About this file
This is a Performance Work Statement (PWS) for a water treatment task order under a Facilities IDIQ contract with the Bureau of Reclamation.
The contractor must provide full-service chemical treatment and maintenance for the Central Plant water system located at the Lower Colorado Basin Regional Office in Boulder City, Nevada. The scope includes monthly preventative maintenance inspections with comprehensive water testing (pH, conductivity, hardness, alkalinity, bacteria, silica, iron, copper, sodium nitrite, and azole levels), semi-annual cooling tower cleaning for two Marley cooling towers, and quarterly Legionella testing conducted four times annually. The contractor must maintain specific system parameters including water cycles at 2.5 or 2,500 mmho conductivity, calcium hardness below 1,200 ppm, M-alkalinity below 600 ppm, pH between 8.5 and 9.2, sodium nitrite between 950 and 1,050 ppm, and free azole between 5-10 ppm. The contractor is responsible for providing all labor, materials, supplies, equipment, management, and supervision. The Central Plant comprises two Smardt centrifugal chillers (closed-loop system) and two Marley cooling towers (open-loop condenser system that cool water for three buildings. Work must not take the plant offline during normal business hours (Monday-Friday, 7:00 a.m. to 4:00 p.m.) between May and October; offline work requires authorization from the Contracting Officer or conducted after hours and weekends.
Key deliverables include a Quality Control Plan, Safety Program with Job Hazard Analyses, Safety Data Sheets for all chemicals, NACI investigation packages for personnel, maintenance records and reports submitted weekly by 2 p.m. on the first business day, and a water system maintenance schedule. The contractor must comply with Reclamation Safety and Health Standards (RSHS), OSHA standards, establish secondary containment systems for chemical handling, maintain employee personal protective equipment, and ensure all contractor personnel undergo background investigations and PIV credentialing per HSPD-12 requirements. The contractor must contact the Contracting Officer Representative 48 hours prior to arriving onsite and coordinate with the Maintenance Department for escorted access to facilities.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4 – Water Treatment Task Order
Document No.
140R3026Q0036
Document Title Facilities IDIQ – Task Order – Water Treatment
PERFORMANCE WORK STATEMENT (PWS)
Central Plant Water Treatment and Cleaning
1.0. SCOPE - The Bureau of Reclamation requires a full-service water treatment contractor to provide regular testing and treatment of the Central Plant water system. The contractor shall provide all management, supervision, labor, subcontractors, materials, supplies/equipment, and shall plan, schedule, coordinate, and ensure effective completion of all services described herein. The contractor shall also provide customer service, quality control, and all other services as listed herein.
2.0. OBJECTIVE - Work to be performed under the project consists of the chemical treatment of the Central Plant at the Bureau of Reclamation Lower Colorado Basin Regional Office (LCBRO).
Reclamation is seeking a comprehensive water treatment program for the Central Plant. The intent is to preserve the HVAC equipment while optimizing water and energy efficiency though proper corrosion, scale, and biological fouling control.
3.0. BACKGROUND - The worksite is located at the LCB in Boulder City, Nevada, which is approximately 24 miles southeast of Las Vegas, NV, in Clark County. The Central Plant is located at 500 Date Street, Boulder City, NV 89005.
Office hours are Monday through Friday, 7:00 a.m. until 4:00 p.m. The Central Plant will not be taken offline during normal working hours between May and October. Work that requires the plant to be taken offline will be conducted after hours or on weekends, unless requested by the Contracting Officer (CO) or the Contracting Officer’s Representative (COR).
The contractor shall perform monthly open- and closed-loop water system chemical treatment. The Central Plant is a closed-loop system comprising of two Smardt centrifugal chillers, model WA046.
The condenser is an open-loop system with two Marley cooling towers, model NC8401KAN2SGF.
The primary function of the Central Plant is to provide cool water to the air conditioning system for the Lower Colorado Green Building and the Date 100 and Date 200 buildings.
The contractor shall determine how much labor is needed to perform the tasks, what methods will be used to complete the job, and which supplies, materials, and equipment are needed. The contractor’s maintenance actions shall work to reduce or mitigate the growth of macrobiotic organisms, reduce or remove rust, fowling, and calcification within the systems.
These performance-based specifications express the Government’s requirements in the form of General Work Quality Standards (GWQS). GWQS are provided as the Government’s best gauge of the minimum quality standards to be met. The results of the work performed under this contract shall conform to the GWQS, and the Government expects that upon completion of the periodic inspection, testing, and treatment these minimum standards will be met or exceeded.
4.0. Quality Control Plan – The quality of work provided shall be of a high standard for the Central Plant water system treatment, as defined within this performance work statement.
The contractor shall establish and maintain a complete Quality Control Plan (QCP) to ensure requirements of the contract are provided as specified. In accordance with Sections 10.0 and 11.0, Contractor Submittals, one copy of the contractor’s QCP shall be provided to the CO for approval not
Treatment Task Order
Document No.
140R3026Q0036
Document Title Facilities IDIQ – Task Order – Water later than the post-award Conference. A revised copy of the QCP shall also be provided to the CO for approval as changes occur. No payments will be made under the contract until the initial QCP is approved by the Government.
The plan shall include the following, as a minimum:
1. A self-inspection system covering all the services. It must specify the areas to be inspected on both a scheduled or unscheduled basis, how often inspections will be accomplished, and the title of the individual(s) who will perform the inspections.
2. The methods for identifying and preventing defects in the quality of service performed before the level of performance becomes unacceptable.
3. A method of maintaining onsite records of all inspections conducted by the contractor and necessary corrective action taken. These records shall be made available to the Government upon request during the term of the contract.
5.0. TASKS/Deliverables - The contractor shall perform and provide the following tasks/deliverables: The contractor shall conduct monthly Central Plant chemical treatment. If the contractor determines that additional work may be required, the contractor shall provide a detailed written estimate/quote to the CO/COR. The contractor shall not perform any additional work until authorized by the CO. The contractor shall ensure that maintenance actions conducted as part of this contract maintain the following system characteristics:
• water cycles will be operated at 2.5 or at 2,500 mmho for known conductive levels;
• calcium hardness will be less than 1,200 ppm;
• M-alkalinity levels will be less than 600 ppm;
• pH levels will be maintained between 8.5 and 9.2;
• Sodium Nitrite will be maintained between 950 and 1,050 ppm;
• Free and available azole 5–10 ppm;
• Iron: <1 ppm
• Copper: <0.5 ppm
• Water loops checked for biological activity. If biological activity is above 1,000 cells/ml, the system must be shocked with a non-oxidizer type biocide.
5.1. Monthly Preventative Maintenance Inspections
The contractor shall provide written copies of all monthly chemical test results; the contractor shall also provide a written report of inspection actions taken, plus provide a written report of chemicals used during the inspection.
The contractor will provide regular testing of cooling tower water systems, inspections of equipment, measurement of water treatment chemicals and chemical inventory control. These actions will be conducted on a monthly basis, once per calendar month, not to exceed 12 times annually.
5.1.1. Tests performed for each sample
Treatment Task Order
Document No.
140R3026Q0036
Document Title Facilities IDIQ – Task Order – Water
City Water Samples Condenser Water Sample pH Conductivity
TDS
“M” Alkalinity Total Hardness Calcium Hardness Chloride Chloride Free/Total Bromine Free/Total Bacteria ATP Bacteria Testing Silica Iron Copper Sodium Nitride Free and available azole pH Conductivity
TDS
“M” Alkalinity Total Hardness Calcium Hardness Chloride Chloride Free/Total Bromine Free/Total Bacteria Silica On-Trac testing Iron Copper Sodium Nitride Free and available azole
5.2. Cooling Tower Cleaning
The contractor shall clean the cooling towers on a semi-annual basis. Semi-annual cooling tower cleaning shall occur during April and October of each contract year.
5.3. Legionella Testing
The contractor shall conduct Legionella testing four times per contract year for each cooling tower.
The interval between tests shall not be sooner than 80 days or exceed 100 days.
6.0. Task List
Task Quantity Frequency
5.1. Monthly Preventative Maintenance Inspections 12 Monthly
5.2. Cooling Tower Cleaning’s semi-annually for both
Towers 2 (per tower) Semi-Annually
5.3. Legionella Testing 4 (per tower) Quarterly
7.0. Safety
7.1 General.
Treatment Task Order
Document No.
140R3026Q0036
Document Title Facilities IDIQ – Task Order – Water
Contractor employees shall operate equipment in compliance with all Federal, State, and local safety codes, and in accordance with the manufacturer's guidelines and manuals. Contractor will also follow all Applicable RSHS. The contractor may obtain the RSHS manual from the Bureau of Reclamation's website at: http://www.usbr.gov/ssle/safety/RSHS/rshs.html.
The contractor shall not require any contractor employees in the performance of this contract to work under conditions that are unsanitary, hazardous, or dangerous to the contractor’s employee's health or safety, as determined under safety and health standards promulgated by the Secretary of Labor under Section 107, of the contract Work Hours and Safety Standards Act (40 U.S.C 327 et seq), as amended, and Reclamation Safety and Health Standards (RSHS).
The contractor shall maintain a binder containing labels and Safety Data Sheets (SDS) for all chemicals used to treat the cooling tower's closed-loop water system. The binder must be available for inspection whenever chemicals are on Reclamation property. All SDS information shall be provided to the COR no later than 10 days prior to delivery and onsite use, with certifications that the chemicals meet or exceed the contractual requirements.
The contractor shall comply with all applicable safety and occupational health requirements set forth in 29 CFR 1910, OSHA's General Industry Standards and with the RSHS, including the ERRATA dated 2014, published by the Bureau of Reclamation. In the case of a conflict between 29 CFR 1910, OSHA's General Industry Standards and the RSHS, the more stringent requirements apply.
If the contractor fails or refuses to promptly comply with safety requirements, the CO may issue an order stopping all or part of the work until satisfactory corrective action has been taken.
The Bureau of Reclamation Regional Safety Office will review the contractor’s “Safety Program” for compliance with the RSHS. Job Hazardous Analysis (JHA) submitted for approval must be site-specific and follow guidelines set forth in the RSHS. Both Safety Plan and JHAs must be submitted for approval at least two (2) weeks prior to the start of work.
7.2 Chemicals.
The contractor shall submit for approval Safety Data Sheets (SDS) product labels and JHAs for all chemicals and potentially hazardous materials anticipated to be used during performance of the contract. This document shall be reviewed and approved in writing prior to onsite delivery and use.
Any other chemicals or potentially hazardous solids intended for use onsite shall be approved by the COR prior to onsite delivery and use. The contractor shall not store hazardous chemicals on Government property. The contractor shall dispose of chemical and chemical containers in accordance with label instructions off Government property. The contactor shall also exercise extreme caution while adding chemicals into the water system. The contractor shall use a secondary containment system when adding chemicals to prevent chemicals from contacting the surface area in accordance with OSHA 1910.120, Compliance Guideline paragraph 9, Reclamation Safety and Health Standard, Section 11, Standards for Material Handling, Storage, and Disposal, EPA, State and local standard. An approved catchment system shall remain in place under the fill area to safely contain any unanticipated seepage—the container or containment system shall be made of non-reactive materials.
Treatment Task Order
Document No.
140R3026Q0036
Document Title Facilities IDIQ – Task Order – Water
7.3 Safety Measures.
The contractor shall require that all employees wear personal protective equipment in accordance with RSHS, OSHA, and all other Federal, State, and local regulations and policies whenever conducting services on Reclamation property.
7.4 Emergency Spill Response.
The contractor shall ensure that all employees carrying out chemical treatment processes are properly trained to effectively mitigate and report onsite spills involving hazardous materials. If there is a spill, contact maintenance at extension 702-293-8345.
7.5 Safety Hazards.
The contractor shall ensure that all employees or subcontractors assigned to perform work within the Central Plant exercise caution when working in the area. Some examples of hazards are tripping, slipping, pressurized systems, overhead piping, energized electrical circuit/systems, etc.
The contractor shall ensure that all employees or subcontractors follow all applicable RSHS, OSHA, Federal, State, and local regulations or policies associated with working in industrial plants or areas.
Contractor shall make sure employees or subcontractors have a signed JHA for processes they are performing.
Contractor and/or subcontractor personnel shall report on site injuries to the COR.
8.0 Security
8.1 General.
Contractor shall not employ persons for work on this contract if such employees are identified as a potential threat to the health, safety, security, general wellbeing, or operational mission of the installation and its population.
In accordance with Homeland Security Presidential Directive-12 (HSPD-12), Contractor personnel may be required to undergo the Government-Issued Personal Identity Verification (PIV) credentialing process before being allowed access to work at the site. The cost of suitability and PIV-related background investigations will be borne by the Government.
Following the submittal to the COR of the investigation package for each employee, the employee will receive an invitation to provide additional information required for their background investigation through the on-line e-QIP process. The background investigation will be conducted by the Lower Colorado Basin Region Security Office. Contractor employees may not be assigned to a Reclamation facility until advised by the COR that a preliminary favorable suitability determination by the Government has been completed.
Treatment Task Order
Document No.
140R3026Q0036
Document Title Facilities IDIQ – Task Order – Water
Once a favorable determination has been made contractor personnel shall be invited to visit the Reclamation Credentialing Center at:
Lower Colorado Regional Security Office 200 Date Street Boulder City, NV 89005
(702) 293-8008
The contractor shall be responsible for ensuring that its employees comply with all established security rules and regulations. Contract personnel shall not be permitted to enter established or designated restricted areas unless authorized by the Government. Entry shall be in accordance with and subject to the security regulations established in the area. It shall be the contractor’s responsibility to ensure that its personnel do not enter these areas unless authorized.
8.2 Onsite Security Requirements.
Restricted areas are designated and may be modified or changed by the CO. All necessary security measures required by this contract shall be subject to the approval of the CO. The contractor shall initiate necessary measures to ensure that its employees comply with all established security rules and regulations, including but not restricted to the following:
1. The contractor shall ensure by appropriate and effective means that its personnel do not enter any Reclamation facilities without being escorted by a Reclamation assigned escort.
2. Restricted areas: Contractor personnel are only permitted on site for maintenance of
Reclamation’s Central Plant and building 1400, to access the boiler room.
3. Identification of contractor employees: The contractor shall issue all personnel who will require access to the facilities an identification badge with photograph that clearly identifies the employee and its employer. Such identification shall be required for all employees on the jobsite and shall be worn at all times.
8.3 Physical Security of Work Areas.
The contractor will contact the COR 48 hours prior to arriving on site to perform any maintenance, unless called out for an emergency. The contractor will check in with the Maintenance Department located in building 1200 on the Date Street Campus upon arrival. An escort will be provided. The contractor or contractor's subcontractor is not allowed to access any Reclamation facility without an escort. Contact the Maintenance Department at 702-293-8345, or call 702-293-8024, or the Maintenance Foreman, Mr. Pete Gonzales at 702-575-0041.
9.0 Government-Furnished Property - No Government-furnished equipment will be provided.
The contractor will provide 100% of the materials deemed necessary to meet the requirements of this task order.
10.0 PERFORMANCE REQUIREMENTS SUMMARY
Treatment Task Order
Document No.
140R3026Q0036
Document Title Facilities IDIQ – Task Order – Water
Required Services
Task Description
Performance Standard (PS)
Surveillance Method
Positive/Negative
Task 5.1 Monthly Preventative Maintenance Inspections
Heat transfer surfaces will be keep free of rust, scale and bio-fouling
Monthly summary report
Failure to meet the AQL will result in negative past performance feedback; poor performance could also lead to termination of this contract.
Task 5.2
Cooling Tower Cleaning’s Semi-annually for both Towers
Perform semi-annual cooling tower cleaning
Semi-annual cooling tower cleaning summary report
Failure to meet the AQL will result in negative past performance feedback; poor performance could also lead to termination of this contract.
Task 5.3 Legionella Testing Conduct quarterly Legionella testing; BOR will be notified immediately of any positive findings. Provide copies of quarterly inspection results
Quarterly Legionella testing report
Failure to meet the AQL will result in negative past performance feedback; poor performance could also lead to termination of this contract.
11.0 Submittals -
RSN Submittals
Required Reference Paragraph or clause
Number or set to mail to*
Due date or delivery date
CO COR
001 Insurance FAR 52.228-5 1 0 Within 15 calendar days after award
002 Quality Control Plan
4.0. 1 1 Post award conference
Treatment Task Order
Document No.
140R3026Q0036
Document Title Facilities IDIQ – Task Order – Water
003 NACI
Investigation Package
8.0. 1 1 Within 14 calendar days after contract award and before any new employees start working onsite
004 Safety Program (to include JHAs)
4.0 0 1 Post award conference
005 Contractor’s Representative’s Information
3.0. 1 1 Post award conference
006 Cellular telephone number
3.0. 1 1 Prior to commencement of work onsite and updated as necessary
007 Safety Data Sheets
(SDS)
7.0. 0 1 Prior to award and updated during performance of the contract as necessary. Submit updates 10 days prior to delivery and onsite use of each hazardous material.
008 Water System Maintenance Schedule
5.0. thru 6.0. 1 1 Post award conference (initial) and updated during performance of the contract as necessary.
009 Maintenance Records/Reports
5.0 0 1 By 2 p.m., on the first business day of each week.
7.2 Chemicals.