About this file

This document is a collection of architectural drawings (Volume 1 of 4) for the EHRM Infrastructure Upgrades project at the Carl Vinson VA Medical Center in Dublin, Georgia. The project involves comprehensive telecommunications room infrastructure improvements across 29 different buildings on the medical center campus, with specific focus on upgrading telecom rooms, electrical systems, and associated mechanical support infrastructure.

The drawings provide detailed coverage diagrams for each building, illustrating planned modifications to telecom rooms across multiple levels. Key technical elements include installing new electrical panels, routing fiber and UTP cabling, providing new condensing units for split system HVAC, and implementing fire-rated penetration sealing. The project scope encompasses precise electrical circuitry modifications, with each building requiring specific breaker replacements, power routing, and telecommunications infrastructure upgrades. The project is part of VA Project Number 557-22-700, with documents dated November 8, 2024, and is prepared for 100% bid document stage by Apogee Consulting Group.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DZ--EHRM Infrastructure Upgrades Dublin, GA Project 557-22-700, newest first.
File Type Posted
Atch 1 - PreBid RFIs 7.30.2025.xlsx XLSX spreadsheet
36C77625B0013 0004.docx DOCX document
Atch 1 - PreBid RFIs 7.24.2025.xlsx XLSX spreadsheet
36C77625B0013 0003.docx DOCX document
Atch 3 - ICRALevel_Department - Dublin - 557-22-700.pdf PDF
Atch 2 - Annual Hydrant Flow Report_9JUL25 - Dublin - 557-22-700.xlsx XLSX spreadsheet
36C77625B0013 0002.docx DOCX document
Atch 9 - 22-192 Existing Cable Counts by TR - Dublin - 557-22-700.xlsx XLSX spreadsheet
Atch 7 - 028333.13 Lead Based Paint - Dublin - 557-22-700.pdf PDF
Atch 8 - Dublin EHRM_ACM_Matrix - Dublin - 557-22-700.xlsx XLSX spreadsheet
Atch 6 - 013323 Shop Drawings - Dublin - 557-22-700.pdf PDF
Atch 5 - 013216.15 Project Sched_Small - Dublin - 557-22-700.pdf PDF
Atch 4 - Virtual Bid Opening Information - Dublin - 557-22-700.pdf PDF
Atch 1 - PreBid RFIs.xlsx XLSX spreadsheet
36C77625B0013 0001.docx DOCX document
Attachment 1 - Site Visit Sign-in Sheet - Dublin EHRM.pdf PDF
Attachment 2 - Site Visit Agenda - Dublin EHRM.pdf PDF
Attachment 15 - Drwg 82 of 91 REVISED.pdf PDF
Attachment 13 - VAAR LOS Construction.docx DOCX document
Attachment 11 - SOW Atch 4 Specifications.pdf PDF
Attachment 8 - SOW Atch 1 Design Guide Telecom Spaces.pdf PDF
Attachment 5 - Drawings 4 of 4 - Dublin GA - EHRM.pdf PDF
Attachment 3 - Drawings 2 of 4 - Dublin GA - EHRM.pdf PDF
Attachment 14 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 9 - SOW Atch 2 EUD Requirements.pdf PDF
Attachment 6 - Site Visit Instructions.docx DOCX document
Attachment 1 - Specifications - Dublin GA - EHRM.pdf PDF
Attachment 10 - SOW Atch 3 Elec Panel Labeling.pdf PDF
Attachment 12 - Wage Rates - GA20250095 02072025.pdf PDF
Attachment 7 - SOW - Dublin GA - EHRM.pdf PDF
Attachment 4 - Drawings 3 of 4 - Dublin GA - EHRM.pdf PDF
36C77625B0013.docx DOCX document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7' -0

5'-0"

VAN

ACCESSIBLE

LOADING AREA

SF

SF

EA

SE

MEN

T A

PP

RO

XIM

AT

EL

Y S

HO

WN

' E

XIS

TIN

G W

AT

ER

LI

NE

EA

SE

MEN

T

2.5" PLASTIC WITNESS POST

1/2" REBAR FOUND IN

CONCRETE MONUMENT

CONCRETE NAIL FOUND

Bldg 5 Gen

Bldg 4 Gen

Water Tower Gen

Bldg 8 Gen

Circuit 2 Gen

OBSERVATION MONITORING WELL

UP

UP

DEANE + STROLLO, LLC718 Virginia DriveOrlando, FL. 32803T: (407) 423-5355 F: (407) 422-5994

H

IL

LC

R

ES

T

PK

W

Y.

BE

LL

EV

UE

R D.

INDUSTRIAL BLVD.

INDUSTRIAL BLVD.

H

IL

LC

R

ES

T

PK

W

Y.

FAIRVIEW PARK HOSPITAL

FA

IR

VI

EW

P

AR

K

DR

IV

E

Bldg 27 Gen

F

F

F

F

F F

F

F

FF

F

F

SIGN

NE

FF

PL

AC

E

NE

FF

P

LA

CE

BE

LL

EV

UE

AV

EN

UE

AL

EX

AN

DE

R D

RIV

E

JO

HNSO

N ST

REE

T

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

METAL BLDGS.BLDG. 31

BLDG. 46

BLDG. 36

BLDG. 24

BLDG. 43

BLDG. 32

BLDG. 39

GAZEBO

BLDG. 68

BLDG. 67

BLDG. 21

LAKE LEISURE

AC

AC

PARKING

PARKING

BLDG. 34

BLDG. 35

STEPS

RAMP

PATIO

R

AM

P 1:

S

LO

PE

R

AM

P 1:

S

LO

PE

R

AM

P 1:

S

LO

PE

LA

N

D

IN

G

VAN VAN VAN VAN

RAMP

CONCRETE DITCH

CONCRETE

CONCRETE

CONCRETE

SLAB

SLAB

NEW PARKING

CTCT

AC

AC

AC

AC

OBSERVATION MONITORING WELL

BLDG. 17

BLDG.

BLDG. 47

BLDG. 41

BLDG

BLDG. 63

BLDG. 81

BLDG. 82

BLDG. 27

BLDG.

BLDG. 71BLDG. 28

BLDG. 66

CO

OL

IN

G

TO

W

ER

BLDG. 69

BLDG. 30

WATER TANK

BLDG. 5

BLDG. 3 BLDG. 1

BLDG. 9

BLDG. 13

BLDG. 11

BLDG. 2

BLDG. 40

BLDG. 4

BLDG. 6

BLDG. 8

BLDG. 10

BLDG. 12

BLDG. 85

BLDG. 14

BLDG. 86

BLDG. 25

BLDG. 26

BLDG. 29

BLDG. 15

BLDG. 19

GAZEBO

SUBSTATION

BLDG. 44

BLDG. 62

BLDG. 84

BLDG.

Bldg 2 Gen

FUEL

TANK

MRI

BLDG.29

ANNEX

New Water Tower Location

Bldg.10

New Chiller Plant

BLDG. 87

BLACKWOOD DRIVE

EX

IS

TIN

G

JO

HN

SO

N

ST

RE

ET

JOHNSON STREET

ALEXANDER DRIVE

BLACKWOOD DRIVE

TROJAKOWSKI AVENUE

EVANS AVENUE

TROJAKOWSKI AVENUE

EVANS AVENUE

CROWLEY AVENUE

CROWLEY AVENUE

VETERANS PARKWAY US HWY 80

VETERANS PARKWAY US HWY 80 VETERANS PARKWAY US HWY 80

JOHNSON STREET

BLACKWOOD DRIVE

AL

EX

AN

DE

R D

RIV

E

JOHNSON STREET

THOMAS LANE

THOMAS LANE

NORTHWEST DRIVE

JOHNSON STREET

EVANS AVENUE

TROJAKOWSKI AVENUE

NEW JO

HNSON STREET WEST

SHADED BUILDINGS REPRESENT

PROJECT SCOPE

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027

Engineers Architects Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

/6

/2

5:

:3

PM

C :\U se rs

\a pu lle n\

D oc um en ts \M

S_

-1

-V A

D ub lin E

H R

M _G

EN

_R

_a pu lle nV D

XT

7.

rv t

G-001

COVER

1 54AP,AV,PN

EHRM INFRASTRUCTURE

UPGRADES

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027 NOVEMBER 8, 2024

100% BID DOCUMENTS

557-22-70022-192

VARIOUS

EHRM INFRASTRUCTURE UPGRADES

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027

VA PROJECT #: 557-22-700

DR,BW,KK

NORTH

NORTH

VOLUME 1 OF 4

DRAWING LIST - VOLUME 1 OF 4

SHEET NUMBER SHEET NAME DWG OF DWG

GENERAL

G-001 COVER 1 54

G-002 GENERAL INFORMATION 2 54

G-003 SHEET LIST 3 54

G-004 CAMPUS PLAN 4 54

G-005 ICRA INFORMATION AND DETAILS 5 54

G-006 TYPICAL ICRA CONDITIONS 6 54

G-007 CONTRACTOR WORK SHUTDOWN SUMMARY 7 54

G-101 BUILDING 1, 2, 3, 4 & 40 COVERAGE DIAGRAMS 8 54

G-102 BUILDING 1, 2, 3, 4 & 40 COVERAGE DIAGRAMS 9 54

G-103 BUILDING 6 & 8 COVERAGE DIAGRAMS 10 54

G-104 BUILDING 9, 11, 13, 15, 17 & 19 COVERAGE DIAGRAMS 11 54

G-105 BUILDING 9, 11, 13, 15, 17 & 19 COVERAGE DIAGRAMS 12 54

G-106 BUILDING 10, 12, 14, & 16, 85, & 86 COVERAGE DIAGRAMS 13 54

G-107 BUILDING 10, 12, 14, & 16, 85, & 86 COVERAGE DIAGRAMS 14 54

G-108 BUILDING 10, 12, 14, & 16, 85, & 86 COVERAGE DIAGRAMS 15 54

01.G-101 BUILDING 1, COVERAGE DIAGRAM 16 54

01.G-102 BUILDING 1, COVERAGE DIAGRAM 17 54

02.G-100 BUILDING 2, COVERAGE DIAGRAM 18 54

02.G-101 BUILDING 2, COVERAGE DIAGRAM 19 54

02.G-102 BUILDING 2, COVERAGE DIAGRAM 20 54

03.G-101 BUILDING 3, COVERAGE DIAGRAMS 21 54

03.G-102 BUILDING 3, COVERAGE DIAGRAM 22 54

04.G-101 BUILDING 4, COVERAGE DIAGRAMS 23 54

04.G-102 BUILDING 4, COVERAGE DIAGRAM 24 54

05.G-101 BUILDING 5, COVERAGE DIAGRAM 25 54

06.G-101 BUILDING 6, COVERAGE DIAGRAMS 26 54

08.G-101 BUILDING 8, COVERAGE DIAGRAMS 27 54

09.G-101 BUILDING 9, COVERAGE DIAGRAMS 28 54

10.G-100 BUILDING 10, COVERAGE DIAGRAM 29 54

10.G-101 BUILDING 10, COVERAGE DIAGRAMS 30 54

11.G-101 BUILDING 11, COVERAGE DIAGRAM 31 54

11.G-102 BUILDING 11, COVERAGE DIAGRAM 32 54

12.G-100 BUILDING 12, COVERAGE DIAGRAM 33 54

12.G-101 BUILDING 12, COVERAGE DIAGRAM 34 54

12.G-102 BUILDING 12, COVERAGE DIAGRAM 35 54

13.G-101 BUILDING 13, COVERAGE DIAGRAMS 36 54

14.G-101 BUILDING 14, COVERAGE DIAGRAMS 37 54

14.G-102 BUILDING 14, COVERAGE DIAGRAM 38 54

15.G-101 BUILDING 15, COVERAGE DIAGRAM 39 54

16.G-101 BUILDING 16, COVERAGE DIAGRAM 40 54

16.G-102 BUILDING 16, COVERAGE DIAGRAM 41 54

17.G-101 BUILDING 17, COVERAGE DIAGRAM 42 54

19.G-101 BUILDING 19, COVERAGE DIAGRAM 43 54

25.G-101 BUILDING 25, COVERAGE DIAGRAM 44 54

26.G-101 BUILDING 26, COVERAGE DIAGRAM 45 54

26.G-102 BUILDING 26, COVERAGE DIAGRAM 46 54

27.G-101 BUILDING 27, COVERAGE DIAGRAM 47 54

28.G-101 BUILDING 28, COVERAGE DIAGRAMS 48 54

29.G-101 BUILDING 29, COVERAGE DIAGRAM 49 54

30.G-101 BUILDING 30, COVERAGE DIAGRAM 50 54

85.G-101 BUILDING 85, COVERAGE DIAGRAM 51 54

86.G-101 BUILDING 86, COVERAGE DIAGRAM 52 54

87.G-101 BUILDING 87, COVERAGE DIAGRAM 53 54

89.G-101 BUILDING 89, COVERAGE DIAGRAM 54 54

CIVIL

CD101 CIVIL DEMOLITION PLAN 1 3

CS101 CIVIL SITE, PAVING, AND UTILITY PLAN 2 3

CS501 CIVIL PAVING AND CONSTRUCTION DETAILS 3 3

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

Docusign Envelope ID: 4081B0C2-2BE7-4DDD-B6CF-B1CCFE1038E3

11/7/2024

S SS S

S SS S S

WALL SECTION

SYMBOL INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 1 2

INTERCOM

STATION INTERCOM

MASTER

STATION

INTERCOM

WALL

OUTLET

INTERCOM STATION

1' -6

4'

-0

NOTE: FIRE

EXTINGUISHERS HAVING

A GROSS WEIGHT NOT

EXCEEDING 40 LB (18.14

KG) SHALL BE INSTALLED

SO THAT THE TOP OF THE

FIRE EXTINGUISHER IS

NOT MORE THAN 5'-0"

(1.53 M) ABOVE THE

FLOOR.

FIRE EXTINGUISHER

CABINET

ELECTRICAL PANEL

6' -6

DUPLEX

OUTLET

SWITCH

THERMOSTAT

TELEPHONE

OR DATA

OUTLET

FIRE ALARM

PULL

(3-6" MIN)

(4'-0" MAX)

INTERCOM

STATION

DUPLEX

OUTLET

COMPUTER

TERMINAL 1'

-6

MISC. WALL DEVICES

CLOCK

NURSE

CALL

DOME

LIGHT

CLOCK OUTLET

CLOCK & NURSE CALL DEVICES

6' -7

7' -0

4' -0

WALL PROTECTION

8'- 0"

OR DOOR FRAME

3" TO CORNERGUARD

CORNER GUARD

3'- 0"

DUCTLESS SPLIT INDOOR

UNIT

NOTE: PROVIDE WALL BLOCKING FOR ALL WALL MOUNTED EQUIPMENT AND ADA WALL

MOUNTED ACCESSORIES. BLOCKING SHALL EITHER BE STEEL STRIP, 6" WIDE, WITH LENGTH

EXTENDING ONE STUD SPACE BEYOND END OF ITEM SUPPORTED, 6" WIDE FIRE TREATED

WOOD BLOCKING ONLY AT GRAB BAR CONDITIONS, WITH LENGTH EXTENDING ONE STUD

SPACE BEYOND END OF ITEM SUPPORTED.

TELEPHONE

OR DATA

OUTLET

M

IN

IM

U

M 7'

-4

HANDRAIL/CHAIR RAIL

8"

CRASHRAIL

1.

2.

3.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

1.

2.

3.

GENERAL

REFER TO CIVIL DRAWINGS FOR INFORMATION INCLUDING CONCRETE SIDEWALKS, CONCRETE PADS, AND

PARKING CONFIGURATIONS. CIVIL BACKGROUND IS SHOWN FOR REFERENCE ONLY.

REFER TO MECHANICAL DRAWINGS FOR INFORMATION CONCERNING DAMPERS.

REFER TO ELECTRICAL DRAWINGS FOR FIRE ALARM NOTIFICATION AND EMERGENCY EGRESS LIGHTING

LOCATIONS.

ALL WORK

ALL FIRE-RATED ASSEMBLIES SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND/OR TESTED ASSEMBLIES INDICATED. DEVIATIONS FROM THESE SHALL BE CORRECTED

AT NO ADDITIONAL COST.

WHERE FIRE-RATED CONSTRUCTION IS SHOWN OR NOTED, CONTRACTOR SHALL SUBMIT CERTIFIED ASSEMBLIES. THIS INCLUDES PARTITIONS / BARRIERS, ROOF / FLOOR ASSEMBLIES, TOP AND BOTTOM OF WALL

ASSEMBLIES, PENETRATIONS AND RECESSED ITEMS.

EXTEND ALL FIRE AND/OR SMOKE PARTITIONS / BARRIERS TO BOTTOM OF ROOF / FLOOR DECK ABOVE (OR AS DIRECTED BY UL ASSEMBLY) AND TO EXTERIOR WALL SHEATHING. SEAL JOINT BETWEEN EDGES OF PARTITION

WITH FIRE RATED SEALANT AND/OR INTUMESCENT ASSEMBLY.

ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES SHALL BE FIRE-SEALED IN ACCORDANCE WITH APPROVED MANUFACTURER'S DETAILS FOR LOCATION, TYPE OF CONSTRUCTION, PENETRATING ITEM AND RATING

REQUIRED.

ALL DUCTWORK, DIFFUSERS AND GRILLES PENETRATING FIRE-RATED WALLS, CEILINGS AND FLOORS SHALL HAVE THE APPROPRIATE TYPE OF FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE TYPE OF CONSTRUCTION

BEING PENETRATED AND THE FIRE/SMOKE RATING REQUIRED.

ALL LIGHT FIXTURES AND ELECTRICAL DEVICES PENETRATING FIRE-RATED ASSEMBLIES SHALL BE UL-LISTED FOR INSTALLATION IN THE ASSEMBLY OR SHALL BE INSTALLED SUCH THAT THE FIRE-RATING IS NOT

COMPROMISED.

ALL DOORS, WINDOW ASSEMBLIES, AND OTHER OPENINGS PENETRATING FIRE-RATED WALLS SHALL HAVE AN FIRE-RATING BASED ON THE TYPE OF CONSTRUCTION BEING PENETRATED. DOORS SHALL BE POSITIVE

LATCHING AT ALL FIRE-RATED ASSEMBLIES. WIRE GLASS IS NOT PERMITTED.

DOORS SHALL NOT HAVE AIR TRANSFER OPENINGS AND SHALL NOT BE UNDERCUT IN EXCESS OF CLEARANCE

PERMITTED WITH ACCORDANCE TO NFPA 80.

PROVIDE ENCLOSURE AND ACCESS PANEL AT EACH FIRE PROTECTION INSPECTION TEST VALVE. DO NOT LOCATE VALVES AND PIPES IN EXTERIOR WALLS. ALL ACCESS PANELS SHALL HAVE AN EQUAL FIRE-RATING AS

WALLS AND/OR CEILINGS BEING PENETRATED.

UNLESS SCHEDULED TO RECEIVE SELF-SEALING FIRE-RATED PATHWAYS, METALLIC SLEEVES SHOULD BE INSTALLED AROUND LOW VOLTAGE CABLES THAT PENETRATE THE WALL, AND SEALANT SHOULD BE USED TO

SEAL AROUND THE SLEEVE AND INSIDE THE SLEEVE.

WHERE DEVICES ARE INDICATED IN RATED CONSTRUCTION, PROVIDE INTUMESCENT INSERTS FOR THE

ELECTRICAL BOXES WHERE ANY OF THE FOLLOWING CONDITIONS OCCUR:

- BOX EXCEEDS THE ALLOWABLE SIZE OF 16 SQ. IN.

- AGGREGATE AREA OF BOXES EXCEEDS 100 SQ. IN. PER 100 SF OF PARTITION.

- BOXES ON OPPOSITE SIDES OF PARTITION ARE LESS THAN 24" APART.

- BOXES OCCUR WITHIN THE SAME STUD CAVITY.

WHERE FIRE-RATED WALL ASSEMBLIES OCCUR IN PROXIMITY TO STEEL BEAMS / JOIST WITH INADEQUATE DIMENSION TO INSTALL GYP. BD. ON BOTH SIDES OF STUD FULLY TO THE BOTTOM OF THE ROOF/ FLOOR DECK, PROVIDE STUD FRAMING AROUND THE STRUCTURE WITH LAYERS OF GYP. BD. REFLECTING THE RATING OF THE

WALL ASSEMBLY.

RENOVATION

INSTALL ABOVE CEILING BLOW-OUT PATCHES MADE OF LAYERS OF GYP. BD. EQUAL TO THAT OF THE PARTITION CONSTRUCTION. CUT TO FIT TIGHT TO PENETRATIONS, IN INSTANCES WHERE THE ANNULAR OPENING EXCEEDS WHAT IS ALLOWED BY THE UL ASSEMBLY. DO NOT APPLY JOINT COMPOUND OVER SCREWS AT PATCHES. DO

NOT REMOVE EXCESS COMPOUND FROM EDGES OR PATCH AFTER PLACEMENT.

- THE PATCH SHALL EXTEND A MINIMUM OF 6" BEYOND THE OPENING IN ALL DIRECTIONS.

- WHERE THE DIAMETER OF THE OPENING IS LESS THAN 3" THE PATCH SHALL BE FASTENED NOT LESS THAN

3" FROM THE EDGE OF THE PATCH.

- WHERE THE DIAMETER OF THE OPENING IS MORE THAN 3", THE PATCH SHALL BE FASTENED NOT LESS THAN

3" FROM THE EDGE OF THE PATCH TO THE STUDS & CHANNELS.

- JOINT COMPOUND APPLIED TO THE BACKSIDE.

TEMPORARY PARTITIONS REQUIRED FOR DUST OR INFECTION CONTROL SHALL BE CONSTRUCTED TO MAINTAIN THE EXISTING FIRE WALL ASSEMBLY REQUIREMENTS. WHERE TEMPORARY PARTITIONS MUST INCLUDE DOORS FOR ACCESS OR LIFE SAFETY EGRESS, INSTALL DOOR ASSEMBLIES EQUAL TO THE RATING OF CONSTRUCTION BEING PENETRATED AND PROVIDE POSITIVE LATCHING HARDWARE AND EXIT DEVICES (PANIC BARS) WHERE

REQUIRED.

EGRESS PATHS SHALL BE MAINTAINED CLEAR OF EQUIPMENT, MATERIALS, DEBRIS, ETC. AND SHALL BE MARKED

WITH VISIBLE EXIT SIGNS AT ALL TIMES.

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

1 HOUR FIRE/SMOKE PARTITION

SMOKE RATED

AFF ABOVE FINISHED FLOOR

ACP/APC ACOUSTIC CEILING PANEL/

ACOUSTIC PANEL CEILING

ACT ACOUSTIC(AL) TILE

ADJ ADJUSTABLE

ADT'L ADDITIONAL

AGG AGGREGATE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

ASPH ASPHALT

AUTO AUTOMATIC

B/O BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BRG BEARING

CENTERLINE

C/C CENTER TO CENTER

CJ CONTROL JOINT

CLL CONTRACT LIMIT LINE

CEM CEMENT(ITIOUS)

CMU CONCRETE MASONRY UNIT

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

CTR CENTER(ED)

DF DRINKING FOUNTAIN

DS DOWNSPOUT

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET/DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DWG(S) DRAWING(S)

E EAST

EC ELECTRICAL CONTRACTOR

EHO ELECTRICAL HOLD OPEN

EJ EXPANSION JOINT

EW EACH WAY

EA EACH

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FFE FINISH FLOOR ELEVATION

FV FIELD VERIFY

FEC FIRE EXTINGUISHER CABINET

FDN FOUNDATION

FIN FINISH

FLSHG FLASHING

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

FTG FOOTING

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

HM HOLLOW METAL

HDWR HARDWARE

HOL HOLLOW

HOR HORIZONTAL

HT HEIGHT

HVAC HEATING/VENTILATION/AIR

CONDITIONING

ID INSIDE DIAMETER

IN INCH

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

LAV LAVATORY

LB(S) POUND(S)

L/S LANDSCAPE

LT LIGHT

MO MASONRY OPENING

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PEB PRE-ENGINEERED BUILDING

PJF PREFORMED JOINT FILLER

PT PRESSURE TREATED

PERIM PERIMETER

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLYWD PLYWOOD

PNT PAINT

PR PAIR

PTD PAINTED

PWR POWER

RB RUBBER BASE

RD ROOF DRAIN

RO ROUGH OPENING

RAD RADIUS

REC RECESSED

REINF REINFORCED

REQ'D REQUIRED

REV REVISED (REVISION)

RM ROOM

S SOUTH

SB SPLASH BLOCK

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

T&G TONGUE AND GROOVE

T/O TOP OF

TELE TELEPHONE

TRTD TREATED

TS TUBE STEEL

TYP TYPICAL

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VERT VERTICAL

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WWF WELDED WIRE FABRIC

WD WOOD

WH WATER HEATER

WT WEIGHT

CL

2' X 2' RECESSED TROFFER

2' X 4' RECESSED TROFFER

SYMBOL DESCRIPTION

2' X 4' RECESSED FLAT LENS TROFFER

2' X 4' RECESSED TROFFER -

EMERGENCY BACK UP

1' X 4' RECESSED FLAT LENS TROFFER

2' LINEAR - WALL SCONCE

4' LINEAR - WALL SCONCE

6" DIAMETER RECESSED DOWNLIGHT

4' LINEAR STRIP - SUSPENDED

2' LINEAR - SURFACE MOUNTED

WALL PACK

EXIT SIGN - WALL MOUNTED

EXIT SIGN - CEILING MOUNTED

EMERGENCY LIGHT BATTERY

OPERATED - WALL MOUNTED

WALL PACK - EMERGENCY BACK UP

RETURN GRILLE

SUPPLY DIFFUSER

EXHAUST GRILLE

SEMI-RECESSED SPRINKLER HEAD

SURFACE MOUNTED CURTAIN TRACK

CEILING MOUNTED LIFTS

ACCESS PANEL

CEILING MOUNTED LIGHT

PENDANT LIGHT

WALL MOUNTED LIGHT

CEILING MOUNTED EQUIPMENT

REFLECTED CEILING PLAN

LEGEND

ACT

GYP

CEILING CONTRACTOR TO MEASURE EACH CEILING

AREA AND ESTABLISH A CEILING LAYOUT TO BALANCE

BORDER WIDTHS AT OPPOSITE EDGES OF EACH ROOM.

AVOID USE OF LESS-THAN 6" TILES.

CEILING TAGX'-X" AFF

WOOD

Engineers Architects Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/6

/2

5:

:4

PM

C :\U se rs

\a pu lle n\

D oc um en ts \M

S_

-1

-V A

D ub lin E

H R

M _G

EN

_R

_a pu lle nV D

XT

7.

rv t

G-002

GENERAL INFORMATION

2 54ANP

EHRM INFRASTRUCTURE

UPGRADES

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027 NOVEMBER 8, 2024

100% BID DOCUMENTS

557-22-70022-192

VARIOUS

DJR

GENERAL SYMBOL LEGEND

Scale: 3/8" = 1'-0"

STANDARD MOUNTING HEIGHTS

G_ABBREVIATIONS

WALL RATING LEGEND

LIFE SAFETY GENERAL NOTES

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

Engineers Architects Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/6

/2

5:

:0

PM

C :\U se rs

\a pu lle n\

D oc um en ts \M

S_

-1

-V A

D ub lin E

H R

M _G

EN

_R

_a pu lle nV D

XT

7.

rv t

G-003

SHEET LIST

3 54ANP

EHRM INFRASTRUCTURE

UPGRADES

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027 NOVEMBER 8, 2024

100% BID DOCUMENTS

557-22-70022-192

VARIOUS

DJR

DRAWING LIST - VOLUME 1 OF 4

SHEET NUMBER SHEET NAME DWG OF DWG

GENERAL

G-001 COVER 1 54

G-002 GENERAL INFORMATION 2 54

G-003 SHEET LIST 3 54

G-004 CAMPUS PLAN 4 54

G-005 ICRA INFORMATION AND DETAILS 5 54

G-006 TYPICAL ICRA CONDITIONS 6 54

G-007 CONTRACTOR WORK SHUTDOWN SUMMARY 7 54

G-101 BUILDING 1, 2, 3, 4 & 40 COVERAGE DIAGRAMS 8 54

G-102 BUILDING 1, 2, 3, 4 & 40 COVERAGE DIAGRAMS 9 54

G-103 BUILDING 6 & 8 COVERAGE DIAGRAMS 10 54

G-104 BUILDING 9, 11, 13, 15, 17 & 19 COVERAGE DIAGRAMS 11 54

G-105 BUILDING 9, 11, 13, 15, 17 & 19 COVERAGE DIAGRAMS 12 54

G-106 BUILDING 10, 12, 14, & 16, 85, & 86 COVERAGE DIAGRAMS 13 54

G-107 BUILDING 10, 12, 14, & 16, 85, & 86 COVERAGE DIAGRAMS 14 54

G-108 BUILDING 10, 12, 14, & 16, 85, & 86 COVERAGE DIAGRAMS 15 54

01.G-101 BUILDING 1, COVERAGE DIAGRAM 16 54

01.G-102 BUILDING 1, COVERAGE DIAGRAM 17 54

02.G-100 BUILDING 2, COVERAGE DIAGRAM 18 54

02.G-101 BUILDING 2, COVERAGE DIAGRAM 19 54

02.G-102 BUILDING 2, COVERAGE DIAGRAM 20 54

03.G-101 BUILDING 3, COVERAGE DIAGRAMS 21 54

03.G-102 BUILDING 3, COVERAGE DIAGRAM 22 54

04.G-101 BUILDING 4, COVERAGE DIAGRAMS 23 54

04.G-102 BUILDING 4, COVERAGE DIAGRAM 24 54

05.G-101 BUILDING 5, COVERAGE DIAGRAM 25 54

06.G-101 BUILDING 6, COVERAGE DIAGRAMS 26 54

08.G-101 BUILDING 8, COVERAGE DIAGRAMS 27 54

09.G-101 BUILDING 9, COVERAGE DIAGRAMS 28 54

10.G-100 BUILDING 10, COVERAGE DIAGRAM 29 54

10.G-101 BUILDING 10, COVERAGE DIAGRAMS 30 54

11.G-101 BUILDING 11, COVERAGE DIAGRAM 31 54

11.G-102 BUILDING 11, COVERAGE DIAGRAM 32 54

12.G-100 BUILDING 12, COVERAGE DIAGRAM 33 54

12.G-101 BUILDING 12, COVERAGE DIAGRAM 34 54

12.G-102 BUILDING 12, COVERAGE DIAGRAM 35 54

13.G-101 BUILDING 13, COVERAGE DIAGRAMS 36 54

14.G-101 BUILDING 14, COVERAGE DIAGRAMS 37 54

14.G-102 BUILDING 14, COVERAGE DIAGRAM 38 54

15.G-101 BUILDING 15, COVERAGE DIAGRAM 39 54

16.G-101 BUILDING 16, COVERAGE DIAGRAM 40 54

16.G-102 BUILDING 16, COVERAGE DIAGRAM 41 54

17.G-101 BUILDING 17, COVERAGE DIAGRAM 42 54

19.G-101 BUILDING 19, COVERAGE DIAGRAM 43 54

25.G-101 BUILDING 25, COVERAGE DIAGRAM 44 54

26.G-101 BUILDING 26, COVERAGE DIAGRAM 45 54

26.G-102 BUILDING 26, COVERAGE DIAGRAM 46 54

27.G-101 BUILDING 27, COVERAGE DIAGRAM 47 54

28.G-101 BUILDING 28, COVERAGE DIAGRAMS 48 54

29.G-101 BUILDING 29, COVERAGE DIAGRAM 49 54

30.G-101 BUILDING 30, COVERAGE DIAGRAM 50 54

85.G-101 BUILDING 85, COVERAGE DIAGRAM 51 54

86.G-101 BUILDING 86, COVERAGE DIAGRAM 52 54

87.G-101 BUILDING 87, COVERAGE DIAGRAM 53 54

89.G-101 BUILDING 89, COVERAGE DIAGRAM 54 54

CIVIL

CD101 CIVIL DEMOLITION PLAN 1 3

CS101 CIVIL SITE, PAVING, AND UTILITY PLAN 2 3

CS501 CIVIL PAVING AND CONSTRUCTION DETAILS 3 3

DRAWING LIST - VOLUME 2 OF 4

SHEET NUMBER SHEET NAME DWG OF DWG

GENERAL

GA-001 COVER 1 1

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES 1 56

01.A-411 BUILDING 1, LEVEL A, TELECOM ROOM 101-1 PLANS 2 56

01.A-421 BUILDING 1, LEVEL B, TELECOM ROOM 207-1 PLANS 3 56

02.A-401 BUILDING 2, LEVEL C, TELECOM ROOM BM123B-2 PLANS 4 56

02.A-411 BUILDING 2, LEVEL A, TELECOM ROOM 104-2 PLANS 5 56

02.A-421 BUILDING 2, LEVEL B, TELECOM ROOM 209A-2 PLANS 6 56

03.A-401 BUILDING 3, LEVEL C, TELECOM ROOM BM101A-3 PLANS 7 56

03.A-411 BUILDING 3, LEVEL A, TELECOM ROOM 112A-3 PLANS 8 56

03.A-421 BUILDING 3, LEVEL B, TELECOM ROOM 219-3 PLANS 9 56

04.A-401 BUILDING 4, LEVEL C, TELECOM ROOM BM105-4 PLANS 10 56

04.A-411 BUILDING 4, LEVEL A, TELECOM ROOM 118-4 PLANS 11 56

04.A-421 BUILDING 4, LEVEL B, TELECOM ROOM 202-4 PLANS 12 56

05.A-411 BUILDING 5, LEVEL A, TELECOM ROOM C137-5 PLANS 13 56

06.A-411 BUILDING 6, LEVEL A, TELECOM ROOM 103-6 PLANS 14 56

06.A-421 BUILDING 6, LEVEL B, TELECOM ROOM 226-6 PLANS 15 56

08.A-411 BUILDING 8, LEVEL A, TELECOM ROOM 172C-8 PLANS 16 56

08.A-421 BUILDING 8, LEVEL B, TELECOM ROOM 213-8 PLANS 17 56

09.A-421 BUILDING 9, LEVEL B, TELECOM ROOM 210A-9 PLANS 18 56

10.A-401 BUILDING 10, LEVEL C, TELECOM ROOM BM107A-10 PLANS 19 56

10.A-411 BUILDING 10, LEVEL A, TELECOM ROOM 130-10 PLANS 20 56

10.A-421 BUILDING 10, LEVEL B, TELECOM ROOM 205-10 PLANS 21 56

11.A-401 BUILDING 11, LEVEL C, TELECOM ROOM BM101A-11 PLANS 22 56

11.A-411 BUILDING 11, LEVEL A, TELECOM ROOM 125-11 PLANS 23 56

11.A-421 BUILDING 11, LEVEL B, TELECOM ROOM 235-11 PLANS 24 56

12.A-401 BUILDING 12, LEVEL C, TELECOM ROOM BM103A-12 PLANS 25 56

12.A-411 BUILDING 12, LEVEL A, TELECOM ROOM 117A-12 PLANS 26 56

12.A-421 BUILDING 12, LEVEL B, TELECOM ROOM 232A-12 PLANS 27 56

13.A-411 BUILDING 13, LEVEL A, TELECOM ROOM 141-13 PLANS 28 56

13.A-421 BUILDING 13, LEVEL B, TELECOM ROOM 224-13 PLANS 29 56

14.A-401 BUILDING 14, LEVEL C, TELECOM ROOM BM104A-14 PLANS 30 56

14.A-411 BUILDING 14, LEVEL A, TELECOM ROOM 101A-14 PLANS 31 56

14.A-421 BUILDING 14, LEVEL B, TELECOM ROOM 232-14 PLANS 32 56

15.A-411 BUILDING 15, LEVEL A, TELECOM ROOM 107-15 PLANS 33 56

15.A-421 BUILDING 15, LEVEL B, TELECOM ROOM 230-15 PLANS 34 56

16.A-401 BUILDING 16, LEVEL C, TELECOM ROOM B11A-16 PLANS 35 56

16.A-421 BUILDING 16, LEVEL B, TELECOM ROOM 216-16 PLANS 36 56

17.A-411 BUILDING 17, LEVEL A, TELECOM ROOM 111-17 PLANS 37 56

17.A-421 BUILDING 17, LEVEL B, TELECOM ROOM 205-17 PLANS 38 56

19.A-411 BUILDING 19, LEVEL A, TELECOM ROOM 117-19 PLANS 39 56

19.A-421 BUILDING 19, LEVEL B, TELECOM ROOM 216A-19 PLANS 40 56

25.A-411 BUILDING 25, LEVEL A, TELECOM ROOM 101A-25 PLANS 41 56

26.A-401 BUILDING 26, LEVEL C, TELECOM ENCLOSURE BM108B-26 PLANS 42 56

26.A-411 BUILDING 26, LEVEL A, TELECOM ROOM 106-26 PLANS 43 56

27.A-411 BUILDING 27, LEVEL A, TELECOM ROOM 107-27 PLANS 44 56

28.A-411 BUILDING 28, LEVEL A, TELECOM ROOM 108-28 PLANS 45 56

29.A-411 BUILDING 29, LEVEL A, TELECOM ENCLOSURE 113A-29 PLANS 46 56

30.A-411 BUILDING 30, LEVEL A, TELECOM ENCLOSURE 104-30 PLANS 47 56

85.A-411 BUILDING 85, LEVEL A, TELECOM ROOM 121-85 PLANS 48 56

86.A-411 BUILDING 86, LEVEL A, TELECOM ROOM 106-86 PLANS 49 56

87.A-411 BUILDING 87, LEVEL A, TELECOM ROOM 120-87 PLANS 50 56

87.A-412 BUILDING 87, LEVEL A, TELECOM ROOM 169-87 PLANS 51 56

89.A-411 BUILDING 89, LEVEL A, TELECOM ROOM 1215-89 PLANS 52 56

A-506 PARTITION TYPES AND ARCHITECTURAL DETAILS 53 56

A-601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 54 56

A-602 GENERAL NOTES, BASIS OF DESIGN, ABBREVIATIONS AND FINISH DETAILS 55 56

A-603 ROOM FINISH SCHEDULE 56 56

DRAWING LIST - VOLUME 3 OF 4

SHEET NUMBER SHEET NAME DWG OF DWG

GENERAL

GM-001 COVER 1 1

MECHANICAL

MP001 MECHANICAL GENERAL INFORMATION 1 56

MP002 PLUMBING GENERAL INFORMATION 2 56

MP003 FIRE SUPPRESSION GENERAL INFORMATION 3 56

01.MP411 BUILDING 1, LEVEL A, TELECOM ROOM 101-1 PLANS 4 56

01.MP421 BUILDING 1, LEVEL B, TELECOM ROOM 207-1 PLANS 5 56

02.MP401 BUILDING 2, LEVEL C, TELECOM ROOM BM123B-2 PLANS 6 56

02.MP411 BUILDING 2, LEVEL A, TELECOM ROOM 104-2 PLANS 7 56

02.MP421 BUILDING 2, LEVEL B, TELECOM ROOM 209A-2 PLANS 8 56

03.MP401 BUILDING 3, LEVEL C, TELECOM ROOM BM101A-3 PLANS 9 56

03.MP411 BUILDING 3, LEVEL A, TELECOM ROOM 112A-3 PLANS 10 56

03.MP421 BUILDING 3, LEVEL B, TELECOM ROOM 219-3 PLANS 11 56

04.MP401 BUILDING 4, LEVEL C, TELECOM ROOM BM105-4 PLANS 12 56

04.MP411 BUILDING 4, LEVEL A, TELECOM ROOM 118-4 PLANS 13 56

04.MP421 BUILDING 4, LEVEL B, TELECOM ROOM 202-4 PLANS 14 56

05.MP411 BUILDING 5, LEVEL A, TELECOM ROOM C137-5 PLANS 15 56

06.MP411 BUILDING 6, LEVEL A, TELECOM ROOM 103-6 PLANS 16 56

06.MP421 BUILDING 6, LEVEL B, TELECOM ROOM 226-6 PLANS 17 56

08.MP411 BUILDING 8, LEVEL A, TELECOM ROOM 172C-8 PLANS 18 56

08.MP421 BUILDING 8, LEVEL B, TELECOM ROOM 213-8 PLANS 19 56

09.MP421 BUILDING 9, LEVEL B, TELECOM ROOM 210A-9 PLANS 20 56

10.MP401 BUILDING 10, LEVEL C, TELECOM ROOM BM107A PLANS 21 56

10.MP411 BUILDING 10, LEVEL A, TELECOM ROOM 130-10 PLANS 22 56

10.MP421 BUILDING 10, LEVEL B, TELECOM ROOM 205-10 PLANS 23 56

11.MP401 BUILDING 11, LEVEL C, TELECOM ROOM BM101A-11 PLANS 24 56

11.MP411 BUILDING 11, LEVEL A, TELECOM ROOM 125-11 PLANS 25 56

11.MP421 BUILDING 11, LEVEL B, TELECOM ROOM 235-11 PLANS 26 56

12.MP401 BUILDING 12, LEVEL C, TELECOM ROOM BM103A PLANS 27 56

12.MP411 BUILDING 12, LEVEL A, TELECOM ROOM 117A-12 PLANS 28 56

12.MP421 BUILDING 12, LEVEL B, TELECOM ROOM 232A-12 PLANS 29 56

13.MP411 BUILDING 13, LEVEL A, TELECOM ROOM 141-13 PLANS 30 56

13.MP421 BUILDING 13, LEVEL B, TELECOM ROOM 224-13 PLANS 31 56

14.MP401 BUILDING 14, LEVEL C, TELECOM ROOM BM104A-14 PLANS 32 56

14.MP411 BUILDING 14, LEVEL A, TELECOM ROOM 101A-14 PLANS 33 56

14.MP421 BUILDING 14, LEVEL B, TELECOM ROOM 232-14 PLANS 34 56

15.MP411 BUILDING 15, LEVEL A, TELECOM ROOM 107-15 PLANS 35 56

15.MP421 BUILDING 15, LEVEL B, TELECOM ROOM 230-15 PLANS 36 56

16.MP401 BUILDING 16, LEVEL C, TELECOM ROOM B11A-16 PLANS 37 56

16.MP421 BUILDING 16, LEVEL B, TELECOM 216-16 ROOM PLANS 38 56

17.MP411 BUILDING 17, LEVEL A, TELECOM ROOM 111-17 PLANS 39 56

17.MP421 BUILDING 17, LEVEL B, TELECOM ROOM 205-17 PLANS 40 56

19.MP411 BUILDING 19, LEVEL A, TELECOM ROOM 117-19 PLANS 41 56

19.MP421 BUILDING 19, LEVEL B, TELECOM ROOM 216A-19 PLANS 42 56

25.MP411 BUILDING 25, LEVEL A, TELECOM ROOM 101A-25 PLANS 43 56

26.MP401 BUILDING 26, LEVEL C, TELECOM ENCLOSURE BM108B-26 PLANS 44 56

26.MP411 BUILDING 26, LEVEL A, TELECOM ROOM 106-26 PLANS 45 56

27.MP411 BUILDING 27, LEVEL A, TELECOM ROOM 107-27 PLANS 46 56

28.MP411 BUILDING 28, LEVEL A, TELECOM ROOM 108-28 PLANS 47 56

29.MP411 BUILDING 29, LEVEL A, TELECOM ENCLOSURE 113A-29 PLANS 48 56

30.MP411 BUILDING 30, LEVEL A, TELECOM ENCLOSURE 104-30 PLANS 49 56

85.MP411 BUILDING 85, LEVEL A, TELECOM ROOM 121-85 PLANS 50 56

86.MP411 BUILDING 86, LEVEL A, TELECOM ROOM 106-86 PLANS 51 56

87.MP411 BUILDING 87, LEVEL A, TELECOM ROOM 120-87 PLANS 52 56

87.MP412 BUILDING 87, LEVEL A, TELECOM ROOM 169-87 PLANS 53 56

89.MP411 BUILDING 89, LEVEL A TELECOM ROOM 1215-89 PLANS 54 56

M-501 MECHANICAL DETAILS 55 56

M-601 MECHANICAL SCHEDULES AND CONTROLS 56 56

DRAWING LIST - VOLUME 4 OF 4

SHEET NUMBER SHEET NAME DWG OF DWG

GENERAL

GE-001 COVER 1 1

ELECTRICAL

00.ET001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 91

00.ET002 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 2 91

00.ET501 TYPICAL TELECOM ROOM DETAILS 3 91

00.ET502 ELECTRICAL AND TECHNOLOGY DETAILS 4 91

00.ET503 ELECTRICAL AND TECHNOLOGY DETAILS 5 91

00.ET504 TECHNOLOGY DETAILS 6 91

00.ET505 CHANNEL RACK POWER AND TE DETAILS 7 91

00.ET506 TR RACK DETAILS 8 91

00.ET507 SITE TECHNOLOGY DETAILS 9 91

00.TS101 SITE FIBER BACKBONE ROUTING PLAN 10 91

00.TS102 SITE FIBER BACKBONE ROUTING DIAGRAM 11 91

00.T-601 TECHNOLOGY RISERS 12 91

01.ET411 BUILDING 1, LEVEL A, TELECOM ROOM 101-1 PLANS 13 91

01.ET421 BUILDING 1, LEVEL B, TELECOM ROOM 207-1 PLANS 14 91

01.ET601 BUILDING 1, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 15 91

02.ET401 BUILDING 2, LEVEL C, TELECOM ROOM BM123B-2 PLANS 16 91

02.ET411 BUILDING 2, LEVEL A, TELECOM ROOM 104-2 PLANS 17 91

02.ET421 BUILDING 2, LEVEL B, TELECOM ROOM 209A-2 PLANS 18 91

02.ET601 BUILDING 2, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 19 91

03.ET401 BUILDING 3, LEVEL C, TELECOM ROOM BM101A-3 PLANS 20 91

03.ET412 BUILDING 3, LEVEL A, CONFERENCE ROOM 112A-3 PLANS 21 91

03.ET421 BUILDING 3, LEVEL B, TELECOM ROOM 219-3 PLANS 22 91

03.ET601 BUILDING 3, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 23 91

04.ET401 BUILDING 4, LEVEL C, TELECOM ROOM BM105-4 PLANS 24 91

04.ET411 BUILDING 4, LEVEL A, TELECOM ROOM 118-4 PLANS 25 91

04.ET421 BUILDING 4, LEVEL B, TELECOM ROOM 202-4 PLANS 26 91

04.ET601 BUILDING 4, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 27 91

05.ET411 BUILDING 5, LEVEL A, TELECOM ROOM C137-5 PLANS 28 91

05.ET601 BUILDING 5, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 29 91

06.ET411 BUILDING 6, LEVEL A, TELECOM ROOM 103-6 PLANS 30 91

06.ET421 BUILDING 6, LEVEL B, TELECOM ROOM 226-6 PLANS 31 91

06.ET601 BUILDING 6, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 32 91

08.ET411 BUILDING 8, LEVEL A, TELECOM ROOM 172C-8 PLANS 33 91

08.ET421 BUILDING 8, LEVEL B, TELECOM ROOM 213-8 PLANS 34 91

08.ET601 BUILDING 8, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 35 91

09.ET421 BUILDING 9, LEVEL B, TELECOM 210A-9 PLANS 36 91

09.ET601 BUILDING 9, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 37 91

10.ET401 BUILDING 10, LEVEL C, TELECOM ROOM BM107A-10 PLANS 38 91

10.ET411 BUILDING 10, LEVEL A, TELECOM ROOM 130-10 PLANS 39 91

10.ET421 BUILDING 10, LEVEL B, TELECOM ROOM 205-10 PLANS 40 91

10.ET601 BUILDING 10, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 41 91

11.ET401 BUILDING 11, LEVEL C, TELECOM ROOM BM101A-11 PLANS 42 91

11.ET411 BUILDING 11, LEVEL A, TELECOM ROOM 125-11 PLANS 43 91

11.ET421 BUILDING 11, LEVEL B, TELECOM ROOM 235-11 PLANS 44 91

11.ET601 BUILDING 11, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 45 91

12.ET401 BUILDING 12, LEVEL C, TELECOM ROOM BM103A-12 PLANS 46 91

12.ET411 BUILDING 12, LEVEL A, TELECOM ROOM 117A-12 PLANS 47 91

12.ET421 BUILDING 12, LEVEL B, TELECOM ROOM 232A-12 PLANS 48 91

12.ET601 BUILDING 12, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 49 91

13.ET411 BUILDING 13, LEVEL A, TELECOM ROOM 104-13 PLANS 50 91

13.ET421 BUILDING 13, LEVEL B, TELECOM ROOM 224-13 PLANS 51 91

13.ET601 BUILDING 13, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 52 91

14.ET401 BUILDING 14, LEVEL C, TELECOM ROOM BM104A-14 PLANS 53 91

14.ET411 BUILDING 14, LEVEL A, TELECOM ROOM 101A-14 PLANS 54 91

14.ET421 BUILDING 14, LEVEL B, TELECOM ROOM 232-14 PLANS 55 91

14.ET601 BUILDING 14, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 56 91

15.ET411 BUILDING 15, LEVEL A, TELECOM ROOM 107-15 PLANS 57 91

15.ET421 BUILDING 15, LEVEL B, TELECOM ROOM 230-15 PLANS 58 91

15.ET601 BUILDING 15, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 59 91

16.ET401 BUILDING 16, LEVEL C, TELECOM ROOM B11A-16 PLANS 60 91

16.ET421 BUILDING 16, LEVEL B, TELECOM ROOM 216-16 PLANS 61 91

16.ET601 BUILDING 16, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 62 91

17.ET411 BUILDING 17, LEVEL A, TELECOM ROOM 111-17 PLANS 63 91

17.ET421 BUILDING 17, LEVEL B, TELECOM ROOM 205-17 PLANS 64 91

17.ET601 BUILDING 17, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 65 91

19.ET411 BUILDING 19, LEVEL A, TELECOM ROOM 117-19 PLANS 66 91

19.ET421 BUILDING 19, LEVEL B, TELECOM ROOM 216A-19 PLANS 67 91

19.ET601 BUILDING 19, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 68 91

25.ET411 BUILDING 25, LEVEL A, TELECOM ROOM 101A-25 PLANS 69 91

25.ET601 BUILDING 25, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 70 91

26.ET401 BUILDING 26, LEVEL C, TELECOM ENCLOSURE BM108B-26 PLANS 71 91

26.ET411 BUILDING 26, LEVEL A, TELECOM ROOM 106-26 PLANS 72 91

26.ET601 BUILDING 26, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 73 91

27.ET411 BUILDING 27, LEVEL A, TELECOM ROOM 107-27 PLANS 74 91

27.ET601 BUILDING 27, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 75 91

28.ET411 BUILDING 28, LEVEL A, TELECOM ROOM 108-28 PLANS 76 91

28.ET601 BUILDING 28, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 77 91

29.ET411 BUILDING 29, LEVEL A, TELECOM ENCLOSURE 113A-29 PLANS 78 91

29.ET601 BUILDING 29, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 79 91

30.ET411 BUILDING 30, LEVEL A, TELECOM ENCLOSURE 104-30 PLANS 80 91

30.ET601 BUILDING 30, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 81 91

40.ET412 BUILDING 40, LEVEL A, COMPUTER ROOM 106 TECHNOLOGY PLANS 82 91

85.ET411 BUILDING 85, LEVEL A, TELECOM ROOM 121-85 PLANS 83 91

85.ET601 BUILDING 85, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 84 91

86.ET411 BUILDING 86, LEVEL A, TELECOM ROOM 106-86 PLANS 85 91

86.ET601 BUILDING 86, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 86 91

87.ET411 BUILDING 87, LEVEL A, TELECOM ROOM 120-87 PLANS 87 91

87.ET412 BUILDING 87, LEVEL A, TELECOM ROOM 169-87 PLANS 88 91

87.ET601 BUILDING 87, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 89 91

89.ET411 BUILDING 89, LEVEL A, TELECOM ROOM 1215-89 PLANS 90 91

89.ET601 BUILDING 89, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 91 91

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

FU

TU

R E

EX

PA

N

SI

O N

6, SF

FU

TU

R E

EX

PA

N

SI

O N

6, SF

FU

TU

R E

BU

IL

D

IN

G

,0

S F

D

ET

EN

TI

O N

PO

N

D

T

DEANE + STROLLO, LLC718 Virginia DriveOrlando, FL. 32803T: (407) 423-5355 F: (407) 422-5994

R25'

R188'

R212'

6'

CHAI

N LI

NK

FE

NCE

6'

CHAI

N LI

NK

FE

NCE

" C

U R

B

G U

TT

E

R

" C

U R

B

G U

TT

E

R

2 2

8 86

2 26

52 30

SIGN

NE

FF

P

LA

CE

AL

EX

AN

DE

R

DR

IVE

NE

FF

PL

AC

E

BE

LL

EV

UE

A

VE

NU

E

JO

HN

SO

N

ST

RE

ET

PARKING

PARKING

PARKING

METAL BLDGS.BLDG. 31

BLDG. 32

GAZEBO

BLDG.

68BLDG.

BLDG. 21

LAKE

LEISURE

PARKING

BLDG. 34

SIGN

SIGN

SIGN

STEPS RAMP

PATIO

R A M P

:1

S

LO

P E

R A M P

:1

S

LO

P E

R A M P

:1

S

LO

P E

LA

N D

IN

G

VAN

VAN VAN VAN

RAMP

CONCRETE DITCH

SLAB

NEWPARKING

PARKING #2

PARKING #2

PARKING

PARKING

PARKING #1

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING #6

PARKING #7

PARKING #3

PARKING #4

PARKING #5

PARKING

PARKING #8

LOADING

PARKING

VISITOR'S /

OUTPATIENT

STAFF

SPECIALIST

H.C.

PATIENT /

VISITOR'S

PATIENT /

VISITOR'S

PATIENT /

VISITOR'S

PATIENT /

VISITOR'S

OUTPATIENT

STAFF /

VISITOR'S

STAFF /

VISITOR'S

STAFF /

VISITOR'S

STAFF /

VISITOR'S

STAFF

STAFF /

VISITOR'S

STAFF /

VISITOR'S

STAFF

LOADING

PATIENT/VISITOR'S

PARKING

STAFF /

VISITOR'SSTAFF / VISITOR'S

OUTPATIENT

SOLAR PANELS

PARKING

OUTPATIENT

BLDG.

BLDG. 47

BLDG. 41

BLDG. 63

BLDG. 81

BLDG. 82

BLDG. 71

BLDG. 66

C

OO

LI

NG

T

OW

ER

BLDG. 69

WATER TANK

BLDG. 40

GAZEBO

SUBSTATION

BLDG. 44

BLDG. 62

BLDG. 84

BLDG.

FUEL

TANK

MRI

BLDG.29

ANNEX

New Water Tower Location

New Chiller Plant

BE

LL

EV

UE

R D.

VETERAN'S BLVD. (U.S. HWY 80)

RUSSELL

D

R.

CROWLEY RD.

CROWLE

Y AVENUE

NE

FF

P L.

VERNON ST.

EXECUTIVE OFFICES & ADMIN, BUSINESS OFFICE & HEALTH ADMIN SERVICES

DINING & CANTEEN, AUDITORIUM, CHAPEL, BARBERSHOP

LAB & PATHOLOGY, DENTAL

RADIOLOGY & NUCLEAR MEDICINE, SURGERY

OUTPATIENT CLINIC & EMERGENCY DEPARTMENT, WOMEN'S HEALTH,

MENTAL HEALTH

ADMIN SERVICES, NURSING SERVICES, QUALITY MANAGEMENT, RISK

MANAGEMENT

CLC CARDINAL CIRCLE & FREEDOM LANE, DOMICILIARY

PROSTHETICS, GERIATRICS & EXTENDED CARE (GEC), CHAPLAIN SERVICES,

ICU, COMPENSATION & PENSION

CLC OLD TIMERS’ LODGE, DOMICILIARY

OFFICE OF INFORMATION & TECHNOLOGY (OI&T), AMBULATORY SURGERY

CLC MAGNOLIA LANE, SOCIAL WORK, RESPIRATORY THERAPY

ENDOSCOPY/SURGERY CLINIC

DOMICILIARY, DOMICILIARY ADMIN

PTSD CLINIC, MEDICAL/SURGICAL CARE UNIT

DOMICILIARY

PHYSICAL & OCCUPATIONAL THERAPY, CLC PATRIOTS POINT

CLC PATRIOTS POINT

HOME BASED PRIMARY CARE

ENGINEERING SHOP

BOILER PLANT

CARPENTRY SHOP

ENGINEERING OFFICE

TRANSPORTATION OFFICE, STORAGE

WELLNESS CENTER

HOSPICE CARE UNIT

MENTAL HEALTH

OUTPATIENT PRIMARY CARE & WOMEN'S CLINIC

BUILDINGS IN SCOPE

SITE KEY

BUILDING 5B & PORTION OF

5A TR NOT IN 557-22-700

SOW. SEE SHEET 5.G-110.

BUILDING 40 MCR

NOT IN 577-22-700

SOW

BUILDING 9 LEVEL A TR

NOT IN 557-22-700 SOW

AL

EX

AN

DE

R

DR

IV

E

NEW JO

HNSON STREET W

EST

EX

IS

TI

N

G J

O H

N

SO

N S

TR

EE

T

JOHNSON STREET

BLACKWOOD DRIVE

ALEXANDER DRIVE

TROJAKOWSKI AVENUE

EVANS AVENUE

THOMAS LANE

Engineers Architects Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/6

/2

5:

:0

PM

C :\U se rs

\a pu lle n\

D oc um en ts \M

S_

-1

-V A

D ub lin E

H R

M _G

EN

_R

_a pu lle nV D

XT

7.

rv t

G-004

CAMPUS PLAN

4 54ANP

EHRM INFRASTRUCTURE

UPGRADES

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027 NOVEMBER 8, 2024

100% BID DOCUMENTS

557-22-70022-192

VARIOUS

DJR

Scale: No Scale1 SITE PLAN LOGISTICS PLAN

NORTH

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

HEPA NEGATIVE

AIR UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE

EXISTING WINDOW TO

BE RE-INSTALLED

AFTER CONSTRUCTION

IS COMPLETE.

V.

I.F

EX

IS

TI

N G

W

AL

L

FLOOR SLAB ABOVE

CEILING

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

G-005

_____5 G-005

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY MATS

(CHANGED END OF

SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

ISOLATE AND COVER ALL

SUPPLY DIFFUSERS NOT

IN OPERATION DURING

PROJECT - COORDINATE

W/ COR

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL STATION

WITH AUDIO /

VISUAL

EXISTING WALL

BARRIER

A.

B.

NOTE:

TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL VERIFY LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM EXHAUST. VERIFY LOCAL JURISDICTION CODE AND VA REQUIREMENTS FOR

DISTANCE PRIOR TO STARTING WORK.

CONTRACTOR TO DETERMINE ROUTING TO EXHAUST 100% OUTSIDE IF WINDOW NOT AVAILABLE.

EXHAUST LOCATION

- SEE NOTE A

FLEX DUCT

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR RENOVATION DUBLIN EHRM

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

1/

2" 1"

1"

1/ 2"

1" 1"

1"

1/ 2"

1"

1/ 2"

1'

0" 1/

2" 1/

2"

EQ.EQ.

ICRA NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

DUST CONTROL PLAN NOTES

ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE

OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE

CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED

CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE

CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN

PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.

AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.

PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER

ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE

DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF

DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND

DEBRIS CONTROL

TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES

SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;

DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED

TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED

TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT

PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND

MATERIALS.

CONTRACTOR SHALL USE TWO CARTS TO TRANSFER

CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - A CLEAN

CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED

BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION

STAGING/PREP AREA.

DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH

TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.

EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH

AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF

ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES

SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS

OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED

NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE

OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE

BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE

CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF

THE COR.

EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE

INFILTRATION FROM ANY ADJACENT EXCAVATION DUST.

ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS

SHALL BE COVERED AND PROTECTED PRIOR STARTING IN THAT

AREA.

VENTILATION AND ENVIRONMENTAL CONTROLS

AIR SYSTEM FLOW: THE COR TO VERIFY AND ACKNOWLEDGE

WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-

CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS

COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR

MUST FLOW FROM CLEAN TO DIRTY AREAS.

NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION

AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING

AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT

AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE

ENCLOSURE TO REMOVE DUST, AIR SHALL PASS AIR THROUGH AN

INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF

FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN),

OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY

VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR

SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE

EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.

ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND

INTACT CEILING SHALL BE VERIFIED DAILY.

AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND

CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN

CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR

IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE

CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE

TESTING THROUGHOUT THE PROJECT IN THE FREQUENCY AS

IDENTIFIED BY THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND

RELATED AREAS

WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL

BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE

CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G.,

COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED

VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING

BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS

UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR

ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT

(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND

MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE

MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET

WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE

OR WORK AREA.

POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL

HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED

CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL

CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED

AND APPROVED THE CLEANING.

IIILOW Risk Group 1

Class III Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I I

III

MEDIUM Risk Group 2 HIGH Risk Group 3 HIGHEST Risk Group 4 V

V

IV

V

IV

III

IV

II

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects Includes, but is not limited to:

Removal or replacement of building system component(s).

Removal/installation of drywall partitions.

Invasive large-scale new building construction.

Renovation work in two or more rooms.

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:

Removal of preexisting floor covering, walls, casework or other building components.

New drywall placement.

Renovation work in a single room.

Nonexisting cable pathway or invasive electrical work above ceilings.

The removal of drywall where a moderate amount of dust and debris is created.

Dry sanding where a moderate amount of dust and debris is created.

Work creating significant vibration and/or noise.

Any activity that cannot be completed in a single work shift.

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

Fan shutdown/startup.

Installation of electrical devices or new flooring that produces minimal dust and debris.

The removal of drywall where minimal dust and debris is created.

Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Inspection and Non-Invasive Activities Includes, but is not limited to:

Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.

Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

Clean plumbing activity limited in nature.

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

Physical Therapy Radiology departments All patient waiting rooms All outpatient clinics Research Areas Respiratory Therapy

Office areas (non-clinical) FES/EMS areas

I Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

Emergency Room Clinical Laboratories (specimen) Same Day Surgery Pharmacy Nutrition and Food Service/Canteen Procedural Areas (GI) Inpatient Mental Health

Any area caring for immunocompromised patients Cardiac Cath Lab/IR Central Sterile Supply Sterile Processing Service Intensive Care Units

IIII

TYPE DTYPE CTYPE B

Class IV or control procedures are necessary.

CL

AS

S

IV

During Construction Project Upon Completion of Project

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

Includes all activities required by Class III Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management Maintenance and Engineering department before construction begins.

Construct and complete critical barriers meeting NFPA 241 requirements.

Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

Remove or isolate return air diffusers to avoid dust entering the HVAC system.

Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

Contain all trash and debris in the work area.

Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

Worker clothing must be clean and free of visible dust before leaving the work area. HEPA vacuuming of clothing or use of cover suites is acceptable.

Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

Medical/Surgical Units Negative pressure isolation rooms Outpatient Chemotherapy Areas Operating rooms Post Anesthesia Care Unit Dialysis Dental

CL

AS

S V

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

Includes all activities required by Class IV Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management Maintenance and Engineering department before construction begins.

Construct and complete critical barriers meeting NFPA 241 requirements.

Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

Personnel will be required to wear coveralls at all times during Class V work activities. Coveralls must be removed before leaving the anteroom.

Remove or isolate return air diffusers to avoid dust entering the HVAC system.

Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

If exhaust is directed indoors, then the system must be HEPA filtered.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .