Attachment 4 - Specifications V1 of 2 - Manchester - 608-315.pdf
PDF 16 MB Posted
- Solicitation number
- 36C77625B0024
About this file
This document is a comprehensive set of specifications for a Department of Veterans Affairs (VA) Specialty Care Building project located in Manchester, New Hampshire. The project (VA Project No. 608-315) involves constructing a new 12,830 square foot specialty care building that will connect to the southwest side of the existing Building 1, specifically for an Eye Clinic and Audiology service. The project is scheduled to start on March 31, 2025, with an expected completion date of February 1, 2027, and has a total construction duration of 730 calendar days.
The specifications cover multiple aspects of the construction, including detailed requirements for architectural, structural, mechanical, electrical, and plumbing systems. Notable features include multiple deduct alternate options that could modify the project scope, such as omitting certain architectural elements, adjusting roof heights, and removing specific building components like the basement or pump room. The project will involve site utilities work, including new steam, water, electrical, and stormwater infrastructure connections. The solicitation (36C77625B0024) is being managed by the VA Technology Acquisition Center in Austin, with the construction to be performed at the Manchester VA Medical Center located at 718 Smyth Road in Manchester, New Hampshire.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS
VA MEDICAL CENTER
718 SMYTH ROAD
MANCHESTER, N.H.
PROJECT 608-315:
CONSTRUCT SPECIALTY CARE
BUILDING
DECEMBER 20, 2023
E4H ARCHITECTURE
129 South St. 2nd Floor
Boston, MA 02210
VA PROJECT NO. 608-315
VA MEDICAL CENTER
DESIGN SPECIALTY CARE BUILDING
MANCHESTER, NH
TABLE OF CONTENTS
00 01 10-1
Section 00 01 10
Volume 1 (Division 0 – 14)
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS REVISED
00 01 10 Table of Contents 00 01 15 List of Drawing Sheets
See Drawing AG-1.2 for the complete list of drawings
00 63 25 Substitution Request Form Appendix 1 – Manchester VAMC Signage Standards Appendix 2 – Geotechnical Engineering Report Appendix 3 – Stormwater Report
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 11-21 01 33 23 Shop Drawings, Product Data, and Samples 02-23 01 35 26 Safety Requirements 10-22 01 35 26.1 Accident Prevention Plan Review Checklist 10-22 01 35 26.2 Preliminary Pre-Construction Risk Assessment 01 35 26.3 Preliminary Infection Control Risk Assessment 01 35 26.4 Preliminary Interim Life Safety Measure 01 35 26.5 VA Manchester Excavation Management Standard Operating Procedure 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 33 Structural Special Inspections and Procedures 11-18 01 57 19 Temporary Environmental Controls 01-21 01 73 29 Cutting and Patching 04-23 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17 01 81 13.02 Sustainability Certification Requirements – LEED NC V4 10-17 01 81 13.02.C Guiding Principles Checklist - LEED v4 BD+C: New Construction and
Major Renovations 10-17
01 91 00 General Commissioning Requirements 04-22
DIVISION 02 – EXISTING CONDITIONS (N/A)
DIVISION 03 – CONCRETE
03 05 13 Concrete Sealers 03 30 00 Cast-in-Place Concrete 01-21 03 45 00 Precast Architectural Concrete 01-21
VA MEDICAL CENTER
DESIGN SPECIALTY CARE BUILDING
MANCHESTER, NH
00 01 10-2
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 10-17 04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 12 00 Structural Steel 11-18 05 31 00 Metal Decking 01-21 05 40 00 Cold-Formed Metal Framing 01-21 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17 06 16 63 Cementitious Sheathing 01-21 06 20 00 Finish Carpentry 01-21 06 40 00 Architectural Woodwork 06 61 16 Solid Surfacing Fabrications
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 08 00 Facility Exterior Closure Commissioning 01-21 07 11 13 Bituminous Dampproofing 01-21 07 13 52 Modified Bituminous Sheet Waterproofing 01-21 07 21 00 Thermal Insulation 01-21 07 27 13 Modified Bituminous Sheet Air Barriers 07 42 10.11 Composite Framing Support (CFS) System 07 42 43 Composite Wall Panels 07 46 46 Fiber Cement Siding 07 54 19 Polyvinyl-Chloride (PVC) Roofing 12-18 07 60 00 Flashing and Sheet Metal 07 71 00 Roof Specialties 01-21 07 72 00 Roof Accessories 01-21 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22 07 95 13 Expansion Joint Cover Assemblies 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
VA MEDICAL CENTER
DESIGN SPECIALTY CARE BUILDING
MANCHESTER, NH
00 01 10-3
08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 04-22 08 41 13 Aluminum-Framed Entrances and Storefronts 01-21 08 71 00 Door Hardware (Including Hardware Sets and Hardware Cuts) 05-22 08 80 00 Glazing 01-21 08 84 13 Decorative Plastic Glazing 08 87 00 Glazing Surface Films 08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 05 61 Moisture Vapor Control System 09 21 17 Shaft Wall Assemblies 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 16 Resilient Sheet Flooring 06-22 09 65 19 Resilient Tile Flooring 05-18 09 65 23 Rubber Flooring 09 68 00 Tile Carpeting 01-21 09 72 00 Wall Covering 01-21 09 72 13 High-Impact Wall Covering 09 81 00 Acoustical Insulation 09 91 00 Painting 01-21 09 91 13 Exterior Painting Schedule 09 91 23 Interior Painting Schedule
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21 10 21 23 Cubicle Curtain Tracks 01-21 10 26 00 Wall and Door Protection 01-21 10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Safety Specialties
DIVISION 11 – EQUIPMENT (N/A)
DIVISION 12 – FURNISHINGS
12 48 43 Entrance Floor Mats and Frames
VA MEDICAL CENTER
DESIGN SPECIALTY CARE BUILDING
MANCHESTER, NH
00 01 10-4
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural Components 01-21 13 21 49 Audiology Booth 01-21
DIVISION 14– CONVEYING EQUIPEMENT N/A
Volume 2 (Division 21 – 33) Refer to T.O.C. Preceding Volume 2
END OF TABLE OF CONTENTS
VA MEDICAL CENTER September 22, 2023 VA Project No. 608-315 DESIGN SPECIALTY CARE BUILDING
MANCHESTER, NH
SIGNAGE STANDARDS
APPENDIX – 1
MANCHESTER VAMC SIGNAGE STANDARDS
wayfinding | sign systems | art programs
FACILITY
SHEET
DESIGNER
DRAWN BY
VA Medical Center Manchester, New Hampshire
Amy Blades
MEA
SCALE
SIGN TYPE
DW-01
REVISIONS
07/25/2018
CreativeSignage.com P: 800.220.7446 F: 301.220.0289
HQ: 11460-B Edmonston Rd Beltsville, MD 20705
PROJECT
Interior Signage System
Conference Room
3B126
STAIRS
Interview In
Progress
Do Not Disturb
SIGN SYSTEM STANDARDS INTERIOR FAMILY OF COMPONENTS
Warehouse & Receiving
WOMEN
1”=4”
ROOM IDENTIFICATION &
SMALL DIRECTIONAL
NOTES:
ROOM IDENTIFICATION
TYPE: D1A/F/W — Notes: A, B, C, D, & E
SLIDER UNIT
TYPE: O/W — Notes: E & G
ROOM NUMBER
TYPE: D1A/W — Notes: A, B, & E
ROOM NUMBER
TYPE: SA/W — Notes: A, B, & E
PERMANENT MESSAGE
TYPE: P5/W — Notes: B & E
ROOM ID - PROJECTING SIGN
TYPE: G D/F — Notes: H & I
Waiting Room
ROOM ID - PROJECTING SIGN
TYPE: G D/F — Notes: H & I
A. 1" x 1/32" ADA Tactile Numbers & Grade II Braille
C. 3 Ply Non-Glare Acrylic Construction Subsurface UV Variable Dot Digitally Printed Background Color - CSS Off White Magnetically Mounted
D. Clear Acetate Insert with Futura Md Black Copy
E. Beveled Satin Anodized Aluminum Frame/Bracket with 75% Recycled Aluminum; Mechanically Fastens to Wall
G. 2 Ply Non-Glare Acrylic Construction Slider Unit - UV Variable Dot Digitally Printed Background & Copy
H. 3 Ply Non-Glare Acrylic Construction Subsurface UV Variable Dot Digitally Printed Background Color & Copy
- CSS Off White & Black Copy
I. Satin Anodized Aluminum Bracket with 75% Recycled Aluminum; Mechanically Fastens to Wall
J. ¼” Thick Clear Acrylic Panel with Subsurface UV Variable Dot Digitally Printed Graphic & Copy
K. Cut-Out Satin Aluminum Architectural Letters & Diamonds
B. 2 Ply Non-Glare Acrylic Construction Subsurface UV Variable Dot Digitally Printed Background Color , Graphic, & Copy - CSS Off White & Black Copy
L. Satin Anodized Aluminum Stand-Offs F. 2 Ply Non-Glare Acrylic Construction Subsurface UV Variable Dot Digitally Printed Background Color & Graphic with Surface Applied Vinyl Copy/Graphic
VA MEDICAL CENTER September 22, 2023 VA Project No. 608-315 DESIGN SPECIALTY CARE BUILDING
MANCHESTER, NH
GEOTECHNICAL REPORT
APPENDIX – 2
GEOTECHNICAL ENGINEERING REPORT
(Provided to the A/E by the VA)
Geotechnical Engineering Report VA Critical Care Building
Manchester, New Hampshire
April 6, 2017
Terracon Project No. J1165098
Prepared for:
WBRC Architects & Engineers
Bangor, Maine
Prepared by:
Terracon Consultants, Inc.
Manchester, New Hampshire
Terracon Consultants, Inc. 77 Sundial Ave. Suite 401W Manche ster, New Hampshire 03103
P (603) 647 9700 F (603) 647 4432 terracon.com
April 6, 2017
WBRC Architects & Engineers
44 Central Street
Bangor, ME 04401
Attn: Mr. Paul A. Moynok, P.E., LEED AP
T: (207) 947 4511 x387
E: paul.moynok@wbrcae.com
Re: Geotechnical Engineering Report
VA Critical Care Building
Manchester, New Hampshire
Terracon Project No. J1165098
Dear Mr. Moynok:
Terracon Consultants, Inc. (Terracon) is submitting, herewith, the results of our geotechnical evaluation for the above-referenced project. The purpose of this evaluation was to obtain information on subsurface conditions at the project site and, based on this information, provide recommendations regarding the design and construction of foundations and site development for the proposed building.
We appreciate the opportunity to be of service to you on this project. If you have questions concerning this report, or if we may be of further service, please contact us.
Sincerely, Terracon Consultants, Inc.
Marc A. Gullison, E.I.T. Lawrence J. Dwyer, P.E.
Staff Geotechnical Engineer Principal
Carl W. Thunberg, P.E.
Geotechnical Department Manager
Responsive ■ Resourceful ■ Reliable i
Page
EXECUTIVE SUMMARY ...........................................................................................................iii
INTRODUCTION
PROJECT INFORMATION
2.1 Project Description
2.2 Site Location and Description
SUBSURFACE CONDITIONS
3.1 Typical Profile
3.2 Groundwater
3.3 Soil Laboratory Testing
RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION
4.1 Geotechnical Considerations
4.2 Earthwork
Site Preparation
Material Types
Compaction Requirements
Grading and Drainage
Earthwork Construction Considerations
4.3 Foundations
4.3.1 Foundation Design Recommendations
Foundation Construction Considerations
4.4 Seismic Considerations
4.5 Floor Slabs
Floor Slab Design Recommendations
Floor Slab Construction Considerations
4.6 Pavement
Pavement Design Recommendations
Pavement Construction Considerations
GENERAL COMMENTS
Responsive ■ Resourceful ■ Reliable ii
APPENDIX A – FIELD EXPLORATION
Exhibit A-1 Site Location Exhibit A-2 Exploration Plan - Aerial Exhibit A-3 Exploration Plan – Proposed Layout Exhibit A-4 Field Exploration Description Exhibits A-5 to A-17 Boring Logs B-1 to B-13
APPENDIX B – SOIL LABORATORY TESTING
Exhibit B-1 Laboratory Testing Description Exhibit B-2 Laboratory Results
APPENDIX C – SUPPORTING DOCUMENTS
Exhibit C-1 General Notes Exhibit C-2 Unified Soil Classification System
VA Critical Care Building - 718 Smyth Road ■ Manchester, New Hampshire
April 6, 2017 ■ Terracon Project No. J1165098
Responsive ■ Resourceful ■ Reliable iii
EXECUTIVE SUMMARY
A geotechnical engineering report has been completed for the proposed VA Critical Care Building, located at 718 Smyth Road in Manchester, New Hampshire. Thirteen test borings were advanced to depths ranging from 10.2 and 25.3 feet below existing grade to provide geotechnical information within the proposed building footprint and pavement areas.
Site subsurface conditions generally consist 5 to 7 inches of bituminous concrete or 6 inches of topsoil over 2.2 to 8.5 feet of existing fill over silty sand native soil. Auger refusal on presumed bedrock was encountered at depths not expected to impact design or construction of foundations.
The following geotechnical considerations for project design and construction were identified and are discussed in the report:
The proposed building may be supported on conventional spread footing foundations bearing on proofrolled native soil. The floor slabs may be supported on structural fill over proofrolled existing fill.
We recommend existing foundation elements and utilities within the proposed building area and foundation bearing zone be removed. Existing fill will likely be encountered below footing subgrades. Existing fill should be overexcavated from the footing bearing zone and replaced with compacted structural fill.
Support of floor slabs and pavements on or above existing fill, is discussed in this report. There is an inherent risk for the owner that unsuitable material within or buried during re-grading will not be discovered.
The site is seismic Site Class C.
Site pavements may be constructed using standard DOT specified materials, and a recommended total granular base thickness of at least 12 inches.
Monitoring of the construction operations discussed herein will be critical in achieving the design subgrade support. We recommend Terracon be retained to monitor this portion of the work.
This summary should be used in conjunction with the entire report for design purposes. Details are not included or fully developed in this summary; the report must be read in its entirety of a comprehensive understanding of the information contained herein. The section titled General
Comments should be read for an understanding of the report limitations.
Responsive ■ Resourceful ■ Reliable 1
GEOTECHNICAL ENGINEERING REPORT
VA CRITICAL CARE BUILDING
718 SMYTH ROAD
MANCHESTER, NEW HAMPSHIRE
Terracon Project No. J1165098
April 6, 2017
INTRODUCTION
This report presents the results of our geotechnical engineering services performed for the proposed VA Critical Care Building, located at 718 Smyth Road in Manchester, New Hampshire, as shown on the Site Location (Exhibit A-1) in Appendix A. This evaluation was performed in general accordance with our proposal dated December 7, 2016.
Seven test borings (B-1 through B-7) were advanced proximal to the area of the proposed building to depths of 16.5 to 25.3 feet below the existing grade. Six test borings (B-8 through B-13) were advanced within proposed pavement areas. The Exploration Plan - Aerial (Exhibit A-2) and
Exploration Plan – Proposed Layout (Exhibit A-3) shows the approximate locations of the borings.
Boring logs indicating the encountered conditions are included in Appendix A. The purpose of these services was to provide information and geotechnical engineering recommendations relative to:
Subsurface soil conditions Seismic considerations
Groundwater conditions Slab design and construction
Earthwork Pavement recommendations
Foundation design and construction
PROJECT INFORMATION
2.1 Project Description
Item Description
Site Layout Exploration Plans on Exhibits A-2 and A-3 in Appendix A.
Structures 13,000 square foot (sf) Urgent Care and Outpatient Mental Health
Clinic
Finished Floor Elevation Not available. Assumed to match existing finished floor grade of
Building No. 5.
April 6, 2017 ■ Terracon Project No. J1165098
Responsive ■ Resourceful ■ Reliable 2
Grading Preliminary grading plans not yet available. Minimal cuts and fills are anticipated.
2.2 Site Location and Description
Location 718 Smyth Road in Manchester, New Hampshire.
Existing Improvements Existing Building No. 5 surrounded by landscaped and paved areas.
Current Ground Cover Grass lawn with several trees and small vegetation. Paved parking areas.
Existing Topography
Approximately level, ranging from elevation (El.) 462 to 467 feet, based from topography shown site plan SP101, dated January 5, 2017, provided by WBRC Architects and Engineers.
SUBSURFACE CONDITIONS
3.1 Typical Profile
Based on the results of the explorations, subsurface conditions on the project site can be generalized as follows:
Description Depth to Bottom of
Stratum (feet) Material Encountered
Consistency /
Relative Density
Pavement / Topsoil 0.4 to 0.6 Bituminous concrete / topsoil Not Applicable
Existing Fill 2.2 to 8.0 Poorly-graded sand with gravel to silty sand with gravel, brown to gray
Very loose to dense
Native Soil 16.5 to >25.3 1
Silty sand with gravel to poorly-graded sand with gravel, brown to gray
Medium dense to very dense
1. Auger refusal was encountered between 15.5 and 22.0 feet at B-2, B-3, B-4, B-5, and B-7.
Conditions encountered at each exploration location are indicated on the individual exploration logs in Appendix A of this report. Stratification boundaries on the exploration logs represent the approximate location of changes in soil types; in situ, the transition between materials may be gradual. Further details of the explorations can be found on the exploration logs.
April 6, 2017 ■ Terracon Project No. J1165098
Responsive ■ Resourceful ■ Reliable 3
3.2 Groundwater
The boreholes were observed during drilling operations for the presence and level of groundwater.
Groundwater was encountered in one test boring, B-12, at 10 feet deep. Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff, and other factors not evident at the time the borings were performed. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project.
3.3 Soil Laboratory Testing
Laboratory testing, consisting of gradation and moisture content, was performed on representative soil samples recovered from the test borings. Laboratory test results are included in Appendix B.
RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION
4.1 Geotechnical Considerations
The proposed building may be supported on shallow spread footings bearing on proofrolled native soil. Overexcavation up to 4 feet may be necessary for spread footings in areas of deeper existing fill. The floor slabs may derive support from compacted structural fill placed over proofrolled existing fill.
The proposed building will be constructed partially over the footprint of the existing Building No.
5. We recommend existing foundation elements and utilities within the proposed building area and within the foundation bearing zone be removed. Removal of building foundations should also include removal of loose backfill found adjacent to foundations.
If existing fill or unsuitable materials are encountered below footing subgrades, they should be overexcavated from the footing bearing zone (defined as the volume beneath 1 horizontal to 1.5 vertical lines extending downward and outward from lower edges of the footing) and replaced with compacted structural fill as described in Section 4.2 Earthwork.
Support of floor slabs and pavements on or above existing fill, is discussed in this report.
However, even with the recommended construction testing services, there is an inherent risk for the owner that unsuitable material within or buried during re-grading will not be discovered. This risk of unforeseen conditions cannot be eliminated completely, but can be reduced by performing additional testing and evaluation at the time of construction, such as additional test pits and proof-
Responsive ■ Resourceful ■ Reliable 4 rolling. Where unsuitable conditions are observed, the materials should be replaced with compacted structural fill.
Provided the owner is willing to accept the risk of supporting pavements over the existing fill materials in exchange for reduced construction costs, inorganic stable portions of the existing fill can be left in place for support of the pavements. Undocumented fill may contain soft soils or other unsuitable materials; if they are present and are not discovered and corrected during construction, larger than normal settlement resulting in cracking or other damage could occur in pavements and utilities supported on or above the existing fill.
We recommend the geotechnical engineer be retained to evaluate the bearing material for the foundations and floor slab subgrade soils. Subsurface conditions, as identified by the field testing program, have been reviewed and evaluated with respect to the proposed building plans known to us at this time.
4.2 Earthwork
The following subsections present recommendations for site preparation, excavation, subgrade preparation, and placement of fill for the project. The recommendations presented for design and construction of earth-supported elements, including foundations and slabs, are contingent upon the recommendations outlined in this section.
Evaluation of earthwork should include observation and testing of engineered fill, subgrade preparation, foundation bearing soils, and other geotechnical conditions exposed during construction.
Site Preparation
The proposed building will be constructed partially over the footprint of the existing Building No.
5. We therefore recommend foundation systems be removed within the proposed building area and the foundation bearing zone, which is defined as the volume below 2/3 horizontal (H) to 1 vertical (V) lines extending outward and downward from the lower edges of the footing. The resulting excavation should be filled with compacted lifts of reused excavated soils.
For areas outside the proposed building footprint and foundation bearing zone, existing footings and utilities need only be removed where they conflict with proposed utilities and pavements. In such cases, existing footings and utilities should be removed from a depth of 3 feet below the affected utility or underside of pavement section. Areas disturbed during demolition of the existing structures and the removal of foundation elements should be evaluated by the geotechnical engineer or his representative prior to placement of fill. Disturbed soils should be undercut prior to placement of fill.
April 6, 2017 ■ Terracon Project No. J1165098
Responsive ■ Resourceful ■ Reliable 5
Aside from existing foundation elements, removal of topsoil, vegetation, and otherwise unsuitable materials should be completed prior to excavation and placement of structural fill or concrete.
Wet or disturbed material should either be removed or moisture conditioned and recompacted.
Exposed foundation and floor slab subgrades in granular soils should be proofrolled where possible to aid in locating loose or soft areas. Proofrolling can be performed with at least six passes of a minimum 10-ton (static weight) vibratory roller compactor in open areas, or in areas with limited access, a walk-behind compactor capable of imparting a similar amount of energy may be used.
A geotechnical engineer, or his/her representative, should review the subgrade preparation.
Soft/unstable material, as identified by the geotechnical engineer, should be overexcavated from the building footprint and footing bearing zones to competent material and replaced with compacted structural fill or ¾-inch minus crushed stone. Overexcavation efforts should be accomplished in accordance with the recommendations presented in section 4.3.2 Foundation
Construction Considerations.
Following subgrade preparation, structural fill may be placed, as necessary, and compacted to achieve design footing/slab level. Where subgrades become wet, unstable and/or difficult to proofroll, the use of minus ¾-inch crushed stone should be considered in lieu of structural fill.
Material Types
Fill and backfill should meet the following material property requirements:
Fill Type 1 USCS Classification Acceptable Location for Placement
Structural Fill
GW, GW-GM, SW,
SW-SM, SP, GP 2
All locations and elevations.
Common Fill Varies 3
Common fill may be used for general site grading. Common fill should not be used under settlement or frost-sensitive structures. Excavated soil may be reused as common fill, provided it is free of organic matter and can be adequately compacted.
Crushed Stone GP For use on wet subgrades and as drainage fill. Should be uniform ¾-inch angular crushed stone.
1. Compacted fill should consist of approved materials free of organic matter and debris. Frozen material should not be used. Fill should not be placed on a frozen subgrade.
2. Imported structural fill should meet the following gradation (NHDOT Section 508):
Percent Passing by Weight
Sieve Size Structural Fill
3″ 100
2″ 95 - 100
1″ (55 – 85)*
Responsive ■ Resourceful ■ Reliable 6
Fill Type 1 USCS Classification Acceptable Location for Placement
No. 4 27 - 52
No. 200 0 – 12
*At least 50 percent by weight of 1-inch or greater particle size shall have a fractured face
3. Common fill should have a maximum particle size of 6 inches and no more than 25 percent by weight passing the US No. 200 sieve.
Existing fill materials free of organic matter may be selectively reused as common fill throughout the site, provided material larger than 6 inches in diameter is removed, it is free of deleterious materials, and it can be adequately compacted. Silty soils are considered frost susceptible and should not be used in the upper 18 inches of pavements or exterior concrete slabs or sidewalks.
Existing fill materials containing organic matter are considered unsuitable for pavement or building support but may be reused in landscape areas. Existing topsoil may be reused as topsoil for general site grading.
Compaction Requirements
Fill Lift Thickness 8 inches or less in loose thickness
Minimum Compaction Requirements 1 95 percent maximum Modified Proctor dry density (ASTM
D1557)
Moisture Content – Granular Material Workable moisture levels
1. We recommend structural fill be tested for moisture content and compaction during placement.
Should the results of the in-place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the test should be reworked and retested, as required, until the specified moisture and compaction requirements are achieved.
Grading and Drainage
Adequate drainage should be provided at the site to reduce the likelihood of an increase in moisture content of the foundation soils. Pavement or parking areas should be sloped away from the building to reduce the likelihood of water ponding near the structure.
Earthwork Construction Considerations
Unstable subgrade conditions could develop during general construction operations, particularly if the soils are wetted and/or subjected to repetitive construction traffic. Construction traffic over subgrades should be avoided to the extent practical and the site should be graded to prevent ponding of surface water on prepared subgrades or in excavations. If the subgrade should become frozen, wet, or disturbed, or otherwise unstable, the affected material should be removed, or should be scarified, moisture conditioned, and recompacted.
The contractor should be required to maintain a stable subgrade during construction and prevent groundwater, if encountered, and surface water runoff from collecting in excavations. Subgrade
Responsive ■ Resourceful ■ Reliable 7 soils becoming unstable because of water and/or reworking by construction activity should be replaced with compacted structural fill or crushed stone, as necessary. Disturbance due to poor excavation technique or failure to protect subgrades should be stabilized at the contractor’s expense.
As a minimum, temporary excavations should be sloped or braced, as required by Occupational
Health and Safety Administration (OSHA) regulations, to provide stability and safe working conditions. Temporary excavations will probably be required during grading operations. The contractor, by contract, is usually responsible for designing and constructing stable, temporary excavations and should shore, slope or bench the sides of the excavations, as required, to maintain stability of both the excavation sides and bottom. All excavations should comply with applicable local, state, and federal safety regulations, including current OSHA Excavation and
Trench Safety Standards.
The geotechnical engineer should be retained during the construction phase of the project to observe earthwork and to perform necessary tests and observations during subgrade preparation, proofrolling, placement and compaction of controlled compacted fills, backfilling of excavations in the completed subgrade, and just before construction of foundations.
4.3 Foundations
The proposed building may be supported on shallow spread footing foundations bearing on proofrolled native soil. Design recommendations and construction considerations for spread footings are presented in the following sections.
4.3.1 Foundation Design Recommendations
Description Value
Net Allowable Bearing Pressure 1 6,000 psf
Minimum Isolated Spread Footing Width 24 inches
Minimum Embedment Below Finished Grade 2 48 inches
Approximate Total Settlement 3 1 inch
Estimated Differential Settlement 3 ½ inch
Total Soil Unit Weight (γ) 120 pcf
Passive Earth Pressure Coefficient, Kp 4 3.0
Ultimate Coefficient of Sliding Friction 5 0.5 (ultimate)
1. The recommended net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. Assumes any unsuitable material or soft soils, if encountered, will be undercut and replaced with engineered fill.
2. For frost protection and to reduce effects of seasonal moisture variations in subgrade soils. For perimeter footings and footings beneath unheated areas.
Responsive ■ Resourceful ■ Reliable 8
3. Foundation settlement will depend upon the variations within the subsurface soil profile, the structural loading conditions, the embedment depth of the footing, the thickness of compacted fill, and the quality of the earthwork operations.
4. Passive pressure calculated with this parameter should be reduced by at least a factor of safety of 3, to reflect the amount of movement required to mobilize the passive resistance.
5. A factor of safety of at least 1.5 should be applied to the sliding resistance.
Site underground utilities, light standard foundations, drainage structures, and the like may be soil supported in a similar manner to building footings. Foundations for site appurtenances may be designed on the basis of a net allowable bearing pressure of 6,000 psf. However, the net allowable bearing pressure should be reduced to 4,000 psf, if the foundation dimensions are less than the recommended minimum.
The underside of interior footings not exposed to outside temperatures should be at least 18 inches below finished floor level. If interior footings are to be exposed to freezing temperatures during construction, the underside of interior footings should be at least 48 inches below adjacent grade unless underlain by crushed stone to the frost depth of 48 inches. If construction occurs during cold weather, the soil bearing surfaces in exposed footing excavations should be protected from frost.
Foundation Construction Considerations
The base of prepared foundation excavations should be free of water, loose soil, and deleterious materials prior to placing concrete. Concrete should be placed soon after excavation, compaction, and fill placement to reduce bearing soil disturbance. Should the soils at bearing level become wet, disturbed, or frozen, the affected soil should be removed prior to placing concrete. The geotechnical engineer should be retained to observe and test the soil foundation bearing materials.
If unsuitable bearing soils are encountered in footing excavations, the excavations should be extended deeper to suitable soils and replaced with structural fill or crushed stone.
Overexcavation for compacted structural fill or crushed stone placement below footings should extend laterally beyond all edges of the footings at least 8 inches per foot of overexcavation depth below footing base elevation. The overexcavation should then be backfilled up to the footing base elevation with structural fill placed in lifts of 8 inches or less in loose thickness and compacted to at least 95 percent of the modified Proctor maximum dry density (ASTM D1557). The overexcavation and backfill procedure is described in the following figure.
Responsive ■ Resourceful ■ Reliable 9
4.4 Seismic Considerations
Code Used International Building Code 2009 1
Site Class C1
Maximum Considered Earthquake Ground Motions 2
0.2 second Spectral Response Acceleration, Ss
1.0 second Spectral Response Acceleration, S1
0.352g
0.080g
Liquefaction Potential in Event of an Earthquake 3 Not susceptible
1. The International Building Code 2009 uses a site soil profile determination extending a depth of 100 feet for seismic site classification. The current scope requested does not include a 100-foot soil profile determination; the borings performed for this report extended to a maximum depth of 25.3 feet.
However, we expect soil at least as dense as was encountered or bedrock to extend to a depth of
100 feet.
2. Maximum considered earthquake ground motions are mapped at 5% critical damping for site class B.
3. The design earthquake considered has an average magnitude of 5.8 at an exceedance probability of
2% in 50 years.
4.5 Floor Slabs
Floor Slab Design Recommendations
Floor Slab Support 1 Minimum 12-inch thick layer of compacted structural fill
Modulus of Subgrade Reaction 2 150 pounds per square inch per in (psi/in)
1. Floor slab should be structurally independent of building footings or walls to reduce the possibility of floor slab cracking caused by differential movements between the slab and foundation.
2. Modulus of Subgrade Reaction accounts for the 12-inch thick structural fill layer.
Responsive ■ Resourceful ■ Reliable 10
Where appropriate, control joints should be saw-cut in the slab to help control the location and extent of cracking. The slab designer should refer to the ACI Design Manual for additional recommendations.
The use of a vapor retarder should be considered beneath a concrete floor slab covered with wood, tile, carpet or other moisture sensitive or impervious coverings, or when the slab will support equipment sensitive to moisture. When conditions warrant the use of a vapor retarder, the slab designer should refer to ACI 302 and/or ACI 360 for procedures and cautions regarding the use and placement of a vapor retarder.
Floor Slab Construction Considerations
Following excavation to design slab subgrade elevation, the subgrade should be reviewed and, if granular materials are encountered, proofrolled with a minimum 10-ton (static weight) vibratory roller compactor as described in section 4.2 Earthwork of this report. Alternately, in areas with limited access, a walk-behind compactor capable of imparting a similar amount of energy may be used. Following proofrolling, compacted structural fill may be placed as necessary to achieve slab subgrade.
On most project sites, site grading is generally accomplished early in the construction phase.
However, as construction proceeds, the subgrade may be disturbed because of utility excavations, construction traffic, precipitation, etc. Particular attention should be paid to high-traffic areas that were rutted and disturbed earlier and to areas where backfilled trenches are located. Areas with unsuitable conditions should be replaced with compacted structural fill.
Subgrades should be moisture conditioned and properly compacted to the recommendations in this report, immediately before placement of concrete.
4.6 Pavement
For areas where new pavement is to be constructed we recommend the following.
Pavement Design Recommendations
Pavement Type
Bituminous
Concrete Top
Course
Bituminous
Concrete Binder
Course
Portland
Cement
Concrete
Granular
Base Course
Total
Thickness
Flexible 1.5 2.5 N/A 12 16
Rigid N/A N/A 5 12 17
Responsive ■ Resourceful ■ Reliable 11
Pavement designs were based on AASHTO Guide for Design of Pavement Structures (1993) and our experience with similar projects. The thickness of each course is a function of subgrade strength, traffic, design life, and serviceability factors. Frost susceptibility is a factor in the overall pavement section thickness. The design of pavement thickness was based on:
50,000 18-kip ESALs for parking areas, driveways and truck access lanes
Subgrade rating of “fair”, based on the encountered subsurface conditions
Design life of 20 years
Rigid concrete pavement is recommended at the location of dumpsters where refuse trucks will park, areas of channelized traffic, and loading areas. For dumpster pads, as a minimum, the concrete pavement area should be large enough to support the container and tipping axle of the refuse truck. Concrete pavements should be reinforced and have relatively closely spaced control joints.
The outer edges of concrete pavement are susceptible to damage as trucks move from the concrete to the adjacent bituminous concrete. Therefore, the concrete thickness of the outer 2 feet of the concrete pavement should be increased to 12 inches. Concrete pavements should be protected from construction traffic until a compressive strength of at least 4,000 psi has been achieved. The above sections represent minimum thicknesses and, as such, periodic maintenance should be anticipated.
The granular subbase should be compacted to at least 95 percent of the maximum dry density, as determined by ASTM D1557. The bituminous concrete should be placed in accordance with the
New Hampshire Department of Transportation (NHDOT) Standard Specifications for Road and
Bridge Construction, 2010. Pavement components should meet the following material specifications from the NHDOT Standard Specifications:
Pavement Component Specification
Bituminous Concrete Top Course 1/2-inch max. aggregate size – Section 401 Table 1
Bituminous Concrete Binder Course 3/4-inch max. aggregate size – Section 401 Table 1
Granular Base Course Crushed Stone (Fine) - Item 304.4
Portland Cement Concrete 1 Class AAA Concrete – Section 520 Table 1A
1. Minimum compressive strength of 4,000 psi.
Pavement Construction Considerations
Pavement subgrades prepared early in the project should be carefully evaluated as the time for pavement construction approaches. Pavement areas should be stripped of unsuitable materials and compacted with at least six passes with a minimum 10-ton (static weight) vibratory roller
April 6, 2017 ■ Terracon Project No. J1165098
Responsive ■ Resourceful ■ Reliable 12 compactor, before being proofrolled with a loaded tandem-axle dump truck. Particular attention should be paid to high traffic areas that were rutted and disturbed and in areas where backfilled trenches are located. Areas with unsuitable conditions should be repaired by replacing the materials with properly compacted fill. When proofrolling/subgrade stabilization has been completed to the satisfaction of the geotechnical engineer, the aggregate base may be placed.
Pavements should be sloped to provide rapid drainage of surface water. Water allowed to pond on or adjacent to the pavements could saturate the subgrade, contributing to frost action and premature pavement deterioration. Future performance of pavements constructed on the site will be dependent upon maintaining stable moisture content of the base course soils. The performance of pavements may be enhanced by reducing excess moisture that can reach the base soils. The following recommendations should be considered:
Grading the site to a minimum 2 percent slope away from the pavements;
Installing an edge drain at the edge of the pavement on the higher sides of the site;
Placing compacted backfill against the exterior side of curb and gutter; and, Placing curb and gutter directly on subgrade soils without the use of base course materials.
Preventative maintenance should be planned and provided through an on-going pavement management program in order to enhance future pavement performance, slow the rate of pavement deterioration, and preserve the pavement investment. Preventative maintenance, which consists of both localized maintenance, e.g., crack and joint sealing and patching, and global maintenance, e.g., surface sealing, is usually the first priority when implementing a planned pavement maintenance program, and provides the highest return on investment for pavements.
Prior to implementing such a program, additional engineering observation is recommended to assess the type and extent of preventative maintenance.
GENERAL COMMENTS
Terracon should be retained to review the final design plans and specifications, so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth-related construction phases of the project.
The analysis and recommendations presented in this report are based upon the data obtained from the explorations performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between explorations, across
Responsive ■ Resourceful ■ Reliable 13 the site, or due to the modifying effects of weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified, so that further evaluation and supplemental recommendations can be provided.
The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken.
This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing.
APPENDIX A
FIELD EXPLORATION
SITE LOCATION
Manchester VA Critical Care Building 718 Smyth Rd
Manchester, NH
TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY
QUADRANGLES INCLUDE: MANCHESTER NORTH, NH (1/1/1985) and MANCHESTER SOUTH, NH (1/1/1985).
77 Sundial Ave Ste 401W
Manchester, NH 03103-7236
J1165098 Project Manager:
Drawn by:
Checked by:
Approved by:
MAG
LJD
LJD
1”=2,000’ J1165098 Ex
April 2017
Project No.
Scale:
File Name:
Date:
A-1
Exhibit
CWT
SITE
EXPLORATION PLAN - AERIAL
Manchester VA Critical Care Building 718 Smyth Rd
Manchester, NH
77 Sundial Ave Ste 401W
Manchester, NH 03103-7236
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
J1165098
AERIAL PHOTOGRAPHY PROVIDED
BY MICROSOFT BING MAPS
MAG
LJD
LJD
AS SHOWN
J1165098 Ex
April 2017
Scale:
A-2
Exhibit Project Manager:
Drawn by:
Checked by:
Approved by:
Project No.
File Name:
Date:
CWT
B-1
B-2
B-3
B-4
B-5
B-6
B-7
B-8
B-9
B-10
B-11
B-12
B-13
Proposed
Building
Existing
Building
A-3
CWT
MCR
CWT
As shown
Drawn By:
Checked By:
Approved By:
Project Mngr:
File No.
Date:
Scale:
Project No.
EXHIBIT
LJD
Prepared For:
WBRC Architects and Engineers
J1165098-A3.dwg
April 2017
B-1
J1165098
77 Sundial Avenue, Suite 401W
PH. (603)647-9700
Manchester, NH 03103
Fax. (603)647-4432
MANCHESTER VA CRITICAL CARE BUILDING
718 SMYTH ROAD
MANCHESTER, NEW HAMPSHIRE
VA Critical Care Building ■ Manchester, New Hampshire
Responsive ■ Resourceful ■ Reliable Exhibit A-4
Field Exploration Description
Our field exploration consisted of performing thirteen soil borings at the project site. The borings were extended to depths of about 10.2 to 25.3 feet below the existing grades. The boring locations were laid out in the field by Terracon personnel. The approximate boring locations are indicated on Exhibits A-2 and A-3. The ground surface elevations indicated on the boring logs are also approximate, likely within 1 foot, and were interpreted from topography shown site plan
SP101, dated January 5, 2017, provided by WBRC Architects and Engineers. The locations and elevations of the borings should be considered accurate only to the degree implied by the means and methods used to define them.
The borings were drilled with a truck-mounted drill rig using hollow-stemmed augers to advance the boreholes. Samples were obtained using a split-barrel sampler and Standard Penetration
Test (SPT) procedures. In the SPT procedure, a standard 2-inch outer diameter split-barrel sampling spoon is driven into the ground with a 140-pound hammer falling a distance of 30 inches.
An automatic SPT hammer was used to advance the split-barrel sampler in the borings performed for this project. A significantly greater efficiency is achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. This higher efficiency has an appreciable effect on the SPT N-value. The effect of the automatic hammer's efficiency has been considered in the interpretation and analysis of the subsurface information for this report.
The number of blows required to advance the sampling spoon the last 12 inches of a normal 18-inch penetration is recorded as the standard penetration resistance value. These values are indicated on the boring logs at the corresponding depths of occurrence.
Field logs of the borings were prepared by Terracon personnel. The samples were sealed and returned to the laboratory for testing and classification. Each log included visual classification of the materials encountered during drilling as well as the personnel's interpretation of the subsurface conditions between samples. The boring logs included with this report represent an interpretation of the field logs by a geotechnical engineer and include modifications based on laboratory observation and tests on select samples.
10-9-6-10 N=15
8-11-7-13 N=18
7-8-6-9 N=14
12-21-21-38 N=42
14-30-34-45 N=64
19-40-40-100 N=80
70-50/2"
50/2"
0.6
4.5
25.0 25.2
7-inches of bituminous concrete FILL - POORLY GRADED SAND WITH GRAVEL , trace silt, orange-brown to light brown, medium dense
FILL - POORLY GRADED SAND WITH GRAVEL , light brown, to SILTY SAND WITH GRAVEL, dark brown, medium dense
SILTY SAND (SM), trace gravel, gray-brown, medium dense to very dense
2-inch layer of brown poorly graded sand at 6 feet
Note:
Moist auger cuttings from 17 to 20 feet
Pulverized rock fragments, orange to white Boring Terminated at 25.2 Feet
465.5+/-
461.5+/-
441+/- 441+/-
G R
A P
H
IC
L O
G
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G
E O
S M
A R
T L
O G
-N O
W E
LL
J
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 0/
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
LOCATION
Latitude: 43.011251° Longitude: -71.442112°
See Exhibit A-2
W A
T E
R C
O N
T E
N T
ELEVATION (Ft.)
Approximate Surface Elev: 466 (Ft.) +/-
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
R E
C O
V E
R Y
In
718 Smyth Road Manchester, New Hampshire
SITE:
Advancement Method:
2.25-inch I.D. hollow stem augers
Abandonment Method:
Boring backfilled with soil cuttings and cold patch upon completion.
Notes:
Project No.: J1165098
Drill Rig: CME-75 Truck
Boring Started: 1/19/2017
BORING LOG NO. B-1
WBRC Architects and Engineers
CLIENT:
Driller: Terracon/S. Shaw
Boring Completed: 1/19/2017
Exhibit: A-5
See Exhibit A-3 for description of field procedures.
See Appendix B for description of laboratory procedures and additional data (if any).
See Appendix C for explanation of symbols and abbreviations.
PROJECT: Manchester VA Critical Care Building
77 Sundial Ave Ste 401W Manchester, NH
No free water observed
WATER LEVEL OBSERVATIONS
6-7-10-7 N=17
34-5-8-9 N=13
3-12-20-25 N=32
25-25-20-19 N=45
10-25-36-36 N=61
22-41- 50/0"
0.5
5.0
16.5
6.5-inches of bituminous concrete FILL - POORLY GRADED SAND WITH GRAVEL , orange-brown, to SILTY SAND, gray-brown, medium dense
FILL - SILTY SAND , trace organic matter, brown, medium dense
FILL - POORLY GRADED SAND WITH SILT AND GRAVEL , light gray, medium dense
SILTY SAND (SM), trace gravel, gray, dense to very dense
Auger refusal at 16.5 Feet
465.5+/-
461+/-
449.5+/-
G R
A P
H
IC
L O
G
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
O
S M
A R
T L
O G
-N O
W E
LL
J
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 0/
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
LOCATION
Latitude: 43.011422° Longitude: -71.44195°
See Exhibit A-2
W A
T E
R C
O N
T E
N T
ELEVATION (Ft.)
Approximate Surface Elev: 466 (Ft.) +/-
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
R E
C O
V E
R Y
In
718 Smyth Road Manchester, New Hampshire
SITE:
Advancement Method:
2.25-inch I.D. hollow stem augers
Abandonment Method:
Boring backfilled with soil cuttings and cold patch upon completion.
Notes:
Project No.: J1165098
Drill Rig: CME-75 Truck
Boring Started: 1/19/2017
BORING LOG NO. B-2
WBRC Architects and Engineers
CLIENT:
Driller: Terracon/S. Shaw
Boring Completed: 1/19/2017
Exhibit: A-6
See Exhibit A-3 for description of field procedures.
See Appendix B for description of laboratory procedures and additional data (if any).
See Appendix C for explanation of symbols and abbreviations.
PROJECT: Manchester VA Critical Care Building
77 Sundial Ave Ste 401W Manchester, NH
15-11-8-10 N=19
10-7-8-4 N=15
2-6-11-16 N=17
13-15- 50/5"
50/5"
50/4"
0.5
7.0
10.0
19.0
Topsoil FILL - POORLY GRADED SAND WITH SILT , trace gravel, gray-brown, medium dense
FILL - POORLY GRADED SAND , trace silt and gravel, light brown, medium dense
SILTY SAND (SM), trace gravel, gray-brown, very dense
Rock fragments, orange to black
Auger resistance 10 to 15 feet
Pulverized rock fragments with sand
Auger resistance 15 to 19 feet
Auger refusal at 19 Feet
465.5+/-
459+/-
456+/-
447+/-
G R
A P
H
IC
L O
G
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
O
S M
A R
T L
O G
-N O
W E
LL
J
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 0/
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
LOCATION
Latitude: 43.011721° Longitude: -71.441586°
See Exhibit A-2
W A
T E
R C
O N
T E
N T
ELEVATION (Ft.)
Approximate Surface Elev: 466 (Ft.) +/-
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
R E
C O
V E
R Y
In
718 Smyth Road Manchester, New Hampshire
SITE:
Advancement Method:
2.25-inch I.D. hollow stem augers
Abandonment Method:
Boring backfilled with soil cuttings upon completion.
Notes:
Project No.: J1165098
Drill Rig: CME-75 Truck
Boring Started: 1/18/2017
BORING LOG NO. B-3
WBRC Architects and Engineers
CLIENT:
Driller: Terracon/S. Shaw
Boring Completed: 1/18/2017
Exhibit: A-7
See Exhibit A-3 for description of field procedures.
See Appendix B for description of laboratory procedures and additional data (if any).
See Appendix C for explanation of symbols and abbreviations.
PROJECT: Manchester VA Critical Care Building
77 Sundial Ave Ste 401W Manchester, NH
15-11-7-6 N=18
3-2-2-8 N=4
6-13-15-15 N=28
14-25-21-25 N=46
4-21-31-40 N=52
50/2"
50-50/0"
0.5
8…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .