED ANNUAL AMOUNT)
$ 252,000.00
$ 140,000.00
$ 8,000.00
$ 400,000.00

WORKER'S COMP INSURANCE

15%

$ 21,000.00

AVERAGE FIXED LABOR OVERHEAD

16%

$ 22,400.00

PROJECT OVERHEAD NON PRE-PRICED

18%

$ 25,200.00

MATERIAL MARKUP
5%

$ 12,600.00

EQUIPMENT MARKUP

5%
$ 400.00
SUBTOTAL
$ 60,600.00

GENERAL AND ADMINISTRATIVE

8%

$ 11,200.00

PROFIT
5%
5%
5%
$ 20,000.00
TOTAL
$ 91,800.00
BARE COST
$ 400,000.00

COEFFICIENT FACTOR (TOTAL DIVIDED BY BARE COST)

0.2295

NON-PRE-PRICED BARE COST ADJUSTMENT (PRODUCTION/DISCOUNT - FACTOR)

1.000

NON PRE-PRICED COEFFICIENT

1.2295

Offerors should fully understand "at a minimum" what is to be included in the coefficient. Section 00 21 16 of the RFP, and more specifically paragraphs 00 21 16 03 -2 OFFEROR'S COEFFICIENT AND PRE-PRICED WORK (and its subparagraphs) and -3 NON PRE-PRICED WORK (and its subparagraphs) define the requirements for the pre-priced and non-pre-priced coefficients.

The amounts shown above are based on the presumption that the Contractor has an annual billing amount of $4,000,000 and up. The amounts listed herein are fictitious as are the cost items. These examples should not be construed to be minimum or maximum, or even normal, amounts. Cost items should be added, removed, or separated as the Offeror deems necessary to demonstrate a detailed breakdown of coefficient cost. Any Offeror edits to the form must be explained in detail in the Offeror’s proposal.

NOTE: The profit percentage proposed by the contractor on this form to be included in its pre-priced and non-pre-priced coefficients shall be binding and shall be the maximum profit rate the Contractor will be allowed to propose for all task orders and/or subsequent modifications issued under this contract.

The Contractor may propose a lower profit rate when responding to an individual task order request (or subsequent modifications) based on the tasks identified in the request. Profit will be negotiated on an individual Task Order and modification basis, but shall never exceed the maximum profit rate proposed by the Contractor on this form. The maximum profit rate shall be binding even if the DFARS 215.404-73 ALTERNATE STRUCTURED APPROACH PROFIT WORKSHEET would result in a higher profit. The maximum profit rate shall not be construed as a “fixed” profit percentage for all Task Orders or Modification actions issued under this contract. If DFARS 215.404-73 ALTERNATE STRUCTURED APPROACH PROFIT WORKSHEET calculations indicate a lower profit rate is merited, the lower profit percentage shall be applied.