Attachment 3 - Overall Site Plan.pdf
PDF 1 MB Posted
- Solicitation number
- 36C77625B0050
About this file
This document is an overall site plan for the VA Portland Health Care System (VAPORHCS) EHRM Infrastructure Upgrades - Phase 2 project. The plan depicts the Portland Health Care System campus layout and identifies proposed communications infrastructure improvements, including concrete-encased communication conduit installations at various locations throughout the facility.
The site plan shows the campus divided into multiple functional zones containing primary care clinics (24 locations), specialty care clinics (20 locations), and support facilities including a community living center, transplant lodger, rehabilitation building, boiler plant, maintenance shops, laundry warehouse, and storage areas. The plan indicates four proposed concrete-encased communication conduit routes (CS101, CS102, CS103, CS104) connecting across the campus along Air Force Way, Army Avenue, Marine Corps Drive, Navy Lane, and Coast Guard Street. The drawing was prepared by Blue Trident, LLC, with professional engineering stamp by Daniel F. Kelley (Washington PE #24014515), dated February 12, 2026, at a scale of 1 inch equals 60 feet. The document is issued for construction and includes approvals from the VAPORHCS Director, Service Chief, Chief Facilities Management, Project Engineer, Infection Control, Chief of Planning and Operations, Chief of Maintenance and Repair, and Safety Manager.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNK
X
E
E
UNK
X X
XX
S
UNK
UNK
UNK
PIV
E
I
(C O
M M
(COMM) (COMM) (COMM) (COMM) (COMM)
(C O
M M
(C
O M
M
(C
OM
M
(C
OM
M
(C
OMM)
(C O
M M
(COMM)
(C O
M M
(COMM)
TT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
C
C
(C
OM
M
(C
OM
M
(C
OM
M
(C
OM
M
(C
OM
M
(COMM)
(COMM)
(C O
M M
(COMM)
(COMM)
(COMM)
(COMM)
(COMM)
(COMM)
(COMM)
(COMM)
(COMM)
(COMM)
C
(C O
M M
(C
O M
M
(C O
M M
(COMM)
(C O
M M
(C
O M
M
EAST
4T
H P
LA
IN
B
LV
D
(P
UBLIC
PRIMARY CARE
(24)
CLARK COUNTY CENTER FOR
COMMUNITY HEALTH
(CCH)
(17)
LOT 14
LOT 14
POW / MIA RD
LOT 1
MARINE CORPS DRIVE
LOT 19
SPECIALTY CARE
CLINICS
(20)
PO
W
M
IA
R
D
LOT 17
LOT 7
LOT 5
LOT 6LOT 15
LOT 12
LOT 8
LOT 16
LOT 9
LOT 20
LOT 11
LOT 14
LOT 10
LOT 13
LOT 18
LOT 3
LOT 2 LOT 2
LOT 15
PO
W
M
IA
R
D
AI
R
F O
R C
E W
AY
AI
R F
O R
C E
W
AY
AR
M
Y
AV
E
AR
M
Y
AV
E
NATIONAL GUARD ST
NAVY LN
MARINE CORPS DR
TRANSPLANT LODGER
(18)
RRTP
(12)
BOILER PLANT
(3)
MAINTENANCE
SHOPS
(4)
GROUNDS
(5)
PRIMARY CARE
SUPPORT BUILDING
(15)
FREEDOM'S PATH
(26)
LAUNDARY
WAREHOUSE
(2)
TELE
(13)
STORAGE
(16)
SRO
FISHER HOUSE
(25)
COMMUNITY LIVING CENTER
(1)
C WING B WING
E WING
F WING
BARNES REHABILITATION
(11)
D WING
IMAGING (28)
ADMIN
(21)
COAST GUARD ST
MUSEUM
(T1819)
GARDEN
FUTURE IMAGING
(27)
POW / MIA RD
AIR FORCE W
AY
TR4
FITNESS CENTER
(14) TR3
AR
M
Y
AV
E
PROPOSED CONCRETE
ENCASED COMM CONDUIT
PROPOSED CONCRETE
ENCASED COMM CONDUIT
PROPOSED CONCRETE
ENCASED COMM CONDUIT
EXISTING COMM CONDUIT,
SEE SHEET T100.1
PROPOSED CONCRETE
ENCASED COMM CONDUIT
PROPOSED CONCRETE
ENCASED COMM CONDUIT
CS101
CS103
CS102
CS104
FO
RT
V
AN
CO
UV
ER
W
AY
(P
UB
LI
C)
S&B CHRIST CONSULTING, LLC.
9555 HILLWOOD DRIVE, #160
LAS VEGAS, NV 89134
(702) 202-6004
POC: DANIEL F. KELLEY, PE
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
BLUE TRIDENT, LLC
7829 NE Esperione LN Bainbridge Island, WA 98110
(206) 972-0645
VANCOUVER CAMPUS
648-24-701
DFK KLM
Revisions: Date:
P:
\P ro je ct s\
Bl ue
T rid en t -
V A
Po rtl an d
EH
R
M P ha se
\E ng in ee rin g\ D ra w in gs
\P ro du ct io n
D ra w in gs \5
-2
4-
3- C
S.
dw g
/1
3/
:5
PM
EHRM Infrastructure Upgrades -
PHASE 2 - PORTLAND HCS
CAMPUS
07/24/2025
ISSUED FOR CONSTRUCTION
CS101 CS102
CS104CS103
24014515
PROFESSIONAL ENGIN
EE
R
ST
ATE OF WASHINGTON
R EG I STE R ED
DA
NIEL F. KELLEY
SCALE IN FEET
060 60 120
1" = 60'
OVERALL SITE PLAN
CS100
1. RESPONSE TO PREBID QUESTIONS 02/17/2026
12 Feb 2026
| Sheets and Views |
| CS100 |
File details come from the government source that posted it. Updated .