Exhibit_M UPDATED.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Job Order Contract Construction NAVSEA PHD
Solicitation number
N6339423R0TBD-JOC
Issued by

View the file

Other files

File Type Posted
N6339423R0009 AMENDMENT 0004.pdf PDF
N6339423R0009 AMENDMENT 0003.pdf PDF
Attachment 10- RFI Questions and Answers 2.xlsx XLSX spreadsheet
N6339423R0009 AMENDMENT 0002.pdf PDF
N6339423R0009 AMENDMENT 0001.pdf PDF
Attachment 8- RFI Questions and Answers.xlsx XLSX spreadsheet
Attachment 2- PTO 0001 Part 3 UPDATED.pdf PDF
Attachment 9 - Site Walk Contractors Attendees.pdf PDF
Attachment 3- PTO 0001 Part 6 UPDATED.pdf PDF
CDRLS_A011-A020.pdf PDF
Exhibit_E.doc DOC document
Exhibit_H.doc DOC document
Exhibit_A.docx DOCX document
CDRLS_A001-A010.pdf PDF
Exhibit_G.docx DOCX document
Exhibit_I.pdf PDF
Attachment 4- DD Form 254.pdf PDF
Exhibit_B.doc DOC document
Attachment 7- Base Access Form SECNAV5512.pdf PDF
Exhibit_C.doc DOC document
N6339423R0009 JOC RFP.pdf PDF
Exhibit_J.docx DOCX document
Exhibit_F.docx DOCX document
Attachment 6- QASP.pdf PDF
Attachment 1- PTO 0001 Part 2.pdf PDF
Exhibit_D.doc DOC document
Exhibit_M.xlsx XLSX spreadsheet
Attachment 5- NAVSEA Form 4340-2_GFI List.pdf PDF
Exhibit_K.docx DOCX document
Attachment 2- PTO 0001 Part 3.pdf PDF
Attachment 3- PTO 0001 Part 6.pdf PDF
CDRLS_A021-A030.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRE-PRICED ITEM DESCRIPTIONMEANS ITEM #QTY #QTY UNITOXNARD (930) MATERIAL (MATL) UNIT COSTMATL TOTAL COSTOXNARD (930) LABOR UNIT COSTLABOR TOTAL COSTOXNARD (930) EQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
Remove vinyl rub rail02 42 10.20 063070SF$ 2.42$ 169.40
Remove vinyl Cove Base09 05 05.20 08501515LF$ - 0$ 0.52$ 787.80$ - 0$ - 0$ - 0$ - 0
Remove Carpet Tile permanent09 05 05.20 056015825SF$ - 0$ 0.56$ 8,862.00$ - 0$ - 0$ - 0$ - 0
Remove ceramic tile flooring09 05 05.20 202075SF$ - 0$ 1.66$ 124.50$ - 0$ - 0$ - 0$ - 0
Remove VCT 12"x12"09 05 05.20 09001350SF$ - 0$ 1.04$ 1,404.00$ - 0$ - 0$ - 0$ - 0
Disconnect and Reconnect Fire Alarm devices28 46 20.50 561030Ea$ - 0$ 121.62$ 3,648.60
Remove regular ceiling tiles09 05 05.10 125013000SF$ - 0$ 0.86$ 11,180.00
Repair gypsum walls09 01 70.10 050013635SF$ 0.04$ 545.40$ 0.40$ 5,454.00$ - 0$ - 0$ - 0$ - 0
Paint walls and collumns09 91 23.72 088013635SF$ 0.34$ 4,635.90$ 0.31$ 4,226.85$ - 0$ - 0$ - 0$ - 0
Install vinyl Cove Base09 65 13.13 07001515LF$ 1.27$ 1,924.05$ 1.72$ 2,605.80$ - 0$ - 0$ - 0$ - 0
Install vinyl transition strips09 65 13.37 010050LF$ 6.96$ 348.00$ 1.72$ 86.00
Install metal thresholds 4" x 36"08 71 20.65 23008EA$ 29.37$ 234.96$ 53.66$ 429.28
Install metal thresholds 4" x 72"08 71 20.65 23203EA$ 62.67$ 188.01$ 53.66$ 160.98
Install Vinyl Tile09 65 19.23 78001850SF$ 4.19$ 7,751.50$ 1.08$ 1,998.00$ - 0$ - 0$ - 0$ - 0
Install Vinyl Planks09 65 19.23 780015400SF$ 4.19$ 64,526.00$ 1.08$ 16,632.00
Install vinyl rub rail10 26 23.10 0400750LF$ 3.74$ 2,805.00$ 3.00$ 2,250.00$ - 0$ - 0$ - 0$ - 0
Circuit relocation26 05 36.10 018025CLF$ 23.74$ 593.50$ 56.50$ 1,412.50
Cable tray install27 05 19.90 0100100LF$ 21.16$ 2,116.00$ 13.49$ 1,349.00
Conduit relocation26 05 33.13 5020500LF$ 2.00$ 1,000.00$ 4.77$ 2,385.00$ - 0$ - 0$ - 0$ - 0
Install tegular style ceiling tiles09 51 23.10 116517250SF$ 3.84$ 66,240.00$ 1.46$ 25,185.00
Connect Service/Power poles26 27 23.40 411025EA$ 303.41$ 7,585.25$ 155.66$ 3,891.50
Communicaiton cable relocations27 15 13.13 724058CLF$ - 0$ 88.78$ 5,149.24
Communicaiton cable cat 6 instalation27 15 13.13 724011CLF$ 71.21$ 783.31$ 88.78$ 976.58
NMCI cables relocation27 15 13.13 724058CLF$ - 0$ 88.78$ 5,149.24
NMCI cable cat 6 installation27 15 13.13 724011CLF$ 71.21$ 783.31$ 88.78$ 976.58
TOTALS$ 162,060.19$ 106,493.85$ - 0$ - 0
NON PRE-PRICED ITEM DESCRIPTIONQTY #QTY UNITMATERIAL (MATL) UNIT COSTMATL TOTAL COSTLABOR UNIT COSTLABOR TOTAL COSTEQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
Power Whip installation25ea$ 200.00$ 5,000.00
PREPRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER)$ 268,554.04
APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT __8.75%_______$ 14,180.27THE PROVIDED UNIT PRICING IS BASED ON R. S. MEANS 2023 QUARTER 1 IN OXNARD CA (930) BASE DATA.
SUBTOTAL (PREPRICED LINE ITEMS + CCI + SALES TAX)$ 282,734.31DO NOT CHANGE THE UNIT PRICING OR SALES TAX PROVIDED.
PRE-PRICED COEFFICIENT __________ (FROM EXHIBIT K WORKSHEET)ENTER YOUR EXHIBIT K COEFFICIENTS, COMPLETE THE CALCULATIONS IN ROWS 33 TO 42, AND RETURN.
TOTAL (PRE-PRICED LINE ITEMS + CCI + SALES TAX, LINE 36) + PRE-PRICED COEFFICIENT ADUSTMENT (LINE 36 x LINE 37)$
NON PRE-PRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER)$ 5,000.00
APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT _8.75%_________$ - 0
SUBTOTAL$ 5,000.00
NON PRE-PRICED COEFFICIENT ________ (FROM EXHIBIT K WORKSHEET)$
TOTAL (NON PRE-PRICED LINE ITEMS + SALES TAX, LINE 36) + NON PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 40 x LINE 41)$
TOTAL TASK ORDER PRICE (LINE 36 + LINE 42)$
NOTE: USE OF THIS FORM IS MANDATORY. ANY MODIFICATION OF THIS FORM BY THE OFFEROR WILL RESULT IN THE OFFER BEING REJECTED AS NON-RESPONSIVE.

File details come from the government source that posted it. Updated .