About this file

This document is a detailed mechanical demolition and infrastructure upgrade drawing set for the Carl Vinson VA Medical Center in Dublin, Georgia, specifically Volume 3 of 4 covering Telecom Room plans across multiple buildings. The drawings provide comprehensive mechanical demolition plans for 28 different rooms/areas across Buildings 1-12, featuring three view types for each area: Fire Suppression Demolition Plan, Plumbing Demolition Plan, and Mechanical Demolition Plan.

The drawings include specific demolition instructions for various mechanical systems, such as removing existing split system units, air devices, ductwork, piping, sprinkler heads, and condensing units. Each plan follows consistent demolition guidelines, including coordinating work with the Contracting Officer's Representative (COR), preserving existing infrastructure not marked for demolition, and ensuring no dead-end piping remains. The project appears to be part of a larger EHRM (Enterprise-wide Healthcare Resource Management) Infrastructure Upgrades project, focusing on systematic removal and potential replacement of mechanical systems across the medical center's facilities.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DZ--EHRM Infrastructure Upgrades Dublin, GA Project 557-22-700, newest first.
File Type Posted
Atch 1 - PreBid RFIs 7.30.2025.xlsx XLSX spreadsheet
36C77625B0013 0004.docx DOCX document
Atch 1 - PreBid RFIs 7.24.2025.xlsx XLSX spreadsheet
36C77625B0013 0003.docx DOCX document
Atch 3 - ICRALevel_Department - Dublin - 557-22-700.pdf PDF
Atch 2 - Annual Hydrant Flow Report_9JUL25 - Dublin - 557-22-700.xlsx XLSX spreadsheet
36C77625B0013 0002.docx DOCX document
Atch 8 - Dublin EHRM_ACM_Matrix - Dublin - 557-22-700.xlsx XLSX spreadsheet
Atch 6 - 013323 Shop Drawings - Dublin - 557-22-700.pdf PDF
Atch 5 - 013216.15 Project Sched_Small - Dublin - 557-22-700.pdf PDF
Atch 4 - Virtual Bid Opening Information - Dublin - 557-22-700.pdf PDF
Atch 9 - 22-192 Existing Cable Counts by TR - Dublin - 557-22-700.xlsx XLSX spreadsheet
Atch 7 - 028333.13 Lead Based Paint - Dublin - 557-22-700.pdf PDF
Atch 1 - PreBid RFIs.xlsx XLSX spreadsheet
36C77625B0013 0001.docx DOCX document
Attachment 1 - Site Visit Sign-in Sheet - Dublin EHRM.pdf PDF
Attachment 2 - Site Visit Agenda - Dublin EHRM.pdf PDF
Attachment 15 - Drwg 82 of 91 REVISED.pdf PDF
Attachment 13 - VAAR LOS Construction.docx DOCX document
Attachment 11 - SOW Atch 4 Specifications.pdf PDF
Attachment 8 - SOW Atch 1 Design Guide Telecom Spaces.pdf PDF
Attachment 5 - Drawings 4 of 4 - Dublin GA - EHRM.pdf PDF
Attachment 3 - Drawings 2 of 4 - Dublin GA - EHRM.pdf PDF
Attachment 10 - SOW Atch 3 Elec Panel Labeling.pdf PDF
Attachment 14 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 9 - SOW Atch 2 EUD Requirements.pdf PDF
Attachment 6 - Site Visit Instructions.docx DOCX document
Attachment 1 - Specifications - Dublin GA - EHRM.pdf PDF
Attachment 12 - Wage Rates - GA20250095 02072025.pdf PDF
Attachment 7 - SOW - Dublin GA - EHRM.pdf PDF
Attachment 2 - Drawings 1 of 4 - Dublin GA - EHRM.pdf PDF
36C77625B0013.docx DOCX document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7' -0

5'-0"

VAN

ACCESSIBLE

LOADING AREA

SF

SF

EA

SE

MEN

T A

PP

RO

XIM

AT

EL

Y S

HO

WN

' E

XIS

TIN

G W

AT

ER

LI

NE

EA

SE

MEN

T

2.5" PLASTIC WITNESS POST

1/2" REBAR FOUND IN

CONCRETE MONUMENT

CONCRETE NAIL FOUND

Bldg 5 Gen

Bldg 4 Gen

Water Tower Gen

Bldg 8 Gen

Circuit 2 Gen

OBSERVATION MONITORING WELL

UP

UP

DEANE + STROLLO, LLC718 Virginia DriveOrlando, FL. 32803T: (407) 423-5355 F: (407) 422-5994

H

IL

LC

R

ES

T

PK

W

Y.

BE

LL

EV

UE

R D.

INDUSTRIAL BLVD.

INDUSTRIAL BLVD.

H

IL

LC

R

ES

T

PK

W

Y.

FAIRVIEW PARK HOSPITAL

FA

IR

VI

EW

P

AR

K

DR

IV

E

Bldg 27 Gen

F

F

F

F

F F

F

F

FF

F

F

SIGN

NE

FF

PL

AC

E

NE

FF

P

LA

CE

BE

LL

EV

UE

AV

EN

UE

AL

EX

AN

DE

R D

RIV

E

JO

HNSO

N ST

REE

T

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

METAL BLDGS.BLDG. 31

BLDG. 46

BLDG. 36

BLDG. 24

BLDG. 43

BLDG. 32

BLDG. 39

GAZEBO

BLDG. 68

BLDG. 67

BLDG. 21

LAKE LEISURE

AC

AC

PARKING

PARKING

BLDG. 34

BLDG. 35

STEPS

RAMP

PATIO

R

AM

P 1:

S

LO

PE

R

AM

P 1:

S

LO

PE

R

AM

P 1:

S

LO

PE

LA

N

D

IN

G

VAN VAN VAN VAN

RAMP

CONCRETE DITCH

CONCRETE

CONCRETE

CONCRETE

SLAB

SLAB

NEW PARKING

CTCT

AC

AC

AC

AC

OBSERVATION MONITORING WELL

BLDG. 17

BLDG.

BLDG. 47

BLDG. 41

BLDG

BLDG. 63

BLDG. 81

BLDG. 82

BLDG. 27

BLDG.

BLDG. 71BLDG. 28

BLDG. 66

CO

OL

IN

G

TO

W

ER

BLDG. 69

BLDG. 30

WATER TANK

BLDG. 5

BLDG. 3 BLDG. 1

BLDG. 9

BLDG. 13

BLDG. 11

BLDG. 2

BLDG. 40

BLDG. 4

BLDG. 6

BLDG. 8

BLDG. 10

BLDG. 12

BLDG. 85

BLDG. 14

BLDG. 86

BLDG. 25

BLDG. 26

BLDG. 29

BLDG. 15

BLDG. 19

GAZEBO

SUBSTATION

BLDG. 44

BLDG. 62

BLDG. 84

BLDG.

Bldg 2 Gen

FUEL

TANK

MRI

BLDG.29

ANNEX

New Water Tower Location

Bldg.10

New Chiller Plant

BLDG. 87

BLACKWOOD DRIVE

EX

IS

TIN

G

JO

HN

SO

N

ST

RE

ET

JOHNSON STREET

ALEXANDER DRIVE

BLACKWOOD DRIVE

TROJAKOWSKI AVENUE

EVANS AVENUE

TROJAKOWSKI AVENUE

EVANS AVENUE

CROWLEY AVENUE

CROWLEY AVENUE

VETERANS PARKWAY US HWY 80

VETERANS PARKWAY US HWY 80 VETERANS PARKWAY US HWY 80

JOHNSON STREET

BLACKWOOD DRIVE

AL

EX

AN

DE

R D

RIV

E

JOHNSON STREET

THOMAS LANE

THOMAS LANE

NORTHWEST DRIVE

JOHNSON STREET

EVANS AVENUE

TROJAKOWSKI AVENUE

NEW JO

HNSON STREET WEST

SHADED BUILDINGS REPRESENT

PROJECT SCOPE

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027

Engineers Architects Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

/6

/2

9:

:2

PM

C :\U se rs

\a pu lle n\

D oc um en ts \M

S_

-1

-V A

D ub lin E

H R

M _G

EN

_R

_a pu lle nV D

XT

7.

rv t

GM-001

COVER

1 1AV

EHRM INFRASTRUCTURE

UPGRADES

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027 NOVEMBER 8, 2024

100% BID DOCUMENTS

557-22-70022-192

VARIOUS

EHRM INFRASTRUCTURE UPGRADES

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027

VA PROJECT #: 557-22-700

BPW

NORTH

NORTH

DRAWING LIST - VOLUME 3 OF 4

SHEET NUMBER SHEET NAME DWG OF DWG

GENERAL

GM-001 COVER 1 1

MECHANICAL

MP001 MECHANICAL GENERAL INFORMATION 1 56

MP002 PLUMBING GENERAL INFORMATION 2 56

MP003 FIRE SUPPRESSION GENERAL INFORMATION 3 56

01.MP411 BUILDING 1, LEVEL A, TELECOM ROOM 101-1 PLANS 4 56

01.MP421 BUILDING 1, LEVEL B, TELECOM ROOM 207-1 PLANS 5 56

02.MP401 BUILDING 2, LEVEL C, TELECOM ROOM BM123B-2 PLANS 6 56

02.MP411 BUILDING 2, LEVEL A, TELECOM ROOM 104-2 PLANS 7 56

02.MP421 BUILDING 2, LEVEL B, TELECOM ROOM 209A-2 PLANS 8 56

03.MP401 BUILDING 3, LEVEL C, TELECOM ROOM BM101A-3 PLANS 9 56

03.MP411 BUILDING 3, LEVEL A, TELECOM ROOM 112A-3 PLANS 10 56

03.MP421 BUILDING 3, LEVEL B, TELECOM ROOM 219-3 PLANS 11 56

04.MP401 BUILDING 4, LEVEL C, TELECOM ROOM BM105-4 PLANS 12 56

04.MP411 BUILDING 4, LEVEL A, TELECOM ROOM 118-4 PLANS 13 56

04.MP421 BUILDING 4, LEVEL B, TELECOM ROOM 202-4 PLANS 14 56

05.MP411 BUILDING 5, LEVEL A, TELECOM ROOM C137-5 PLANS 15 56

06.MP411 BUILDING 6, LEVEL A, TELECOM ROOM 103-6 PLANS 16 56

06.MP421 BUILDING 6, LEVEL B, TELECOM ROOM 226-6 PLANS 17 56

08.MP411 BUILDING 8, LEVEL A, TELECOM ROOM 172C-8 PLANS 18 56

08.MP421 BUILDING 8, LEVEL B, TELECOM ROOM 213-8 PLANS 19 56

09.MP421 BUILDING 9, LEVEL B, TELECOM ROOM 210A-9 PLANS 20 56

10.MP401 BUILDING 10, LEVEL C, TELECOM ROOM BM107A PLANS 21 56

10.MP411 BUILDING 10, LEVEL A, TELECOM ROOM 130-10 PLANS 22 56

10.MP421 BUILDING 10, LEVEL B, TELECOM ROOM 205-10 PLANS 23 56

11.MP401 BUILDING 11, LEVEL C, TELECOM ROOM BM101A-11 PLANS 24 56

11.MP411 BUILDING 11, LEVEL A, TELECOM ROOM 125-11 PLANS 25 56

11.MP421 BUILDING 11, LEVEL B, TELECOM ROOM 235-11 PLANS 26 56

12.MP401 BUILDING 12, LEVEL C, TELECOM ROOM BM103A PLANS 27 56

12.MP411 BUILDING 12, LEVEL A, TELECOM ROOM 117A-12 PLANS 28 56

12.MP421 BUILDING 12, LEVEL B, TELECOM ROOM 232A-12 PLANS 29 56

13.MP411 BUILDING 13, LEVEL A, TELECOM ROOM 141-13 PLANS 30 56

13.MP421 BUILDING 13, LEVEL B, TELECOM ROOM 224-13 PLANS 31 56

14.MP401 BUILDING 14, LEVEL C, TELECOM ROOM BM104A-14 PLANS 32 56

14.MP411 BUILDING 14, LEVEL A, TELECOM ROOM 101A-14 PLANS 33 56

14.MP421 BUILDING 14, LEVEL B, TELECOM ROOM 232-14 PLANS 34 56

15.MP411 BUILDING 15, LEVEL A, TELECOM ROOM 107-15 PLANS 35 56

15.MP421 BUILDING 15, LEVEL B, TELECOM ROOM 230-15 PLANS 36 56

16.MP401 BUILDING 16, LEVEL C, TELECOM ROOM B11A-16 PLANS 37 56

16.MP421 BUILDING 16, LEVEL B, TELECOM 216-16 ROOM PLANS 38 56

17.MP411 BUILDING 17, LEVEL A, TELECOM ROOM 111-17 PLANS 39 56

17.MP421 BUILDING 17, LEVEL B, TELECOM ROOM 205-17 PLANS 40 56

19.MP411 BUILDING 19, LEVEL A, TELECOM ROOM 117-19 PLANS 41 56

19.MP421 BUILDING 19, LEVEL B, TELECOM ROOM 216A-19 PLANS 42 56

25.MP411 BUILDING 25, LEVEL A, TELECOM ROOM 101A-25 PLANS 43 56

26.MP401 BUILDING 26, LEVEL C, TELECOM ENCLOSURE BM108B-26 PLANS 44 56

26.MP411 BUILDING 26, LEVEL A, TELECOM ROOM 106-26 PLANS 45 56

27.MP411 BUILDING 27, LEVEL A, TELECOM ROOM 107-27 PLANS 46 56

28.MP411 BUILDING 28, LEVEL A, TELECOM ROOM 108-28 PLANS 47 56

29.MP411 BUILDING 29, LEVEL A, TELECOM ENCLOSURE 113A-29 PLANS 48 56

30.MP411 BUILDING 30, LEVEL A, TELECOM ENCLOSURE 104-30 PLANS 49 56

85.MP411 BUILDING 85, LEVEL A, TELECOM ROOM 121-85 PLANS 50 56

86.MP411 BUILDING 86, LEVEL A, TELECOM ROOM 106-86 PLANS 51 56

87.MP411 BUILDING 87, LEVEL A, TELECOM ROOM 120-87 PLANS 52 56

87.MP412 BUILDING 87, LEVEL A, TELECOM ROOM 169-87 PLANS 53 56

89.MP411 BUILDING 89, LEVEL A TELECOM ROOM 1215-89 PLANS 54 56

M-501 MECHANICAL DETAILS 55 56

M-601 MECHANICAL SCHEDULES AND CONTROLS 56 56

VOLUME 3 OF 4

AC R OHT LIR NO AN

BENJAMIN P WOLFMAN

SSIE OF NO AR LP

SEAL

057741

Docusign Envelope ID: B71C0D48-D83D-418C-8E57-61AA26C33206

11/7/2024

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR-COOLED CONDENSER

ACCH AIR-COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,TWO

POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT

EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BSC BIOLOGICAL SAFETY CABINETS

BT BUFFER TANK

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CENTIGRADE (CELSIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CH CHILLER

CHWP CHILLED WATER PUMP

CHW CHILLER WATER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CHWCC CHILLED WATER COOLING COIL

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

D-4 ECONOMIZER OUTDOOR AIR

DAMPER

dB DECIBELS Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE

ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

H HUMIDIFIER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HHW HEATING HOT WATER

HHWC HEATING HOT WATER COIL

HHWP HEATING HOT WATER PUMP

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM

CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

Hz HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IV INLET VANES

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L LITER

L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LH LATENT HEAT

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPS LOW PRESSURE SUPPLY (STEAM)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL

PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/s METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM

CONDENSATE)

MPS MEDIUM PRESSURE SUPPLY (STEAM)

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OR OPERATING ROOM

OSA OUTSIDE SUPPLY AIR

(CONDITIONED)

P PUMP

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PHCP PREHEAT COIL PUMP

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

R/E RETURN OR EXHAUST

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND

DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SS INDOOR SPLIT SYSTEM

SSR SOLID SEPARATOR

ST STEAM TRAP

SV STEAM SAFETY VALVE

SVS STEAM VENT SILENCER

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TP TRAP

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

UC UNDER CUT

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE)

RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

Wb WET-BULB (TEMPERATURE)

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

XT EXPANSION TANK

YR YEAR

MECHANICAL ABBREVIATIONS

CO2 CARBON DIOXIDE SENSOR

HUMIDISTAT OR HUMIDITY SENSOR

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

ROUND FLEX DUCT

LINEAR SLOT DIFFUSER

BALANCING DAMPER

FIRE DAMPER

SMOKE DAMPER

D

R INCLINED RISE, IN

DIRECTION OF AIRFLOW

INCLINED DROP, IN DIRECTION

OF AIRFLOW

CONNECT NEW DUCT

TO EXISTING

LIMIT OF DEMOLITION

VANED ELBOW (PROVIDE ALL

SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW

(LONG RADIUS)

10x8 NEW DUCT (INSIDE

DIMENSIONS: WIDTH X DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO BE

DEMOLISHED

DUCT TRANSITION

END MOUNTED OR SIDEWALL GRILLE

SUPPLY

RETURN45°

45°

DN

DN

UP

UP

DNUP

STANDARD BRANCH SUPPLY OR

RETURN, NO SPLITTER (45° TAP)

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

S-60

S-15

CR-15

CHWS

CHWR

HIGH PRESSURE STEAM

PIPING (60 PSI)

LOW PRESSURE STEAM PIPING

(15 PSI AND BELOW)

LOW PRESSURE STEAM

CONDENSATE RETURN

CHILLED WATER SUPPLY PIPING

CHILLED WATER RETURN PIPING

PIPE UP

PIPE DOWN

BOTTOM CONNECTION

TOP CONNECTION

CAPPED OR PLUGGED PIPE

GLOBE VALVE

GATE VALVE

BALL VALVE

STEAM SAFETY VALVE

PRESSURE REGULATING VALVE

WYE STRAINER VALVE

BALANCING VALVE

MODULATING TWO-WAY CONTROL

VALVE

STEAM TRAPD CONDENSATE DRAIN LINE

CR-60 HIGH PRESSURE STEAM

CONDENSATE RETURN

HWS

HWR

HEATING HOT WATER SUPPLY

PIPING

HEATING HOT WATER RETURN PIPING

RLS REFRIGERANT LINE SET (LIQUID

AND SUCTION)

CONNECT TO EXISTING PIPE

LIMIT OF DEMOLITION

INLINE CENTRIFUGAL PUMP

STEAM PRESSURE REDUCING

VALVE

DRAIN VALVE

TEST PLUG

SUPPLY

TERMINAL UNIT SUPPLY

DUCT BRANCH (CONICAL

TAP)

CHECK VALVE

FIRE / SMOKE DAMPER

VANED ELBOW (SHORT RADIUS) S-30

CR-30

MEDIUM PRESSURE STEAM

PIPING (16 PSI AND 59 PSI)

MEDIUM PRESSURE STEAM

CONDENSATE RETURN

THERMOSTAT OR TEMPERATURE SENSOR

TWO POSITION CONTROL VALVE

MODULATING THREE-WAY

CONTROL VALVE

T

H

F

SD

FS

MECHANICAL LEGEND

MOTORIZED DAMPER

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

A.

B.

C.

D.

28.

1.

WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.

WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.

EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).

INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.

COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.

PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.

PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.

PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.

DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND

PIPING IN THE FIELD.

FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.

NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.

SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.

INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.

PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.

INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH COR.

DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.

INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE

NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.

INSTALL PIPING FREE OF SAGS AND BENDS.

INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.

PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.

PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.

INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.

DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.

IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS GIVEN.

DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.

INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING

COORDINATION AT NO ADDITIONAL COST

29. SEAL EXISTING AND NEW PIPE, DUCT OR CONTROLS PENETRATIONS AT INTERIOR/EXTERIOR WALL PENETRATIONS. EXISTING PIPE OR DUCT PENETRATIONS AT EXISTING WALLS

SHALL BE SEALED AT ALL TR ROOMS.

30. ALL PENETRATIONS IN FIRE AND/OR SMOKE PARTITIONS/BARRIERS SHALL BE SEALED AND PROTECTED WITH FIRE-RATED ASSEMBLIES TO MAINTAIN THE INTEGRITY OF THE

PARTITION / BARRIER.

32. PROVIDE FIRE RETARDANT CAULK AT ANY PENETRATIONS TO FIRE TREATMENT PLYWOOD

PHASING:

THIS PROJECT WILL BE IMPLEMENTED IN PHASES. THE FIRST PHASE WILL INCLUDE THE HEAD-END EQUIPMENT AND FIBER IMPROVEMENTS TO ACHIEVE THE REDUNDANCY FEEDING THE TELECOMMUNICATIONS ROOMS. THE SECOND PHASE WILL CONSTRUCT ONE OR MORE TELECOMMUNICATIONS ROOMS FOR EACH BUILDING IN A TIMED SEQUENCE AS APPROVED BY THE COR, WITH HVAC SYSTEM TO BE INSTALLED AND ACTIVE. THE THIRD PHASE WILL INCLUDE DISTRIBUTION OF CABLING FROM THE COMPLETED TELECOMMUNICATIONS ROOMS TO THE DATA RECEPTACLES WITHIN THE APPROPRIATE DISTANCE OF THOSE ROOMS AND CONSTRUCTION OF MORE TELECOMMUNICATIONS

ROOMS.

MECHANICAL GENERAL NOTES

1.

2.

3.

4.

A.

B.

C.

5.

6.

7.

8.

9.

10.

11.

VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH WORK.

REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY

GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.

WHERE EXISTING EQUIPMENT, PIPING, DUCTS, ETC. ARE REQUIRED TO BE REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS, BRACING, FOUNDATIONS, ETC.

AFTER REMOVAL, AFFECTED CONSTRUCTION AND SURFACES, SUCH AS FLOORS, WALLS, BASES, AND CEILINGS SHALL BE FINISHED TO MATCH ADJACENT SURFACES. (UNO)

COORDINATE WITH COR/VA ON WHAT EQUIPMENT TO BE REMOVED, DISPOSED OF, SALVAGED, AND/OR RE-INSTALLED:

REMOVED AND DISPOSED OF EQUIPMENT: SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS.

REMOVED AND SALVAGED EQUIPMENT: SHALL BE CLEANED, PACKED OR CRATED AFTER CLEANING, AND LABELED FOR IDENTIFICATION. PROTECT AND TRANSPORT ITEMS TO

VA STORAGE AREA. COORDINATE STORAGE LOCATION WITH COR/VA.

REMOVED AND RE-INSTALLED ITEMS SHALL BE CLEANED AND REPAIRED TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE. PACKED OR CRATED AFTER CLEANING AND LABELED FOR IDENTIFICATION. PROTECT AND TRANSPORT ITEMS TO TEMPORARY STORAGE.COORDINATE TEMPORARY STORAGE LOCATION WITH COR/VA. REINSTALL

ITEMS IN LOCATIONS INDICATED.

DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO

COORDINATE WITH NEW WORK.

AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.

PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT NO ADDITIONAL COST.

TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

SAWCUT OR CORE DRILL CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW MECHANICAL WORK AND WORK OF OTHER TRADES.

MECHANICAL DEMOLITION GENERAL NOTES

EXISTINGEXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

DIFFUSER TAG

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

EQUIPMENT TAG

ANNOTATION SYMBOLS

##-VAV-#

SD-## ###

Engineers Architects Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/5 /2 3:

:1

PM

C :\U se rs \a va sa \D oc um en ts \M P_ -1 -V A D ub lin E H R M G en er al _a va sa N N C 4C .rv t

MP001

MECHANICAL GENERAL INFORMATION

1 56AV

EHRM INFRASTRUCTURE

UPGRADES

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027 NOVEMBER 8, 2024

100% BID DOCUMENTS

557-22-70022-192

BPW

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

WALL RATING LEGEND

AC R OHT LIR NO AN

BENJAMIN P WOLFMAN

SSIE OF NO AR LP

SEAL

057741

Docusign Envelope ID: 2C526E58-3813-481D-8F98-B31FEC57060F

DCWR

DHW

PIPING SYSTEM

NG NATURAL GAS

ST STORM

PD PUMP DISCHARGE

OFD OVERFLOW STORM DRAIN

GW GREASE WASTE

OW OIL WASTE

SAN SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

AW ACID WASTE

N2 NITROGEN

N2O NITROUS OXIDE

MA MEDICAL AIR

O2 OXYGEN

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

OV OIL VENT

AV ACID VENT

NPCW NONPOTABLE COLD WATER

DI DE-IONIZED WATER

SCW SOFTENED COLD WATER

DCW DOMESTIC COLD WATER

RO REVERSE OSMOSIS WATER

DOMESTIC CW RECIRCULATION

DOMESTIC HOT WATER

CO2 CARBON DIOXIDE

DHW 140 DOMESTIC HOT WATER (OTHER TEMP)

PG PROPANE GAS

DHWR DOMESTIC HW RECIRCULATION

NG

ST

PD

OFD

GW

OW

SAN

CD

CA

AW

N2 N2O

MA

O2

WAGD

VAC

CO2

PG

V

OV

AV

HW 140

SCW

NPCW

DI

RO

EXISTINGEXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

NEW PLUMBING EQUIPMENT MARK

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

P-###

EXISTING PLUMBING EQUIPMENT MARKP-###

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CONTROL VALVE

GATE VALVE

GLOBE VALVE

SAFETY RELIEF VALVE

TWO POSITION CONTROL VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

PLUG VALVE

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

CO

PIPE SLOPE ARROW

AV

F

P

T

M

CIRCUIT SETTER

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PASCAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH -

ABSOLUTE

PSIG POUNDS PER SQUARE INCH - GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REFRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

DA DENTAL COMPRESSED AIR

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DV DENTAL VACUUM

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

PLUMBING SYMBOLS PLUMBING SYMBOLS

ANNOTATION SYMBOLS

PLUMBING SYMBOLS & ABBREVIATIONS

ANNOTATION ABBREVIATIONS 1.

2.

3.

4.

A.

B.

C.

5.

6.

7.

8.

9.

10.

11.

VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH

WORK.

REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.

WHERE EXISTING EQUIPMENT, PIPING, DUCTS, ETC. ARE REQUIRED TO BE REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS, BRACING, FOUNDATIONS, ETC. AFTER REMOVAL, AFFECTED CONSTRUCTION AND SURFACES, SUCH AS FLOORS, WALLS, BASES, AND CEILINGS SHALL BE FINISHED TO MATCH ADJACENT SURFACES. (UNO)

COORDINATE WITH COR/VA ON WHAT EQUIPMENT TO BE REMOVED, DISPOSED OF, SALVAGED, AND/OR RE-INSTALLED:

REMOVED AND DISPOSED OF EQUIPMENT: SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS.

REMOVED AND SALVAGED EQUIPMENT: SHALL BE CLEANED, PACKED OR CRATED AFTER CLEANING, AND LABELED FOR IDENTIFICATION. PROTECT AND TRANSPORT ITEMS TO VA STORAGE AREA. COORDINATE STORAGE LOCATION WITH

COR/VA.

REMOVED AND RE-INSTALLED ITEMS SHALL BE CLEANED AND REPAIRED TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE. PACKED OR CRATED AFTER CLEANING AND LABELED FOR IDENTIFICATION. PROTECT AND TRANSPORT ITEMS TO TEMPORARY STORAGE.COORDINATE TEMPORARY STORAGE LOCATION WITH COR/VA. REINSTALL ITEMS IN

LOCATIONS INDICATED.

DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST

MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.

PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT

NO ADDITIONAL COST.

TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING WORK

AND WORK OF OTHER TRADES.

PLUMBING DEMOLITION GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

1.

WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE

PURPOSES INTENDED.

EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT

EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT

MAINTENANCE, REPAIRS, AND REPLACEMENT.

AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO

MANUFACTURER'S RECOMMENDATIONS.

SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE.

SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED OTHERWISE.

SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS.

TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH

EXISTING CONDITIONS.

PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING

SYSTEMS.

CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR 2 WEEK IN ADVANCE AND

CONFIRM 48 HOURS PRIOR.

PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

21. SEAL EXISTING AND NEW PIPE, DUCT OR CONTROLS PENETRATIONS AT INTERIOR/EXTERIOR WALL PENETRATIONS. EXISTING

PIPE OR DUCT PENETRATIONS AT EXISTING WALLS SHALL BE SEALED AT ALL TR ROOMS.

30. ALL PENETRATIONS IN FIRE AND/OR SMOKE PARTITIONS/BARRIERS SHALL BE SEALED AND PROTECTED WITH FIRE-RATED

ASSEMBLIES TO MAINTAIN THE INTEGRITY OF THE PARTITION / BARRIER.

32. PROVIDE FIRE RETARDANT CAULK AT ANY PENETRATIONS TO FIRE TREATMENT PLYWOOD

PHASING:

THIS PROJECT WILL BE IMPLEMENTED IN PHASES. THE FIRST PHASE WILL INCLUDE THE HEAD-END EQUIPMENT AND FIBER IMPROVEMENTS TO ACHIEVE THE REDUNDANCY FEEDING THE TELECOMMUNICATIONS ROOMS. THE SECOND PHASE WILL CONSTRUCT ONE OR MORE TELECOMMUNICATIONS ROOMS FOR EACH BUILDING IN A TIMED SEQUENCE AS APPROVED BY THE COR, WITH HVAC SYSTEM TO BE INSTALLED AND ACTIVE. THE THIRD PHASE WILL INCLUDE DISTRIBUTION OF CABLING FROM THE COMPLETED TELECOMMUNICATIONS ROOMS TO THE DATA RECEPTACLES WITHIN THE APPROPRIATE DISTANCE

OF THOSE ROOMS AND CONSTRUCTION OF MORE TELECOMMUNICATIONS ROOMS.

PLUMBING GENERAL NOTES

Engineers Architects

# NEW KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/5 /2 3:

:1

PM

C :\U se rs \a va sa \D oc um en ts \M P_ -1 -V A D ub lin E H R M G en er al _a va sa N N C 4C .rv t

MP002

PLUMBING GENERAL INFORMATION

2 56AV

EHRM INFRASTRUCTURE

UPGRADES

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027 NOVEMBER 8, 2024

100% BID DOCUMENTS

557-22-70022-192

BPW

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

WALL RATING LEGEND

AC R OHT LIR NO AN

BENJAMIN P WOLFMAN

SSIE OF NO AR LP

SEAL

057741

NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT

SEMI-RECESSED SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

FIRE LINEFL

CONCEALED SPRINKLER HEAD

PENDANT SPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

FIRE DEPARTMENT CONNECTION (FDC)

FIRE DRAINDRAIN

POINT OF NEW CONNECTION

LIMIT OF DEMOLITION

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

FIRE PROTECTION CONTRACTORFPC

TAMPER SWITCH

FLOW SWITCH

CHECK VALVE

GATE VALVE

EXTERIOR ALARM GONG (WATER ACTIVATED)

TEST AND DRAIN ASSEMBLY

BACKFLOW PREVENTER

T&D

TS

FS

ORDINARY HAZARD

GROUP 1 OCCUPANCY

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

ORDINARY HAZARD

GROUP 2 OCCUPANCY

LIGHT HAZARD

FIRE SUPPRESSION SYMBOLS & ABBREVIATIONS

THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA

13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE

PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS

DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE

PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION

SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS

DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE

BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING

CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING

CODE, NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION

REQUIREMENTS.

FLUSHING CONNECTION

FEED OR CROSS MAIN.

TYPICAL TEE WITH

CROSS MAIN PITCH

TOWARDS FEED MAIN.

NOTE: INSTALL FLUSHING

CONNECTION AT END OF

CROSS MAINS.

2" NIPPLE 4" LONG

WITH CAP.

MECHANICAL TEE

NEW PIPING

MECHANICAL TEE

SCREWED END

STEEL BEAM

RETAINING STRAP

C-CLAMP

THREADED HANGER ROD

ADJUSTABLE RING HANGER

NOTE:

HANGING DETAILS SHOWN ARE SUBJECT TO REQUIREMENTS OF SEISMIC DESIGN.

EXPANSION ANCHOR HILT QUIK

BOLT TZ OR APPROVED EQUAL.

EXPANSION ANCHOR SHALL BE

QUALIFIED FOR USE IN CRACKED

CONCRETE PER ACI 355.2

EXISTING CONCRETE SLAB

AUTO. SPRINKLER PIPE

SET SCREW

SURGE RESTRAINER

DUCTWORK OR OTHER

OBSTRUCTION OVER

48" IN WIDTH.

UPRIGHT HEAD

SPRINKLER BRANCH LINE

ALL EXPOSED

SPRINKLER PIPING

SHALL BE PAINTED RED.

UPRIGHT HEAD.

PROVIDE GUARD.

1.

2.

3.

4.

NOTE:

PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR OTHER OBSTRUCTION OVER 48" IN WIDTH.

COORDINATE SPRINKLER PIPE ROUTING AND LOCATION WITH COR AND ALL PARTIES INVOLVED WITH

INSTALLATION OF THE OBSTRUCTION.

PROVIDE PIPE SUPPORTS THAT COMPLY WITH NFPA 13 REQUIREMENTS. INCLUDE COST OF ADDITIONAL

SUPPORTS AS REQUIRED.

ATTACH PIPE SUPPORTS TO BUILDING STRUCTURE OR PROVIDE SUPPLEMENTAL STEEL ANCHOR POINTS. DO NOT ATTACH PIPE SUPPORTS TO DUCTWORK, PIPES, CONDUIT, OR EXISTING HANGER RODS FOR OTHER

EQUIPMENT.

INSTALL INSULATION AFTER

CAULKING SLEEVE, SEAL

ANNULAR SPACE.

FIRE RATED WALL AND OR SLAB.

STEEL PIPE SLEEVE TERMINATE

SLEEVE FLUSH WITH FINISHED

SURFACE.

UL-LISTED FIRESTOPPING

FINISHED ESCUTCHEON PLATE

FLUSH AGAINST WALL AND OF

SIZE TO COMPLETELY COVER

OPENING.

APPROVED TYPE FIRE SAFE &

SMOKE TIGHT CAULKING SEALER

BETWEEN BARE PIPE AND SLEEVE.

NOTE:

MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF CONCRETE OR CMU WALLS

SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC REQUIREMENTS.

1" X ARMOVER

1" 90 EL

1" X DROP

DROP NIPPLE

1" x 1/2" R.C. REDUCER

NOTE:

1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.

2. ALL EXPOSED PIPING SHALL BE PAINTED RED.

SUSPENDED CEILING

HANGERS SHALL

BE PROVIDED AS

REQUIRED BY

NFPA 13 TYPICAL

1" x 2" NIPPLE

BRANCH LINE

PENDENT SPRINKLER HEAD

1.

2.

3.

4.

5.

LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES PRIOR TO START OF

WORK.

COORDINATE WITH COR FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. GIVE THE

COR THREE (3) DAYS NOTICE PRIOR TO PLANNED SHUTDOWN OR INTERRUPTION.

COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT

OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.

FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN OFFSITE AND

DISPOSED OF.

REMOVE SPRINKLER MAINS, BRANCHES AND SPRINKLERS BACK TO THE ZONE CONTROL VALVE AS NEEDED TO INSTALL NEW

SPRINKLER SYSTEM.

FIRE SUPPRESSION DEMOLITION GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

1.

USE NFPA-13 (CURRENT EDITION), PLANS AND CALCULATIONS CHAPTER AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE

INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM.

COMPLY WITH VA REQUIREMENTS. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL REQUIRED PLUMBING CODES.

REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS.

COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS.

LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE

HAZARD CLASSIFICATION.

THIS FACILITY IS FULLY SPRINKLERED. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY NFPA AND VA

REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.

SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13 AND VA

STANDARDS.

HYDRAULICALLY CALCULATE SPRINKLER IN ACCORDANCE WITH REQUIREMENTS FOR APPROPRIATE HAZARD OCCUPANCY.

PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND OPERABLE SYSTEM IN ACCORDANCE WITH

NFPA AND VA REQUIREMENTS.

FIRE PROTECTION CONTRACTOR SHALL OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW, STATIC PRESSURE AVAILABLE WITH NO FLOW, AND RESIDUAL PRESSURE AT FULL FLOW TO THE FACILITY. SUBMIT HYDRAULIC CALCULATIONS

AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR REVIEW.

PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING. SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES TO AVOID CONFLICT.

SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS

AT PRIMARY BUILDING STRUCTURAL MEMBERS.

PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS IN ACCORDANCE WITH NFPA REQUIREMENTS.

CLEAN ENTIRE WORK AREA OF ALL DUST, DIRT, AND OTHER DEBRIS. MAINTAIN WORK AREA IN CLEAN CONDITION.

PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS

SPECIFIED AND INDICATED ON THE DRAWINGS.

SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A

PROFESSIONAL ENGINEER.

REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE WORK AT NO ADDITIONAL COST TO THE VA.

PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL

PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.

FLOW AND TAMPER SWITCHES ARE TO BE PURCHASED AND INSTALLED AS WORK OF DIVISION 21. PROVIDE WIRING TO FLOW

AND TAMPER SWITCHES AS WORK OF DIVISION 26.

WATER SERVICE AND DETECTOR TYPE REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER TO BE PROVIDED AND TESTED AS WORK OF DIVISION 22. INCORPORATE ASSOCIATED PRESSURE DROP OF SELECTED BACKFLOW PREVENTER

DEVICE IN HYDRAULIC CALCULATIONS.

FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH LINES IN ACCORDANCE WITH NFPA-13.

ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONNECTION AT TOP OF PIPE.

SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS OR CORRIDORS.

LOCATE CENTERED IN CEILING TILE WHERE POSSIBLE.

LOCATE THE INSPECTOR'S TEST CONNECTION AND MAIN DRAIN LOCATIONS IN ACCORDANCE WITH NFPA-13.

WHERE EXISTING CEILINGS ARE BEING PERMANENTLY REMOVED IN NEW OR EXPANDED TELECOMMUNICATION ROOMS (TRs), COORDINATE THE WORK SUCH THAT REPLACEMENT OF THE EXISTING PENDENT SPRINKLERS WITH NEW UPRIGHT SPRINKLERS OCCURS AT THE SAME TIME TO AVOID A LOSS IN SPRINKLER PROTECTION IN THE CONSTRUCTION AREA.

PROVIDE FIRE RETARDANT CAULK AT ANY PENETRATIONS TO FIRE TREATMENT PLYWOOD.

ALL EXPOSED FIRE SUPPRESSION PIPING SHALL BE PAINTED RED IN ACCORDANCE WITH SPECIFICATION CHAPTER 09 91 00.

PHASING:

THIS PROJECT WILL BE IMPLEMENTED IN PHASES. THE FIRST PHASE WILL INCLUDE THE HEAD-END EQUIPMENT AND FIBER IMPROVEMENTS TO ACHIEVE THE REDUNDANCY FEEDING THE TELECOMMUNICATIONS ROOMS. THE SECOND PHASE WILL CONSTRUCT ONE OR MORE TELECOMMUNICATIONS ROOMS FOR EACH BUILDING IN A TIMED SEQUENCE AS APPROVED BY THE COR, WITH HVAC SYSTEM TO BE INSTALLED AND ACTIVE. THE THIRD PHASE WILL INCLUDE DISTRIBUTION OF CABLING FROM THE COMPLETED TELECOMMUNICATIONS ROOMS TO THE DATA RECEPTACLES WITHIN THE APPROPRIATE DISTANCE

OF THOSE ROOMS AND CONSTRUCTION OF MORE TELECOMMUNICATIONS ROOMS.

FIRE SUPPRESSION GENERAL NOTES

1.

2.

3.

4.

DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS OUT OF COMMISSION, CONTRACTOR SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY IN ACCORDANCE WITH VA REQUIREMENTS. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION. REFER TO INTERNATIONAL FIRE CODE CHAPTER 9, SECTION 901.7.

FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS

PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.

FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS USE.

THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND

ROOM OF THE FIRE AREA IS COVERED.

BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF

FIRE PROTECTION SERVICE

1.

2.

3.

4.

5.

CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST

CONTROL PLAN.

EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE MAINTAINED.

RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.

PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.

FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC

PATHOGENS.

CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE COR ACCEPTANCE.

INFECTION CONTROL MEASURES

NOTE:

1. ALL EXPOSED PIPING SHALL BE PAINTED RED.

2. PROVIDE GUARDS ON UPRIGHT SPRINKLERS

UNLESS OTHERWISE NOTED.

THREADED

HANGER ROD

SURGE

RESTRAINER

ADJUSTABLE

RING HANGER

BRANCHLINE

AUTO. SPRINKLER FEED

UPRIGHT AUTOMATIC

SPRINKLER, FM APPROVED,

QUICK RESPONSE.

REDUCER

RISER NIPPLE

REDUCING TEE

Engineers Architects

# NEW KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/5 /2 3:

:1

PM

C :\U se rs \a va sa \D oc um en ts \M P_ -1 -V A D ub lin E H R M G en er al _a va sa N N C 4C .rv t

MP003

FIRE SUPPRESSION GENERAL

INFORMATION

3 56AV

EHRM INFRASTRUCTURE

UPGRADES

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027 NOVEMBER 8, 2024

100% BID DOCUMENTS

557-22-70022-192

BPW

Scale: No Scale1 MECHANICAL TEE AND FLUSHING CONNECTION DETAIL

Scale: No Scale2 PIPE HANGER SUPPORT DETAIL

Scale: No Scale3 SPRINKLER ABOVE AND BELOW DUCT DETAIL

Scale: No Scale4 SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL DETAIL

Scale: No Scale6 SEMI-RECESSED PENDENT SPRINKLER DETAIL

Scale: No Scale5 UPRIGHT AUTOMATIC SPRINKLER DETAIL

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

WALL RATING LEGEND

AC R OHT LIR NO AN

BENJAMIN P WOLFMAN

SSIE OF NO AR LP

SEAL

057741

101-1

TR

C11-1

CORRIDOR

102-1

ENVIRONMENT

MGMT HK CLOSET

103-1

CENTRALIZED

STAFF FAC MENS

TLT

PLUG IN

WINDOW AC

RADIATOR

UNDER

WINDOW

3101-1

TR

102-1

ENVIRONMENT

MGMT HK

CLOSET

103-1

CENTRALIZED

STAFF FAC

MENS TLT

CORRIDOR

C11-1

5 101-1

TR

C11-1

CORRIDOR

102-1

ENVIRONMENT

MGMT HK

CLOSET

103-1

CENTRALIZED

STAFF FAC

MENS TLT

C11-1

CORRIDOR

102-1

ENVIRONMENT

MGMT HK CLOSET

103-1

CENTRALIZED

STAFF FAC MENS

TLT

T H 3

1 2

01-SS-101 01-CU-101

RSRL

3/4" D

101-1

TR

C11-1

CORRIDOR

102-1

ENVIRONMENT

MGMT HK CLOSET

103-1

CENTRALIZED

STAFF FAC MENS

TLT

101-1

TR

102-1

ENVIRONMENT

MGMT HK CLOSET

103-1

CENTRALIZED

STAFF FAC MENS

TLT

C11-1

CORRIDOR

101-1

TR

Engineers Architects

# DEMOLITION KEY NOTES:

# NEW KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/4 /2 :0 4:

P M

C :\U se rs \a va sa \D oc um en ts \M P_ -1 -V A D ub lin E H R M -B ld g 1_ R _a va sa N N C 4C .rv t

01.MP411

BUILDING 1, LEVEL A, TELECOM ROOM

101-1 PLANS

4 56AV

E…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .