This document is a detailed mechanical demolition and infrastructure upgrade drawing set for the Carl Vinson VA Medical Center in Dublin, Georgia, specifically Volume 3 of 4 covering Telecom Room plans across multiple buildings. The drawings provide comprehensive mechanical demolition plans for 28 different rooms/areas across Buildings 1-12, featuring three view types for each area: Fire Suppression Demolition Plan, Plumbing Demolition Plan, and Mechanical Demolition Plan.
The drawings include specific demolition instructions for various mechanical systems, such as removing existing split system units, air devices, ductwork, piping, sprinkler heads, and condensing units. Each plan follows consistent demolition guidelines, including coordinating work with the Contracting Officer's Representative (COR), preserving existing infrastructure not marked for demolition, and ensuring no dead-end piping remains. The project appears to be part of a larger EHRM (Enterprise-wide Healthcare Resource Management) Infrastructure Upgrades project, focusing on systematic removal and potential replacement of mechanical systems across the medical center's facilities.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7' -0
5'-0"
VAN
ACCESSIBLE
LOADING AREA
SF
SF
EA
SE
MEN
T A
PP
RO
XIM
AT
EL
Y S
HO
WN
' E
XIS
TIN
G W
AT
ER
LI
NE
EA
SE
MEN
T
2.5" PLASTIC WITNESS POST
1/2" REBAR FOUND IN
CONCRETE MONUMENT
CONCRETE NAIL FOUND
Bldg 5 Gen
Bldg 4 Gen
Water Tower Gen
Bldg 8 Gen
Circuit 2 Gen
OBSERVATION MONITORING WELL
UP
UP
DEANE + STROLLO, LLC718 Virginia DriveOrlando, FL. 32803T: (407) 423-5355 F: (407) 422-5994
H
IL
LC
R
ES
T
PK
W
Y.
BE
LL
EV
UE
R D.
INDUSTRIAL BLVD.
INDUSTRIAL BLVD.
H
IL
LC
R
ES
T
PK
W
Y.
FAIRVIEW PARK HOSPITAL
FA
IR
VI
EW
P
AR
K
DR
IV
E
Bldg 27 Gen
F
F
F
F
F F
F
F
FF
F
F
SIGN
NE
FF
PL
AC
E
NE
FF
P
LA
CE
BE
LL
EV
UE
AV
EN
UE
AL
EX
AN
DE
R D
RIV
E
JO
HNSO
N ST
REE
T
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
METAL BLDGS.BLDG. 31
BLDG. 46
BLDG. 36
BLDG. 24
BLDG. 43
BLDG. 32
BLDG. 39
GAZEBO
BLDG. 68
BLDG. 67
BLDG. 21
LAKE LEISURE
AC
AC
PARKING
PARKING
BLDG. 34
BLDG. 35
STEPS
RAMP
PATIO
R
AM
P 1:
S
LO
PE
R
AM
P 1:
S
LO
PE
R
AM
P 1:
S
LO
PE
LA
N
D
IN
G
VAN VAN VAN VAN
RAMP
CONCRETE DITCH
CONCRETE
CONCRETE
CONCRETE
SLAB
SLAB
NEW PARKING
CTCT
AC
AC
AC
AC
OBSERVATION MONITORING WELL
BLDG. 17
BLDG.
BLDG. 47
BLDG. 41
BLDG
BLDG. 63
BLDG. 81
BLDG. 82
BLDG. 27
BLDG.
BLDG. 71BLDG. 28
BLDG. 66
CO
OL
IN
G
TO
W
ER
BLDG. 69
BLDG. 30
WATER TANK
BLDG. 5
BLDG. 3 BLDG. 1
BLDG. 9
BLDG. 13
BLDG. 11
BLDG. 2
BLDG. 40
BLDG. 4
BLDG. 6
BLDG. 8
BLDG. 10
BLDG. 12
BLDG. 85
BLDG. 14
BLDG. 86
BLDG. 25
BLDG. 26
BLDG. 29
BLDG. 15
BLDG. 19
GAZEBO
SUBSTATION
BLDG. 44
BLDG. 62
BLDG. 84
BLDG.
Bldg 2 Gen
FUEL
TANK
MRI
BLDG.29
ANNEX
New Water Tower Location
Bldg.10
New Chiller Plant
BLDG. 87
BLACKWOOD DRIVE
EX
IS
TIN
G
JO
HN
SO
N
ST
RE
ET
JOHNSON STREET
ALEXANDER DRIVE
BLACKWOOD DRIVE
TROJAKOWSKI AVENUE
EVANS AVENUE
TROJAKOWSKI AVENUE
EVANS AVENUE
CROWLEY AVENUE
CROWLEY AVENUE
VETERANS PARKWAY US HWY 80
VETERANS PARKWAY US HWY 80 VETERANS PARKWAY US HWY 80
JOHNSON STREET
BLACKWOOD DRIVE
AL
EX
AN
DE
R D
RIV
E
JOHNSON STREET
THOMAS LANE
THOMAS LANE
NORTHWEST DRIVE
JOHNSON STREET
EVANS AVENUE
TROJAKOWSKI AVENUE
NEW JO
HNSON STREET WEST
SHADED BUILDINGS REPRESENT
PROJECT SCOPE
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027
Engineers Architects Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
/6
/2
9:
:2
PM
C :\U se rs
\a pu lle n\
D oc um en ts \M
S_
-1
-V A
D ub lin E
H R
M _G
EN
_R
_a pu lle nV D
XT
7.
rv t
GM-001
COVER
1 1AV
EHRM INFRASTRUCTURE
UPGRADES
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027 NOVEMBER 8, 2024
100% BID DOCUMENTS
557-22-70022-192
VARIOUS
EHRM INFRASTRUCTURE UPGRADES
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027
VA PROJECT #: 557-22-700
BPW
NORTH
NORTH
DRAWING LIST - VOLUME 3 OF 4
SHEET NUMBER SHEET NAME DWG OF DWG
GENERAL
GM-001 COVER 1 1
MECHANICAL
MP001 MECHANICAL GENERAL INFORMATION 1 56
MP002 PLUMBING GENERAL INFORMATION 2 56
MP003 FIRE SUPPRESSION GENERAL INFORMATION 3 56
01.MP411 BUILDING 1, LEVEL A, TELECOM ROOM 101-1 PLANS 4 56
01.MP421 BUILDING 1, LEVEL B, TELECOM ROOM 207-1 PLANS 5 56
02.MP401 BUILDING 2, LEVEL C, TELECOM ROOM BM123B-2 PLANS 6 56
02.MP411 BUILDING 2, LEVEL A, TELECOM ROOM 104-2 PLANS 7 56
02.MP421 BUILDING 2, LEVEL B, TELECOM ROOM 209A-2 PLANS 8 56
03.MP401 BUILDING 3, LEVEL C, TELECOM ROOM BM101A-3 PLANS 9 56
03.MP411 BUILDING 3, LEVEL A, TELECOM ROOM 112A-3 PLANS 10 56
03.MP421 BUILDING 3, LEVEL B, TELECOM ROOM 219-3 PLANS 11 56
04.MP401 BUILDING 4, LEVEL C, TELECOM ROOM BM105-4 PLANS 12 56
04.MP411 BUILDING 4, LEVEL A, TELECOM ROOM 118-4 PLANS 13 56
04.MP421 BUILDING 4, LEVEL B, TELECOM ROOM 202-4 PLANS 14 56
05.MP411 BUILDING 5, LEVEL A, TELECOM ROOM C137-5 PLANS 15 56
06.MP411 BUILDING 6, LEVEL A, TELECOM ROOM 103-6 PLANS 16 56
06.MP421 BUILDING 6, LEVEL B, TELECOM ROOM 226-6 PLANS 17 56
08.MP411 BUILDING 8, LEVEL A, TELECOM ROOM 172C-8 PLANS 18 56
08.MP421 BUILDING 8, LEVEL B, TELECOM ROOM 213-8 PLANS 19 56
09.MP421 BUILDING 9, LEVEL B, TELECOM ROOM 210A-9 PLANS 20 56
10.MP401 BUILDING 10, LEVEL C, TELECOM ROOM BM107A PLANS 21 56
10.MP411 BUILDING 10, LEVEL A, TELECOM ROOM 130-10 PLANS 22 56
10.MP421 BUILDING 10, LEVEL B, TELECOM ROOM 205-10 PLANS 23 56
11.MP401 BUILDING 11, LEVEL C, TELECOM ROOM BM101A-11 PLANS 24 56
11.MP411 BUILDING 11, LEVEL A, TELECOM ROOM 125-11 PLANS 25 56
11.MP421 BUILDING 11, LEVEL B, TELECOM ROOM 235-11 PLANS 26 56
12.MP401 BUILDING 12, LEVEL C, TELECOM ROOM BM103A PLANS 27 56
12.MP411 BUILDING 12, LEVEL A, TELECOM ROOM 117A-12 PLANS 28 56
12.MP421 BUILDING 12, LEVEL B, TELECOM ROOM 232A-12 PLANS 29 56
13.MP411 BUILDING 13, LEVEL A, TELECOM ROOM 141-13 PLANS 30 56
13.MP421 BUILDING 13, LEVEL B, TELECOM ROOM 224-13 PLANS 31 56
14.MP401 BUILDING 14, LEVEL C, TELECOM ROOM BM104A-14 PLANS 32 56
14.MP411 BUILDING 14, LEVEL A, TELECOM ROOM 101A-14 PLANS 33 56
14.MP421 BUILDING 14, LEVEL B, TELECOM ROOM 232-14 PLANS 34 56
15.MP411 BUILDING 15, LEVEL A, TELECOM ROOM 107-15 PLANS 35 56
15.MP421 BUILDING 15, LEVEL B, TELECOM ROOM 230-15 PLANS 36 56
16.MP401 BUILDING 16, LEVEL C, TELECOM ROOM B11A-16 PLANS 37 56
16.MP421 BUILDING 16, LEVEL B, TELECOM 216-16 ROOM PLANS 38 56
17.MP411 BUILDING 17, LEVEL A, TELECOM ROOM 111-17 PLANS 39 56
17.MP421 BUILDING 17, LEVEL B, TELECOM ROOM 205-17 PLANS 40 56
19.MP411 BUILDING 19, LEVEL A, TELECOM ROOM 117-19 PLANS 41 56
19.MP421 BUILDING 19, LEVEL B, TELECOM ROOM 216A-19 PLANS 42 56
25.MP411 BUILDING 25, LEVEL A, TELECOM ROOM 101A-25 PLANS 43 56
26.MP401 BUILDING 26, LEVEL C, TELECOM ENCLOSURE BM108B-26 PLANS 44 56
26.MP411 BUILDING 26, LEVEL A, TELECOM ROOM 106-26 PLANS 45 56
27.MP411 BUILDING 27, LEVEL A, TELECOM ROOM 107-27 PLANS 46 56
28.MP411 BUILDING 28, LEVEL A, TELECOM ROOM 108-28 PLANS 47 56
29.MP411 BUILDING 29, LEVEL A, TELECOM ENCLOSURE 113A-29 PLANS 48 56
30.MP411 BUILDING 30, LEVEL A, TELECOM ENCLOSURE 104-30 PLANS 49 56
85.MP411 BUILDING 85, LEVEL A, TELECOM ROOM 121-85 PLANS 50 56
86.MP411 BUILDING 86, LEVEL A, TELECOM ROOM 106-86 PLANS 51 56
87.MP411 BUILDING 87, LEVEL A, TELECOM ROOM 120-87 PLANS 52 56
87.MP412 BUILDING 87, LEVEL A, TELECOM ROOM 169-87 PLANS 53 56
89.MP411 BUILDING 89, LEVEL A TELECOM ROOM 1215-89 PLANS 54 56
M-501 MECHANICAL DETAILS 55 56
M-601 MECHANICAL SCHEDULES AND CONTROLS 56 56
VOLUME 3 OF 4
AC R OHT LIR NO AN
BENJAMIN P WOLFMAN
SSIE OF NO AR LP
SEAL
057741
Docusign Envelope ID: B71C0D48-D83D-418C-8E57-61AA26C33206
11/7/2024
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR
DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR
(CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SS INDOOR SPLIT SYSTEM
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
CO2 CARBON DIOXIDE SENSOR
HUMIDISTAT OR HUMIDITY SENSOR
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
LINEAR SLOT DIFFUSER
BALANCING DAMPER
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
END MOUNTED OR SIDEWALL GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
S-60
S-15
CR-15
CHWS
CHWR
HIGH PRESSURE STEAM
PIPING (60 PSI)
LOW PRESSURE STEAM PIPING
(15 PSI AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OR PLUGGED PIPE
GLOBE VALVE
GATE VALVE
BALL VALVE
STEAM SAFETY VALVE
PRESSURE REGULATING VALVE
WYE STRAINER VALVE
BALANCING VALVE
MODULATING TWO-WAY CONTROL
VALVE
STEAM TRAPD CONDENSATE DRAIN LINE
CR-60 HIGH PRESSURE STEAM
CONDENSATE RETURN
HWS
HWR
HEATING HOT WATER SUPPLY
PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMIT OF DEMOLITION
INLINE CENTRIFUGAL PUMP
STEAM PRESSURE REDUCING
VALVE
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
CHECK VALVE
FIRE / SMOKE DAMPER
VANED ELBOW (SHORT RADIUS) S-30
CR-30
MEDIUM PRESSURE STEAM
PIPING (16 PSI AND 59 PSI)
MEDIUM PRESSURE STEAM
CONDENSATE RETURN
THERMOSTAT OR TEMPERATURE SENSOR
TWO POSITION CONTROL VALVE
MODULATING THREE-WAY
CONTROL VALVE
T
H
F
SD
FS
MECHANICAL LEGEND
MOTORIZED DAMPER
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
A.
B.
C.
D.
28.
1.
WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.
EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH COR.
DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE
NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
INSTALL PIPING FREE OF SAGS AND BENDS.
INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.
DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS GIVEN.
DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST
29. SEAL EXISTING AND NEW PIPE, DUCT OR CONTROLS PENETRATIONS AT INTERIOR/EXTERIOR WALL PENETRATIONS. EXISTING PIPE OR DUCT PENETRATIONS AT EXISTING WALLS
SHALL BE SEALED AT ALL TR ROOMS.
30. ALL PENETRATIONS IN FIRE AND/OR SMOKE PARTITIONS/BARRIERS SHALL BE SEALED AND PROTECTED WITH FIRE-RATED ASSEMBLIES TO MAINTAIN THE INTEGRITY OF THE
PARTITION / BARRIER.
32. PROVIDE FIRE RETARDANT CAULK AT ANY PENETRATIONS TO FIRE TREATMENT PLYWOOD
PHASING:
THIS PROJECT WILL BE IMPLEMENTED IN PHASES. THE FIRST PHASE WILL INCLUDE THE HEAD-END EQUIPMENT AND FIBER IMPROVEMENTS TO ACHIEVE THE REDUNDANCY FEEDING THE TELECOMMUNICATIONS ROOMS. THE SECOND PHASE WILL CONSTRUCT ONE OR MORE TELECOMMUNICATIONS ROOMS FOR EACH BUILDING IN A TIMED SEQUENCE AS APPROVED BY THE COR, WITH HVAC SYSTEM TO BE INSTALLED AND ACTIVE. THE THIRD PHASE WILL INCLUDE DISTRIBUTION OF CABLING FROM THE COMPLETED TELECOMMUNICATIONS ROOMS TO THE DATA RECEPTACLES WITHIN THE APPROPRIATE DISTANCE OF THOSE ROOMS AND CONSTRUCTION OF MORE TELECOMMUNICATIONS
ROOMS.
MECHANICAL GENERAL NOTES
1.
2.
3.
4.
A.
B.
C.
5.
6.
7.
8.
9.
10.
11.
VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH WORK.
REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY
GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.
WHERE EXISTING EQUIPMENT, PIPING, DUCTS, ETC. ARE REQUIRED TO BE REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS, BRACING, FOUNDATIONS, ETC.
AFTER REMOVAL, AFFECTED CONSTRUCTION AND SURFACES, SUCH AS FLOORS, WALLS, BASES, AND CEILINGS SHALL BE FINISHED TO MATCH ADJACENT SURFACES. (UNO)
COORDINATE WITH COR/VA ON WHAT EQUIPMENT TO BE REMOVED, DISPOSED OF, SALVAGED, AND/OR RE-INSTALLED:
REMOVED AND DISPOSED OF EQUIPMENT: SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS.
REMOVED AND SALVAGED EQUIPMENT: SHALL BE CLEANED, PACKED OR CRATED AFTER CLEANING, AND LABELED FOR IDENTIFICATION. PROTECT AND TRANSPORT ITEMS TO
VA STORAGE AREA. COORDINATE STORAGE LOCATION WITH COR/VA.
REMOVED AND RE-INSTALLED ITEMS SHALL BE CLEANED AND REPAIRED TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE. PACKED OR CRATED AFTER CLEANING AND LABELED FOR IDENTIFICATION. PROTECT AND TRANSPORT ITEMS TO TEMPORARY STORAGE.COORDINATE TEMPORARY STORAGE LOCATION WITH COR/VA. REINSTALL
ITEMS IN LOCATIONS INDICATED.
DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO
COORDINATE WITH NEW WORK.
AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.
PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT NO ADDITIONAL COST.
TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
SAWCUT OR CORE DRILL CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW MECHANICAL WORK AND WORK OF OTHER TRADES.
MECHANICAL DEMOLITION GENERAL NOTES
EXISTINGEXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
DIFFUSER TAG
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
EQUIPMENT TAG
ANNOTATION SYMBOLS
##-VAV-#
SD-## ###
Engineers Architects Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/5 /2 3:
:1
PM
C :\U se rs \a va sa \D oc um en ts \M P_ -1 -V A D ub lin E H R M G en er al _a va sa N N C 4C .rv t
MP001
MECHANICAL GENERAL INFORMATION
1 56AV
EHRM INFRASTRUCTURE
UPGRADES
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027 NOVEMBER 8, 2024
100% BID DOCUMENTS
557-22-70022-192
BPW
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
WALL RATING LEGEND
AC R OHT LIR NO AN
BENJAMIN P WOLFMAN
SSIE OF NO AR LP
SEAL
057741
Docusign Envelope ID: 2C526E58-3813-481D-8F98-B31FEC57060F
DCWR
DHW
PIPING SYSTEM
NG NATURAL GAS
ST STORM
PD PUMP DISCHARGE
OFD OVERFLOW STORM DRAIN
GW GREASE WASTE
OW OIL WASTE
SAN SANITARY WASTE
CD CONDENSATE DRAIN
CA COMPRESSED AIR
AW ACID WASTE
N2 NITROGEN
N2O NITROUS OXIDE
MA MEDICAL AIR
O2 OXYGEN
WAGD WASTE ANESTHETIC GAS DISPOSAL
VAC VACUUM
V SANITARY VENT
OV OIL VENT
AV ACID VENT
NPCW NONPOTABLE COLD WATER
DI DE-IONIZED WATER
SCW SOFTENED COLD WATER
DCW DOMESTIC COLD WATER
RO REVERSE OSMOSIS WATER
DOMESTIC CW RECIRCULATION
DOMESTIC HOT WATER
CO2 CARBON DIOXIDE
DHW 140 DOMESTIC HOT WATER (OTHER TEMP)
PG PROPANE GAS
DHWR DOMESTIC HW RECIRCULATION
NG
ST
PD
OFD
GW
OW
SAN
CD
CA
AW
N2 N2O
MA
O2
WAGD
VAC
CO2
PG
V
OV
AV
HW 140
SCW
NPCW
DI
RO
EXISTINGEXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
NEW PLUMBING EQUIPMENT MARK
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
P-###
EXISTING PLUMBING EQUIPMENT MARKP-###
3-WAY CONTROL VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CONTROL VALVE
GATE VALVE
GLOBE VALVE
SAFETY RELIEF VALVE
TWO POSITION CONTROL VALVE
BACKFLOW PREVENTER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
HOSE BIBB / SILLCOCK
PLUG VALVE
PRESSURE REDUCING VALVE (WATER)
PRESSURE REGULATOR (GAS)
PIPE ANCHOR
PIPE GUIDES
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
WYE STRAINER
WYE STRAINER W/DRAIN VALVE
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
FLEXIBLE PIPE CONNECTOR
WATER METER
PUMP
AUTOMATIC AIR VENT
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
FLOW SWITCH
TEMPERATURE SWITCH
OR
CO
PIPE SLOPE ARROW
AV
F
P
T
M
CIRCUIT SETTER
F FAHRENHEIT
FA FROM ABOVE
FB FROM BELOW
FBO FURNISHED BY OTHERS
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FU FIXTURE UNITS
G GALLON
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUTS
GD GARBAGE DISPOSAL
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB (INTERIOR)
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SINK BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PASCAL
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH -
ABSOLUTE
PSIG POUNDS PER SQUARE INCH - GAUGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MIN
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FOOT
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TDL TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V SANITARY VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WHD WALL HYDRANT
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
YCO YARD CLEANOUT
YH YARD HYDRANT
A/E ARCHITECT/ENGINEER
AC ABOVE CEILING
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
AFG ABOVE FINISHED GRADE
ASD ADJUSTABLE SPEED DRIVE
ASHRAE AMERICAN SOCIETY HEATING,
REFRIGERATING, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BAS BUILDING AUTOMATION SYSTEM
BF BELOW FLOOR
BFP BACKFLOW PREVENTER
BG BELOW GRADE
BH BOOSTER HEATER
BHP BREAK HORSEPOWER
BJ BETWEEN JOISTS
BOP BOTTOM OF PIPE
BSP BLACK STEEL PIPE
BT BATHTUB
BTUH BRITISH THERMAL UNITS PER HOUR
C CELSIUS
CF COMBINATION FIXTURE
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
COND CONDENSATE
CP CONDENSATE PUMP
CS CLINICAL SINK
CV CONTROL VALVE
DA DENTAL COMPRESSED AIR
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DF DRINKING FOUNTAIN
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DV DENTAL VACUUM
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL
SYSTEM
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYEWASH STATION
EX EXISTING
PLUMBING SYMBOLS PLUMBING SYMBOLS
ANNOTATION SYMBOLS
PLUMBING SYMBOLS & ABBREVIATIONS
ANNOTATION ABBREVIATIONS 1.
2.
3.
4.
A.
B.
C.
5.
6.
7.
8.
9.
10.
11.
VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH
WORK.
REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.
WHERE EXISTING EQUIPMENT, PIPING, DUCTS, ETC. ARE REQUIRED TO BE REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS, BRACING, FOUNDATIONS, ETC. AFTER REMOVAL, AFFECTED CONSTRUCTION AND SURFACES, SUCH AS FLOORS, WALLS, BASES, AND CEILINGS SHALL BE FINISHED TO MATCH ADJACENT SURFACES. (UNO)
COORDINATE WITH COR/VA ON WHAT EQUIPMENT TO BE REMOVED, DISPOSED OF, SALVAGED, AND/OR RE-INSTALLED:
REMOVED AND DISPOSED OF EQUIPMENT: SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS.
REMOVED AND SALVAGED EQUIPMENT: SHALL BE CLEANED, PACKED OR CRATED AFTER CLEANING, AND LABELED FOR IDENTIFICATION. PROTECT AND TRANSPORT ITEMS TO VA STORAGE AREA. COORDINATE STORAGE LOCATION WITH
COR/VA.
REMOVED AND RE-INSTALLED ITEMS SHALL BE CLEANED AND REPAIRED TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE. PACKED OR CRATED AFTER CLEANING AND LABELED FOR IDENTIFICATION. PROTECT AND TRANSPORT ITEMS TO TEMPORARY STORAGE.COORDINATE TEMPORARY STORAGE LOCATION WITH COR/VA. REINSTALL ITEMS IN
LOCATIONS INDICATED.
DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST
MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.
AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.
PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT
NO ADDITIONAL COST.
TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING WORK
AND WORK OF OTHER TRADES.
PLUMBING DEMOLITION GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
1.
WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE
PURPOSES INTENDED.
EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT
EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT
MAINTENANCE, REPAIRS, AND REPLACEMENT.
AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS.
SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE.
SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED OTHERWISE.
SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH
SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS.
TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA
STANDARDS.
COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.
DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND
APPLICABLE VA STANDARDS.
PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH
EXISTING CONDITIONS.
PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING
SYSTEMS.
CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR 2 WEEK IN ADVANCE AND
CONFIRM 48 HOURS PRIOR.
PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.
21. SEAL EXISTING AND NEW PIPE, DUCT OR CONTROLS PENETRATIONS AT INTERIOR/EXTERIOR WALL PENETRATIONS. EXISTING
PIPE OR DUCT PENETRATIONS AT EXISTING WALLS SHALL BE SEALED AT ALL TR ROOMS.
30. ALL PENETRATIONS IN FIRE AND/OR SMOKE PARTITIONS/BARRIERS SHALL BE SEALED AND PROTECTED WITH FIRE-RATED
ASSEMBLIES TO MAINTAIN THE INTEGRITY OF THE PARTITION / BARRIER.
32. PROVIDE FIRE RETARDANT CAULK AT ANY PENETRATIONS TO FIRE TREATMENT PLYWOOD
PHASING:
THIS PROJECT WILL BE IMPLEMENTED IN PHASES. THE FIRST PHASE WILL INCLUDE THE HEAD-END EQUIPMENT AND FIBER IMPROVEMENTS TO ACHIEVE THE REDUNDANCY FEEDING THE TELECOMMUNICATIONS ROOMS. THE SECOND PHASE WILL CONSTRUCT ONE OR MORE TELECOMMUNICATIONS ROOMS FOR EACH BUILDING IN A TIMED SEQUENCE AS APPROVED BY THE COR, WITH HVAC SYSTEM TO BE INSTALLED AND ACTIVE. THE THIRD PHASE WILL INCLUDE DISTRIBUTION OF CABLING FROM THE COMPLETED TELECOMMUNICATIONS ROOMS TO THE DATA RECEPTACLES WITHIN THE APPROPRIATE DISTANCE
OF THOSE ROOMS AND CONSTRUCTION OF MORE TELECOMMUNICATIONS ROOMS.
PLUMBING GENERAL NOTES
Engineers Architects
# NEW KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/5 /2 3:
:1
PM
C :\U se rs \a va sa \D oc um en ts \M P_ -1 -V A D ub lin E H R M G en er al _a va sa N N C 4C .rv t
MP002
PLUMBING GENERAL INFORMATION
2 56AV
EHRM INFRASTRUCTURE
UPGRADES
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027 NOVEMBER 8, 2024
100% BID DOCUMENTS
557-22-70022-192
BPW
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
WALL RATING LEGEND
AC R OHT LIR NO AN
BENJAMIN P WOLFMAN
SSIE OF NO AR LP
SEAL
057741
NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT
SEMI-RECESSED SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
FIRE LINEFL
CONCEALED SPRINKLER HEAD
PENDANT SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
FIRE DEPARTMENT CONNECTION (FDC)
FIRE DRAINDRAIN
POINT OF NEW CONNECTION
LIMIT OF DEMOLITION
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
FIRE PROTECTION CONTRACTORFPC
TAMPER SWITCH
FLOW SWITCH
CHECK VALVE
GATE VALVE
EXTERIOR ALARM GONG (WATER ACTIVATED)
TEST AND DRAIN ASSEMBLY
BACKFLOW PREVENTER
T&D
TS
FS
ORDINARY HAZARD
GROUP 1 OCCUPANCY
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
ORDINARY HAZARD
GROUP 2 OCCUPANCY
LIGHT HAZARD
FIRE SUPPRESSION SYMBOLS & ABBREVIATIONS
THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA
13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE
PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS
DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE
PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION
SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS
DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE
BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING
CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING
CODE, NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION
REQUIREMENTS.
FLUSHING CONNECTION
FEED OR CROSS MAIN.
TYPICAL TEE WITH
CROSS MAIN PITCH
TOWARDS FEED MAIN.
NOTE: INSTALL FLUSHING
CONNECTION AT END OF
CROSS MAINS.
2" NIPPLE 4" LONG
WITH CAP.
MECHANICAL TEE
NEW PIPING
MECHANICAL TEE
SCREWED END
STEEL BEAM
RETAINING STRAP
C-CLAMP
THREADED HANGER ROD
ADJUSTABLE RING HANGER
NOTE:
HANGING DETAILS SHOWN ARE SUBJECT TO REQUIREMENTS OF SEISMIC DESIGN.
EXPANSION ANCHOR HILT QUIK
BOLT TZ OR APPROVED EQUAL.
EXPANSION ANCHOR SHALL BE
QUALIFIED FOR USE IN CRACKED
CONCRETE PER ACI 355.2
EXISTING CONCRETE SLAB
AUTO. SPRINKLER PIPE
SET SCREW
SURGE RESTRAINER
DUCTWORK OR OTHER
OBSTRUCTION OVER
48" IN WIDTH.
UPRIGHT HEAD
SPRINKLER BRANCH LINE
ALL EXPOSED
SPRINKLER PIPING
SHALL BE PAINTED RED.
UPRIGHT HEAD.
PROVIDE GUARD.
1.
2.
3.
4.
NOTE:
PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR OTHER OBSTRUCTION OVER 48" IN WIDTH.
COORDINATE SPRINKLER PIPE ROUTING AND LOCATION WITH COR AND ALL PARTIES INVOLVED WITH
INSTALLATION OF THE OBSTRUCTION.
PROVIDE PIPE SUPPORTS THAT COMPLY WITH NFPA 13 REQUIREMENTS. INCLUDE COST OF ADDITIONAL
SUPPORTS AS REQUIRED.
ATTACH PIPE SUPPORTS TO BUILDING STRUCTURE OR PROVIDE SUPPLEMENTAL STEEL ANCHOR POINTS. DO NOT ATTACH PIPE SUPPORTS TO DUCTWORK, PIPES, CONDUIT, OR EXISTING HANGER RODS FOR OTHER
EQUIPMENT.
INSTALL INSULATION AFTER
CAULKING SLEEVE, SEAL
ANNULAR SPACE.
FIRE RATED WALL AND OR SLAB.
STEEL PIPE SLEEVE TERMINATE
SLEEVE FLUSH WITH FINISHED
SURFACE.
UL-LISTED FIRESTOPPING
FINISHED ESCUTCHEON PLATE
FLUSH AGAINST WALL AND OF
SIZE TO COMPLETELY COVER
OPENING.
APPROVED TYPE FIRE SAFE &
SMOKE TIGHT CAULKING SEALER
BETWEEN BARE PIPE AND SLEEVE.
NOTE:
MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF CONCRETE OR CMU WALLS
SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC REQUIREMENTS.
1" X ARMOVER
1" 90 EL
1" X DROP
DROP NIPPLE
1" x 1/2" R.C. REDUCER
NOTE:
1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.
2. ALL EXPOSED PIPING SHALL BE PAINTED RED.
SUSPENDED CEILING
HANGERS SHALL
BE PROVIDED AS
REQUIRED BY
NFPA 13 TYPICAL
1" x 2" NIPPLE
BRANCH LINE
PENDENT SPRINKLER HEAD
1.
2.
3.
4.
5.
LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES PRIOR TO START OF
WORK.
COORDINATE WITH COR FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. GIVE THE
COR THREE (3) DAYS NOTICE PRIOR TO PLANNED SHUTDOWN OR INTERRUPTION.
COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT
OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.
FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN OFFSITE AND
DISPOSED OF.
REMOVE SPRINKLER MAINS, BRANCHES AND SPRINKLERS BACK TO THE ZONE CONTROL VALVE AS NEEDED TO INSTALL NEW
SPRINKLER SYSTEM.
FIRE SUPPRESSION DEMOLITION GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
1.
USE NFPA-13 (CURRENT EDITION), PLANS AND CALCULATIONS CHAPTER AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE
INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM.
COMPLY WITH VA REQUIREMENTS. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL REQUIRED PLUMBING CODES.
REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS.
COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS.
LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE
HAZARD CLASSIFICATION.
THIS FACILITY IS FULLY SPRINKLERED. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY NFPA AND VA
REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.
SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13 AND VA
STANDARDS.
HYDRAULICALLY CALCULATE SPRINKLER IN ACCORDANCE WITH REQUIREMENTS FOR APPROPRIATE HAZARD OCCUPANCY.
PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND OPERABLE SYSTEM IN ACCORDANCE WITH
NFPA AND VA REQUIREMENTS.
FIRE PROTECTION CONTRACTOR SHALL OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW, STATIC PRESSURE AVAILABLE WITH NO FLOW, AND RESIDUAL PRESSURE AT FULL FLOW TO THE FACILITY. SUBMIT HYDRAULIC CALCULATIONS
AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR REVIEW.
PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING. SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES TO AVOID CONFLICT.
SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS
AT PRIMARY BUILDING STRUCTURAL MEMBERS.
PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS IN ACCORDANCE WITH NFPA REQUIREMENTS.
CLEAN ENTIRE WORK AREA OF ALL DUST, DIRT, AND OTHER DEBRIS. MAINTAIN WORK AREA IN CLEAN CONDITION.
PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS
SPECIFIED AND INDICATED ON THE DRAWINGS.
SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A
PROFESSIONAL ENGINEER.
REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE WORK AT NO ADDITIONAL COST TO THE VA.
PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL
PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.
FLOW AND TAMPER SWITCHES ARE TO BE PURCHASED AND INSTALLED AS WORK OF DIVISION 21. PROVIDE WIRING TO FLOW
AND TAMPER SWITCHES AS WORK OF DIVISION 26.
WATER SERVICE AND DETECTOR TYPE REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER TO BE PROVIDED AND TESTED AS WORK OF DIVISION 22. INCORPORATE ASSOCIATED PRESSURE DROP OF SELECTED BACKFLOW PREVENTER
DEVICE IN HYDRAULIC CALCULATIONS.
FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH LINES IN ACCORDANCE WITH NFPA-13.
ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONNECTION AT TOP OF PIPE.
SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS OR CORRIDORS.
LOCATE CENTERED IN CEILING TILE WHERE POSSIBLE.
LOCATE THE INSPECTOR'S TEST CONNECTION AND MAIN DRAIN LOCATIONS IN ACCORDANCE WITH NFPA-13.
WHERE EXISTING CEILINGS ARE BEING PERMANENTLY REMOVED IN NEW OR EXPANDED TELECOMMUNICATION ROOMS (TRs), COORDINATE THE WORK SUCH THAT REPLACEMENT OF THE EXISTING PENDENT SPRINKLERS WITH NEW UPRIGHT SPRINKLERS OCCURS AT THE SAME TIME TO AVOID A LOSS IN SPRINKLER PROTECTION IN THE CONSTRUCTION AREA.
PROVIDE FIRE RETARDANT CAULK AT ANY PENETRATIONS TO FIRE TREATMENT PLYWOOD.
ALL EXPOSED FIRE SUPPRESSION PIPING SHALL BE PAINTED RED IN ACCORDANCE WITH SPECIFICATION CHAPTER 09 91 00.
PHASING:
THIS PROJECT WILL BE IMPLEMENTED IN PHASES. THE FIRST PHASE WILL INCLUDE THE HEAD-END EQUIPMENT AND FIBER IMPROVEMENTS TO ACHIEVE THE REDUNDANCY FEEDING THE TELECOMMUNICATIONS ROOMS. THE SECOND PHASE WILL CONSTRUCT ONE OR MORE TELECOMMUNICATIONS ROOMS FOR EACH BUILDING IN A TIMED SEQUENCE AS APPROVED BY THE COR, WITH HVAC SYSTEM TO BE INSTALLED AND ACTIVE. THE THIRD PHASE WILL INCLUDE DISTRIBUTION OF CABLING FROM THE COMPLETED TELECOMMUNICATIONS ROOMS TO THE DATA RECEPTACLES WITHIN THE APPROPRIATE DISTANCE
OF THOSE ROOMS AND CONSTRUCTION OF MORE TELECOMMUNICATIONS ROOMS.
FIRE SUPPRESSION GENERAL NOTES
1.
2.
3.
4.
DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS OUT OF COMMISSION, CONTRACTOR SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY IN ACCORDANCE WITH VA REQUIREMENTS. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION. REFER TO INTERNATIONAL FIRE CODE CHAPTER 9, SECTION 901.7.
FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS
PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.
FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS USE.
THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND
ROOM OF THE FIRE AREA IS COVERED.
BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF
FIRE PROTECTION SERVICE
1.
2.
3.
4.
5.
CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST
CONTROL PLAN.
EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE MAINTAINED.
RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.
PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.
FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC
PATHOGENS.
CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE COR ACCEPTANCE.
INFECTION CONTROL MEASURES
NOTE:
1. ALL EXPOSED PIPING SHALL BE PAINTED RED.
2. PROVIDE GUARDS ON UPRIGHT SPRINKLERS
UNLESS OTHERWISE NOTED.
THREADED
HANGER ROD
SURGE
RESTRAINER
ADJUSTABLE
RING HANGER
BRANCHLINE
AUTO. SPRINKLER FEED
UPRIGHT AUTOMATIC
SPRINKLER, FM APPROVED,
QUICK RESPONSE.
REDUCER
RISER NIPPLE
REDUCING TEE
Engineers Architects
# NEW KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/5 /2 3:
:1
PM
C :\U se rs \a va sa \D oc um en ts \M P_ -1 -V A D ub lin E H R M G en er al _a va sa N N C 4C .rv t
MP003
FIRE SUPPRESSION GENERAL
INFORMATION
3 56AV
EHRM INFRASTRUCTURE
UPGRADES
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027 NOVEMBER 8, 2024
100% BID DOCUMENTS
557-22-70022-192
BPW
Scale: No Scale1 MECHANICAL TEE AND FLUSHING CONNECTION DETAIL
Scale: No Scale2 PIPE HANGER SUPPORT DETAIL
Scale: No Scale3 SPRINKLER ABOVE AND BELOW DUCT DETAIL
Scale: No Scale4 SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL DETAIL
Scale: No Scale6 SEMI-RECESSED PENDENT SPRINKLER DETAIL
Scale: No Scale5 UPRIGHT AUTOMATIC SPRINKLER DETAIL
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
WALL RATING LEGEND
AC R OHT LIR NO AN
BENJAMIN P WOLFMAN
SSIE OF NO AR LP
SEAL
057741
101-1
TR
C11-1
CORRIDOR
102-1
ENVIRONMENT
MGMT HK CLOSET
103-1
CENTRALIZED
STAFF FAC MENS
TLT
PLUG IN
WINDOW AC
RADIATOR
UNDER
WINDOW
3101-1
TR
102-1
ENVIRONMENT
MGMT HK
CLOSET
103-1
CENTRALIZED
STAFF FAC
MENS TLT
CORRIDOR
C11-1
5 101-1
TR
C11-1
CORRIDOR
102-1
ENVIRONMENT
MGMT HK
CLOSET
103-1
CENTRALIZED
STAFF FAC
MENS TLT
C11-1
CORRIDOR
102-1
ENVIRONMENT
MGMT HK CLOSET
103-1
CENTRALIZED
STAFF FAC MENS
TLT
T H 3
1 2
01-SS-101 01-CU-101
RSRL
3/4" D
101-1
TR
C11-1
CORRIDOR
102-1
ENVIRONMENT
MGMT HK CLOSET
103-1
CENTRALIZED
STAFF FAC MENS
TLT
101-1
TR
102-1
ENVIRONMENT
MGMT HK CLOSET
103-1
CENTRALIZED
STAFF FAC MENS
TLT
C11-1
CORRIDOR
101-1
TR
Engineers Architects
# DEMOLITION KEY NOTES:
# NEW KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4 /2 :0 4:
P M
C :\U se rs \a va sa \D oc um en ts \M P_ -1 -V A D ub lin E H R M -B ld g 1_ R _a va sa N N C 4C .rv t
01.MP411
BUILDING 1, LEVEL A, TELECOM ROOM
101-1 PLANS
4 56AV
E…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .