This document is a detailed architectural drawing (Attachment 1) for the Portland EHRM (Electronic Health Record Modernization) Phase 2 Infrastructure Upgrades project for the VA Portland Healthcare System. The drawing, dated 07/24/2025, is part of a comprehensive set of site and building plans for renovations across the Portland and Vancouver campuses.
Key details include a comprehensive site plan for the Portland campus, showing building layouts, parking areas, and infrastructure details. The project involves multiple buildings (Building 100, 101, 103, 104) and includes extensive work on technology infrastructure, electrical systems, mechanical systems, and site logistics. Specific considerations include maintaining hospital operations during construction, strict infection control measures, noise and dust mitigation, and careful coordination of work schedules. The drawings provide detailed floor plans, room designations, and specify work to be performed in various campus locations, with particular attention to minimizing disruption to ongoing VA healthcare operations.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRINCIPAL IN CHARGE: Blue Trident, LLC Emmanuel (Manny) Bautista, PE*, F.SAME (206) 972-0645 PROJECT MANAGER: Blue Trident, LLC Brian Moll, PE, SE (206) 351-2217 ARCHITECT: Blue Trident, LLC Lauri Strauss, AIA, LEED AP BD&C (907) 317-5040 CIVIL ENGINEER: SBCC Daniel Kelley, PE (702) 202-6004 TECHNOLOGY ENGINEER: IMEG Pete McGhee, CNIDP, RCDD (480) 222-3789 MECHANICAL ENGINEER: IMEG Brandon Garbrecht, PE, LEED AP BD+C (210) 530-7009 ELECTRICAL ENGINEER: IMEG Jacinto Fuentes, E.I.T. (210) 530-7086 COST ESTIMATOR: OCMI Heike Salewski-Smith (206) 395-9738
PROJECT TEAM
PORTLAND CAMPUS MAP
VANCOUVER CAMPUS MAP VANCOUVER CAMPUS OVERVIEW
PORTLAND CAMPUS OVERVIEW
1. THESE DRAWINGS ARE SUPPLIED TO THE CONTRACTOR
AND OTHERS FOR THEIR USE FOR THIS SPECIFIC PROJECT.
2. THE ORGANIZATION OF DOCUMENTS ARE NOT INTENDED
TO CONTROL THE DIVISION OF WORK. DIVISION OF WORK
SHALL BE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
3. CONTRACTOR SHALL VERIFY DIMENSIONS, REQUIRED
CLEARANCES, AND POWER AND HVAC REQUIREMENTS FOR
ALL ITEMS. NOTIFY COR OF ANY DISCREPANCIES PRIOR TO
COMMENCEMENT OF WORK.
4. DO NOT SCALE DRAWINGS; VERIFY ALL DIMENSIONS
PRIOR TO CONSTRUCTION.
5. VERIFY ALL ROUGH IN DIMENSIONS FOR ELECTRICAL
APPURTENANCES.
GENERAL NOTES
6. FIRE PROTECTION SYSTEM MUST REMAIN FULLY
OPERATIONAL DURING CONSTRUCTION.
7. CONTRACTOR SHALL PATCH AND REPAIR ALL FINISHES
WHERE DEMOLITION AND/OR NEW WORK IS TAKING PLACE.
THIS INCLUDES WALL SUBSTRATES AND FINISHES, CEILING
MATERIALS AND FINISHES, AND FLOOR SUBSTRATES AND
FINISHES. WHERE NOT INDICATED OTHERWISE, REPAIR
SHALL MATCH ADJACENT SUBSTRATE, MATERIALS,
TEXTURE, PATTERN, COLOR, AND FINISH. WHERE PATCHED
AREA FINISHES DO NOT MATCH EXACTLY, THE ENTIRE
AREA SHALL BE REPAIRED / REPLACED / REFINISHED TO
PROVIDE A UNIFORM FINISH.
8. THERE ARE MANY LOCATIONS THROUGHOUT THE
CAMPUS WHERE THE FIRESTOPPING IN THE
PENETRATIONS FOR THE CABLING HAS BEEN DAMAGED,
SLOUGHED OUT OF THE OPENINGS, OR IS COMPLETELY
MISSING. THE CONTRACTOR SHALL REMOVE DAMAGED
AND MELTED FIRESTOPPING AND REPLACE IT WITH NEW.
WHERE FIRESTOPPING IS MISSING, IT SHALL BE PROVIDED
AND INSTALLED. SEE DETAILS FOR SAMPLE LOCATIONS.
NOTE, SOME OF THE LOCATIONS MAY REQUIRE DIFFERENT
MATERIALS SUCH AS FIRE STOPPING PILLOWS OR FIRE
BARRIER SEALANT RATHER THAN PUTTY.
FOR BIDDING, CONTRACTOR SHALL INCLUDE (100) 4" DIAM,
PENETRATIONS, WITH 15% FIRE STOP PILLOWS, 75%
PUTTY, 5% COLLARS, AND THE REST OTHER MATERIALS AS
NEEDED TO MATCH EXISTING.
9. SITE WORK TO OCCUR DURING NORMAL BUSINESS
HOURS.
10. CUT-OVER WORK AND INTERIOR CONSTRUCTION WORK
SHALL BE DONE ON SWING SHIFT ONLY.
11. CONTRACTORS ARE ALLOWED TO TERMINATE FIBER
AND CAT6A DURING NORMAL BUSINESS HOURS BEHIND A
CLOSED DOOR. ALL OTHER WORK TO OCCUR DURING
SWING SHIFT HOURS. THIS IS A NON NEGOTIABLE
REQUIREMENT.
12. CONTRACTORS MUST BE PRESENT TO PERFORM CUT
OVER WORK AND SUPPORT FOR VA STAFF WHILE CUT
OVER WORK IS SCHEDULED AND ONGOING.
13. CONSTRUCTION CONTRACTOR MUST PROVIDE TWO VA
BADGED ESCORTS FOR EACH TR AND TE WORK.
PHASING PLAN:
VANCOUVER AND PORTLAND CAMPUSES
1. BUILDINGS WILL REMAIN OCCUPIED WHILE THE VA
PERFORMS NORMAL BUSINESS OPERATIONS THROUGHOUT THE
DURATION OF THIS PROJECT. CONTRACTOR IS RESPONSIBLE
TO PERFORM ALL WORK SO THE NORMAL BUSINESS
OPERATIONS CAN OCCUR UNIMPEDED. CONTRACTOR SHALL
COORDINATE IN ADVANCE WITH THE COR FOR THE REMOVAL
AND RELOCATION OF EXISTING EQUIPMENT. A MINIMUM OF TWO
BADGED ESCORTS SHALL BE PRESENT AND AVAILABLE AT ALL
TIMES FOR EACH TR AND TE WORK. (ESCORTS WILL BE
PROVIDED SOLELY FOR THE PURPOSE OF SECURITY AND
INSTRUCTED NOT TO ANSWER CONTRACTOR QUESTIONS ABOUT
THE WORK.)
2. CONTRACTORS ARE ALLOWED TO TERMINATE FIBER AND
CAT6A DURING NORMAL BUSINESS HOURS BEHIND A CLOSED
DOOR. ALL OTHER WORK TO OCCUR DURING SWING SHIFT
HOURS (1600HRS TO 2400HRS). THIS IS A NON NEGOTIABLE
REQUIREMENT.
3. CONTRACTOR IS RESPONSIBLE TO PERFORM ALL WORK SO
THE FIRE AND LIFE SAFETY DEVICES REMAIN FUNCTIONAL.
4. CONTRACTOR SHALL SUBMIT A WORK SCHEDULE INDICATING
PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE
DEMOLITION AND CONSTRUCTION WORK TO DESIGN TEAM AND
VA FOR REVIEW.
5. CONTRACTOR SHALL PROPOSE A PHASING PLAN FOR
SEQUENCING THE WORK ON THE SITE INDICATING THE START
AND FINISH FOR GETTING TO EACH BUILDING, AND FOR WORK
WITHIN EACH BUILDING. SITE WORK TO OCCUR DURING
NORMAL BUSINESS HOURS. PHASING PLANS SHALL HAVE AN
ADEQUATE BREAKDOWN OF ACTIVITIES TO ALLOW COR TO
DETERMINE WORKFLOW AND PRIORITIES OF THE PROPOSED
WORK. PHASING SHALL BE BROKEN DOWN INTO AREA & WORK
WEEKS.
INCLUDE COORDINATION FOR SHUT OFF, CAPPING AND/OR
CONTINUATION OF UTILITY SERVICES AS REQUIRED WITH
DETAILS FOR DUST AND NOISE CONTROL. PROVIDE DETAILED
SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE
UNINTERRUPTED PROGRESS OF OWNER'S ONSITE OPERATIONS
AND BUILDING OPERATIONS.
6. THE CONTRACTOR WILL PERFORM THE SITE WORK IN A
PROFESSIONAL AND CONSISTENT MANNER. THE VA EXPECTS
FOOT AND VEHICLE TRAFFIC TO EXPERIENCE MINIMAL
INTERRUPTIONS THROUGHOUT THE COURSE OF THE WORK. IF A
ROAD MUST BE COMPLETELY SHUT DOWN, COORDINATE
ACCESS TO SERVICES WITH COR. CONTRACTOR TO PROVIDE
AND OPERATE ALL ROAD CLOSURES ACCORDING TO VA
STANDARDS.
CONTRACTOR SHALL PROVIDE AND BE RESPONSIBLE FOR ALL
SIDEWALK AND ROADWORK SIGNAGE, DETOURS, FLAGGERS,
SAFETY EQUIPMENT AND NOTIFICATIONS.
ALL BARRIERS SHALL BE MOVED IN COORDINATION WITH
HOSPITAL FACILITIES PERSONNEL TO MINIMIZE TRAFFIC
DISRUPTIONS (E.G., AFTER 1800 HRS., ON WEEKENDS, ETC.).
7. CONTRACTOR SHALL PROVIDE AN EXTERIOR ADA ROUTE
BETWEEN BUILDINGS WHERE CONSTRUCTION ACTIVITIES
IMPEDE NORMAL PATHS OF TRAVEL.
8. CONTRACTOR MUST BE PRESENT TO PERFORM CUT OVER
WORK AND SUPPORT FOR VA STAFF WHILE CUT OVER WORK IS
SCHEDULED AND ONGOING.
9. THE DESIGN INTENT IS THAT THE UNDERGROUND TRENCHING
AND FIBER INSTALL ON THE CAMPUS CAN BE COMPLETED
WITHOUT INTERFERING WITH, REMOVING, CUTTING, OR OTHER
DESTRUCTIVE MEANS, EXISTING UNDERGROUND FIBER
INFRASTRUCTURE. DURING UNDERGROUND UTILITY TRENCH
EXCAVATION, MEASURES SHALL BE EMPLOYED TO PREVENT
EXCAVATED MATERIAL FROM BECOMING AIRBORNE. TRENCHES
SHALL BE EXCAVATED IN SMALL AREAS WITHOUT THE USE OF
LARGE, NOISE AND VIBRATION-GENERATING EQUIPMENT.
10. ALL UNFINISHED WORK SHALL BE COVERED WITH STEEL
TRENCH PLATES AT THE END OF EVERY WORKDAY AND BEFORE
WEEKENDS
11. CONTRACTOR TO COORDINATE SITE OFFICE AND MATERIAL
LAYDOWN AREA WITH COR PRIOR TO MOBILIZATION.
12. PERMITS:
a. AN INTERNAL ELECTRICAL PERMIT IS REQUIRED PRIOR
TO START OF ELECTRICAL WORK.
b. A TRAFFIC CONTROL PLANS BY A LICENSED TRAFFIC
CONTROL DESIGNER SHALL BE SUBMITTED AND
APPROVED BY COR PRIOR TO START OF WORK. SEE
SPECIFICATION 01 57 00. TRAFFIC CONTROL PLANS SHALL
CONFORM TO MUTCD STANDARDS. TRAFFIC CONTROL
PLANS SHALL INDICATE LIMITS OF WORK AREA.
c. CONTRACTOR SHALL COORDINATE ANY WORK
IMPACTING THE CTRAN BUS WITH THE CO PRIOR TO START
OF WORK
13. CONTRACTOR RESTRICTIONS
CONSTRUCTION CONSIDERATIONS FOR AIRBORNE DEBRIS
1. DURING UNDERGROUND UTILITY TRENCH EXCAVATION,
MEASURES SHALL BE EMPLOYED TO PREVENT EXCAVATED
MATERIAL FROM BECOMING AIRBORNE.
2. AIRBORNE PARTICLES FROM EXCAVATION CAN BE
HARMFUL TO IMMUNE- COMPROMISED PATIENTS WITHIN
THE VA CAMPUS.
3. MEASURES TO PREVENT AIRBORNE DEBRIS INCLUDE:
A. SPRAY EXCAVATED SOIL MATERIAL AND
ROADWAYS WITH WATER UNTIL SURFACE OR SOIL IS
WET. RESPRAY AREA AS NECESSARY TO KEEP
DUST TO A MINIMUM.
B. SPRAY EXPOSED SOILS WITH A DUST
SUPPRESSANTS PER MANUFACTURER’S
INSTRUCTIONS
C. COVER SOIL STOCKPILES WITH PLASTIC
SHEETING.
D. CONSTRUCT NATURAL OR ARTIFICIAL
WINDBREAKS OR WINDSCREENS.
E. REMOVE EXCAVATED MATERIAL FROM TRENCH
AND IMMEDIATELY HAUL MATERIAL AWAY FROM THE
SITE TO AN APPROVED DISPOSAL SITE.
F. LIMIT WORK ON WINDY DAYS.
G. USE VACUUM STREET SWEEPERS.
H. REMOVE MUD AND OTHER DIRT PROMPTLY SO IT
DOES NOT DRY AND THEN TURN INTO DUST.
I. OTHER MEASURES PRESENTED BY THE
CONTRACTOR TO THE OWNER AND INFECTION
CONTROL DEPARTMENT FOR APPROVAL.
4. CONSTRUCTION ACTIVITIES CAN BE SHUT DOWN BY THE
OWNER AND VA INFECTION CONTROL DEPARTMENT, IF
ADEQUATE DUST CONTROL MEASURES ARE NOT
IMPLEMENTED.
CONSTRUCTION CONSIDERATIONS FOR NOISE AND EARTH
VIBRATIONS
1. THE VA PATIENT POPULATION IS SENSITIVE TO HIGH
NOISE VOLUMES AND EARTH VIBRATION FROM
CONSTRUCTION EQUIPMENT. MEASURES SHALL BE
EMPLOYED TO ADDRESS NOISE AND VIBRATIONS THAT
INCLUDE THE FOLLOWING:
A. PERFORMING CONSTRUCTION ACTIVITIES DURING
WEEKENDS AND OFF-HOURS
B. LIMIT THE USE OF LARGE CONSTRUCTION
EQUIPMENT
C. USE MANUAL LABOR FOR TRENCH EXCAVATION IN
SMALL CONFINED AREAS OR SECTIONS OF WORK.
D. COORDINATE WITH OWNER PRIOR TO DAILY
CONSTRUCTION OPERATIONS TO DISCUSS POSSIBLE
WORK THAT MAY GENERATE HIGHER NOISE
VOLUMES OR EARTH VIBRATION.
2. CONSTRUCTION ACTIVITIES CAN BE SHUT DOWN BY THE
OWNER IF NOISE AND EARTH VIBRATION IS BEYOND
ACCEPTABLE LEVELS.
3. PIPE RAMMING OR TRENCHLESS OPERATIONS SHALL BE
CONDUCTED DURING WEEKEND HOURS AND DURING
HOLIDAYS.
CONSTRUCTION CONSIDERATIONS FOR CONSTRUCTION
ACTIVITIES
1. MEASURES SHALL BE EMPLOYED TO MAINTAIN ACCESS
TO PARKING LOTS, STORAGE AREAS, AND EXISTING
BUILDINGS WITHIN THE VA CAMPUS. MEASURES TO
MAINTAIN ACCESS ROUTES INCLUDE:
A. PROVIDING STEEL PLATES OVER EXCAVATED
TRENCHES WITHIN ROADWAYS
B. PROVIDE TRAFFIC CONTROL PLAN TO OWNER FOR
APPROVAL PRIOR TO START OF CONSTRUCTION
ACTIVITIES.
14. UPCOMING PHASED WORK SHALL BE AN AGENDA ITEM IN
WEEKLY PROGRESS MEETINGS
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
Sheet of ---
ISSUED for CONSTRUCTION
900 Winslow Way E, Suite 130
BAINBRIDGE ISLAND, WA 98110
206-972-0645
BLUE TRIDENT, LLC
Emmanuel (Manny) Bautista, P.E., F. SAMEC :\U se rs
\la ur i\O ne
D riv e
- d es ig n2 la st .c om \d
2L -P ro je ct s\
-0
EH
R M
V an c_ Po rt w
B T\
-D
ES
IG
N \B
IM
M
O D
EL
A
N D
L
IN
KS
\2
4-
- E H
R M
P O
R T.
rv t
7/
/2
5:
:1
PM
G100
COVER SHEET EHRM Infrastructure Upgrades -
PHASE 2 - PORTLAND HCS
648-24-701
07/24/2025
MR LMSCAMPUS
PORTLAND CAMPUS
EHRM Infrastructure Upgrades PHASE 2 at Portland and Vancouver Campuses
DEPARTMENT OF VETERANS AFFAIRS
VA PORTLAND HEALTHCARE SYSTEM
PROJECT # 648-24-701
DRAWING INDEX
SHEET
NAME SHEET DESCRIPTION
G100 COVER SHEET
PORTLAND
CS002 HAUL ROUTE AND STAGING
AS100.0 SITE PLAN - PORTLAND CAMPUS
A-101.0 BUILDING 100 - B1 AREAS 'C' AND 'D'
A-110.0 ENLARGED PLANS
A-120.0 UL PENETRATION DETAILS
M000 MECHANICAL COVERSHEET
M201.0 BASEMENT - BLDNG 100
M300.0 BLDNG 100 ENLARGED PLANS
M600 MECH DETAILS, CONTROLS, & SCHEDULES
E000 ELECTRICAL COVERSHEET
ED101.0 DEMOLITION PLAN -ELECTRICAL - BASEMENT -
BLDNG 100
ES201.0 ELECTRICAL - BASEMENT - BLDNG 100
ES301.0 BLDNG 100 ENLARGED PLANS
E400 ELECTRICAL DETAILS
E401 ELECTRICAL DETAILS
ES601 ELECTRICAL SCHEDULES
TS000 TECHNOLOGY COVERSHEET
T100.0 TECHNOLOGY - SITE PLAN
TD100.0 DEMOLITION PLAN - TECHNOLOGY - BASEMENT -
BUILDING 100
TS201.0 TECHNOLOGY - BASEMENT - BUILDING 100
TS201.1 TECHNOLOGY - LEVEL 01 - BUILDING 101
TS203.1 TECHNOLOGY - LEVEL 01 - BUILDING 103
TS203.2 TECHNOLOGY - LEVEL 02 - BUILDING 103
TS203.P2 TECHNOLOGY - PARKING LEVEL 02 - BUILDING 103
TS203.P3 TECHNOLOGY - PARKING LEVEL 03 - BUILDING 103
TS203.P4 TECHNOLOGY - PARKING LEVEL 04 - BUILDING 103
TS203.P5 TECHNOLOGY - PARKING LEVEL 05 - BUILDING 103
TS204.0 TECHNOLOGY - BASEMENT - BUILDING 104
TS204.1 TECHNOLOGY - LEVEL 01 - BUILDING 104
TS308 BLDNG 100 ENLARGED PLANS
TS309 BLDNG 101 ENLARGED PLANS
TS310 BLDNG 103 ENLARGED PLANS
TS311 BLDNG 104 ENLARGED PLANS
TS400 TECHNOLOGY DETAILS
TS401 TECHNOLOGY DETAILS
TS402 TECHNOLOGY DETAILS
TS403 TECHNOLOGY DETAILS
TS404 TECHNOLOGY DETAILS
TS500 TECHNOLOGY DIAGRAMS
TS600 TECHNOLOGY SCHEDULES
DRAWING INDEX
SHEET
NAME SHEET DESCRIPTION
VANCOUVER
G-001 LEGEND & ABBREVIATION
CS001 HAUL ROUTE AND STAGING
CS100 OVERALL SITE PLAN
CS101 SITE PLAN 1
CS102 SITE PLAN 2
CS103 SITE PLAN 3
CS104 SITE PLAN 4
CD501 CIVIL DETAILS
AS100.1 SITE PLAN - VANCOUVER CAMPUS
A-102.1 BUILDING 2 LAUNDRY/ WAREHOUSE
A-125.1 BUILDING 25 AND TYPICAL DETAILS
E 001 ELECTRICAL COVERSHEET
ES202.1 ELECTRICAL - LEVEL 01 PLAN - BUILDING 2
ES302.1 ELECTRICAL ENLARGED PLANS - BUILDING 2
E 400 ELECTRICAL DETAILS
E 401 ELECTRICAL DETAILS
TS 000 TECHNOLOGY COVERSHEET
T100.1 TECHNOLOGY - SITE PLAN
TS1.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 1
TS2.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 2
TS3.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 3
TS4.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 4
TS11.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 11
TS11.2 TECHNOLOGY - LEVEL 02 PLAN - BUILDING 11
TS11.3 TECHNOLOGY - LEVEL 03 PLAN - BUILDING 11
TS12.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 12
TS13.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 13
TS14.1 TECHNOLOGY - BUILDING 14
TS15.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 15
TS17.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 17
TS17.2 TECHNOLOGY - LEVEL 02 PLAN - BUILDING 17
TS17.3 TECHNOLOGY - LEVEL 03 PLAN - BUILDING 17
TS17.4 TECHNOLOGY - LEVEL 04 PLAN - BUILDING 17
TS18.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 18
TS20.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 20
TS20.2 TECHNOLOGY - LEVEL 02 PLAN - BUILDING 20
TS21.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 21
TS25.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 25
TS27.1 TECHNOLOGY - LEVEL 01 PLAN - BUILDING 27
TS300 TECHNOLOGY ENLARGED PLANS
TS301 TECHNOLOGY ENLARGED PLANS
TS302 TECHNOLOGY ENLARGED PLANS
TS303 TECHNOLOGY ENLARGED PLANS
TS304 TECHNOLOGY ENLARGED PLANS
TS305 TECHNOLOGY ENLARGED PLANS
TS306 TECHNOLOGY ENLARGED PLANS
TS307 TECHNOLOGY ENLARGED PLANS
TS 400 TECHNOLOGY DETAILS
TS 401 TECHNOLOGY DETAILS
TS 402 TECHNOLOGY DETAILS
TS 403 TECHNOLOGY DETAILS
TS 404 TECHNOLOGY DETAILS
TS 501 TECHNOLOGY DIAGRAMS
TS 600 TECHNOLOGY SCHEDULES
PORTLAND & VANCOUVER CAMPUS
NOTE: SOME COVER SHEETS AND DETAIL SHEETS HAVE BEEN
DUPLICATED AND PLACED IN ORDER IN BOTH SETS FOR CLARITY.
Revisions: Date:
T51
NO PARKING
SW 6TH AVENUE
SW CAMPUS DRIVE
SW
CAMPUS DRIVE
27A
Trailer
Trailer
LOT 4
LOT 1
LOT 5
LOT 7
ONLY
ONLY
STOP
ONLY
STOP
STOP
STO
P AHE
AD
ST
OP
STOP
ST
OP
AH
EA
D
ST
OP
STO
P
STOP
AHEAD
'C' 'D' 'A'
'B'
ST
OP
BUS
STOP
STOP
S
TA
IR
S
FIR
E LA
N E
HAZARDOUS
MATERIAL
AREA
RADIA
TIO
N S
TORAGE
SHUTTLE B
US P
ARKIN
G
SW TERWI L L I GER BLVD .
LOT 9
SW US VETERANS HOSPITAL ROAD
SW GAIN
ES STREET
SW
U
S V
ETERA
N S H
O
SPITA
L RO
A
D
LOT 14
LOT 8
SW US VETERANS HOSPITAL ROAD
ST
OP
ST
OP
LOT 5
LOT 4
S T
A
IR
S
STOP
POLICE
POLICE
POLICE
POLICE
LOT 1
SW
6TH AVENUE
Boundary Line
LOT 4
HAUL ROUTE AND STAGING
CS002
S&B CHRIST CONSULTING, LLC.
9555 HILLWOOD DRIVE, #160
LAS VEGAS, NV 89134
(702) 202-6004
POC: DANIEL F. KELLEY, PE
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
BLUE TRIDENT, LLC
7829 NE Esperione LN Bainbridge Island, WA 98110
(206) 972-0645
PORTLAND CAMPUS
648-24-701
DFK KLM
Revisions: Date:
P:
\P ro je ct s\
Bl ue
T rid en t -
V A
Po rtl an d
EH
R
M P ha se
\E ng in ee rin g\ D ra w in gs
\P ro du ct io n
D ra w in gs \5
-2
4-
3- C
S-
PO
R T.
dw g
/1
3/
:5
PM
EHRM Infrastructure Upgrades -
PHASE 2 - PORTLAND HCS
CAMPUS
06/17/2025
ISSUED FOR CONSTRUCTION
24014515
PROFESSIONAL ENGIN
EE
R
ST
ATE OF WASHINGTON
R EG I STE R ED
DA
NIEL F. KELLEY
LOT 6
CONTRACTOR PARKING
SCALE IN FEET
080 80 160
1" = 80'
HAUL ROUTE AND STAGING NOTES:
1. JOB TRAILER LOCATION TO BE DETERMINED DURING SOLICITATION.
2. COORDINATE TEMPORARY CONSTRUCTION BARRIERS WITH INFECTION
CONTROL.
3. COORDINATE WITH OIT AND VA POLICE FOR ANY STAGING EFFORTS NEAR IT
CLOSETS AND SERVER ROOM DOORS.
4. HALLWAY WORK FOR HORIZONTAL CABLING SHALL BE COMPLETED IN A MOBILE
CONTAINMENT CART.
AutoCAD SHX Text
STACKED PARKING #1-8
AutoCAD SHX Text 71B
AutoCAD SHX Text 71A
AutoCAD SHX Text 70B
AutoCAD SHX Text
7OA
AutoCAD SHX Text 69B
AutoCAD SHX Text 69A
AutoCAD SHX Text 68B
AutoCAD SHX Text 68A
AutoCAD SHX Text 67B
AutoCAD SHX Text 67A
AutoCAD SHX Text 66B
AutoCAD SHX Text 66A
AutoCAD SHX Text 65B
AutoCAD SHX Text 65A
AutoCAD SHX Text 64B
AutoCAD SHX Text 64A
AutoCAD SHX Text 63B
AutoCAD SHX Text 63A
AutoCAD SHX Text 62B
AutoCAD SHX Text 62A
AutoCAD SHX Text 61B
AutoCAD SHX Text 61A
AutoCAD SHX Text 60B
AutoCAD SHX Text 60A
AutoCAD SHX Text 45B
AutoCAD SHX Text 45A
AutoCAD SHX Text 44B
AutoCAD SHX Text 43B
AutoCAD SHX Text 42B
AutoCAD SHX Text 41B
AutoCAD SHX Text 40B
AutoCAD SHX Text 44A
AutoCAD SHX Text 43A
AutoCAD SHX Text 42A
AutoCAD SHX Text 41A
AutoCAD SHX Text 40A
AutoCAD SHX Text
GOV.
AutoCAD SHX Text
GOV.
AutoCAD SHX Text
GOV.
AutoCAD SHX Text
GOV.
AutoCAD SHX Text
T-51 PATIENT LODGERS
AutoCAD SHX Text
T-51 PATIENT LODGERS
AutoCAD SHX Text
T-51 PATIENT LODGERS
AutoCAD SHX Text
T-51 PATIENT LODGERS
AutoCAD SHX Text
T-51 PATIENT LODGERS
AutoCAD SHX Text
AFGE
AutoCAD SHX Text
AFGE
AutoCAD SHX Text
AFGE
AutoCAD SHX Text
AFGE
AutoCAD SHX Text
MHICM
AutoCAD SHX Text
T-51 PATIENT LODGERS
AutoCAD SHX Text 7B
AutoCAD SHX Text 8B
AutoCAD SHX Text 9B
AutoCAD SHX Text 10B
AutoCAD SHX Text 11B
AutoCAD SHX Text 12B
AutoCAD SHX Text 13B
AutoCAD SHX Text 14B
AutoCAD SHX Text 15B
AutoCAD SHX Text 16B
AutoCAD SHX Text 7A
AutoCAD SHX Text 8A
AutoCAD SHX Text 9A
AutoCAD SHX Text 10A
AutoCAD SHX Text 11A
AutoCAD SHX Text 12A
AutoCAD SHX Text 13A
AutoCAD SHX Text 14A
AutoCAD SHX Text 15A
AutoCAD SHX Text 16A
AutoCAD SHX Text
C.C. STAFF
AutoCAD SHX Text 27B
AutoCAD SHX Text 26B
AutoCAD SHX Text 25C
AutoCAD SHX Text 24C
AutoCAD SHX Text 23C
AutoCAD SHX Text 22B
AutoCAD SHX Text 21B
AutoCAD SHX Text 20B
AutoCAD SHX Text 26A
AutoCAD SHX Text 25B
AutoCAD SHX Text 24B
AutoCAD SHX Text 23B
AutoCAD SHX Text 22A
AutoCAD SHX Text 21A
AutoCAD SHX Text 20A
AutoCAD SHX Text 25A
AutoCAD SHX Text 24A
AutoCAD SHX Text 23A
AutoCAD SHX Text
PARKING OFFICE
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
ECU STAFF
AutoCAD SHX Text
ECU STAFF
AutoCAD SHX Text
DAV PARKING
AutoCAD SHX Text
ED NURSE
AutoCAD SHX Text
GOV. VEHICLE
AutoCAD SHX Text
GOV. VEHICLE
AutoCAD SHX Text
ED CHIEF
AutoCAD SHX Text
ECU STAFF
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text 50A
AutoCAD SHX Text 50B
AutoCAD SHX Text 51A
AutoCAD SHX Text 51B
AutoCAD SHX Text 52A
AutoCAD SHX Text 52B
AutoCAD SHX Text 53A
AutoCAD SHX Text 53B
AutoCAD SHX Text 54A
AutoCAD SHX Text 54B
AutoCAD SHX Text 55A
AutoCAD SHX Text 55B
AutoCAD SHX Text 56A
AutoCAD SHX Text 56B
AutoCAD SHX Text 57A
AutoCAD SHX Text 57B
AutoCAD SHX Text
VENDOR
AutoCAD SHX Text
VENDOR
AutoCAD SHX Text
VENDOR
AutoCAD SHX Text
PATIENT OVERSIZED
AutoCAD SHX Text
PATIENT OVERSIZED
AutoCAD SHX Text
PATIENT OVERSIZED
AutoCAD SHX Text
PATIENT OVERSIZED
AutoCAD SHX Text
PATIENT OVERSIZED
AutoCAD SHX Text
PATIENT OVERSIZED
AutoCAD SHX Text
PATIENT OVERSIZED
AutoCAD SHX Text
PATIENT OVERSIZED
AutoCAD SHX Text
PATIENT TRANS.
AutoCAD SHX Text
PATIENT TRANS.
AutoCAD SHX Text
ENG. SHOP
AutoCAD SHX Text
ENG. SHOP
AutoCAD SHX Text
ENG. SHOP
AutoCAD SHX Text
PATIENT TRANS.
AutoCAD SHX Text
GOV.
AutoCAD SHX Text
GOV.
AutoCAD SHX Text
E-85 FUEL STATION
AutoCAD SHX Text
WELL BUILDING
AutoCAD SHX Text
WATER TANK 96200 GAL 26' DIAMETER 24' HEIGHT
AutoCAD SHX Text
GAZEBO
AutoCAD SHX Text
FIRE ZONE
AutoCAD SHX Text
VTS
AutoCAD SHX Text
VTS
AutoCAD SHX Text
VTS
AutoCAD SHX Text
VTS
AutoCAD SHX Text
GUARD SHACK
AutoCAD SHX Text
NO PARKING
AutoCAD SHX Text 1B
AutoCAD SHX Text 1A
AutoCAD SHX Text 2B
AutoCAD SHX Text 2A
AutoCAD SHX Text
H.R. PARKING ONLY 30 MIN MAX
AutoCAD SHX Text
H.R. PARKING ONLY 30 MIN MAX
AutoCAD SHX Text
DN
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
POLICE PARKING
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
RIDE SHARE
AutoCAD SHX Text
POLICE PARKING
AutoCAD SHX Text
POLICE PARKING
AutoCAD SHX Text #71
AutoCAD SHX Text
SKYWALK
AutoCAD SHX Text
MHICM
AutoCAD SHX Text
MHICM
AutoCAD SHX Text
MHICM
AutoCAD SHX Text
MHICM
AutoCAD SHX Text #70
AutoCAD SHX Text #72
AutoCAD SHX Text 39A
AutoCAD SHX Text
SKYBRIDGE
AutoCAD SHX Text
ECU STAFF
AutoCAD SHX Text
ED NURSE
AutoCAD SHX Text
CHILD CARE PLAY AREA
AutoCAD SHX Text
GOV #4
AutoCAD SHX Text
GOV #3
AutoCAD SHX Text
GOV #2
AutoCAD SHX Text
GOV #1
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 1/2'
AutoCAD SHX Text
AutoCAD SHX Text 1'' = 1'-0''
AutoCAD SHX Text 3'' = 1'-0''
AutoCAD SHX Text 1'
AutoCAD SHX Text 1 1/2'' = 1'-0''
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 1/2'
AutoCAD SHX Text 1'
AutoCAD SHX Text 6'' = 1'-0''
AutoCAD SHX Text
AutoCAD SHX Text 1/4"
AutoCAD SHX Text 1/2"
AutoCAD SHX Text 1/2'' = 1'-0''
AutoCAD SHX Text 1'
AutoCAD SHX Text 4'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 8'
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text 2'
AutoCAD SHX Text 2'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1/8'' = 1'-0''
AutoCAD SHX Text 1/16'' = 1'-0''
AutoCAD SHX Text 1/4'' = 1'-0''
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 1'
AutoCAD SHX Text 1/2'
AutoCAD SHX Text 2'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1'' = 1'-0''
AutoCAD SHX Text 3/8'' = 1'-0''
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 3'
AutoCAD SHX Text 1'' = 20'-0''
AutoCAD SHX Text 10'
AutoCAD SHX Text 20'
AutoCAD SHX Text 0'
AutoCAD SHX Text Call
AutoCAD SHX Text Know what's BELOW. CALL 811 before you dig.
AutoCAD SHX Text
DIG ALERT
FIRE
ZONE
FIR
E LA
N E
ONLY
ONLY
STOP
ONLY
STOP
STOP
STO
P AHE
AD
ST
OP
STOP
ST
OP
AH
EA
D
ST
OP
STO
P
STOP
AHEAD
ST
OP
BUS
STOP
STOP
ST
OP
ST
OP
STOP
POLICE
POLICE
POLICE
POLICE
S
TA
IR
S
HAZARDOUS
MATERIAL
AREA
RADIA
TIO
N S
TORAGE
SHUTTLE B
US P
ARKIN
G
S T
A
IR
S
T51
Trailer 1
Trailer
LOT 1
'C' 'D''A'
'B'
LOT 9
SK
YB
RI
DG
E
LOT 4
LOT 1
S
TA
C K E D
P A R K
IN
G
71B
71A
70B
7OA
69B
69A
68B
68A
67B
67A
66B
66A
65B
65A
64B
64A
63B
63A
62B
62A
61B
61A
60B
60A
45B
45A
44B 43B42B41B40B
44A43A42A41A40A
GOV.
GOV.
GOV.
GOV.
NO PARKING
T-
51 PA
TIE
NT LO
DG
ER
S
T-
51 PA
TIE
NT LO
DG
ER
S
T-
51 PA
TIE
NT LO
DG
ER
S
T-
51 PA
TIE
NT LO
DG
ER
S
T-
51 PA
TIE
NT LO
DG
ER
S
AFGE
AFGE
AFGE
AFGE
MHICM
T-
51 PA
TIE
NT LO
DG
ER
S
7B
8B
9B
10B
11B
12B
13B
14B
15B
16B
7A
8A
9A
10A
11A
12A
13A
14A
15A
16A
C.C
STA
FF
27B
26B25C 24C
23C
22B
21B
20B
27A
26A
25B
24B
23B
22A
21A
20A
25A
24A
23A
PARKING
OFFICERIDE
SHARE
RIDE
SHARERIDE
SHARE
RIDE
SHARE
RIDE
SHARE
RID
E SH
AR
E
RID
E SH
AR
E
RID
E SH
AR
E
RIDE
SHARE
ECU
STAFF
ECU
STAFF
DAV
PARKINGED
NURSE
GOV.
VEHICLE
GOV.
VEHICLEED
CHIEF
ECU
STAFF
RIDE
SHARE
CHIEF
C
HIEF
C H
IE
F
C H
IE
F
C H
IE
F
C H
IEF
C H
IEF
CHIEF
CHIEF
CHIEF
CHIEF
CHIEF
CHIEF
CHIEF
CHIEF
CHIEF
C H
IE
F
C H
IE
F
C H
IE
F
50A
50B
51A
51B
52A
52B
53A
53B
54A
54B
55A
55B
56A
56B
57A
57B
V E N D O R
V E N D O R
V E N D O R
P A
TIE
N T
O V E R S
IZ
E D
P A
TIE
N T
O V E R S
IZ
E D
P A
TIE
N T
O V E R S
IZ
E D
PATIENT
OVERSIZED
PATIEN
T
O
VERSIZED
PATIEN
T
O
VERSIZED
P
ATIEN
T
O
VER
SIZED
P
ATIEN
T
O
VER
SIZED
PATIENT
TRANS.
PATIENT
TRANS.
ENG.
SHOP
ENG.
SHOP
ENG.
SHOP
PATIENT
TRANS.
LOT 4
LOT 5
LOT 7
GOV.
GOV.
E-85 FUELSTATION
WELLBUILDING
WATERTANK96200 GAL
26' DIAMETER
24' HEIGHT
GAZEBO
VTS
VTS
VTS
VTS
G U A R D
S H A C K
NO
PARKING
1B
1A
2B
2A
H .R
P
AR
K
IN
G
O N
LY
M
IN
M
AX
H .R
P
AR
K
IN
G
O N
LY
M
IN
M
AX
RID
E SH
AR
E
RID
E SH
AR
E
RIDE
SHARE
PO
LIC
E PA
RK
ING
RID
E SH
AR
E
RID
E SH
AR
E
PO
LIC
E PA
RK
ING
PO
LIC
E PA
RK
ING
#71
MHICM
MHICM
MHICM
MHICM
#70
#72
39A
LOT 5
ECU
STAFFED
NURSE
CHILD CARE
PLAYAREA
GOV
#4
GOV
#3
GOV
#2
GOV
#1
LOT 4
SW 6TH AVENUE
SW CAMPUS DRIVE
SW
CAMPUS DRIVE
S K Y W A
LK
SW
6TH AVENUE
DN
S
W
T
E
R
W
I
L
L
I
G
E
R
B
L
V
D
SW US VETERANS HOSPITAL ROAD
SW GAIN
ES STREET
SW
U
S V
ETERA
N S H
O
SPITA
L RO
A
D
LOT 14
LOT 8
SW US VETERANS HOSPITAL ROAD
Boundary Line
D.F.
D.F.
D.F.
DEPT COLORDEPT IDDGSFDEPARTMENT TYPEAdult Day CareAudiologyBeds Medical/SurgicalBeds 23 Hr ObservationBeds Blind RehabBeds CLCBeds ICUBeds MH/Behavioral MedBeds PolytraumaBeds Psych Res RehabBed SCIBehavioral HealthCanteen ServiceCardiologyCentralized Staff FacilitiesChaplain/ChapelCommon/Lobby SpaceDentalDiagnostic ImagingDialysisDigestive/EndosopyDirector's Suite/Quality MgmtEducationEmployee WellnessEngineeringEnvironmental MgmtEye ClinicFiscal ServiceGeriatricsHealthcare Admin ServiceHome Based Health CareHuman Resources ServiceInformation ManagementLibraryLogisticsMedical MediaMedical Service AdminNursing Service AdminNutrition/FoodOn-Call ProgramOn-Site LaundryPathologyPatient LodgingPharmacyPolice/SecurityPolytrauma ClinicPrimary CareProstheticsPsychosocial Rehab & Recovery CenterRecreational TherapyRehab MedicineResearchResidential QuartersSpace Under ConstructionSpecialty CareSPS ServiceSurgicalSwing SpaceTenant SpaceUrgent CareVacant SpaceVet CenterVoluntary ServiceVSO/Vet Assitance/UnionTOTAL##
170210101105010080903112030310470220520560770230420240260630490750530500270640280670290650660540600550620680480690512350150360710201180370340430440570760900190580460780790200990800590720
9514101181738341403337575350545878870737799189192961311411011311714714330144148168164160163167189185213182196190193197217181210214218228224220221225229237231232236248
UP
DN
UP
DN
UP
DN
UP
R A M P
U P
UP UP
DN
R A M P
UP
STERILIZER
9 8 7 6 5 4 3 2 1
N
M
L
J
K
9 8 7 6 5 4 3 2
G
H
F
E
C
19 17 16 15 14 13 12 11
H
10.6
D
9.810.2 9.4
B
A
N
M
L
K
J
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF 92
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF 96
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF482
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF 152
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF37
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF 101
SF
SF
SF
SF
SF
SF
S-3
S-2
S-4
STAIR
STAIR
ELEV. ELEV.
ELEV. ELEV.
ELEV. ELEV.
CB1-1
S-5
B1C-134b
B1C-134c
B1C-134
B1C-134e B1C-134dB1C-134a
B1C-134H
B1C-127
B1C-131
B1C-128a
B1C-118
B1C-125
B1C-126
CB1-6
B1C-128
B1C-129
B1C-130
CB1-5
B1C-106c B1C-132
B1C-106b
ELEV. ELEV.
CB1-8
CB1-7
B1C-135
B1C-138
B1C-139
CB1-9
B1C-124
B1C-123
B1C-119
B1C-120a
B1C-122
B1C-121B1C-120
CL-3
CL-2
CL-4
B1C-106
B1C-139b
B1C-139c
B1C-139a
B1C-101d
B1C-101B1C-101b B1C-101C
B1C-101c
CB1-2
B1C-104
B1C-100k
B1C-116a
B1C-116
B1C-116b
B1C-116c
B1C-117
B1C-118b
B1C-118a
B1C-100a
B1C-100
B1C-102
B1C-103
B1C-100d B1C-100e B1C-100g
B1C-100f
B1C-100p
DW-1
B1C-118c
B1C-118d
B1A-113c
B1A-113
B1A-109
CB1-10
CB1-15
CB1-14
CB1-13
CB1-11
B1A-114
B1A-115 B1A-116 B1A-117
B1A-112
B1A-119
B1A-110
B1A-104
B1A-110a
B1A-118
B1A-118a
B1A-118b
B1A-118c
B1A-104a
B1A-118d
B1A-108
B1A-107 B1A-106
B1A-105
B1A-102a
B1A-102b
B1A-103b
B1A-103a
B1A-103
B1A-102
CB1-11a
B1D-119a B1D-119b
B1D-119
ELEV. ELEV.
CB1-12
B1D-102
STAIR
B1D-117a
S-9
STAIR
STAIR
STAIR
CAT
B1D-100r
B1D-103
B1D-100t
B1D-100pB1D-100s
B1D-100x
B1D-100n
B1D-100u
B1D-100v
CB1-21
B1D-100y
B1D-100w B1D-100m
CB1-20
B1D-101a
B1D-101 B1D-100k
CB1-9
B1D-100
B1D-100g
B1D-100f
B1D-100e
B1D-100d
B1D-100c
B1D-100d
B1D-100b
B1D-105 B1D-104
B1A-100a
B1A-100
B1D-106
B1D-106a
B1D-107
CB1-16
B1D-108 B1D-109
B1D-100h
B1D-110
B1D-111B1D-118 CB1-23
B1D-112
B1D-113
CB1-17
B1D-117
STAIR
CANTEEN
B1D-114
CB1-18
B1D-115
B1D-116
CL-1
CB1-11B
B1A-120
B1A-113a
B1D-100z
B1C-100h B1C-100i
B1C-133
B1A-105C
B1A-105B
B1C-100j
B1A-113b B1A-111
B1C-107 B1C-108
B1C-110
B1C-113
B1C-115
B1C-112 B1C-111 B1C-110a
B1C-115a
B1A-105A
B1C-100b B1C-100c
P2-2
B1C-136 B1C-136a B1C-134i
B1C-134gB1C-134f
B1C-138a
B1D-100a
S8
STAIR
STAIR
STAIR
NO. 6
NO. 8
NO. S1 NO. S6
NO. S2 NO. S5
NO. S3 NO. S4
ELEV. LOBBY
STAIR
OFFICE, FMS CHIEF
OFFICE
OFFICE, FACILITIES MGT SERVICE
OFFICE
OFFICEOFFICE
OFFICE, STAFF
ELEC. ROOM
LAB
SCM OFFICE
MECH. RM. SERV. BAY No. 2
MECH. RM. SERV. BAY No. 3
CLOSET, TELE.
CORRIDOR
SCM OFFICE
H.A.C.
SCM OFFICE
CORRIDOR
SCM RECEIVING SCM OFFICE
SCM STORAGE
NO. F9 NO. F10
ELEV. LOBBY
CORRIDOR
CLOSET, ELEC/TELCOM
WORK ROOM PREP & STER.
RECEIVING, SOILED AND DECON.
CORRIDOR
EMER. TRANS. SWITCH
ELEC. ROOM
ELEC. ROOM
SCM CHIEF
SCM OFFICESPS OFFICE
CART LIFT
CART LIFT
CART LIFT
SPS STORAGE
CART WASHER
EQUIP. WASH ROOM
H.A.C.
TOILET, M.
VEST. DECON.TOILET, F.
LOCKER RM.
LOCKER RM.
CORRIDOR
CLOSET, ELEC.
OFFICE
SPS CHIEF
LOCKER ROOM
LOCKER ROOM
TOILET, M.
CLOSET, TELE.
BREAK ROOM
STORAGE, IRM
STOR. DRUG VAULT
PHARMACY, INPATIENT
ENTRY
STORAGE, BULK
PREP. CHEMO. CHEMO. ANTE PREP. IV CLASS 7
IV ANTE ROOM
BREAK ROOM
PIPING TUNNEL
PIPING TUNNEL
CONFERENCE ROOM
OFFICE
TELE. EQUIP.
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
OFFICE
MACH. RM. P1/P2 OFFICE, STAFF TRAIN. MACH. RM. P3/P4
OFFICE
OFFICE
TELE. SWITCHBOARD
OFFICE
TOILET, STAFF
NUTR. & FOOD SVC.
ADMIN. DIETITIAN
OFFICE, OPS. MANAG.
CHEIF, NUTR. & FOOD SVC.
STOR
DIETETIC INTERNSHIP
OFFICE
MACH. RM., ELEV. OFFICE, SUPERV.
MEDICAL RECORDS OFFICE
LOCKER ROOM
TOILET, M.
TOILET, F.
LOCKER ROOM
VESTIBULE
VESTIBULE
CORRIDOR
RESTROOM RESTROOM
VESTIBULE
NO. P6 NO. P5
ELEV. LOBBY
MECH. RM., ELEV.
NO. 7
MEZZANINE
STAIR
NO. 35
NO. 36
NO. 37
WALK
FREZ. WALK-IN MEAT
STORAGE
FREZ. WALK-IN, VEG.
REFER. WALK-IN MEATREFER. WALK-IN, VEG.
STOR. NON-FOOD
REFER. WALK-IN DAIRY
H.A.C.
CLOSET, ELEC.
CORRIDOR
RECEIVING
STOR. BULK DRY FOOD W.R. INGRED. CNTRL.
CORRIDOR
CONF. RM.
OFFICE
OFFICE, FOOD SUPER.
CORRIDOR
KIT. DIETETICS, FOOD PROC/PREP.
DISHWASHING
CLOSET, ELEC.
STOR. CLEAN EQUIP.
CART WASH, MANUAL
H.A.C.
STOR. SANIT. SUPPLIES
CART WASHER
RECEIVING SENDING
STORAGE
SOILED UTIL/BIO HAZARD
BIO-MED. SHOP
OFFICE
SERVER ROOM
CORRIDOR
ELEC. RM. HIGH VOLT. SWITCH ELEC. RM. UNIT SUB.
STOR. EQUIP. CART
STOR. BIO-MED.
EMER. TRANS. SWITCHUPS MECH. RM. CORRIDOR
MECH. RM. CHILLER UNIT
STORAGE, VCS
CORRIDOR
MEZZ. ENERGY CENTER
NO. 10
ELEV.
CLOSET, TELE.
VESTIBULE
CLOSET, ELEC.
MECH. RM. SERV. BAY No. 5
CART LIFT
VESTIBULE
SPS SUPERVISOR
OFFICE
OFFICE
REFRIG. MED STORAGE
LOCKER ROOM
SCM STORAGE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
TOILET, WOMEN
H.A.C.
IN-PATIENT PHARMACY
OFFICE
OFFICE
OFFICE OFFICE OFFICE
PHARM. STORAGE
SPH STORAGE
MED STORAGE PHARMACY
UNIFORM ROOM
ANTE-ROOM VHP
CONF. ROOM
OFFICEOFFICE
MECH ROOM STERILIZERS
CONFERENCE ROOM
SPS OFFICE
OFFICE
EMER. ELEV
F.D. F.D.
D.F.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.F.D.
F.D.
F.D.
F.D.F.D. F.D.
F.D.
F.D.
F.D.
F.D. F.D. F.D.
F.S.
F.S.
F.S.
F.S.
F.S.
F.S.
F.S.
F.S.
F.D.
F.S.
F.D.
F.D.
F.D.
D.F.
OPEN TO ENERGY CENTER
BELOW
UP
UP
DN
UP
DN
DN
DN
U
TL
IT
Y
TU
N N E L
OPEN TO FLOOR
BELOW
SOILED DISH COLLECTION
DISH WASHING/DISH
STORAGE
ACCESS
PANEL
EXPANSION
JOINT
ACCESS
PANEL
RISER
G R A
TE
ACCESS
DOOR
ACCESS
DOOR
EMERGENCY
EYEWASH/
SHOWER
C U R B
C U R B
CURB
TUB
SINK
RISERS
HUB
DRAIN
G R A
TE
RISER
WINDOW
COVERED
WINDOW
COVERED
RISER
CURB CURB
HOOD
C U R B
RISER
G R A
TE
G R A
TE
DN
G R A
TE
G R A
TE
UP
DN
METAL
DAM
LO
U V E R
HOOD
HOOD
HOOD
6"
SEISMIC
JOINT
ACCESS
DOOR ACCESS
DOOR
TRASH
CHUTE
RISER
EMERGENCY
EYEWASH
PNEUMATIC TUBE
STATION
KITCHEN
EQUIPMENT
TRENCH TRENCH
DRAIN
GRATE
P1 LEVEL PARKING
GARAGE
C U R B
LO
U V E R
LOUVER
LO
U V E R
LOUVER
CHAINLINK
FENCE
CAGE
FREEZERS
REFRIG.
R E F R
IG
E R A
TO
R S
DEPOSIT
BIN
"A"
DEPOSIT
BIN
"B"
UNIT
"A"
UNIT
"B"
EXPANSION
JOINT
STEAM
#1
STEAM
#2
STEAM
#3
WINDOW WASHER
#1
WASHER
#2
WASHER
#3
WASHER
#4
EMERGENCY
EYEWASH
9514101181738341403337575350545878870737799189192961311411011311714714330144148168164160163167189185213182196190193197217181210214218228224220221225229237231232236248
DEPT COLORDEPT IDDGSFDEPARTMENT TYPEAdult Day CareAudiologyBeds Medical/SurgicalBeds 23 Hr ObservationBeds Blind RehabBeds CLCBeds ICUBeds MH/Behavioral MedBeds PolytraumaBeds Psych Res RehabBed SCIBehavioral HealthCanteen ServiceCardiologyCentralized Staff FacilitiesChaplain/ChapelCommon/Lobby SpaceDentalDiagnostic ImagingDialysisDigestive/EndosopyDirector's Suite/Quality MgmtEducationEmployee WellnessEngineeringEnvironmental MgmtEye ClinicFiscal ServiceGeriatricsHealthcare Admin ServiceHome Based Health CareHuman Resources ServiceInformation ManagementLibraryLogisticsMedical MediaMedical Service AdminNursing Service AdminNutrition/FoodOn-Call ProgramOn-Site LaundryPathologyPatient LodgingPharmacyPolice/SecurityPolytrauma ClinicPrimary CareProstheticsPsychosocial Rehab & Recovery CenterRecreational TherapyRehab MedicineResearchResidential QuartersSpace Under ConstructionSpecialty CareSPS ServiceSurgicalSwing SpaceTenant SpaceUrgent CareVacant SpaceVet CenterVoluntary ServiceVSO/Vet Assitance/UnionTOTAL##
170210101105010080903112030310470220520560770230420240260630490750530500270640280670290650660540600550620680480690512350150360710201180370340430440570760900190580460780790200990800590720
F.E.C.
F.E.C.
F.E.C.
24.3 23.9 23.1
Y.3
22.2 21.3 20.4 19.6 18.6 17.9
X.9
X.4
V.7
DN
UP
UP
SLIDING
WINDOWS
SLIDE
DOOR
P-TUBE
STN
A F P P
A F P P
M A
TC
TH
LI
N E
A F P P
M A
TC
TH
LI
N E
A F P P
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF 83
SF
SF
S F
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
S F
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
ELEV.
B1G-112
CB1-4
B1G-113 B1G-111 B1G-110 B1G-109 B1G-108 B1G-107 B1G-106 B1G-101
CB1-1
CB1-2
CB1-0
B1G-100
B G
B1G-102
B1G-104
CB1-11
CB1-3
CB1-10
CB1-9
B1G-163 B1G-100a
B1G-164 B1G-166
B1G-173
B1G-172
B1G-171
B G
B1G-171a
B1G-169B1G-168B1G-167B1G-165B1G-162B1G-161B1G-159B1G-158B1G-157B1G-156B1G-155B1G-154B1G-153B1G-152 B1G-151
CB1-7
B1G-160
B1G-105
B1G-103
B1G-143
B1G-145
B1G-146
B1G-144
B1G-142
B1G-141
B1G-140
B1G-139
B1G-137
B1G-135
B1G-133
B1G-131
CB1-8CB1-6
B1G-138
B1G-136
B1G-134
B1G-132
B1G-130
B1G-129
B1G-127
B1G-125
B1G-123
B1G-121
CB1-5
B1G-150
B1G-128
B1G-126
B1G-124
B1G-122
B1G-120
STAIR
P-10
PSYCH. OFFICE
CORRIDOR
PSYCH. OFFICE PSYCH. OFFICE SOCIAL WORK NURSE OFFICE PHARMACY OFFICE PCL OFFICE SOCIAL WORK GROUP RM
CORRIDOR
WAITING
ELEV. VEST.
RECEPTION CL
OS
ET
TOILET, M.
TOILET, F.
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
BREAK ROOM ADMIN.
OFFICE
PSYCH. OFFICE
NURSE EXAM
NURSE EXAM
VESTIBULE
S.
T
LT
ELEC/TEL.
STORAGEPSYCH. OFFICEPSYCH. OFFICEPSYCH. OFFICEPCL MANAGERSOCIAL WORKPSYCH. OFFICEPSYCH. OFFICEPSYCH. OFFICEPSYCH. OFFICEPSYCH. OFFICEPSYCH. OFFICEPSYCH. OFFICEPSYCH. OFFICE
PSYCH. OFFICE
CORRIDOR
HSRD OFFICE
GROUP RM.
GROUP RM.
H.A.C.
S. TLT.
M.H. CHAPLAIN
PSYCH. OFFICE
PSYCH. OFFICE
SOCIAL WORK
OFFICE
NURSE OFFICE
COUNSELING OFFICE
SOCIAL WORK
SOCIAL WORK
PSYCH. OFFICE
CORRIDORCORRIDOR
PSYCH. OFFICE
SOCIAL WORK
COUNSELING OFFICE
NURSE OFFICE
OFFICE
PSYCH. OFFICE
OFFICE
OFFICE
OFFICE
S. TLT.
CORRIDOR
PSYCH. OFFICE
SOCIAL WORK
NURSE OFFICE
PSYCH. OFFICE
PSYCH. OFFICE
NURSE OFFICE
ST-6
DF
CAPITAL ASSET INVENTORY (CAI) FY22DEPT IDColor #DEPARTMENT TYPEDept #95Adult Day Care17014Audiology21010Beds Medical/Surgical10118Beds 23 Hr Observation11017Beds Blind Rehab5038Beds CLC10034Beds ICU80140Beds MH/Behavioral Med9033Beds Polytrauma3137Beds Psych Res Rehab12057Beds SCI3053Behavioral Health31050Canteen Service47054Cardiology22058Centralized Staff Facilities52078Chaplain/Chapel5608Common/Lobby Space77070Dental23073Diagnostic Imaging42077Dialysis24099Digestive/Endosopy26018Director's Suite/Quality Mgmt63091Education49092Employee Wellness75096Engineering53013Environmental Mgmt500114Eye Clinic270110Fiscal Service640113Geriatrics280117Healthcare Admin Service670147Home Based Health Care290143Human Resources Service65030Information Management660144Library540148Logistics600168Medical Media550164Medical Service Admin620160Nursing Service Admin680163Nutrition/Food480167On-Call Program690189On-Site Laundry512185Pathology350213Patient Lodging150182Pharmacy360196Police/Security710190Polytrauma Clinic201193Primary Care180197Prosthetics370217Psychosocial Rehab & Recovery Center340181Recreational Therapy430210Rehab Medicine440214Research570218Residential Quarters760228Space Under Construction900224Specialty Care190220SPS Service580221Surgical460225Swing Space780229Tenant Space790237Urgent Care200231Vacant Space990232Vet Center800236Voluntary Service590248VSO/Vet Assitance/Union720
LAYERSC-BLDG-GROSS-SF###- DEPT NAMEC-AREA-NET-SFSee Color TableC-AREA-GROSS-SF
DEPT COLORDEPT IDDGSFDEPARTMENT TYPEAdult Day CareAudiologyBeds Medical/SurgicalBeds 23 Hr ObservationBeds Blind RehabBeds CLCBeds ICUBeds MH/Behavioral MedBeds PolytraumaBeds Psych Res RehabBed SCIBehavioral HealthCanteen ServiceCardiologyCentralized Staff FacilitiesChaplain/ChapelCommon/Lobby SpaceDentalDiagnostic ImagingDialysisDigestive/EndosopyDirector's Suite/Quality MgmtEducationEmployee WellnessEngineeringEnvironmental MgmtEye ClinicFiscal ServiceGeriatricsHealthcare Admin ServiceHome Based Health CareHuman Resources ServiceInformation ManagementLibraryLogisticsMedical MediaMedical Service AdminNursing Service AdminNutrition/FoodOn-Call ProgramOn-Site LaundryPathologyPatient LodgingPharmacyPolice/SecurityPolytrauma ClinicPrimary CareProstheticsPsychosocial Rehab & Recovery CenterRecreational TherapyRehab MedicineResearchResidential QuartersSpace Under ConstructionSpecialty CareSPS ServiceSurgicalSwing SpaceTenant SpaceUrgent CareVacant SpaceVet CenterVoluntary ServiceVSO/Vet Assitance/UnionTOTAL##
170210101105010080903112030310470220520560770230420240260630490750530500270640280670290650660540600550620680480690512350150360710201180370340430440570760900190580460780790200990800590720
9514101181738341403337575350545878870737799189192961311411011311714714330144148168164160163167189185213182196190193197217181210214218228224220221225229237231232236248P-2 E-3P-2
E-1
P-2 E-2
P-2 E-4
P-2 E-5
P-2 E-6
P-2 E-7
P-2 E-8
P-2 E-9
P-2 E-10
P-2 E-11
P-2 E-12
P-2 E-13
P-2 E-14
P-2 F-3P-2
F-1
P-2 F-2
P-2 F-4
P-2 F-5
P-2 F-6
P-2 F-7
P-2 F-8
P-2 F-9
P-2 F-10
P-2 F-11
P-2 F-12
P-2 F-13
P-2 F-14
P-2 G-3
P-2 G-1
P-2 G-2
P-2 G-4
P-2 G-5
P-2 G-6
P-2 G-7
P-2 G-8
P-2 G-9
P-2 G-10
P-2 G-11
P-2 G-12
P-2 G-13
P-2 G-14
P-2 H-3
P-2 H-1
P-2 H-2
P-2 H-4
P-2 H-5
P-2 H-6
P-2 H-7
P-2 H-8
P-2 H-9
P-2 H-10
P-2 H-11
P-2 H-12
P-2 H-13
P-2 H-14
COMPACT
COMPACT
COMPACT
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T
COMPACTCOMPACT COMPACTCOMPACT COMPACT COMPACT
COMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT
COMPACTCOMPACT COMPACTCOMPACT COMPACTCOMPACT COMPACT
COMPACTCOMPACTCOMPACT COMPACT COMPACT COMPACT
COMPACT
COMPACT
C O
M P
A C
T C
O M
P A
C T
COMPACT
COMPACT
COMPACT
COMPACTCOMPACT COMPACTCOMPACTCOMPACT COMPACT COMPACT
COMPACTCOMPACTCOMPACT COMPACTCOMPACT COMPACT
COMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT
COMPACTCOMPACT COMPACT COMPACT COMPACT
COMPACT
C O
M P
A C
T
COMPACT
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T
COMPACT COMPACTCOMPACTCOMPACT
C O
M P
A C
T
A F P P
A F P P
M A
TC
TH
LI
N E
A F P P
M A
TC
TH
LI
N E
A F P P
F.E.C.
9.215.116.317 14.1 13.5 12.5 11.5 10.8 10.5 9.5 8.5 7.5 6.1 5.3 4.5 3.8 3
Z
X1
Y1
Y
X
46,778
SF
S.F.
S.F.
S.F.
S.F.
P2-LEVEL
ELEV.
NO.
NO.
NO.
NO.
PARKING STRUCTURE
P9
STAIR
STAIR
STAIR
STAIR
DN
DN
RAMP
UP
RAMP
DN
VISITOR
PARKING
VISITOR
PARKING
PATIENT/VISITOR
PARKING
BUILDING
UP
DN UP
FD
RAMP
UP
TRENCH
DRAIN
DN
UP
WHEEL
CHAIR
STOR.
BIKE
LOCKERS
CONC.
BOLLARD
AREA WELL GRATE
BELOW
RAMP
DOWN
RAMP
DOWN
RAMP
UP
FD
STAND
PIPE
FD
STAND
PIPE
FD
STAND
PIPE
CAPITAL ASSET INVENTORY (CAI) FY22DEPT IDColor #DEPARTMENT TYPEDept #95Adult Day Care17014Audiology21010Beds Medical/Surgical10118Beds 23 Hr Observation11017Beds Blind Rehab5038Beds CLC10034Beds ICU80140Beds MH/Behavioral Med9033Beds Polytrauma3137Beds Psych Res Rehab12057Beds SCI3053Behavioral Health31050Canteen Service47054Cardiology22058Centralized Staff Facilities52078Chaplain/Chapel5608Common/Lobby Space77070Dental23073Diagnostic Imaging42077Dialysis24099Digestive/Endosopy26018Director's Suite/Quality Mgmt63091Education49092Employee Wellness75096Engineering53013Environmental Mgmt500114Eye Clinic270110Fiscal Service640113Geriatrics280117Healthcare Admin Service670147Home Based Health Care290143Human Resources Service65030Information Management660144Library540148Logistics600168Medical Media550164Medical Service Admin620160Nursing Service Admin680163Nutrition/Food480167On-Call Program690189On-Site Laundry512185Pathology350213Patient Lodging150182Pharmacy360196Police/Security710190Polytrauma Clinic201193Primary Care180197Prosthetics370217Psychosocial Rehab & Recovery Center340181Recreational Therapy430210Rehab Medicine440214Research570218Residential Quarters760228Space Under Construction900224Specialty Care190220SPS Service580221Surgical460225Swing Space780229Tenant Space790237Urgent Care200231Vacant Space990232Vet Center800236Voluntary Service590248VSO/Vet Assitance/Union720
LAYERSC-BLDG-GROSS-SF###- DEPT NAMEC-AREA-NET-SFSee Color TableC-AREA-GROSS-SF
A-101.0 D1
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
Sheet of ---
ISSUED for CONSTRUCTION
900 Winslow Way E, Suite 130
BAINBRIDGE ISLAND, WA 98110
206-972-0645
BLUE TRIDENT, LLC
Emmanuel (Manny) Bautista, P.E., F. SAMEC :\U se rs
\la ur i\O ne
D riv e
- d es ig n2 la st .c om \d
2L -P ro je ct s\
-0
EH
R M
V an c_ Po rt w
B T\
-D
ES
IG
N \B
IM
M
O D
EL
A
N D
L
IN
KS
\2
4-
- E H
R M
P O
R T.
rv t
7/
/2
5:
:2
PM
AS100.0
SITE PLAN - PORTLAND CAMPUS EHRM Infrastructure Upgrades -
PHASE 2 - PORTLAND HCS
648-24-701
07/24/2025
MR LMSCAMPUS
PORTLAND CAMPUS
SCALE: 1" = 30'-0"F4 SITE - BASEMENT (-P2)
D.F.
D.F.
D.F.
DEPT COLORDEPT IDDGSFDEPARTMENT TYPEAdult Day CareAudiologyBeds Medical/SurgicalBeds 23 Hr ObservationBeds Blind RehabBeds CLCBeds ICUBeds MH/Behavioral MedBeds PolytraumaBeds Psych Res RehabBed SCIBehavioral HealthCanteen ServiceCardiologyCentralized Staff FacilitiesChaplain/ChapelCommon/Lobby SpaceDentalDiagnostic ImagingDialysisDigestive/EndosopyDirector's Suite/Quality MgmtEducationEmployee WellnessEngineeringEnvironmental MgmtEye ClinicFiscal ServiceGeriatricsHealthcare Admin ServiceHome Based Health CareHuman Resources ServiceInformation ManagementLibraryLogisticsMedical MediaMedical Service AdminNursing Service AdminNutrition/FoodOn-Call ProgramOn-Site LaundryPathologyPatient LodgingPharmacyPolice/SecurityPolytrauma ClinicPrimary CareProstheticsPsychosocial Rehab & Recovery CenterRecreational TherapyRehab MedicineResearchResidential QuartersSpace Under ConstructionSpecialty CareSPS ServiceSurgicalSwing SpaceTenant SpaceUrgent CareVacant SpaceVet CenterVoluntary ServiceVSO/Vet Assitance/UnionTOTAL##
170210101105010080903112030310470220520560770230420240260630490750530500270640280670290650660540600550620680480690512350150360710201180370340430440570760900190580460780790200990800590720
9514101181738341403337575350545878870737799189192961311411011311714714330144148168164160163167189185213182196190193197217181210214218228224220221225229237231232236248
UP
DN
UP
DN
UP
DN
UP
R A M P
U P
UP UP
DN
R A M P
UP
STERILIZER
9 8 7 6 5 4 3 2 1
N
M
L
J
K
9 8 7 6 5 4 3 2
G
H
F
E
C
19 17 16 15 14 13 12 11
H
10.6
D
9.810.2 9.4
B
A
N
M
L
K
J
S-3
S-2
S-4
STAIR
STAIR
ELEV. ELEV.
ELEV. ELEV.
ELEV. ELEV.
CB1-1
S-5
B1C-134b
B1C-134c
B1C-134
B1C-134e B1C-134dB1C-134a
B1C-134H
B1C-127
B1C-131
B1C-128a
B1C-118
B1C-125
B1C-126
CB1-6
B1C-128
B1C-129
B1C-130
CB1-5
B1C-106c B1C-132
B1C-106b
ELEV. ELEV.
CB1-8
CB1-7
B1C-135
B1C-138
B1C-139
CB1-9
B1C-124
B1C-123
B1C-119
B1C-120a
B1C-122
B1C-121B1C-120
CL-3
CL-2
CL-4
B1C-106
B1C-139b
B1C-139c
B1C-139a
B1C-101d
B1C-101B1C-101b B1C-101C
B1C-101c
CB1-2
B1C-104
B1C-100k
B1C-116a
B1C-116
B1C-116b
B1C-116c
B1C-117
B1C-118b
B1C-118a
B1C-100a
B1C-100
B1C-102
B1C-103
B1C-100d B1C-100e B1C-100g
B1C-100f
B1C-100p
DW-1
B1C-118c
B1C-118d
B1A-113c
B1A-113
B1A-109
CB1-10
CB1-15
CB1-14
CB1-13
CB1-11
B1A-114
B1A-115 B1A-116 B1A-117
B1A-112
B1A-119
B1A-110
B1A-104
B1A-110a
B1A-118
B1A-118a
B1A-118b
B1A-118c
B1A-104a
B1A-118d
B1A-108
B1A-107 B1A-106
B1A-105
B1A-102a
B1A-102b
B1A-103b
B1A-103a
B1A-103
B1A-102
CB1-11a
B1D-119a B1D-119b
B1D-119
ELEV. ELEV.
CB1-12
B1D-102
STAIR
B1D-117a
S-9
STAIR
STAIR
STAIR
CAT
B1D-100r
B1D-103
B1D-100t
B1D-100pB1D-100s
B1D-100x
B1D-100n
B1D-100u
B1D-100v
CB1-21
B1D-100y
B1D-100w B1D-100m
CB1-20
B1D-101a
B1D-101 B1D-100k
CB1-9
B1D-100
B1D-100g
B1D-100f
B1D-100e
B1D-100d
B1D-100c
B1D-100d
B1D-100b
B1D-105 B1D-104
B1A-100a
B1A-100
B1D-106
B1D-106a
B1D-107
CB1-16
B1D-108 B1D-109
B1D-100h
B1D-110
B1D-111B1D-118 CB1-23
B1D-112
B1D-113
CB1-17
B1D-117
STAIR
CANTEEN
B1D-114
CB1-18
B1D-115
B1D-116
CL-1
CB1-11B
B1A-120
B1A-113a
B1D-100z
B1C-100h B1C-100i
B1C-133
B1A-105C
B1A-105B
B1C-100j
B1A-113b B1A-111
B1C-107 B1C-108
B1C-110
B1C-113
B1C-115
B1C-112 B1C-111 B1C-110a
B1C-115a
B1A-105A
B1C-100b B1C-100c
P2-2
B1C-136 B1C-136a B1C-134i
B1C-134gB1C-134f
B1C-138a
B1D-100a
S8
STAIR
STAIR
STAIR
NO. 6
NO. 8
NO. S1 NO. S6
NO. S2 NO. S5
NO. S3 NO. S4
ELEV. LOBBY
STAIR
OFFICE, FMS CHIEF
OFFICE
OFFICE, FACILITIES MGT SERVICE
OFFICE
OFFICEOFFICE
OFFICE, STAFF
ELEC. ROOM
LAB
SCM OFFICE
MECH. RM. SERV. BAY No. 2
MECH. RM. SERV. BAY No. 3
CLOSET, TELE.
CORRIDOR
SCM OFFICE
H.A.C.
SCM OFFICE
CORRIDOR
SCM RECEIVING SCM OFFICE
SCM STORAGE
NO. F9 NO. F10
ELEV. LOBBY
CORRIDOR
CLOSET, ELEC/TELCOM
WORK ROOM PREP & STER.
RECEIVING, SOILED AND DECON.
CORRIDOR
EMER. TRANS. SWITCH
ELEC. ROOM
ELEC. ROOM
SCM CHIEF
SCM OFFICESPS OFFICE
CART LIFT
CART LIFT
CART LIFT
SPS STORAGE
CART WASHER
EQUIP. WASH ROOM
H.A.C.
TOILET, M.
VEST. DECON.TOILET, F.
LOCKER RM.
LOCKER RM.
CORRIDOR
CLOSET, ELEC.
OFFICE
SPS CHIEF
LOCKER ROOM
LOCKER ROOM
TOILET, M.
CLOSET, TELE.
BREAK ROOM
STORAGE, IRM
STOR. DRUG VAULT
PHARMACY, INPATIENT
ENTRY
STORAGE, BULK
PREP. CHEMO. CHEMO. ANTE PREP. IV CLASS 7
IV ANTE ROOM
BREAK ROOM
PIPING TUNNEL
PIPING TUNNEL
CONFERENCE ROOM
OFFICE
TELE. EQUIP.
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
OFFICE
MACH. RM. P1/P2 OFFICE, STAFF TRAIN. MACH. RM. P3/P4
OFFICE
OFFICE
TELE. SWITCHBOARD
OFFICE
TOILET, STAFF
NUTR. & FOOD SVC.
ADMIN. DIETITIAN
OFFICE, OPS. MANAG.
CHEIF, NUTR. & FOOD SVC.
STOR
DIETETIC INTERNSHIP
OFFICE
MACH. RM., ELEV. OFFICE, SUPERV.
MEDICAL RECORDS OFFICE
LOCKER ROOM
TOILET, M.
TOILET, F.
LOCKER ROOM
VESTIBULE
VESTIBULE
CORRIDOR
RESTROOM RESTROOM
VESTIBULE
NO. P6 NO. P5
ELEV. LOBBY
MECH. RM., ELEV.
NO. 7
MEZZANINE
STAIR
NO. 35
NO. 36
NO. 37
WALK
FREZ. WALK-IN MEAT
STORAGE
FREZ. WALK-IN, VEG.
REFER. WALK-IN MEATREFER. WALK-IN, VEG.
STOR. NON-FOOD
REFER. WALK-IN DAIRY
H.A.C.
CLOSET, ELEC.
CORRIDOR
RECEIVING
STOR. BULK DRY FOOD W.R. INGRED. CNTRL.
CORRIDOR
CONF. RM.
OFFICE
OFFICE, FOOD SUPER.
CORRIDOR
KIT. DIETETICS, FOOD PROC/PREP.
DISHWASHING
CLOSET, ELEC.
STOR. CLEAN EQUIP.
CART WASH, MANUAL
H.A.C.
STOR. SANIT. SUPPLIES
CART WASHER
RECEIVING SENDING
STORAGE
SOILED UTIL/BIO HAZARD
BIO-MED. SHOP
OFFICE
SERVER ROOM
CORRIDOR
ELEC. RM. HIGH VOLT. SWITCH ELEC. RM. UNIT SUB.
STOR. EQUIP. CART
STOR. BIO-MED.
EMER. TRANS. SWITCHUPS MECH. RM. CORRIDOR
MECH. RM. CHILLER UNIT
STORAGE, VCS
CORRIDOR
MEZZ. ENERGY CENTER
NO. 10
ELEV.
CLOSET, TELE.
VESTIBULE
CLOSET, ELEC.
MECH. RM. SERV. BAY No. 5
CART LIFT
VESTIBULE
SPS SUPERVISOR
OFFICE
OFFICE
REFRIG. MED STORAGE
LOCKER ROOM
SCM STORAGE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
TOILET, WOMEN
H.A.C.
IN-PATIENT PHARMACY
OFFICE
OFFICE
OFFICE OFFICE OFFICE
PHARM. STORAGE
SPH STORAGE
MED STORAGE PHARMACY
UNIFORM ROOM
ANTE-ROOM VHP
CONF. ROOM
OFFICEOFFICE
MECH ROOM STERILIZERS
CONFERENCE ROOM
SPS OFFICE
OFFICE
EMER. ELEV
F.D. F.D.
D.F.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.F.D.
F.D.
F.D.
F.D.F.D. F.D.
F.D.
F.D.
F.D.
F.D. F.D. F.D.
F.S.
F.S.
F.S.
F.S.
F.S.
F.S.
F.S.
F.S.
F.D.
F.S.
F.D.
F.D.
F.D.
D.F.
OPEN TO ENERGY CENTER
BELOW
UP
UP
DN
UP
DN
DN
DN
U
TL
IT
Y
TU
N N E L
OPEN TO FLOOR
BELOW
SOILED DISH COLLECTION
DISH WASHING/DISH
STORAGE
ACCESS
PANEL
EXPANSION
JOINT
ACCESS
PANEL
RISER
G R A
TE
ACCESS
DOOR
ACCESS
DOOR
EMERGENCY
EYEWASH/
SHOWER
C U R B
C U R B
CURB
TUB
SINK
RISERS
HUB
DRAIN
G R A
TE
RISER
WINDOW
COVERED
WINDOW
COVERED
RISER
CURB CURB
HOOD
C U R B
RISER
G R A
TE
G R A
TE
DN
G R A
TE
G R A
TE
UP
DN
METAL
DAM
LO
U V E R
HOOD
HOOD
HOOD
6"
SEISMIC
JOINT
ACCESS
DOOR ACCESS
DOOR
TRASH
CHUTE
RISER
EMERGENCY
EYEWASH
PNEUMATIC TUBE
STATION
KITCHEN
EQUIPMENT
TRENCH TRENCH
DRAIN
GRATE
P1 LEVEL PARKING
GARAGE
C U R B
LO
U V E R
LOUVER
LO
U V E R
LOUVER
CHAINLINK
FENCE
CAGE
FREEZERS
REFRIG.
R E F R
IG
E R A
TO
R S
DEPOSIT
BIN
"A"
DEPOSIT
BIN
"B"
UNIT
"A"
UNIT
"B"
EXPANSION
JOINT
STEAM
#1
STEAM
#2
STEAM
#3
WINDOW WASHER
#1
WASHER
#2
WASHER
#3
WASHER
#4
EMERGENCY
EYEWASH
CAPITAL ASSET INVENTORY (CAI) FY22DEPT IDColor #DEPARTMENT TYPEDept #95Adult Day Care17014Audiology 21010Beds Medical/Surgical10118Beds 23 Hr Observation11017Beds Blind Rehab5038Beds CLC 10034Beds ICU 80140Beds MH/Behavioral Med9033Beds Polytrauma3137Beds Psych Res Rehab12057Beds SCI 3053Behavioral Health31050Canteen Service47054Cardiology 22058Centralized Staff Facilities52078Chaplain/Chapel5608Common/Lobby Space77070Dental 23073Diagnostic Imaging42077Dialysis 24099Digestive/Endosopy26018Director's Suite/Quality Mgmt63091Education 49092Employee Wellness75096Engineering53013Environmental Mgmt500114Eye Clinic 270110Fiscal Service640113Geriatrics 280117Healthcare Admin Service670147Home Based Health Care290143Human Resources Service65030Information Management660144Library 540148Logistics 600168Medical Media550164Medical Service Admin620160Nursing Service Admin680163Nutrition/Food480167On-Call Program690189On-Site Laundry512185Pathology 350213Patient Lodging150182Pharmacy 360196Police/Security710190Polytrauma Clinic201193Primary Care180197Prosthetics 370217Psychosocial Rehab & Recovery Center340181Recreational Therapy430210Rehab Medicine440214Research 570218Residential Quarters760228Space Under Construction900224Specialty Care190220SPS Service580221Surgical 460225Swing Space780229Tenant Space790237Urgent Care200231Vacant Space990232Vet Center 800236Voluntary Service590248VSO/Vet Assitance/Union720
LAYERSC-BLDG-GROSS-SF
###- DEPT NAME
C-AREA-NET-SF
See Color Table
C-AREA-GROSS-SF
9514101181738341403337575350545878870737799189192961311411011311714714330144148168164160163167189185213182196190193197217181210214218228224220221225229237231232236248
DEPT COLORDEPT IDDGSFDEPARTMENT TYPEAdult Day CareAudiologyBeds Medical/SurgicalBeds 23 Hr ObservationBeds Blind RehabBeds CLCBeds ICUBeds MH/Behavioral MedBeds PolytraumaBeds Psych Res RehabBed SCIBehavioral HealthCanteen ServiceCardiologyCentralized Staff FacilitiesChaplain/ChapelCommon/Lobby SpaceDentalDiagnostic ImagingDialysisDigestive/EndosopyDirector's Suite/Quality MgmtEducationEmployee WellnessEngineeringEnvironmental MgmtEye ClinicFiscal ServiceGeriatricsHealthcare Admin ServiceHome Based Health CareHuman Resources ServiceInformation ManagementLibraryLogisticsMedical MediaMedical Service AdminNursing Service AdminNutrition/FoodOn-Call ProgramOn-Site LaundryPathologyPatient LodgingPharmacyPolice/SecurityPolytrauma ClinicPrimary CareProstheticsPsychosocial Rehab & Recovery CenterRecreational TherapyRehab MedicineResearchResidential QuartersSpace Under ConstructionSpecialty CareSPS ServiceSurgicalSwing SpaceTenant SpaceUrgent CareVacant SpaceVet CenterVoluntary ServiceVSO/Vet Assitance/UnionTOTAL##
170210101105010080903112030310470220520560770230420240260630490750530500270640280670290650660540600550620680480690512350150360710201180370340430440570760900190580460780790200990800590720
F.E.C.
F.E.C.
F.E.C.
24.3 23.9 23.1
Y.3
22.2 21.3 20.4 19.6 18.6 17.9
X.9
X.4
V.7
DN
UP
UP
SLIDING
WINDOWS
SLIDE
DOOR
P-TUBE
STN
A F P P
A F P P
M A
TC
TH
LI
N E
A F P P
M A
TC
TH
LI
N E
A F P P
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF 83
SF
SF
S F
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
S F
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF122
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .