Attachment 2- PTO 0001 Part 3.pdf

PDF 136 KB Posted

Attached to
Job Order Contract Construction NAVSEA PHD
Solicitation number
N6339423R0TBD-JOC
Issued by

View the file

Other files

File Type Posted
N6339423R0009 AMENDMENT 0004.pdf PDF
N6339423R0009 AMENDMENT 0003.pdf PDF
Attachment 10- RFI Questions and Answers 2.xlsx XLSX spreadsheet
N6339423R0009 AMENDMENT 0002.pdf PDF
N6339423R0009 AMENDMENT 0001.pdf PDF
Attachment 8- RFI Questions and Answers.xlsx XLSX spreadsheet
Attachment 2- PTO 0001 Part 3 UPDATED.pdf PDF
Exhibit_M UPDATED.xlsx XLSX spreadsheet
Attachment 9 - Site Walk Contractors Attendees.pdf PDF
Attachment 3- PTO 0001 Part 6 UPDATED.pdf PDF
CDRLS_A011-A020.pdf PDF
Exhibit_E.doc DOC document
Exhibit_H.doc DOC document
Exhibit_A.docx DOCX document
CDRLS_A001-A010.pdf PDF
Exhibit_G.docx DOCX document
Exhibit_I.pdf PDF
Attachment 4- DD Form 254.pdf PDF
Exhibit_B.doc DOC document
Attachment 7- Base Access Form SECNAV5512.pdf PDF
Exhibit_C.doc DOC document
N6339423R0009 JOC RFP.pdf PDF
Exhibit_J.docx DOCX document
Exhibit_F.docx DOCX document
Attachment 6- QASP.pdf PDF
Attachment 1- PTO 0001 Part 2.pdf PDF
Exhibit_D.doc DOC document
Exhibit_M.xlsx XLSX spreadsheet
Attachment 5- NAVSEA Form 4340-2_GFI List.pdf PDF
Exhibit_K.docx DOCX document
Attachment 3- PTO 0001 Part 6.pdf PDF
CDRLS_A021-A030.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6339423R0009 PH1388 Painting and Flooring

Naval Base Ventura County Port Hueneme, California

Part 3 Statement of Work / Project Program

Project title: PH1388 Painting and Flooring Attachment 2 Project Location: NBVC PORT HUENEME, CALIFORNIA PTO 0001

PART 3 STATEMENT OF WORK AND PROJECT PROGRAM- Page 2

Part 3 Statement of Work / Project Program

Part 3

Table of Contents

CHAPTERS

1. PROJECT DESCRIPTION

2. PROJECT OBJECTIVES

3. SITE ANALYSIS

4. BUILDING REQUIREMENTS

5. ROOM REQUIREMENTS

6. ENGINEERING SYSTEMS REQUIREMENTS

C10 Interior Construction C30 Interior Finishes D50 Electrical Power and Lighting E20 Furnishings F20 Selective Building Demolition G10 Site Preparations

1.0 PROJECT DESCRIPTION

Naval Surface Warfare Center (NSWC), Port Hueneme is updating the West Wing of building 1388. The project is to disconnect electrical and communication lines from existing furniture specified in attachment

3.02. Replace the existing carpet, ceramic tile, and linoleum tile throughout the areas designated in attachment 3.02 with vinyl flooring (details provided in Section C3010 below). Replace all baseboards/cove base adjacent to all areas where carpet has been replaced with cove base. Patch and paint all walls in the designated areas within the first floor of the west wing (see attachment 3.04 in Part 6 and paint details provided in Section C3020 below).

The Contractor shall provide all labor, equipment, materials and tools necessary to accomplish all the required tasks within this Part 3.

2.0 PROJECT OBJECTIVES

Project title: PH1388 Painting and Flooring Attachment 2

N6339423R0009

PART 3 STATEMENT OF WORK AND PROJECT PROGRAM- Page 3

Building 1388 1st Floor West Wing Electrical disconnect and reconnect

Contractor shall disconnect all electrical and communication lines from furniture specified in attachment

3.02. Contractor shall relocate the electrical and communication lines to new furniture configuration and provide new electrical and communication lines to additional workstations. It is up to the contractor to test connections for usable receptacles. Electrical requirements of workstations to be provided upon request.

Building 1388 1st Floor West Wing Painting and Flooring

Contractor shall remove, dispose and provide new flooring as identified in the C30 paragraph of this Statement of Work (SOW) and as illustrated on the drawings. See attachment 3.03 for details of area that will receive new flooring. Replace baseboards or cove base with new cove base of a similar material and grade where new flooring will be installed. Patch and paint all walls and columns in designated areas specified in attached drawings with approved paint adhering to the Naval Base Ventura County (NBVC) paint standard. Paint location markers with approved paint and color. Replace all regular ceiling tiles with tegular ceiling tiles.

2.1 APPLICABLE CODES AND STANDARDS

Code/Regulation Compliance: Demolition and Installation work shall conform to all applicable sections of the National Electric Code (NEC), Unified Facilities Guide Specifications (UFGS), and Unified Facilities Criteria (UFC). Requirements stated within this SOW will not supersede requirements in the FAR, UFGS, UFC, and all applicable laws and building codes.

The Construction Superintendent can be the Site Safety and Health Officer (SSHO) and the QC Manager.

Health/Safety/OSHA: Contractor shall perform all work in accordance with requirement specification (Standard – 29CFR; Part 1924, 1925, 1926 and 1977) Work Site Condition: Contractor is required to keep the work site neat and in presentable condition at all times. Contractor shall continuously maintain a safe working area. All debris shall be removed from the work site on a continual and daily basis, and at project completion at an offsite approved hauler/TSD facility.

Submittals: Every copy of each submittal shall have a "Submittal Transmittal Approval Form” attached to the cover. Proof that materials and finishes are in compliance with the “Buy American Act” shall be included.

Finishes: Prior to ordering equipment, fixtures, furnishings, and/or materials, provide performance data, color selections, and finish choices to the Government Project Manager for selection and approval.

Accessibility: This project shall comply with all provisions of the ADA (Americans with Disabilities Act) and ABA (Architectural Barriers Act), latest edition. The Contractor shall ensure that all doors, hardware, controls, materials, surfaces and other project elements shall meet all current accessibility regulations and guidelines.

2.2 SUSTAINABLE DESIGN

Not used

Project title: PH1388 Painting and Flooring Attachment 2

N6339423R0009

PART 3 STATEMENT OF WORK AND PROJECT PROGRAM- Page 4

2.3 STORMWATER MANAGMENT - LOW IMPACT DEVELOPMENT

2.4 CYBERSECURITY

3.0 SITE ANALYSIS

Site Investigation

1. The Contractor shall visit the job site to investigate all areas indicated within this SOW.

Contractor shall visually inspect, measure, photograph, and otherwise document all areas as required to accurately document the existing conditions, potential obstructions and constraints.

2. Floor plans, maps or other drawings provided by the Government are for general information and project orientation only and should be field verified before beginning work. Any drawings of existing conditions should be considered incomplete or inaccurate and are provided for reference purposes only. Drawings provided by the Government may not be up to date and should not be considered to be as-built drawings. All conditions should be confirmed on site by Contractor personnel.

3.1 EXISTING SITE CONDITIONS

For the site location, refer to Part 6.

Technical Data: Not provided

3.2 SITE DEVELOPMENT

Construction Access/Laydown Area

Contractor access and lay down areas shall be determined in coordination with the Contracting Officer.

Under no circumstances, should lay down area restrict emergency or fire access or affect environmentally sensitive or archaeological areas.

ADA/ABA

Accessibility requirements shall be protected and access to parking spaces shall be maintained, including signage, curb ramps, and striping throughout the project.

4.0 BUILDING REQUIREMENTS

This building will be occupied and the surrounding parking areas will be used throughout the project duration. The overall building envelope and primary structure are in fair condition and have not been upgraded since their construction.

Project title: PH1388 Painting and Flooring Attachment 2

N6339423R0009

PART 3 STATEMENT OF WORK AND PROJECT PROGRAM- Page 5

5.0 ROOM REQUIREMENTS

The room requirements are described in the summary below. See Part 6 Attachments for floor plans showing rooms within the area of work for reference.

Demolition Items for rooms 1302, 1303, 1301, 1313, 1306, 1308, 1309, 1310, 1316, 1317, 1311, 1312, 1314, 1315, 1318, corridor/hallway

Remove existing carpet tiles and its adhesive Remove existing ceramic tiles and its mortar in room 1311 Remove existing VCT and its adhesive in corridor/hallway and room 1318 Remove all existing cove base Remove existing thresholds Remove regular style ceiling tiles Disconnect electrical lines, communication lines and NMCI lines for furniture in rooms 1313 and

Installation Items for rooms 1302, 1303, 1301, 1313, 1306, 1308, 1309, 1310, 1316, 1317, 1311, 1312, 1314, 1315, 1318, corridor/hallway

Install new vinyl tiles in rooms 1318, 1303, and corridor/hallway Install new vinyl planks in rooms 1313, 1302, 1301, 1313, 1306, 1308, 1309, 1310, 1316, 1317, 1311, 1312, 1314, 1315 Install new cove base in rooms 1302, 1303, 1301, 1313, 1306, 1308, 1309, 1310, 1316, 1317, 1311, 1312, 1314, 1315, 1318, corridor/hallway Prep, clean, prime and paint all walls, columns, doors, and door frames throughout the area of work.

Install new thresholds/transition strips between flooring transitions Install new tegular edge ceiling tiles where the regular tiles were removed Install 12” rub rail wall paneling in rooms 1313, 1301, 1302, 1303, 1310, 1316, 1317, 1318, 1315, Reconnect electrical lines, communication lines, and NMCI lines to new furniture in rooms 1313 and 1316.

Run new electrical lines from electrical panel to new furniture workstations and terminate Run communication lines and NMCI lines from new workstations to data room; coordination with

NAVSEA IT will be necessary

Disclaimer: This contract does not include the procurement or furnishing of new furniture workstations.

6.0 ENGINEERING SYSTEMS REQUIREMENTS (ESR)

C10 Interior Construction C30 Interior Finishes D50 Electrical Power and Lighting E20 Furnishings F20 Selective Building Demolition G10 Site Preparation

Project title: PH1388 Painting and Flooring Attachment 2

N6339423R0009

PART 3 STATEMENT OF WORK AND PROJECT PROGRAM- Page 6

C10 INTERIOR CONSTRUCTION

For furniture in the construction areas specified in attachment 3.01, the contractor shall retain the item(s) in the construction area and may move the item(s) as necessary to complete their work.

Replace existing carpet with Vinyl Tiles (per section C30) in the designated areas in the west wing of the building, replace transition strips between new flooring and flooring to remain. Patch and paint walls in designated areas indicated on attachment 3.06.

C30 INTERIOR FINISHES

C3010. FLOOR FINISHES

Provide new flooring materials as required. All flooring materials, adhesives, finish coats, sealers and mortar materials must meet or exceed EPA requirements for toxic substance content restrictions and air quality requirements; and meet or exceed fire protection requirements, such as smoke and flame spread requirements. When laying resilient flooring, use the widest sheet materials available to avoid or minimize the number and extent of seams. When seams are required, locate seams at infrequent traffic areas. Contractor is required to submit seam layout to Contracting Officer for approval prior to installation.

1. Resilient Luxury Vinyl Tile characteristics:

24” x 24” Square LVT Shaw or equivalent No wax finish floor Low to moderate maintenance Antistatic and antibacterial requirements Compound + Cast

20MM

Warranty – 15 years commercial warranty High Slip-resistance requirements

2. Resilient Luxury Vinyl Plank characteristics:

Product Type – Floating LVP Wear Layer – 20mil (.5mm) Finish – M-Force Overall thickness – 6mm (.25”) Size – 7.75 “W x 59.75” (Nominal) Installation Method – Floating LVP with Unipush Locking System Square FT/Carton - 19.294sf/ctn Warranty – 15 years Commercial Warranty

3. Rubber Cove Base

Size- 4” Top set Style – TS

Project title: PH1388 Painting and Flooring Attachment 2

PART 3 STATEMENT OF WORK AND PROJECT PROGRAM- Page 7

C3020. PAINTING

All painting and coating materials must be low VOC, comply with local air quality control laws and, regulations; and conform to the Master's Painters Institute's (MPI) Architectural, Interior Systems Manual and the MPI's Maintenance and Repainting Manual recommendations for paint systems, surface preparation and applications.

Provide minimum of one prime coat and two finish coats. The prime coat must not be combined with texture or other coatings. Seal and prime all surfaces to cover underlying stains or discoloration that may affect finish paint. Finish coats must provide full coverage of undercoats and substrates. All walls and ceilings in wet area must have semi-gloss paint. All wood or metal cased openings, door trims and casings, window trims and casing, and other finish trim must have semi-gloss paint. All interior walls and ceilings must have satin or eggshell finish. For previously painted surfaces, prime all surfaces to ensure compatibility of finish coats. Do not paint prefinished surfaces except as noted.

Provide Institutional Low Odor/Low VOC Latex paint or High Performance Architectural Latex systems as defined and approved by the MPI Systems Manual for the various substrates required to be painted.

Paint/Color Selection: Provide paint systems tested to "Detailed Performance Level" standard as defined by MPI. Paints must be readily available for purchase in standard colors and meet the Installation Appearance Plan.

C3030. Ceiling

Primary ceiling finish must be 24 inch by 48 inch by 3/4 inch minimum thickness suspended acoustic ceiling tiles with tegular edge.

D50 ELECTRICAL POWER AND LIGHTING

All electrical work must comply with Unified Facilities Criteria UFC 3-501-01 Electrical Engineering with change 2, and UFC 3-520-01 Interior Electrical Systems with change 2. Comply with UFC 1- 200-01. UFC 1-200-01 implements the National Codes to include seismic, life safety, and the core Unified Facilities Criteria Documents.

Any disruption or removal of electrical equipment and services to areas of the building during construction shall be restored or replaced.

GENERAL SYSTEM REQUIREMENTS

All equipment shall be installed per the criteria of the manufacturer’s recommendations. Where the word “should” is used in the manufacturer’s recommendations, substitute the word “shall”. Provide calculations to assure properly installed electric equipment meets the loads.

The existing electrical conduit and circuits shall be disconnected from the office furniture specified in attachment 3.02. While the electrical is disconnected the contractor shall ensure the circuits are locked out tagged out and comply with the applicable UFC.

Project title: PH1388 Painting and Flooring Attachment 2

PART 3 STATEMENT OF WORK AND PROJECT PROGRAM- Page 8

An assessment shall be done by a certified electrician to ensure the existing power can be used for the new furniture to be installed.

Once the furniture has been installed the contractor shall reconnect the electrical by using the existing power; conduit may be moved and extended as necessary for correct location of power poles to new furniture. Power whips for new furniture shall be connect to the existing circuits.

D5020 COMMUNICATIONS

Telecommunications Systems

Coordinate with local activity authorities and building users for specific requirements as may be directed by the Contracting Officer.

Per UFC 3-580-01 requires new building renovation to provide CAT-6 for voice and data telecommunications. Relocate existing NMCI infrastructure to relocated workstations and provide new NMCI to all new workstation (9) from building entrance terminal patch panel (XX-blocks).

E20 FURNISHINGS

Decorated furnishings including any wall mounted photos, signs, pictures, white boards, bulletin boards, and anything identified by customer during site visit and construction. These furnishings are to be removed and placed in government possession for proper handling.

Functional furnishings include egress signage and room identification signage which shall be removed and placed back in existing location after work completion in that area.

12” Plastic wall panel shall be installed in rooms 1313, 1314, 1316, and 1317 and placed 30” – 42” off the ground. Rm 1314 has existing wall panel to protect wall from chair scuffs.

F20 SELECTIVE BUILDING DEMOLITION

In general terms, demolition work must include the removal and disposition of existing construction. Take care to prevent damage to existing construction that are not scheduled for demolition. If damage occurs, make repairs to the satisfaction of the Contracting Officer and at no cost to the Government. Comply with local Activity and Installation local requirements regarding demolition and removal. Unless otherwise specified in Part 3, all demolished materials must be removed from government property and disposed of in accordance with applicable laws and regulations, including local Activity or Installation regulations. Selling of demolished or salvaged materials and equipment on government properties is prohibited.

Floors

Remove and dispose of all flooring and its components specified in drawing attached in Part 6.

Walls

Remove and dispose of the cove base that is connected to all the demolished flooring.

Project title: PH1388 Painting and Flooring Attachment 2

N6339423R0009

PART 3 STATEMENT OF WORK AND PROJECT PROGRAM- Page 9

Ceiling

Replace any ceiling tiles that have been damaged before and during construction.

G10 SITE PREPARATION

G1040 HAZARDOUS WASTE REMEDIATION

Any remediation would be as required in 40 CFR 260-260 and Cal Code 260

--End of Part 3--