This document is a Price Schedule Template for a Task Order under the National Park Service (NPS) - ConOps Strategic Solicitation Number: 140PS124R0003 for the PARK - PMIS: SEKI 326438 project to Mitigate Tree Hazards, KNP Complex Wildfire.
The Price Schedule lists 28 line items for various tree felling, limbing, topping, slashing, bucking, loading, and disposal activities across different diameter ranges. It also includes line items for silt fence installation, ditch repair, hydraulic mulching, culvert inlet cleanout, traffic control, and biomass transport and sale. Offerors are required to provide unit prices for all line items. The contract will be awarded on the basis of the Total Evaluated Price for line items 1 through 28. The government will deduct the merchantable value of the logs and biomass from the transportation costs.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Task Order Price Schedule | ||
| National Park Service (NPS) - ConOps Strategic | ||
| Solicitation Number: | 140PS124R0003 | |
| PARK - PMIS: | SEKI 326438 | |
| Location: | Parkwide | |
| Project Title: | Mitigate Tree Hazards, KNP Complex Wildfire | |
| Notice: Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for all line items. Failure to do so may render the proposal unacceptable. For all unit-priced line items, provide the unit price for every line. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. |
| Contract Line Item (CLIN) | PWS | Item Title | Estimated Quantity | Unit of Measure | Unit Price | Total Price |
| 0001 | 1.1, 1.2 | Mobilization | 1 | Lump Sum | $0.00 | |
| 0002 | 1.3 | Tree, fell, limb & top, 4-11" DBH | 827 | Each | $0.00 | |
| 0003 | 1.3 | Tree, fell, limb & top, 12-19" DBH | 2,403 | Each | $0.00 | |
| 0004 | 1.3 | Tree, fell, limb & top, 20-25" DBH | 1,556 | Each | $0.00 | |
| 0005 | 1.3 | Tree, fell, limb & top, 26-29" DBH | 791 | Each | $0.00 | |
| 0006 | 1.3 | Tree, fell, limb & top, 30-41" DBH | 1,096 | Each | $0.00 | |
| 0007 | 1.3 | Tree, fell, limb & top, 42+" DBH | 687 | Each | $0.00 | |
| 0008 | 1.4 | Slash and stem, pile or lop & scatter , 4-11" DBH tree | 827 | Each | $0.00 | |
| 0009 | 1.4 | Slash, pile or lop & scatter, 12-19" DBH tree | 2,403 | Each | $0.00 | |
| 0010 | 1.4 | Slash, pile or lop & scatter, 20-25" DBH tree | 1,556 | Each | $0.00 | |
| 0011 | 1.4 | Slash, pile or lop & scatter, 26-29" DBH tree | 791 | Each | $0.00 | |
| 0012 | 1.4 | Slash, pile or lop & scatter, 30-41" DBH tree | 1,096 | Each | $0.00 | |
| 0013 | 1.4 | Slash, pile or lop & scatter, 42+" DBH tree | 687 | Each | $0.00 | |
| 0014 | 1.5 | Bole, buck and load, 12-19" DBH | 1,328 | Each | $0.00 | |
| 0015 | 1.5 | Bole, buck and load, 20-25" DBH | 842 | Each | $0.00 | |
| 0016 | 1.5 | Bole, buck and load, 26-29" DBH | 455 | Each | $0.00 | |
| 0017 | 1.5 | Bole, buck and load, 30-41" DBH | 542 | Each | $0.00 | |
| 0018 | 1.5 | Bole, buck and load, 42-60" DBH | 252 | Each | $0.00 | |
| 0019 | 1.6 | Existing high stump, flush-cut | 1,500 | Each | $0.00 | |
| 0020 | 1.7 | Slash, lop and scatter, existing felled tree | 1,500 | Each | $0.00 | |
| 0021 | 1.8 | Bole, buck and load, existing felled tree (28" max. DBH) | 500 | Each | $0.00 | |
| 0022 | 1.9 | Silt fence, install | 5,000 | Linear Foot | $0.00 | |
| 0023 | 1.10, 2.8 | Ditch, repair incidental damage | 1 | Lump Sum | $0.00 | |
| 0024 | 1.11 | Hydraulic mulching, ditch repair areas | 10 | Acre | $0.00 | |
| 0025 | 1.12, 2.10 | Culvert inlet, cleanout, incidental | 30 | Each | $0.00 | |
| 0026 | 1.13, 2.11 | Traffic control | 1 | Lump Sum | $0.00 | |
| 0027 | 1.15 | Logs, grind for biomass sale | 8,857 | Ton | $0.00 | |
| 0028 | 1.14 | Logs, transport to sawmill | 2,500 | Ton | *This pricing is represented below as a lump sum for offsite disposal. The Merchantable value, or price you'll receive for sale of the material, is deducted from transportation cost. | |
| Merchantable value of Logs (deduct) | 2,500 | Ton | ||||
| 1.16 | Biomass, transport to biomass plant | 8,857 | Ton | |||
| Merchantable value of biomass (deduct) | 8,857 | Ton | ||||
| Off-sight Disposal | 1 | Lump Sum | $0.00 | $0.00 | ||
| Total Evaluated Price - (Task Order Line Item Number 1 through 28) | $0.00 |