This is an electrical schedules drawing for the VA Portland Health Care System's EHRM Infrastructure Upgrades Phase 2 project. The drawing was issued for construction on July 24, 2025, and prepared by Blue Trident, LLC, with consultant IMEG Corp serving as the architect/engineer. The project number is 24004752.00, and the drawing sheet is ES601.
The document contains electrical panel schedules and specifications for multiple distribution panels, including Panel NX, Panel B1L1-F-6 UPS, Panel MCB1, and Panel MCB2. Key electrical components specified include 60-ampere molded case breakers (MCB) for 120/208V, three-phase, four-wire systems, two 30-kilovolt-ampere transformers (T-15 and T-152) with 480:120/208V ratios, and associated disconnect and starter equipment. The schedules detail circuit layouts with load classifications for receptacles and power distribution, indicating estimated demand loads ranging from 2.88 to 5.17 kilowatts across various panels. The document also includes LED luminaire schedules specifying 4-foot commercial LED striplights with frost round lenses, 4000K color temperature, 80 CRI, and 0-10V dimming drivers. A partial electrical riser diagram illustrates the interconnection between existing panels (B1C-126) and new equipment, with notes requiring installation of new 35-ampere and 60-ampere three-phase breakers in available panel spaces. Lighting sequence of operations notes indicate vacancy-controlled lighting with occupancy sensors and automatic shutoff after 15 minutes of inactivity.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
120/208V,3Ø4W
60A MCB
NX
120/208V,3Ø4W
60A MCB
MCB2
120/208V,3Ø4W
60A MCB
MCB1
T-15
30KVA
480:120/208V
FDS-
FUFU 60AF/60AT
T-152
30KVA
480:120/208V
FDS-
FUFU 60AF/60AT
NEW NEW NEW
EXIST.
PANEL
B1DEL1-F-14
EXIST.
PANEL
SWBD-
B1SPEC-E-18
EXIST.
PANEL
B1SDEC-G-3
NEW NEW
NEW NEW
4#4 & 1#8 SSBJ IN 1-1/4" C. 4#4 & 1#8 SSBJ IN 1-1/4" C.
3#6 & 1#8 EGC IN 1" C. 3#6 & 1#8 EGC IN 1" C.
4#4 & 1#8 EGC IN 1-1/4" C.
11044 RESEARCH BLVD
A-230
AUSTIN, TX 78759
P: 512.416.1654 F: 512.416.7547 www.imegcorp.com
PROJECT #24004752.00
2'
1' 0'
1' 4'
4' 8'
0'
0'
0'
4' 2'
2'
8'
1' 0'
0' 0'
4'
1' 0'
1' 2'
1' 2'
2' 2'
0'
0'
1'
8'
1' 0'
1'
2' 4'
1/ 2'
0'
2'
2'
1' 3'
0'
4"
2"
6'
8' 8'
1' 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
Sheet of ---
ISSUED FOR CONSTRUCTION
PORTLAND
A u to d e s k D o c s /2
.0
V
A -P o rt la n d
O
R -E
H R
M P h a s e
/M
E P
T
.0
V
A -P o rt la n d
O
R -E
H R
M P h a s e
C .r v t
/1
/2
:3
:1
P
M
ES601
ELECTRICAL SCHEDULES - PORTLAND
BLUE TRIDENT, LLC
7829 NE Esperione LN
Bainbridge Island, WA 98110
206-972-0645
EHRM Infrastructure Upgrades -
PHASE 2 - PORTLAND HCS
648-24-701
07/24/2025
EZ JFCAMPUS
AMS-ASSEMBLED MOTOR STARTER
FS - FUSED SWITCH
MX - MANUAL SWITCH
MS - MANUAL STARTER
SS - SOLID STATE
RV - REDUCED VOLTAGE AUTOXFMR
SW - 2 SPEED, 1 WINDING
TW - 2 SPEED, 2 WINDING
RE - REVERSING HL - HANDLE PADLOCK HASP
YD - WYE - DELTA S/N - INSULATED NEUTRAL ASSEMBLY SS - START-STOP PUSHBUTTON IN DOOR
FV - FULL VOLTAGE *TA - TWO CONVERTIBLE AUXILIARY CONTACTS EI - ELECTRICAL INTERLOCK (2)-N.O. & (2)-N.C.
STARTER TYPE: *RP - RED (RUN) PILOT LIGHT IN DOOR FA - 4-CONVERTIBLE AUXILIARY CONTACTS
*HA - HAND-OFF-AUTO IN DOOR GP - GREEN (OFF) PILOT LIGHT IN DOOR
CB - CIRCUIT BREAKER *EO - ELECTRONIC OVERLOAD (3 PHASE MOTORS) TS - 2 SPEED SELECTOR SWITCH IN DOOR
NF - NON-FUSED *CT - CONTROL TRANSFORMER, FUSED 120V TO - MELTING THERMAL OVERLOADS (1 PHASE)
FU - FUSED SA - STANDARD ACCESSORIES (INCLUDES * ITEMS) PF - PHASE LOSS PROTECTION (5 HP OR GREATER, 3 PHASE...
DISCONNECT TYPE: ACCESSORIES & OPTIONS
NOTE: ALL DISCONNECTS (EXCEPT MANUAL STARTERS) SHALL BE HEAVY DUTY TYPE.
DISCONNECT AND STARTER SCHEDULE
ITEM
DISCONNECT TYPE &
RATING
VOLTAGE POLES
STARTER
ENCLOSURE
REQUIRED
ACCESSORIES &
OPTIONS COMMENTSTYPE RATING
TRIP
RATING
NEMA
SIZE TYPE
FDS- FU 60 60 208 3 NEMA 1
FDS- FU 60 60 208 3 NEMA 1
MX-EXISTING SPLIT SYSTEM NF 30 208 2 0 MX NEMA 1 S/N
MX-SS-1 NF 30 208 2 0 MX NEMA 1 S/N
REFER TO SPECIFICATION SECTIONS [LED LIGHTING 26 51 19] [AND EMERGENCY LIGHTING INVERTER 26 52 15] FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
INTERIOR CORRELATED COLOR TEMPERATURE [2700, 3000, 3500, 4000/4100]K, COLOR RENDERING INDEX (CRI) AT OR ABOVE [80, 85, 90], UNLESS NOTED OTHERWISE.
EXTERIOR CORRELATED COLOR TEMPERATURE [2700, 3000, 3500, 4000/4100]K, COLOR RENDERING INDEX (CRI) AT OR ABOVE [80, 85, 90], UNLESS NOTED OTHERWISE.
[PROVIDE CHICAGO PLENUM CCEA FOR ALL RECESSED LUMINAIRES LOCATED IN PLENUM CEILINGS.]
CATALOG NUMBER SHALL NOT BE CONSIDERED COMPLETE AND MATERIAL SHALL NOT BE ORDERED BY MANUFACTURER AND CATALOG NUMBER ONLY. THE COMPLETE DESCRIPTION AND THE SPECIFICATION SHALL BE COORDINATED WITH THE CATALOG NUMBER TO DETERMINE THE EXACT MATERIAL AND ACCESSORIES TO BE ORDERED. THE FIRST MANUFACTURER LISTED IS THE BASIS OF
DESIGN.
VERIFY AND COORDINATE ALL CEILING TYPES WITH LUMINAIRE MOUNTING AND TRIM REQUIREMENTS PRIOR TO THE RELEASE OF THE LUMINAIRE ORDER.
CONFIRM ALL COLORS AND FINISHES OF ALL LUMINAIRE COMPONENTS WITH ARCHITECT AND INTERIOR DESIGNER PRIOR TO THE RELEASE OF THE LUMINAIRE ORDER.
UNLESS INDICATED ON LIGHTING PLANS OR BELOW, REFER TO ARCHITECTURAL AND INTERIOR DESIGN ELEVATIONS, SECTIONS AND DETAILS FOR ALL SUSPENDED AND WALL MOUNTED LUMINAIRE
MOUNTING HEIGHTS.
DMX - DIGITAL MULTIPLEX EM - EMERGENCY BATTERY ML - MULTI-LEVEL SWITCHING O - OTHER (SEE DESCRIPTION)
DALI - DIGITAL ADDRESSABLE ELV - ELECTRONIC LOW VOLTAGE LINE - LINE VOLTAGE DIMMING REM - REMOTE
0-10V - 0-10V DIMMING EB - ELECTRONIC HL - HIGH/LOW (100%/50%) STEP DIM MV - MULTI-VOLTAGE ELECTRONIC
(TYPE) DRIVER:
PL - POLE O - OTHER (SEE DESCRIPTION) DLED - DYNAMIC TUNABLE LED WLED - WARM DIM LED
P - PERIMETER WL - WALL OLED - ORGANIC LED RLED - RETROFIT LED
FR - FLANGED RECESSED UC - UNDER CABINET TLED - TUBULAR LED LAMP RGBA - COLOR CHANGING + AMBER
CV - COVE SU - SURFACE LED - LIGHT EMITTING DIODE RGBW - COLOR CHANGING + WHITE
CL - CEILING SURFACE SP - SUSPENDED (TYPE) LED RGB - COLOR CHANGING LED
(MTG) MOUNTING: RE - RECESSED (WATT) PER: FIX - FIXTURE, FT - FOOT, LAMP
CFSA - COLOR-FINISH SELECTION BY ARCHITECT [DESIGN SPECIFIC BLANKS]
PAF - PAINT AFTER FABRICATION WW - WALL WASH K - KSH12 .125" ACRYLIC O - OTHER (SEE DESCRIPTION)
FINISH: VWD - VERY WIDE G - TEMPERED GLASS SS - SEMI-SPECULAR CLEAR
RS - REGRESSED STEEL V - ANSI/IES TYPE 5 DISTRIBUTION WD - WIDE F - FROSTED ACRYLIC R - HIGH IMPACT DR ACRYLIC
RA - REGRESSED ALUMINUM IV - ANSI/IES TYPE 4 DISTRIBUTION MD - MEDIUM C - CLEAR ALZAK P - POLYCARBONATE
FS - FLAT STEEL III - ANSI/IES TYPE 3 DISTRIBUTION SP - SPOT B - BAFFLE/LOUVER N - NONE
FA - FLAT ALUMINUM II - ANSI/IES TYPE 2 DISTRIBUTION NSP - VERY NARROW SPOT A - .125" ACRYLIC M - MATTE DIFFUSE CLEAR
(DESC) DOOR: DISTRIBUTION: BEAMWIDTH: (L/L) LENS/LOUVER: K19 - KSH19 .156" ACRYLIC
LED LUMINAIRE SCHEDULE
ITEM DESCRIPTION L/L MTG
DIMENSIONS WATT LED DRIVER
MANUFACTURER AND MODELL W H DIA.
ANSI
WATTS PER TYPE QTY
DELIVERED
LUMENS
(MIN) VOLTS TYPE
A1 4FT COMMERCIAL LED STRIPLIGHT FROST
ROUND LENS 4000K, 80CRI, DIMMING DRIVER
CV 4'-0" 2 3/4" 2 3/4" 0 FIX LED 1 LUMENS 120 0-10V METALUX
#4SNLED-LD5-XX-LW-UNV-L840-C
D-1-U-AYC
A1E 4FT COMMERCIAL LED STRIPLIGHT FROST
ROUND LENS 4000K, 80CRI, DIMMING DRIVER,
EMERGENCY BATTERY PACK
CV 4'-0" 2 3/4" 2 3/4" 0 FIX LED 1 LUMENS 120 0-10V METALUX
#4SNLED-LD5-XX-LW-UNV-L840-C
D-1-U-AYC
NOTES:
1. {L##} DENOTES THE LIGHTING SEQUENCE OF OPERATIONS FOR THIS SPACE.
2. [#B] PUSH BUTTON REFERS TO SCENE QUANTITY. CONTROL STATION SHALL BE CAPABLE OF [RAISE/LOWER AND] SWITCHING ON/OFF FOR MULTIPLE SCENES AS INDICATED ON SHEETS AND THE LIGHTING SEQUENCE OF OPERATIONS {L##}.
COORDINATE QUANTITIES OF BUTTONS FOR CONTROL STATIONS WITH LIGHTING CONTROL MANUFACTURER.
3. [Z#] DENOTES LIGHTING CONTROL ZONE. PROVIDE SEPARATE CONTROL OF EACH CONTROLLED ZONE. LUMINAIRES ASSOCIATED WITH THE SAME ZONE SHALL OPERATE TOGETHER WITHIN THE SAME PROGRAMMED SCENE.
4. a = SWITCH DESIGNATION FOR LIGHTING CONTROL
5. VERIFY AND COORDINATE ALL TIME CLOCK SETTINGS WITH OWNER PRIOR TO FINAL PROGRAMMING.
6. VERIFY AND COORDINATE ALL PUSH BUTTON WALL DEVICES AND QUANTITIES OF INDIVIDUAL BUTTONS WITH SCENES AND
ZONES PER LOCATION.
7. VERIFY AND COORDINATE ALL PUSH BUTTON QUANTITIES AND SCENE NAMES WITH OWNER PRIOR TO SUBMITTING
ENGRAVING TEMPLATE TO MANUFACTURER.
LIGHTING SEQUENCE OF OPERATION
PLAN ID LIGHTING SWITCHED
{LS1} SEQUENCE: SWITCHED LIGHTS ARE VACANCY CONTROLLED IN THIS SPACE.
ON:
THE LIGHTS TURN ON USING THE OCCUPANCY SENSORS.
ADJUST:
LIGHTS ARE RAISED / LOWERED CONTROLLED USING A WALL CONTROLLER.
OFF:
LIGHTS CAN BE TURNED OFF MANUALLY USING THE WALL SWITCH OR AFTER THE SPACE HAS BEEN VACANT
FOR 15 MINUTES, THE LIGHTS WILL AUTOMATICALLY TURN OFF.
CIRCUIT KEY NOTES:
*TOTAL DEMAND CALCS SUBTRACT ANY REDUNDANT LOAD AND THE SMALLER OF ANY NONCOINCIDENT HVAC LOADS. THIS CALC IS DONE AT EACH PANEL.
TOTAL ESTIMATED DEMAND AMPS: 10.5
TOTAL CONNECTED AMPS: 10.49 A
TOTAL ESTIMATED DEMAND LOAD: 3.78 kVA
Receptacles 0.9 kVA 100.00% 0.9 kVA TOTAL CONNECTED LOAD: 3.78 kVA
Power 2.88 kVA 100.00% 2.88 kVA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND
TOTALS*
LOAD SUMMARY
Total Amps: 27.69 5.19 0.00
Total Load: 3.24 kVA 0.54 kVA 0.00 kVA
-- 29 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 30 --
-- 27 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 28 --
-- 25 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 26 --
-- 23 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 24 --
-- 21 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 22 --
-- 19 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 20 --
-- 17 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 18 --
-- 15 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 16 --
-- 13 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 14 --
-- 11 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 12 --
-- 9 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 10 --
-- 7 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 8 --
-- 5 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 6 --
3 QUAD-107 20 1 12 12 12 0.19 0.36 0.18 0.11 12 12 12 1 20 RECP-107 4
1 SP. RECEPT. 30 1 10 10 10 0.92 2.88 0.36 0.18 12 12 12 1 20 QUAD-107 2
K E Y
CKT
NO. LOAD DESCRIPTION
OCPD
AMPS P
WIRE
SIZE
H N G
VD
A B C VD
WIRE
SIZE
G N H
OCPD
P AMPS LOAD DESCRIPTION
CKT
NO.
K E Y
NOTES:
ISC UNKNOWN 0.00 kA
SCCR: 65 kA
LOCATION: Room 1 WIRE: 4
FED FROM: 60/3P @ B1DEL1-F-4 GROUND BUS PHASE: 3
ENCLOSURE: NEMA 1 SOLID NEUTRAL VOLTS: 120/208 Wye
MOUNTING: SURFACE SINGLE TUB MAIN: 60 MCB
PANEL NX
CIRCUIT KEY NOTES:
*TOTAL DEMAND CALCS SUBTRACT ANY REDUNDANT LOAD AND THE SMALLER OF ANY NONCOINCIDENT HVAC LOADS. THIS CALC IS DONE AT EACH PANEL.
TOTAL ESTIMATED DEMAND AMPS: 10.5
TOTAL CONNECTED AMPS: 10.49 A
TOTAL ESTIMATED DEMAND LOAD: 3.78 kVA
Receptacles 0.9 kVA 100.00% 0.9 kVA TOTAL CONNECTED LOAD: 3.78 kVA
Power 2.88 kVA 100.00% 2.88 kVA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND
TOTALS*
LOAD SUMMARY
Total Amps: 0.00 27.69 5.19
Total Load: 0.00 kVA 3.24 kVA 0.54 kVA
-- 41 SPACE -- 1 -- -- -- -- 0 -- -- -- 1 20 SPARE 42 --
-- 39 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 40 --
-- 37 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 38 --
-- 35 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 36 --
-- 33 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 34 --
-- 31 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 32 --
-- 29 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 30 --
27 SP. RECEPT. 30 1 10 10 10 1.2 2.88 -- -- -- -- 1 -- SPACE 28 --
-- 25 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 26 --
-- 23 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 24 --
-- 21 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 22 --
-- 19 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 20 --
-- 17 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 18 --
-- 15 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 16 --
-- 13 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 14 --
11 RECEPT.-EXTERIOR 20 1 12 12 12 0.23 0.18 0.36 0.26 12 12 12 1 20 RECEPT.- TE 12
9 RECEPT.- TE 20 1 12 12 12 0.26 0.36 0 -- -- -- 1 20 SPARE 10 --
-- 7 RECEPT.- SOUTH 20 1 -- -- -- 0 0 -- -- -- 1 20 GUTTER RECEPT- 107 8 --
-- 5 LTG- B1D 107 20 1 -- -- -- 0 0 -- -- -- 1 20 GUTTER RECEPT- 107 6 --
-- 3 12X12 J-BOX 20 1 -- -- -- 0 0 -- -- -- 1 20 GUTTER RECEPT- 107 4 --
-- 1 QUAD- PNL BOTTOM 20 1 -- -- -- 0 0 -- -- -- 1 20 GUTTER RECEPT- 107 2 --
K E Y
CKT
NO. LOAD DESCRIPTION
OCPD
AMPS P
WIRE
SIZE
H N G
VD
A B C VD
WIRE
SIZE
G N H
OCPD
P AMPS LOAD DESCRIPTION
CKT
NO.
K E Y
NOTES:
ISC UNKNOWN 0.00 kA
SCCR: EXISTING
LOCATION: NEW TR B1D-107a WIRE: 4
FED FROM: 0/0P @ GROUND BUS PHASE: 3
ENCLOSURE: NEMA 1 SOLID NEUTRAL VOLTS: 120/208 Wye
MOUNTING: SURFACE SINGLE TUB MAIN: 150 MCB
PANEL B1L1-F-6 UPS
CIRCUIT KEY NOTES:
*TOTAL DEMAND CALCS SUBTRACT ANY REDUNDANT LOAD AND THE SMALLER OF ANY NONCOINCIDENT HVAC LOADS. THIS CALC IS DONE AT EACH PANEL.
TOTAL ESTIMATED DEMAND AMPS: 14.3
TOTAL CONNECTED AMPS: 14.34 A
TOTAL ESTIMATED DEMAND LOAD: 5.168 kVA
TOTAL CONNECTED LOAD: 5.17 kVA
Power 5.168 kVA 100.00% 5.168 kVA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND
TOTALS*
LOAD SUMMARY
Total Amps: 35.00 11.00 0.00
Total Load: 4.02 kVA 1.14 kVA 0.00 kVA
-- 29 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 30 --
-- 27 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 28 --
-- 25 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 26 --
-- 23 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 24 --
-- 21 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 22 --
-- 19 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 20 --
-- 17 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 18 --
-- 15 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 16 --
-- 13 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 14 --
-- 11 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 12 --
-- 9 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 10 --
-- 7 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 8 --
-- 5 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 6 --
-- 3 SPARE 20 1 -- -- -- 0 1.14 4
1 SP. RECEPT. 30 1 10 10 10 1.08 2.88 1.14
0.7 12 -- 12 2 30 SS-2
K E Y
CKT
NO. LOAD DESCRIPTION
OCPD
AMPS P
WIRE
SIZE
H N G
VD
A B C VD
WIRE
SIZE
G N H
OCPD
P AMPS LOAD DESCRIPTION
CKT
NO.
K E Y
NOTES:
ISC: 1.87 kA
SCCR: 10 kA
LOCATION: NEW TR B1D-107a WIRE: 4
FED FROM: 60/3P @ T-15 GROUND BUS PHASE: 3
ENCLOSURE: NEMA 1 SOLID NEUTRAL VOLTS: 120/208 Wye
MOUNTING: SURFACE SINGLE TUB MAIN: 60 MCB
PANEL MCB1
CIRCUIT KEY NOTES:
*TOTAL DEMAND CALCS SUBTRACT ANY REDUNDANT LOAD AND THE SMALLER OF ANY NONCOINCIDENT HVAC LOADS. THIS CALC IS DONE AT EACH PANEL.
TOTAL ESTIMATED DEMAND AMPS: 8
TOTAL CONNECTED AMPS: 7.99 A
TOTAL ESTIMATED DEMAND LOAD: 2.88 kVA
TOTAL CONNECTED LOAD: 2.88 kVA
Power 2.88 kVA 100.00% 2.88 kVA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND
TOTALS*
LOAD SUMMARY
Total Amps: 24.00 0.00 0.00
Total Load: 2.88 kVA 0.00 kVA 0.00 kVA
-- 29 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 30 --
-- 27 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 28 --
-- 25 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 26 --
-- 23 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 24 --
-- 21 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 22 --
-- 19 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 20 --
-- 17 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 18 --
-- 15 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 16 --
-- 13 SPACE -- 1 -- -- -- -- -- -- -- -- 1 -- SPACE 14 --
-- 11 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 12 --
-- 9 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 10 --
-- 7 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 8 --
-- 5 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 6 --
-- 3 SPARE 20 1 -- -- -- 0 0 -- -- -- 1 20 SPARE 4 --
1 EM. SP. RECEPT. 30 1 10 10 10 0.93 2.88 0 -- -- -- 1 20 SPARE 2 --
K E Y
CKT
NO. LOAD DESCRIPTION
OCPD
AMPS P
WIRE
SIZE
H N G
VD
A B C VD
WIRE
SIZE
G N H
OCPD
P AMPS LOAD DESCRIPTION
CKT
NO.
K E Y
NOTES:
ISC: 2.28 kA
SCCR: 10 kA
LOCATION: Room 1 WIRE: 4
FED FROM: 60/3P @ T-152 GROUND BUS PHASE: 3
ENCLOSURE: NEMA 1 SOLID NEUTRAL VOLTS: 120/208 Wye
MOUNTING: SURFACE SINGLE TUB MAIN: 60 MCB
PANEL MCB2
NO SCALE1
PARTIAL ELECTRICAL RISER DIAGRAM
RISER DIAGRAM KEYNOTES:
1. PROVIDE A NEW 35A/3P BREAKER IN
AVAILABLE SPACE TO SERVE NEW
TRANSFORMER.
2. PROVIDE A NEW 60A/3P BREAKER IN
AVAILABLE SPACE TO SERVE NEW PANEL.
EXISTING
EXISTING
B1C-126
B1C-126
Revisions: Date:
RESPONSE TO PREBID QUESTIONS 02/17/2026
| Sheets |
| ES601 - ELECTRICAL SCHEDULES - PORTLAND |