This document is an amendment to a solicitation for hazard tree removal services at Sequoia and Kings Canyon National Parks (SEKI). The key details are:

The purpose of this amendment is to: post answers to questions from the site visit, modify the Period of Performance, update the Performance Work Statement (PWS), update the Price Schedule, update the Hazard Tree Quantities/Locations/Sizes, and add a Project Activity Levels attachment. The Period of Performance is 08/01/2024 to 11/30/2026. The solicitation was amended to add 42 new line items for tree felling, limbing, topping, slashing, bole manipulation, high stump flush-cutting, existing felled tree processing, and other related services. The contractor will be required to document completed work with photographs and GPS coordinates. The government will inspect the work. The contractor can bill monthly for work completed. Qualified HUBZone companies can subcontract with non-qualified HUBZone companies under certain limitations. The solicitation number is 140PS124R0003, and it is being issued by the Department of the Interior, National Park Service.

View the file

Other files for this federal contract opportunity

Other files attached to SEKI 326438 KNP Hazard Tree Removal, newest first.
File Type Posted
Attachment__7_-_Hazard_Tree_Quantities__Locations__and_Sizes_v4_0_(06_18_2024_)_0004.pdf PDF
Attachment__4_-_Price_Schedule_(06_18_2024)_0004.xlsx XLSX spreadsheet
Attachment__10_-_Performance_Work_Statement_REV7_(06_18_2024)_0004.docx DOCX document
Attachment__11_-_Project_Activity_Levels_(06_18_2024_)_0004.docx DOCX document
Attachment__3_-_Transmittal_Letter_0003.docx DOCX document
Sol_140PS124R0003_Amd_0003.pdf PDF
Sol_140PS124R0003_Amd_0002.pdf PDF
Attachment__3_-_Transmittal_Letter_0002.docx DOCX document
Attachment__10_-_Site_Visit_Map_0002.pdf PDF
B08h_-_Attachment__7_-_Hazard_Tree_Quantities__Locations__and_Sizes_v2_0_0001.pdf PDF
Sol_140PS124R0003_Amd_0001.pdf PDF
Attachment__8_-_AT_T_Phone_Line_Map.pdf PDF
Attachment__9_-_Limitation_on_Subcontracting_Report.xlsx XLSX spreadsheet
Attachment__2_-_Client_Authorization_Letter.docx DOCX document
Attachment__7_-_Hazard_Tree_Quantities__Locations__and_Sizes.pdf PDF
Attachment__1_-_Past_Performance_FACTS_Sheet.docx DOCX document
Sol_140PS124R0003.pdf PDF
Attachment__3_-_Transmittal_Letter.docx DOCX document
Attachment__4_-_Price_Schedule.xlsx XLSX spreadsheet
Attachment__5_-_Past_Performance_Questionnaire.docx DOCX document
Attachment__6_-_WD_2015-5657_(Rev__19).pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140PS124R0003

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PS1

Washington DC 20240 1849 C Street MS2719 Business Services Contracting Division DOI, NPS ConOps Strategic

06/21/20240004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/21/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

NPS-ConOps Strategic, SEKI/KNP

FFP, Hazardous Tree Removal

a. The purpose of this amendment is to post answers to questions from the site visit;

b. Modify the Period of Performance;

c. Update the Performance Work Statement (PWS), incorporated here as Attachment #10;

d. Update the Price Schedule (Attachment #4) to incorporate PWS changes through the deletion of CLINS 0001 thru 00028 and the addition of CLINS 0101 thru 0142;

e. Update Hazard Tree Quantities, Locations, and Sized (Attachment #7);

f. Add Attachment #11, Project Activity Levels.

g. All other terms and conditions remain unchanged.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Ronald Hilliard

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 17

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140PS124R0003/0004

Period of Performance: 08/01/2024 to 11/30/2026

Add Item 00101 as follows:

00101 Mobilization

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00102 as follows:

00102 Tree, fell, limb & top, 4-11" DBH 978 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00103 as follows:

00103 Tree, fell, limb & top, 12-19" DBH 2791 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00104 as follows:

00104 Tree, fell, limb & top, 20-25" DBH 1685 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00105 as follows:

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 17

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140PS124R0003/0004

00105 Tree, fell, limb & top, 26-29" DBH 834 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00106 as follows:

00106 Tree, fell, limb & top, 30-41" DBH 1154 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00107 as follows:

00107 Tree, fell, limb & top, 42+" DBH 733 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00108 as follows:

00108 Slash and stem, pile or lop & scatter , 4-11" DBH 978 EA tree

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00109 as follows:

00109 Slash, pile or lop & scatter, 12-19" DBH tree 2791 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 17

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140PS124R0003/0004

REHABILITATION (NON-CONSTRUCTION)

Add Item 00110 as follows:

00110 Slash, pile or lop & scatter, 20-25" DBH tree 1685 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00111 as follows:

00111 Slash, pile or lop & scatter, 26-29" DBH tree 834 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00112 as follows:

00112 Slash, pile or lop & scatter, 30-41" DBH tree 1154 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00113 as follows:

00113 Slash, pile or lop & scatter, 42+" DBH tree 733 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00114 as follows:

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 17

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140PS124R0003/0004

00114 Slash, Red Fir Spray Field, Masticate or Chip &

Spread

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00115 as follows:

00115 Bole, buck and load, 12-19" DBH 1271 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00116 as follows:

00116 Bole, buck and load, 20-25" DBH 703 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00117 as follows:

00117 Bole, buck and load, 26-29" DBH 667 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00118 as follows:

00118 Bole, buck and load, 30-41" DBH 486 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

6 17

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140PS124R0003/0004

REHABILITATION (NON-CONSTRUCTION)

Add Item 00119 as follows:

00119 Bole, buck and load, 42-60" DBH 261 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00120 as follows:

00120 Bole, manipulate to disperse, 12-19" DBH 823 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00121 as follows:

00121 Bole, manipulate to disperse, 20-25" DBH 216 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00122 as follows:

00122 Bole, manipulate to disperse, 26-29" DBH 349 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00123 as follows:

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

7 17

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140PS124R0003/0004

00123 Bole, manipulate to disperse, 30-41" DBH 100 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00124 as follows:

00124 Bole, manipulate to disperse, 42-60" DBH 14 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00125 as follows:

00125 Existing high stump, flush-cut 1500 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00126 as follows:

00126 Existing felled tree, limb, top, lop & 500 EA scatter/chip slash, 12-19" DBH

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00127 as follows:

00127 Existing felled tree, limb, top, lop & 400 EA scatter/chip slash, 20-25" DBH tree

Product/Service Code: F004

Product/Service Description: NATURAL

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

8 17

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140PS124R0003/0004

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00128 as follows:

00128 Existing felled tree, limb, top, lop & 400 EA scatter/chip slash, 26-29" DBH

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00129 as follows:

00129 Existing felled tree, limb, top, lop & 100 EA scatter/chip slash, 30-41" DBH

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00130 as follows:

00130 Existing felled tree, limb, top, lop & 100 EA scatter/chip slash, 42-60" DBH

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00131 as follows:

00131 Existing felled tree, manipulate bole to 250 EA disperse, 12-19" DBH

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

9 17

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140PS124R0003/0004

Add Item 00132 as follows:

00132 Existing felled tree, manipulate bole to 150 EA disperse, 20-25" DBH tree

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00133 as follows:

00133 Existing felled tree, manipulate bole to 50 EA disperse, 26-29" DBH

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00134 as follows:

00134 Existing felled tree, manipulate bole to 30 EA disperse, 30-41" DBH

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00135 as follows:

00135 Existing felled tree, manipulate bole to 20 EA disperse, 42-60" DBH

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

10 17

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140PS124R0003/0004

Add Item 00136 as follows:

00136 Silt fence, install 5000 LF

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00137 as follows:

00137 Ditch, repair incidental damage

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00138 as follows:

00138 Hydraulic mulching, ditch repair areas 10 AC

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00139 as follows:

00139 Culvert inlet, cleanout, incidental 30 EA

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00140 as follows:

00140 Traffic control

Product/Service Code: F004

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

11 17

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140PS124R0003/0004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00141 as follows:

00141 Traffic control, supervisor

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

Add Item 00142 as follows:

00142 Offsite Disposal 9160 TN

Product/Service Code: F004

Product/Service Description: NATURAL

RESOURCES/CONSERVATION- FOREST/RANGE FIRE

REHABILITATION (NON-CONSTRUCTION)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

140PS124R0003-04 Page 12 of 17

SEKI Questions & Answers

1. I have a question about a temporary wooden bridge on the Mineral King Road.

Can you get me the weight limitation on that bridge?

Answer: From County of Tulare Public Works: "The County has two bridges on Mineral King, one being the temporary bridge at mile post 4 and the old arch bridge at mile post 6.5. The temporary bridge is rated for legal loads but no permit loads. The arch bridge is currently rated to handle all legal loads under the condition that speeds are limited to 15 MPH. Permit loads are Orange (O) rated for 5-13 axles."

2. What is the maximum depth of chips permitted to be dispersed back on the project site?

Answer: Two inches.

3. Will dispersed chips substitute for hydro-mulching?

Answer: No.

4. What are the specifications for winching material out of the 80’ zone?

Answer: Moving the material beyond the 80’ zone (i.e., further from the road) for deposition on site will NOT be permitted.

a. How deep can the material be in the 80-foot zone?

Answer: Lop and scatter debris can be up to 12” deep.

b. Does the material need to be spread out past the 80-foot zone?

Answer: Moving material from inside the 80’ zone to beyond the 80’ zone is NOT permitted. Trees that fall outside the 80’ zone during felling operations do not need to be spread out.

c. Can the material be piled past the 80-foot zone?

Answer: No.

5. Can merchantable material be exported?

Answer: Yes, if the tree is a marked hazard tree or an already down tree within 80’ of the roadway.

6. Can logs be skidded down paved roads by skidder to sites suitable for loading the logs onto trucks?

Answer: No. Logs must be lifted and carried above the roadway surface.

7. Are the preexisting high stumps required to be cut lower marked?

Answer: No. See 19 below.

8. What are the guidelines or restrictions for electronic traffic signs to be placed on the road informing the public that tree work is in progress?

Answer: Electronic traffic signs shall conform to the latest edition of the Manual on Uniform Traffic Control Devices for Streets and Highways. The message, sign type, locations will be components of the traffic control schedule submitted prior to its use. The park routinely uses variable message signs and contractor’s use on this project will simply require coordination.

9. Is the “three weeks’ notice” flexible to change traffic control? The project will be fluid. Can the traffic control be adjusted with shorter notice if progress exceeds anticipated timelines?

Answer: Yes. However, the three-week notice is designed to maximize our joint ability to communicate closure updates to visitors, residents, and staff. Repeated requests for shortened timeframes should be made to accommodate faster progress as noted in the question and not to make changes for convenience.

10. What are the weight limits on the bridges throughout and to the project area?

Are there any restrictions or prerequisites with crossing these bridges, like obtaining permits?

Answer: Bridges within the parks are designed to handle legal loads per California Vehicular code 35550-35558. Given the multitude of possibilities for getting to the park, bidders are encouraged to research out of park restrictions with the appropriate jurisdiction.

11. Can Generals Hwy. be closed from Wuksachi to Crystal Cave during the summer months to allow access to large equipment?

Answer: Yes, short-term closures up to three hours in duration are allowed for moving large equipment.

12. What is the maximum linear distance, in miles, a road can be closed or reduced to one way?

Answer: This will depend on several factors including work efficiency, site distance, facility locations, and visitor destinations within the proposed closure area, etc. Closure areas should consider the work likely to occur that day or the next; long linear closures without active work transpiring will not be permitted.

13. Can the working hours of 8 am to 5 pm in Crystal Cave be extended due to Crystal Cave being closed to the public?

Answer: No.

14. Work on Mineral King Rd. and Crystal Cave Rd. may be done during fire season.

a. What fire matrix does the National Park Service follow?

Answer: Project Activity Level System

b. If the Project Activity Level (PAL) System, what are the minimum requirements? Does it meet the Forest Service requirements?

Answer: See attached Project Activity Level document.

15. On Mineral King Road can material over 10 inches be piled to get rid of boles?

Answer: Boles over 10” DBH cannot be piled.

16. Do all hazard trees for removal have to be removed from the park, or can they be spread out to meet the wildfire fuel reduction intent?

Answer: Boles can be manipulated within the 80’ treatment zone so that bole concentrations remain at or below required limits. Boles shall not be relocated more than 100-feet from the original location and shall not be relocated outside the 80’ treatment zone.

17. How is the 80’ debris treatment zone along the edge of roadway measured:

horizontally or parallel to the slope?

Answer: The 80’ zone is to be measured horizontally from the edge of road.

18. Is it acceptable to chip slash material and broadcast the chips?

Answer: In addition to the debris treatment methods described in Section 2.2(c), debris may be chipped and broadcast. Chips must be broadcast a minimum of 20’ from the edge of roadway to a maximum depth of 2”.

19. How will actual quantities of trees cut and processed be confirmed for payment?

Answer: The Contractor is required to measure the DBH and take photographs of every hazard tree, every downed tree for dispersal/removal, and every high stump for cutting (no DBH needed for stumps), with GPS coordinates recorded in the digital photo file. NPS contract management representatives will inspect the work to confirm completion. The Contractor is responsible for maintaining a running tally of trees treated and coordinating that with the Contracting Officer as work progresses.

20. Can slash in the Red Fir Spray Field be chipped or masticated?

Answer: In the Red Fir Spray field, slash may be chipped and spread on site or masticated to 90% minimum of slash under 12” in length. Chips may be spread to a maximum depth of 12” in the Spray Field.

21. If felled trees damage the underground distribution lines in the Spray Field, will the Contractor be responsible for repairs?

Answer: No. See 23 below.

22. Are we allowed to camp in the park?

Answer: The contractor may camp at a normally operating campground; special work camps will not be allowed. Campground restrictions will not be modified for the contractor. This includes the use of trailers, noise, trash, etc. The park will coordinate with a contractor should they wish to camp, however, we cannot guarantee a contractor will be able to obtain sufficient sites. Sites must be paid for through recreation.gov.

23. Who is liable for sprinkler repair at the Red Fir Spray Field?

Answer: The contractor will repair any damaged riser and connection point to the underground pipes (saddles, etc.). Damage to underground pipes will be repaired by the government. NPS staff will be available to mark out the underground pipes prior to felling operations. Contractor will make every attempt to not fall trees across underground pipes. Failure to exercise due care will result in repair responsibilities transferring back to the contractor. Approximately ½ the spray field will be available for felling during the first year. Once repairs have been made restoring functionality to that zone, the second half of the spray field will be available for felling. It is likely that repairs will require the second half of the spray field work to be completed during the following season.

24. What is the method required to quantify work completed on the trees that are already down? (We prefer to scale butt diameter and bid on a cost per diameter inch)

Answer: See 19 above.

25. What is the actual tree count on Crystal Cave Road?

Answer: The number of currently marked hazard trees is 1,086. Because of the park forester’s anticipation that there will be significant increase in the total hazards marked for felling, the quantity in the attached amended RFP is twice that amount, 2,172.

26. Is there any variance possible on the time frame for the red sections on the map?

Two months would be a very tight window.

Answer: No. However, the work in the Red Fir Spray Field may be completed in 2026 (must be complete by November 30, 2026).

27. Are the Red Fir Spray Field sprinkler engineering specifications available to the contractor? Will the contractor be responsible for damages to underground PVC not shown on the engineering plans?

Answer: Engineering specifications are not available at this time. Inadvertent damage to underground pipes will be repaired by the government. See 23 above.

28. Will there be designated staging areas for large-size equipment? To cut costs, will the use of turnouts be allowed for the overnight staging of heavy equipment?

Answer: It depends on the location. Large turnouts in the work zone AND not at a visitor attraction could be used for staging equipment.

29. Is there currently an accessible SWPPP for the red fir spray field?

Answer: No. Because ground disturbing activities are not anticipated, the SWPPP requirement is deleted from the scope of the contract.

30. Is it necessary to obtain weight tickets from certified truck scales for every load of logs hauled out of the park? Travel to certified scale locations will add a significant amount of haul time and expense.

Answer: No. Logging trucks equipped with load cells may be used instead. The Contractor will coordinate with NPS contract inspectors prior to start of work to establish a standard tonnage per load for purposes of quantifying contract work for payment.

31. At what interval is the contractor allowed to bill for work completed? Is it by the unit, weekly, monthly, or at the project's end?

Answer: Monthly.

32. For purposes of this contract, can qualified HUBZone companies subcontract non-qualified HUBZone companies?

Answer: Yes, IAW the limitations of 52.219-14 in the solicitation.