Attachment 4A - Construction WD - Vancouver WA - 01-02-2026.pdf

PDF 2 MB Posted

Attached to
Z1DA--648-24-701 EHRM Infrastructure Upgrades Phase 2 Construction - Portland, OR
Solicitation number
36C77625B0050
Issued by

About this file

This document is a General Decision wage determination for building construction projects in Clark and Skamania Counties, Washington, effective 01/02/2026. The document details prevailing hourly wage rates and fringe benefits for multiple construction trade classifications, including Heat & Frost Insulators ($62.02 base rate), Bricklayers ($49.60), Electricians ($63.50), Carpenters ($54.69), and various Laborer classifications ranging from $18.25 to $52.31 per hour.

The wage determination includes important notes about Executive Orders 13706 and 13658, which establish paid sick leave requirements and minimum wage rates for federal contractors subject to the Davis-Bacon Act. It also explains the methodology for rate identifiers, including union rates, survey rates, and state-adopted rates. The document provides a detailed appeals process for wage determinations, with specific contact information for the U.S. Department of Labor's Wage and Hour Division for submitting requests for review or reconsideration.

View the file

Other files

File Type Posted
36C77625B0050 0008.pdf PDF
S05 - Tech Questions Tracker - EHRM Portland Phase 2 - VA Responses Update 2-26-26.pdf PDF
36C77625B0050 0007.pdf PDF
36C77625B0050 0006.pdf PDF
Tech Questions Tracker - EHRM Portland Phase 2 - VA Responses Update.pdf PDF
Attachment 5 - Div 28 Specifications.pdf PDF
Attachment 1 - Site Map.pdf PDF
Attachment 4 - Electrical Schedules.pdf PDF
Attachment 2 - Project Schedules.pdf PDF
36C77625B0050 0005.pdf PDF
Attachment 6 - Geotech Report Vancouver Campus WA.pdf PDF
Attachment 3 - Overall Site Plan.pdf PDF
Tech Questions Tracker - EHRM Portland Phase 2 - VA Responses.pdf PDF
36C77625B0050 0004.pdf PDF
Attachment - Site Visit Sign-in Sheet - Vancouver Campus - Completed 1-29-26.pdf PDF
36C77625B0050 0003.pdf PDF
Attachment - Site Visit Sign-in Sheet - Portland Campus - Completed 1-29-26.pdf PDF
36C77625B0050 0002.pdf PDF
EHRM Pre Bid Site Maps Portland and Vancouver 1-22-2026.pdf PDF
36C77625B0050 0001.pdf PDF
EHRM Infra Upgrades Phase 2 Portland Site Visit Instructions.pdf PDF
EHRM pre-bid site visit maps.pdf PDF
Attachment 6 - Limitations on Subcontracting - Construction.pdf PDF
Attachment 4B - Construction WD - Portland OR - 01-02-2026.pdf PDF
Attachment 2 - Portland EHRM Phase 2 ICRA - Final.pdf PDF
Attachment 1 - Portland EHRM Phase 2 Drawings - Final.pdf PDF
Attachment 3 - Portland EHRM Phase 2 Specs - Final.pdf PDF
36C77625B0050_1.docx DOCX document
Attachment 5 - Site Visit Instructions.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .