Attachment 2 - Drawings 1 of 4 - Dublin GA - EHRM.pdf
PDF 24 MB Posted
- Attached to
- Z2DZ--EHRM Infrastructure Upgrades Dublin, GA Project 557-22-700 Federal contract opportunity
- Solicitation number
- 36C77625B0013
About this file
This document is a collection of architectural drawings (Volume 1 of 4) for the EHRM Infrastructure Upgrades project at the Carl Vinson VA Medical Center in Dublin, Georgia. The project involves comprehensive telecommunications room infrastructure improvements across 29 different buildings on the medical center campus, with specific focus on upgrading telecom rooms, electrical systems, and associated mechanical support infrastructure.
The drawings provide detailed coverage diagrams for each building, illustrating planned modifications to telecom rooms across multiple levels. Key technical elements include installing new electrical panels, routing fiber and UTP cabling, providing new condensing units for split system HVAC, and implementing fire-rated penetration sealing. The project scope encompasses precise electrical circuitry modifications, with each building requiring specific breaker replacements, power routing, and telecommunications infrastructure upgrades. The project is part of VA Project Number 557-22-700, with documents dated November 8, 2024, and is prepared for 100% bid document stage by Apogee Consulting Group.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7' -0
5'-0"
VAN
ACCESSIBLE
LOADING AREA
SF
SF
EA
SE
MEN
T A
PP
RO
XIM
AT
EL
Y S
HO
WN
' E
XIS
TIN
G W
AT
ER
LI
NE
EA
SE
MEN
T
2.5" PLASTIC WITNESS POST
1/2" REBAR FOUND IN
CONCRETE MONUMENT
CONCRETE NAIL FOUND
Bldg 5 Gen
Bldg 4 Gen
Water Tower Gen
Bldg 8 Gen
Circuit 2 Gen
OBSERVATION MONITORING WELL
UP
UP
DEANE + STROLLO, LLC718 Virginia DriveOrlando, FL. 32803T: (407) 423-5355 F: (407) 422-5994
H
IL
LC
R
ES
T
PK
W
Y.
BE
LL
EV
UE
R D.
INDUSTRIAL BLVD.
INDUSTRIAL BLVD.
H
IL
LC
R
ES
T
PK
W
Y.
FAIRVIEW PARK HOSPITAL
FA
IR
VI
EW
P
AR
K
DR
IV
E
Bldg 27 Gen
F
F
F
F
F F
F
F
FF
F
F
SIGN
NE
FF
PL
AC
E
NE
FF
P
LA
CE
BE
LL
EV
UE
AV
EN
UE
AL
EX
AN
DE
R D
RIV
E
JO
HNSO
N ST
REE
T
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
METAL BLDGS.BLDG. 31
BLDG. 46
BLDG. 36
BLDG. 24
BLDG. 43
BLDG. 32
BLDG. 39
GAZEBO
BLDG. 68
BLDG. 67
BLDG. 21
LAKE LEISURE
AC
AC
PARKING
PARKING
BLDG. 34
BLDG. 35
STEPS
RAMP
PATIO
R
AM
P 1:
S
LO
PE
R
AM
P 1:
S
LO
PE
R
AM
P 1:
S
LO
PE
LA
N
D
IN
G
VAN VAN VAN VAN
RAMP
CONCRETE DITCH
CONCRETE
CONCRETE
CONCRETE
SLAB
SLAB
NEW PARKING
CTCT
AC
AC
AC
AC
OBSERVATION MONITORING WELL
BLDG. 17
BLDG.
BLDG. 47
BLDG. 41
BLDG
BLDG. 63
BLDG. 81
BLDG. 82
BLDG. 27
BLDG.
BLDG. 71BLDG. 28
BLDG. 66
CO
OL
IN
G
TO
W
ER
BLDG. 69
BLDG. 30
WATER TANK
BLDG. 5
BLDG. 3 BLDG. 1
BLDG. 9
BLDG. 13
BLDG. 11
BLDG. 2
BLDG. 40
BLDG. 4
BLDG. 6
BLDG. 8
BLDG. 10
BLDG. 12
BLDG. 85
BLDG. 14
BLDG. 86
BLDG. 25
BLDG. 26
BLDG. 29
BLDG. 15
BLDG. 19
GAZEBO
SUBSTATION
BLDG. 44
BLDG. 62
BLDG. 84
BLDG.
Bldg 2 Gen
FUEL
TANK
MRI
BLDG.29
ANNEX
New Water Tower Location
Bldg.10
New Chiller Plant
BLDG. 87
BLACKWOOD DRIVE
EX
IS
TIN
G
JO
HN
SO
N
ST
RE
ET
JOHNSON STREET
ALEXANDER DRIVE
BLACKWOOD DRIVE
TROJAKOWSKI AVENUE
EVANS AVENUE
TROJAKOWSKI AVENUE
EVANS AVENUE
CROWLEY AVENUE
CROWLEY AVENUE
VETERANS PARKWAY US HWY 80
VETERANS PARKWAY US HWY 80 VETERANS PARKWAY US HWY 80
JOHNSON STREET
BLACKWOOD DRIVE
AL
EX
AN
DE
R D
RIV
E
JOHNSON STREET
THOMAS LANE
THOMAS LANE
NORTHWEST DRIVE
JOHNSON STREET
EVANS AVENUE
TROJAKOWSKI AVENUE
NEW JO
HNSON STREET WEST
SHADED BUILDINGS REPRESENT
PROJECT SCOPE
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027
Engineers Architects Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
/6
/2
5:
:3
PM
C :\U se rs
\a pu lle n\
D oc um en ts \M
S_
-1
-V A
D ub lin E
H R
M _G
EN
_R
_a pu lle nV D
XT
7.
rv t
G-001
COVER
1 54AP,AV,PN
EHRM INFRASTRUCTURE
UPGRADES
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027 NOVEMBER 8, 2024
100% BID DOCUMENTS
557-22-70022-192
VARIOUS
EHRM INFRASTRUCTURE UPGRADES
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027
VA PROJECT #: 557-22-700
DR,BW,KK
NORTH
NORTH
VOLUME 1 OF 4
DRAWING LIST - VOLUME 1 OF 4
SHEET NUMBER SHEET NAME DWG OF DWG
GENERAL
G-001 COVER 1 54
G-002 GENERAL INFORMATION 2 54
G-003 SHEET LIST 3 54
G-004 CAMPUS PLAN 4 54
G-005 ICRA INFORMATION AND DETAILS 5 54
G-006 TYPICAL ICRA CONDITIONS 6 54
G-007 CONTRACTOR WORK SHUTDOWN SUMMARY 7 54
G-101 BUILDING 1, 2, 3, 4 & 40 COVERAGE DIAGRAMS 8 54
G-102 BUILDING 1, 2, 3, 4 & 40 COVERAGE DIAGRAMS 9 54
G-103 BUILDING 6 & 8 COVERAGE DIAGRAMS 10 54
G-104 BUILDING 9, 11, 13, 15, 17 & 19 COVERAGE DIAGRAMS 11 54
G-105 BUILDING 9, 11, 13, 15, 17 & 19 COVERAGE DIAGRAMS 12 54
G-106 BUILDING 10, 12, 14, & 16, 85, & 86 COVERAGE DIAGRAMS 13 54
G-107 BUILDING 10, 12, 14, & 16, 85, & 86 COVERAGE DIAGRAMS 14 54
G-108 BUILDING 10, 12, 14, & 16, 85, & 86 COVERAGE DIAGRAMS 15 54
01.G-101 BUILDING 1, COVERAGE DIAGRAM 16 54
01.G-102 BUILDING 1, COVERAGE DIAGRAM 17 54
02.G-100 BUILDING 2, COVERAGE DIAGRAM 18 54
02.G-101 BUILDING 2, COVERAGE DIAGRAM 19 54
02.G-102 BUILDING 2, COVERAGE DIAGRAM 20 54
03.G-101 BUILDING 3, COVERAGE DIAGRAMS 21 54
03.G-102 BUILDING 3, COVERAGE DIAGRAM 22 54
04.G-101 BUILDING 4, COVERAGE DIAGRAMS 23 54
04.G-102 BUILDING 4, COVERAGE DIAGRAM 24 54
05.G-101 BUILDING 5, COVERAGE DIAGRAM 25 54
06.G-101 BUILDING 6, COVERAGE DIAGRAMS 26 54
08.G-101 BUILDING 8, COVERAGE DIAGRAMS 27 54
09.G-101 BUILDING 9, COVERAGE DIAGRAMS 28 54
10.G-100 BUILDING 10, COVERAGE DIAGRAM 29 54
10.G-101 BUILDING 10, COVERAGE DIAGRAMS 30 54
11.G-101 BUILDING 11, COVERAGE DIAGRAM 31 54
11.G-102 BUILDING 11, COVERAGE DIAGRAM 32 54
12.G-100 BUILDING 12, COVERAGE DIAGRAM 33 54
12.G-101 BUILDING 12, COVERAGE DIAGRAM 34 54
12.G-102 BUILDING 12, COVERAGE DIAGRAM 35 54
13.G-101 BUILDING 13, COVERAGE DIAGRAMS 36 54
14.G-101 BUILDING 14, COVERAGE DIAGRAMS 37 54
14.G-102 BUILDING 14, COVERAGE DIAGRAM 38 54
15.G-101 BUILDING 15, COVERAGE DIAGRAM 39 54
16.G-101 BUILDING 16, COVERAGE DIAGRAM 40 54
16.G-102 BUILDING 16, COVERAGE DIAGRAM 41 54
17.G-101 BUILDING 17, COVERAGE DIAGRAM 42 54
19.G-101 BUILDING 19, COVERAGE DIAGRAM 43 54
25.G-101 BUILDING 25, COVERAGE DIAGRAM 44 54
26.G-101 BUILDING 26, COVERAGE DIAGRAM 45 54
26.G-102 BUILDING 26, COVERAGE DIAGRAM 46 54
27.G-101 BUILDING 27, COVERAGE DIAGRAM 47 54
28.G-101 BUILDING 28, COVERAGE DIAGRAMS 48 54
29.G-101 BUILDING 29, COVERAGE DIAGRAM 49 54
30.G-101 BUILDING 30, COVERAGE DIAGRAM 50 54
85.G-101 BUILDING 85, COVERAGE DIAGRAM 51 54
86.G-101 BUILDING 86, COVERAGE DIAGRAM 52 54
87.G-101 BUILDING 87, COVERAGE DIAGRAM 53 54
89.G-101 BUILDING 89, COVERAGE DIAGRAM 54 54
CIVIL
CD101 CIVIL DEMOLITION PLAN 1 3
CS101 CIVIL SITE, PAVING, AND UTILITY PLAN 2 3
CS501 CIVIL PAVING AND CONSTRUCTION DETAILS 3 3
5070L
IC
E N
S E D A RC H I T ECT
DA
V ID J . REICHARD
NOR T H CA RO L I NA
Docusign Envelope ID: 4081B0C2-2BE7-4DDD-B6CF-B1CCFE1038E3
11/7/2024
S SS S
S SS S S
WALL SECTION
SYMBOL INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 1 2
INTERCOM
STATION INTERCOM
MASTER
STATION
INTERCOM
WALL
OUTLET
INTERCOM STATION
1' -6
4'
-0
NOTE: FIRE
EXTINGUISHERS HAVING
A GROSS WEIGHT NOT
EXCEEDING 40 LB (18.14
KG) SHALL BE INSTALLED
SO THAT THE TOP OF THE
FIRE EXTINGUISHER IS
NOT MORE THAN 5'-0"
(1.53 M) ABOVE THE
FLOOR.
FIRE EXTINGUISHER
CABINET
ELECTRICAL PANEL
6' -6
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
(3-6" MIN)
(4'-0" MAX)
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL 1'
-6
MISC. WALL DEVICES
CLOCK
NURSE
CALL
DOME
LIGHT
CLOCK OUTLET
CLOCK & NURSE CALL DEVICES
6' -7
7' -0
4' -0
WALL PROTECTION
8'- 0"
OR DOOR FRAME
3" TO CORNERGUARD
CORNER GUARD
3'- 0"
DUCTLESS SPLIT INDOOR
UNIT
NOTE: PROVIDE WALL BLOCKING FOR ALL WALL MOUNTED EQUIPMENT AND ADA WALL
MOUNTED ACCESSORIES. BLOCKING SHALL EITHER BE STEEL STRIP, 6" WIDE, WITH LENGTH
EXTENDING ONE STUD SPACE BEYOND END OF ITEM SUPPORTED, 6" WIDE FIRE TREATED
WOOD BLOCKING ONLY AT GRAB BAR CONDITIONS, WITH LENGTH EXTENDING ONE STUD
SPACE BEYOND END OF ITEM SUPPORTED.
TELEPHONE
OR DATA
OUTLET
M
IN
IM
U
M 7'
-4
HANDRAIL/CHAIR RAIL
8"
CRASHRAIL
1.
2.
3.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
1.
2.
3.
GENERAL
REFER TO CIVIL DRAWINGS FOR INFORMATION INCLUDING CONCRETE SIDEWALKS, CONCRETE PADS, AND
PARKING CONFIGURATIONS. CIVIL BACKGROUND IS SHOWN FOR REFERENCE ONLY.
REFER TO MECHANICAL DRAWINGS FOR INFORMATION CONCERNING DAMPERS.
REFER TO ELECTRICAL DRAWINGS FOR FIRE ALARM NOTIFICATION AND EMERGENCY EGRESS LIGHTING
LOCATIONS.
ALL WORK
ALL FIRE-RATED ASSEMBLIES SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND/OR TESTED ASSEMBLIES INDICATED. DEVIATIONS FROM THESE SHALL BE CORRECTED
AT NO ADDITIONAL COST.
WHERE FIRE-RATED CONSTRUCTION IS SHOWN OR NOTED, CONTRACTOR SHALL SUBMIT CERTIFIED ASSEMBLIES. THIS INCLUDES PARTITIONS / BARRIERS, ROOF / FLOOR ASSEMBLIES, TOP AND BOTTOM OF WALL
ASSEMBLIES, PENETRATIONS AND RECESSED ITEMS.
EXTEND ALL FIRE AND/OR SMOKE PARTITIONS / BARRIERS TO BOTTOM OF ROOF / FLOOR DECK ABOVE (OR AS DIRECTED BY UL ASSEMBLY) AND TO EXTERIOR WALL SHEATHING. SEAL JOINT BETWEEN EDGES OF PARTITION
WITH FIRE RATED SEALANT AND/OR INTUMESCENT ASSEMBLY.
ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES SHALL BE FIRE-SEALED IN ACCORDANCE WITH APPROVED MANUFACTURER'S DETAILS FOR LOCATION, TYPE OF CONSTRUCTION, PENETRATING ITEM AND RATING
REQUIRED.
ALL DUCTWORK, DIFFUSERS AND GRILLES PENETRATING FIRE-RATED WALLS, CEILINGS AND FLOORS SHALL HAVE THE APPROPRIATE TYPE OF FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE TYPE OF CONSTRUCTION
BEING PENETRATED AND THE FIRE/SMOKE RATING REQUIRED.
ALL LIGHT FIXTURES AND ELECTRICAL DEVICES PENETRATING FIRE-RATED ASSEMBLIES SHALL BE UL-LISTED FOR INSTALLATION IN THE ASSEMBLY OR SHALL BE INSTALLED SUCH THAT THE FIRE-RATING IS NOT
COMPROMISED.
ALL DOORS, WINDOW ASSEMBLIES, AND OTHER OPENINGS PENETRATING FIRE-RATED WALLS SHALL HAVE AN FIRE-RATING BASED ON THE TYPE OF CONSTRUCTION BEING PENETRATED. DOORS SHALL BE POSITIVE
LATCHING AT ALL FIRE-RATED ASSEMBLIES. WIRE GLASS IS NOT PERMITTED.
DOORS SHALL NOT HAVE AIR TRANSFER OPENINGS AND SHALL NOT BE UNDERCUT IN EXCESS OF CLEARANCE
PERMITTED WITH ACCORDANCE TO NFPA 80.
PROVIDE ENCLOSURE AND ACCESS PANEL AT EACH FIRE PROTECTION INSPECTION TEST VALVE. DO NOT LOCATE VALVES AND PIPES IN EXTERIOR WALLS. ALL ACCESS PANELS SHALL HAVE AN EQUAL FIRE-RATING AS
WALLS AND/OR CEILINGS BEING PENETRATED.
UNLESS SCHEDULED TO RECEIVE SELF-SEALING FIRE-RATED PATHWAYS, METALLIC SLEEVES SHOULD BE INSTALLED AROUND LOW VOLTAGE CABLES THAT PENETRATE THE WALL, AND SEALANT SHOULD BE USED TO
SEAL AROUND THE SLEEVE AND INSIDE THE SLEEVE.
WHERE DEVICES ARE INDICATED IN RATED CONSTRUCTION, PROVIDE INTUMESCENT INSERTS FOR THE
ELECTRICAL BOXES WHERE ANY OF THE FOLLOWING CONDITIONS OCCUR:
- BOX EXCEEDS THE ALLOWABLE SIZE OF 16 SQ. IN.
- AGGREGATE AREA OF BOXES EXCEEDS 100 SQ. IN. PER 100 SF OF PARTITION.
- BOXES ON OPPOSITE SIDES OF PARTITION ARE LESS THAN 24" APART.
- BOXES OCCUR WITHIN THE SAME STUD CAVITY.
WHERE FIRE-RATED WALL ASSEMBLIES OCCUR IN PROXIMITY TO STEEL BEAMS / JOIST WITH INADEQUATE DIMENSION TO INSTALL GYP. BD. ON BOTH SIDES OF STUD FULLY TO THE BOTTOM OF THE ROOF/ FLOOR DECK, PROVIDE STUD FRAMING AROUND THE STRUCTURE WITH LAYERS OF GYP. BD. REFLECTING THE RATING OF THE
WALL ASSEMBLY.
RENOVATION
INSTALL ABOVE CEILING BLOW-OUT PATCHES MADE OF LAYERS OF GYP. BD. EQUAL TO THAT OF THE PARTITION CONSTRUCTION. CUT TO FIT TIGHT TO PENETRATIONS, IN INSTANCES WHERE THE ANNULAR OPENING EXCEEDS WHAT IS ALLOWED BY THE UL ASSEMBLY. DO NOT APPLY JOINT COMPOUND OVER SCREWS AT PATCHES. DO
NOT REMOVE EXCESS COMPOUND FROM EDGES OR PATCH AFTER PLACEMENT.
- THE PATCH SHALL EXTEND A MINIMUM OF 6" BEYOND THE OPENING IN ALL DIRECTIONS.
- WHERE THE DIAMETER OF THE OPENING IS LESS THAN 3" THE PATCH SHALL BE FASTENED NOT LESS THAN
3" FROM THE EDGE OF THE PATCH.
- WHERE THE DIAMETER OF THE OPENING IS MORE THAN 3", THE PATCH SHALL BE FASTENED NOT LESS THAN
3" FROM THE EDGE OF THE PATCH TO THE STUDS & CHANNELS.
- JOINT COMPOUND APPLIED TO THE BACKSIDE.
TEMPORARY PARTITIONS REQUIRED FOR DUST OR INFECTION CONTROL SHALL BE CONSTRUCTED TO MAINTAIN THE EXISTING FIRE WALL ASSEMBLY REQUIREMENTS. WHERE TEMPORARY PARTITIONS MUST INCLUDE DOORS FOR ACCESS OR LIFE SAFETY EGRESS, INSTALL DOOR ASSEMBLIES EQUAL TO THE RATING OF CONSTRUCTION BEING PENETRATED AND PROVIDE POSITIVE LATCHING HARDWARE AND EXIT DEVICES (PANIC BARS) WHERE
REQUIRED.
EGRESS PATHS SHALL BE MAINTAINED CLEAR OF EQUIPMENT, MATERIALS, DEBRIS, ETC. AND SHALL BE MARKED
WITH VISIBLE EXIT SIGNS AT ALL TIMES.
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
1 HOUR FIRE/SMOKE PARTITION
SMOKE RATED
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
2' X 2' RECESSED TROFFER
2' X 4' RECESSED TROFFER
SYMBOL DESCRIPTION
2' X 4' RECESSED FLAT LENS TROFFER
2' X 4' RECESSED TROFFER -
EMERGENCY BACK UP
1' X 4' RECESSED FLAT LENS TROFFER
2' LINEAR - WALL SCONCE
4' LINEAR - WALL SCONCE
6" DIAMETER RECESSED DOWNLIGHT
4' LINEAR STRIP - SUSPENDED
2' LINEAR - SURFACE MOUNTED
WALL PACK
EXIT SIGN - WALL MOUNTED
EXIT SIGN - CEILING MOUNTED
EMERGENCY LIGHT BATTERY
OPERATED - WALL MOUNTED
WALL PACK - EMERGENCY BACK UP
RETURN GRILLE
SUPPLY DIFFUSER
EXHAUST GRILLE
SEMI-RECESSED SPRINKLER HEAD
SURFACE MOUNTED CURTAIN TRACK
CEILING MOUNTED LIFTS
ACCESS PANEL
CEILING MOUNTED LIGHT
PENDANT LIGHT
WALL MOUNTED LIGHT
CEILING MOUNTED EQUIPMENT
REFLECTED CEILING PLAN
LEGEND
ACT
GYP
CEILING CONTRACTOR TO MEASURE EACH CEILING
AREA AND ESTABLISH A CEILING LAYOUT TO BALANCE
BORDER WIDTHS AT OPPOSITE EDGES OF EACH ROOM.
AVOID USE OF LESS-THAN 6" TILES.
CEILING TAGX'-X" AFF
WOOD
Engineers Architects Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
5:
:4
PM
C :\U se rs
\a pu lle n\
D oc um en ts \M
S_
-1
-V A
D ub lin E
H R
M _G
EN
_R
_a pu lle nV D
XT
7.
rv t
G-002
GENERAL INFORMATION
2 54ANP
EHRM INFRASTRUCTURE
UPGRADES
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027 NOVEMBER 8, 2024
100% BID DOCUMENTS
557-22-70022-192
VARIOUS
DJR
GENERAL SYMBOL LEGEND
Scale: 3/8" = 1'-0"
STANDARD MOUNTING HEIGHTS
G_ABBREVIATIONS
WALL RATING LEGEND
LIFE SAFETY GENERAL NOTES
5070L
IC
E N
S E D A RC H I T ECT
DA
V ID J . REICHARD
NOR T H CA RO L I NA
Engineers Architects Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
5:
:0
PM
C :\U se rs
\a pu lle n\
D oc um en ts \M
S_
-1
-V A
D ub lin E
H R
M _G
EN
_R
_a pu lle nV D
XT
7.
rv t
G-003
SHEET LIST
3 54ANP
EHRM INFRASTRUCTURE
UPGRADES
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027 NOVEMBER 8, 2024
100% BID DOCUMENTS
557-22-70022-192
VARIOUS
DJR
DRAWING LIST - VOLUME 1 OF 4
SHEET NUMBER SHEET NAME DWG OF DWG
GENERAL
G-001 COVER 1 54
G-002 GENERAL INFORMATION 2 54
G-003 SHEET LIST 3 54
G-004 CAMPUS PLAN 4 54
G-005 ICRA INFORMATION AND DETAILS 5 54
G-006 TYPICAL ICRA CONDITIONS 6 54
G-007 CONTRACTOR WORK SHUTDOWN SUMMARY 7 54
G-101 BUILDING 1, 2, 3, 4 & 40 COVERAGE DIAGRAMS 8 54
G-102 BUILDING 1, 2, 3, 4 & 40 COVERAGE DIAGRAMS 9 54
G-103 BUILDING 6 & 8 COVERAGE DIAGRAMS 10 54
G-104 BUILDING 9, 11, 13, 15, 17 & 19 COVERAGE DIAGRAMS 11 54
G-105 BUILDING 9, 11, 13, 15, 17 & 19 COVERAGE DIAGRAMS 12 54
G-106 BUILDING 10, 12, 14, & 16, 85, & 86 COVERAGE DIAGRAMS 13 54
G-107 BUILDING 10, 12, 14, & 16, 85, & 86 COVERAGE DIAGRAMS 14 54
G-108 BUILDING 10, 12, 14, & 16, 85, & 86 COVERAGE DIAGRAMS 15 54
01.G-101 BUILDING 1, COVERAGE DIAGRAM 16 54
01.G-102 BUILDING 1, COVERAGE DIAGRAM 17 54
02.G-100 BUILDING 2, COVERAGE DIAGRAM 18 54
02.G-101 BUILDING 2, COVERAGE DIAGRAM 19 54
02.G-102 BUILDING 2, COVERAGE DIAGRAM 20 54
03.G-101 BUILDING 3, COVERAGE DIAGRAMS 21 54
03.G-102 BUILDING 3, COVERAGE DIAGRAM 22 54
04.G-101 BUILDING 4, COVERAGE DIAGRAMS 23 54
04.G-102 BUILDING 4, COVERAGE DIAGRAM 24 54
05.G-101 BUILDING 5, COVERAGE DIAGRAM 25 54
06.G-101 BUILDING 6, COVERAGE DIAGRAMS 26 54
08.G-101 BUILDING 8, COVERAGE DIAGRAMS 27 54
09.G-101 BUILDING 9, COVERAGE DIAGRAMS 28 54
10.G-100 BUILDING 10, COVERAGE DIAGRAM 29 54
10.G-101 BUILDING 10, COVERAGE DIAGRAMS 30 54
11.G-101 BUILDING 11, COVERAGE DIAGRAM 31 54
11.G-102 BUILDING 11, COVERAGE DIAGRAM 32 54
12.G-100 BUILDING 12, COVERAGE DIAGRAM 33 54
12.G-101 BUILDING 12, COVERAGE DIAGRAM 34 54
12.G-102 BUILDING 12, COVERAGE DIAGRAM 35 54
13.G-101 BUILDING 13, COVERAGE DIAGRAMS 36 54
14.G-101 BUILDING 14, COVERAGE DIAGRAMS 37 54
14.G-102 BUILDING 14, COVERAGE DIAGRAM 38 54
15.G-101 BUILDING 15, COVERAGE DIAGRAM 39 54
16.G-101 BUILDING 16, COVERAGE DIAGRAM 40 54
16.G-102 BUILDING 16, COVERAGE DIAGRAM 41 54
17.G-101 BUILDING 17, COVERAGE DIAGRAM 42 54
19.G-101 BUILDING 19, COVERAGE DIAGRAM 43 54
25.G-101 BUILDING 25, COVERAGE DIAGRAM 44 54
26.G-101 BUILDING 26, COVERAGE DIAGRAM 45 54
26.G-102 BUILDING 26, COVERAGE DIAGRAM 46 54
27.G-101 BUILDING 27, COVERAGE DIAGRAM 47 54
28.G-101 BUILDING 28, COVERAGE DIAGRAMS 48 54
29.G-101 BUILDING 29, COVERAGE DIAGRAM 49 54
30.G-101 BUILDING 30, COVERAGE DIAGRAM 50 54
85.G-101 BUILDING 85, COVERAGE DIAGRAM 51 54
86.G-101 BUILDING 86, COVERAGE DIAGRAM 52 54
87.G-101 BUILDING 87, COVERAGE DIAGRAM 53 54
89.G-101 BUILDING 89, COVERAGE DIAGRAM 54 54
CIVIL
CD101 CIVIL DEMOLITION PLAN 1 3
CS101 CIVIL SITE, PAVING, AND UTILITY PLAN 2 3
CS501 CIVIL PAVING AND CONSTRUCTION DETAILS 3 3
DRAWING LIST - VOLUME 2 OF 4
SHEET NUMBER SHEET NAME DWG OF DWG
GENERAL
GA-001 COVER 1 1
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES 1 56
01.A-411 BUILDING 1, LEVEL A, TELECOM ROOM 101-1 PLANS 2 56
01.A-421 BUILDING 1, LEVEL B, TELECOM ROOM 207-1 PLANS 3 56
02.A-401 BUILDING 2, LEVEL C, TELECOM ROOM BM123B-2 PLANS 4 56
02.A-411 BUILDING 2, LEVEL A, TELECOM ROOM 104-2 PLANS 5 56
02.A-421 BUILDING 2, LEVEL B, TELECOM ROOM 209A-2 PLANS 6 56
03.A-401 BUILDING 3, LEVEL C, TELECOM ROOM BM101A-3 PLANS 7 56
03.A-411 BUILDING 3, LEVEL A, TELECOM ROOM 112A-3 PLANS 8 56
03.A-421 BUILDING 3, LEVEL B, TELECOM ROOM 219-3 PLANS 9 56
04.A-401 BUILDING 4, LEVEL C, TELECOM ROOM BM105-4 PLANS 10 56
04.A-411 BUILDING 4, LEVEL A, TELECOM ROOM 118-4 PLANS 11 56
04.A-421 BUILDING 4, LEVEL B, TELECOM ROOM 202-4 PLANS 12 56
05.A-411 BUILDING 5, LEVEL A, TELECOM ROOM C137-5 PLANS 13 56
06.A-411 BUILDING 6, LEVEL A, TELECOM ROOM 103-6 PLANS 14 56
06.A-421 BUILDING 6, LEVEL B, TELECOM ROOM 226-6 PLANS 15 56
08.A-411 BUILDING 8, LEVEL A, TELECOM ROOM 172C-8 PLANS 16 56
08.A-421 BUILDING 8, LEVEL B, TELECOM ROOM 213-8 PLANS 17 56
09.A-421 BUILDING 9, LEVEL B, TELECOM ROOM 210A-9 PLANS 18 56
10.A-401 BUILDING 10, LEVEL C, TELECOM ROOM BM107A-10 PLANS 19 56
10.A-411 BUILDING 10, LEVEL A, TELECOM ROOM 130-10 PLANS 20 56
10.A-421 BUILDING 10, LEVEL B, TELECOM ROOM 205-10 PLANS 21 56
11.A-401 BUILDING 11, LEVEL C, TELECOM ROOM BM101A-11 PLANS 22 56
11.A-411 BUILDING 11, LEVEL A, TELECOM ROOM 125-11 PLANS 23 56
11.A-421 BUILDING 11, LEVEL B, TELECOM ROOM 235-11 PLANS 24 56
12.A-401 BUILDING 12, LEVEL C, TELECOM ROOM BM103A-12 PLANS 25 56
12.A-411 BUILDING 12, LEVEL A, TELECOM ROOM 117A-12 PLANS 26 56
12.A-421 BUILDING 12, LEVEL B, TELECOM ROOM 232A-12 PLANS 27 56
13.A-411 BUILDING 13, LEVEL A, TELECOM ROOM 141-13 PLANS 28 56
13.A-421 BUILDING 13, LEVEL B, TELECOM ROOM 224-13 PLANS 29 56
14.A-401 BUILDING 14, LEVEL C, TELECOM ROOM BM104A-14 PLANS 30 56
14.A-411 BUILDING 14, LEVEL A, TELECOM ROOM 101A-14 PLANS 31 56
14.A-421 BUILDING 14, LEVEL B, TELECOM ROOM 232-14 PLANS 32 56
15.A-411 BUILDING 15, LEVEL A, TELECOM ROOM 107-15 PLANS 33 56
15.A-421 BUILDING 15, LEVEL B, TELECOM ROOM 230-15 PLANS 34 56
16.A-401 BUILDING 16, LEVEL C, TELECOM ROOM B11A-16 PLANS 35 56
16.A-421 BUILDING 16, LEVEL B, TELECOM ROOM 216-16 PLANS 36 56
17.A-411 BUILDING 17, LEVEL A, TELECOM ROOM 111-17 PLANS 37 56
17.A-421 BUILDING 17, LEVEL B, TELECOM ROOM 205-17 PLANS 38 56
19.A-411 BUILDING 19, LEVEL A, TELECOM ROOM 117-19 PLANS 39 56
19.A-421 BUILDING 19, LEVEL B, TELECOM ROOM 216A-19 PLANS 40 56
25.A-411 BUILDING 25, LEVEL A, TELECOM ROOM 101A-25 PLANS 41 56
26.A-401 BUILDING 26, LEVEL C, TELECOM ENCLOSURE BM108B-26 PLANS 42 56
26.A-411 BUILDING 26, LEVEL A, TELECOM ROOM 106-26 PLANS 43 56
27.A-411 BUILDING 27, LEVEL A, TELECOM ROOM 107-27 PLANS 44 56
28.A-411 BUILDING 28, LEVEL A, TELECOM ROOM 108-28 PLANS 45 56
29.A-411 BUILDING 29, LEVEL A, TELECOM ENCLOSURE 113A-29 PLANS 46 56
30.A-411 BUILDING 30, LEVEL A, TELECOM ENCLOSURE 104-30 PLANS 47 56
85.A-411 BUILDING 85, LEVEL A, TELECOM ROOM 121-85 PLANS 48 56
86.A-411 BUILDING 86, LEVEL A, TELECOM ROOM 106-86 PLANS 49 56
87.A-411 BUILDING 87, LEVEL A, TELECOM ROOM 120-87 PLANS 50 56
87.A-412 BUILDING 87, LEVEL A, TELECOM ROOM 169-87 PLANS 51 56
89.A-411 BUILDING 89, LEVEL A, TELECOM ROOM 1215-89 PLANS 52 56
A-506 PARTITION TYPES AND ARCHITECTURAL DETAILS 53 56
A-601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 54 56
A-602 GENERAL NOTES, BASIS OF DESIGN, ABBREVIATIONS AND FINISH DETAILS 55 56
A-603 ROOM FINISH SCHEDULE 56 56
DRAWING LIST - VOLUME 3 OF 4
SHEET NUMBER SHEET NAME DWG OF DWG
GENERAL
GM-001 COVER 1 1
MECHANICAL
MP001 MECHANICAL GENERAL INFORMATION 1 56
MP002 PLUMBING GENERAL INFORMATION 2 56
MP003 FIRE SUPPRESSION GENERAL INFORMATION 3 56
01.MP411 BUILDING 1, LEVEL A, TELECOM ROOM 101-1 PLANS 4 56
01.MP421 BUILDING 1, LEVEL B, TELECOM ROOM 207-1 PLANS 5 56
02.MP401 BUILDING 2, LEVEL C, TELECOM ROOM BM123B-2 PLANS 6 56
02.MP411 BUILDING 2, LEVEL A, TELECOM ROOM 104-2 PLANS 7 56
02.MP421 BUILDING 2, LEVEL B, TELECOM ROOM 209A-2 PLANS 8 56
03.MP401 BUILDING 3, LEVEL C, TELECOM ROOM BM101A-3 PLANS 9 56
03.MP411 BUILDING 3, LEVEL A, TELECOM ROOM 112A-3 PLANS 10 56
03.MP421 BUILDING 3, LEVEL B, TELECOM ROOM 219-3 PLANS 11 56
04.MP401 BUILDING 4, LEVEL C, TELECOM ROOM BM105-4 PLANS 12 56
04.MP411 BUILDING 4, LEVEL A, TELECOM ROOM 118-4 PLANS 13 56
04.MP421 BUILDING 4, LEVEL B, TELECOM ROOM 202-4 PLANS 14 56
05.MP411 BUILDING 5, LEVEL A, TELECOM ROOM C137-5 PLANS 15 56
06.MP411 BUILDING 6, LEVEL A, TELECOM ROOM 103-6 PLANS 16 56
06.MP421 BUILDING 6, LEVEL B, TELECOM ROOM 226-6 PLANS 17 56
08.MP411 BUILDING 8, LEVEL A, TELECOM ROOM 172C-8 PLANS 18 56
08.MP421 BUILDING 8, LEVEL B, TELECOM ROOM 213-8 PLANS 19 56
09.MP421 BUILDING 9, LEVEL B, TELECOM ROOM 210A-9 PLANS 20 56
10.MP401 BUILDING 10, LEVEL C, TELECOM ROOM BM107A PLANS 21 56
10.MP411 BUILDING 10, LEVEL A, TELECOM ROOM 130-10 PLANS 22 56
10.MP421 BUILDING 10, LEVEL B, TELECOM ROOM 205-10 PLANS 23 56
11.MP401 BUILDING 11, LEVEL C, TELECOM ROOM BM101A-11 PLANS 24 56
11.MP411 BUILDING 11, LEVEL A, TELECOM ROOM 125-11 PLANS 25 56
11.MP421 BUILDING 11, LEVEL B, TELECOM ROOM 235-11 PLANS 26 56
12.MP401 BUILDING 12, LEVEL C, TELECOM ROOM BM103A PLANS 27 56
12.MP411 BUILDING 12, LEVEL A, TELECOM ROOM 117A-12 PLANS 28 56
12.MP421 BUILDING 12, LEVEL B, TELECOM ROOM 232A-12 PLANS 29 56
13.MP411 BUILDING 13, LEVEL A, TELECOM ROOM 141-13 PLANS 30 56
13.MP421 BUILDING 13, LEVEL B, TELECOM ROOM 224-13 PLANS 31 56
14.MP401 BUILDING 14, LEVEL C, TELECOM ROOM BM104A-14 PLANS 32 56
14.MP411 BUILDING 14, LEVEL A, TELECOM ROOM 101A-14 PLANS 33 56
14.MP421 BUILDING 14, LEVEL B, TELECOM ROOM 232-14 PLANS 34 56
15.MP411 BUILDING 15, LEVEL A, TELECOM ROOM 107-15 PLANS 35 56
15.MP421 BUILDING 15, LEVEL B, TELECOM ROOM 230-15 PLANS 36 56
16.MP401 BUILDING 16, LEVEL C, TELECOM ROOM B11A-16 PLANS 37 56
16.MP421 BUILDING 16, LEVEL B, TELECOM 216-16 ROOM PLANS 38 56
17.MP411 BUILDING 17, LEVEL A, TELECOM ROOM 111-17 PLANS 39 56
17.MP421 BUILDING 17, LEVEL B, TELECOM ROOM 205-17 PLANS 40 56
19.MP411 BUILDING 19, LEVEL A, TELECOM ROOM 117-19 PLANS 41 56
19.MP421 BUILDING 19, LEVEL B, TELECOM ROOM 216A-19 PLANS 42 56
25.MP411 BUILDING 25, LEVEL A, TELECOM ROOM 101A-25 PLANS 43 56
26.MP401 BUILDING 26, LEVEL C, TELECOM ENCLOSURE BM108B-26 PLANS 44 56
26.MP411 BUILDING 26, LEVEL A, TELECOM ROOM 106-26 PLANS 45 56
27.MP411 BUILDING 27, LEVEL A, TELECOM ROOM 107-27 PLANS 46 56
28.MP411 BUILDING 28, LEVEL A, TELECOM ROOM 108-28 PLANS 47 56
29.MP411 BUILDING 29, LEVEL A, TELECOM ENCLOSURE 113A-29 PLANS 48 56
30.MP411 BUILDING 30, LEVEL A, TELECOM ENCLOSURE 104-30 PLANS 49 56
85.MP411 BUILDING 85, LEVEL A, TELECOM ROOM 121-85 PLANS 50 56
86.MP411 BUILDING 86, LEVEL A, TELECOM ROOM 106-86 PLANS 51 56
87.MP411 BUILDING 87, LEVEL A, TELECOM ROOM 120-87 PLANS 52 56
87.MP412 BUILDING 87, LEVEL A, TELECOM ROOM 169-87 PLANS 53 56
89.MP411 BUILDING 89, LEVEL A TELECOM ROOM 1215-89 PLANS 54 56
M-501 MECHANICAL DETAILS 55 56
M-601 MECHANICAL SCHEDULES AND CONTROLS 56 56
DRAWING LIST - VOLUME 4 OF 4
SHEET NUMBER SHEET NAME DWG OF DWG
GENERAL
GE-001 COVER 1 1
ELECTRICAL
00.ET001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 91
00.ET002 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 2 91
00.ET501 TYPICAL TELECOM ROOM DETAILS 3 91
00.ET502 ELECTRICAL AND TECHNOLOGY DETAILS 4 91
00.ET503 ELECTRICAL AND TECHNOLOGY DETAILS 5 91
00.ET504 TECHNOLOGY DETAILS 6 91
00.ET505 CHANNEL RACK POWER AND TE DETAILS 7 91
00.ET506 TR RACK DETAILS 8 91
00.ET507 SITE TECHNOLOGY DETAILS 9 91
00.TS101 SITE FIBER BACKBONE ROUTING PLAN 10 91
00.TS102 SITE FIBER BACKBONE ROUTING DIAGRAM 11 91
00.T-601 TECHNOLOGY RISERS 12 91
01.ET411 BUILDING 1, LEVEL A, TELECOM ROOM 101-1 PLANS 13 91
01.ET421 BUILDING 1, LEVEL B, TELECOM ROOM 207-1 PLANS 14 91
01.ET601 BUILDING 1, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 15 91
02.ET401 BUILDING 2, LEVEL C, TELECOM ROOM BM123B-2 PLANS 16 91
02.ET411 BUILDING 2, LEVEL A, TELECOM ROOM 104-2 PLANS 17 91
02.ET421 BUILDING 2, LEVEL B, TELECOM ROOM 209A-2 PLANS 18 91
02.ET601 BUILDING 2, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 19 91
03.ET401 BUILDING 3, LEVEL C, TELECOM ROOM BM101A-3 PLANS 20 91
03.ET412 BUILDING 3, LEVEL A, CONFERENCE ROOM 112A-3 PLANS 21 91
03.ET421 BUILDING 3, LEVEL B, TELECOM ROOM 219-3 PLANS 22 91
03.ET601 BUILDING 3, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 23 91
04.ET401 BUILDING 4, LEVEL C, TELECOM ROOM BM105-4 PLANS 24 91
04.ET411 BUILDING 4, LEVEL A, TELECOM ROOM 118-4 PLANS 25 91
04.ET421 BUILDING 4, LEVEL B, TELECOM ROOM 202-4 PLANS 26 91
04.ET601 BUILDING 4, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 27 91
05.ET411 BUILDING 5, LEVEL A, TELECOM ROOM C137-5 PLANS 28 91
05.ET601 BUILDING 5, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 29 91
06.ET411 BUILDING 6, LEVEL A, TELECOM ROOM 103-6 PLANS 30 91
06.ET421 BUILDING 6, LEVEL B, TELECOM ROOM 226-6 PLANS 31 91
06.ET601 BUILDING 6, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 32 91
08.ET411 BUILDING 8, LEVEL A, TELECOM ROOM 172C-8 PLANS 33 91
08.ET421 BUILDING 8, LEVEL B, TELECOM ROOM 213-8 PLANS 34 91
08.ET601 BUILDING 8, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 35 91
09.ET421 BUILDING 9, LEVEL B, TELECOM 210A-9 PLANS 36 91
09.ET601 BUILDING 9, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 37 91
10.ET401 BUILDING 10, LEVEL C, TELECOM ROOM BM107A-10 PLANS 38 91
10.ET411 BUILDING 10, LEVEL A, TELECOM ROOM 130-10 PLANS 39 91
10.ET421 BUILDING 10, LEVEL B, TELECOM ROOM 205-10 PLANS 40 91
10.ET601 BUILDING 10, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 41 91
11.ET401 BUILDING 11, LEVEL C, TELECOM ROOM BM101A-11 PLANS 42 91
11.ET411 BUILDING 11, LEVEL A, TELECOM ROOM 125-11 PLANS 43 91
11.ET421 BUILDING 11, LEVEL B, TELECOM ROOM 235-11 PLANS 44 91
11.ET601 BUILDING 11, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 45 91
12.ET401 BUILDING 12, LEVEL C, TELECOM ROOM BM103A-12 PLANS 46 91
12.ET411 BUILDING 12, LEVEL A, TELECOM ROOM 117A-12 PLANS 47 91
12.ET421 BUILDING 12, LEVEL B, TELECOM ROOM 232A-12 PLANS 48 91
12.ET601 BUILDING 12, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 49 91
13.ET411 BUILDING 13, LEVEL A, TELECOM ROOM 104-13 PLANS 50 91
13.ET421 BUILDING 13, LEVEL B, TELECOM ROOM 224-13 PLANS 51 91
13.ET601 BUILDING 13, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 52 91
14.ET401 BUILDING 14, LEVEL C, TELECOM ROOM BM104A-14 PLANS 53 91
14.ET411 BUILDING 14, LEVEL A, TELECOM ROOM 101A-14 PLANS 54 91
14.ET421 BUILDING 14, LEVEL B, TELECOM ROOM 232-14 PLANS 55 91
14.ET601 BUILDING 14, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 56 91
15.ET411 BUILDING 15, LEVEL A, TELECOM ROOM 107-15 PLANS 57 91
15.ET421 BUILDING 15, LEVEL B, TELECOM ROOM 230-15 PLANS 58 91
15.ET601 BUILDING 15, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 59 91
16.ET401 BUILDING 16, LEVEL C, TELECOM ROOM B11A-16 PLANS 60 91
16.ET421 BUILDING 16, LEVEL B, TELECOM ROOM 216-16 PLANS 61 91
16.ET601 BUILDING 16, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 62 91
17.ET411 BUILDING 17, LEVEL A, TELECOM ROOM 111-17 PLANS 63 91
17.ET421 BUILDING 17, LEVEL B, TELECOM ROOM 205-17 PLANS 64 91
17.ET601 BUILDING 17, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 65 91
19.ET411 BUILDING 19, LEVEL A, TELECOM ROOM 117-19 PLANS 66 91
19.ET421 BUILDING 19, LEVEL B, TELECOM ROOM 216A-19 PLANS 67 91
19.ET601 BUILDING 19, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 68 91
25.ET411 BUILDING 25, LEVEL A, TELECOM ROOM 101A-25 PLANS 69 91
25.ET601 BUILDING 25, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 70 91
26.ET401 BUILDING 26, LEVEL C, TELECOM ENCLOSURE BM108B-26 PLANS 71 91
26.ET411 BUILDING 26, LEVEL A, TELECOM ROOM 106-26 PLANS 72 91
26.ET601 BUILDING 26, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 73 91
27.ET411 BUILDING 27, LEVEL A, TELECOM ROOM 107-27 PLANS 74 91
27.ET601 BUILDING 27, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 75 91
28.ET411 BUILDING 28, LEVEL A, TELECOM ROOM 108-28 PLANS 76 91
28.ET601 BUILDING 28, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 77 91
29.ET411 BUILDING 29, LEVEL A, TELECOM ENCLOSURE 113A-29 PLANS 78 91
29.ET601 BUILDING 29, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 79 91
30.ET411 BUILDING 30, LEVEL A, TELECOM ENCLOSURE 104-30 PLANS 80 91
30.ET601 BUILDING 30, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 81 91
40.ET412 BUILDING 40, LEVEL A, COMPUTER ROOM 106 TECHNOLOGY PLANS 82 91
85.ET411 BUILDING 85, LEVEL A, TELECOM ROOM 121-85 PLANS 83 91
85.ET601 BUILDING 85, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 84 91
86.ET411 BUILDING 86, LEVEL A, TELECOM ROOM 106-86 PLANS 85 91
86.ET601 BUILDING 86, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 86 91
87.ET411 BUILDING 87, LEVEL A, TELECOM ROOM 120-87 PLANS 87 91
87.ET412 BUILDING 87, LEVEL A, TELECOM ROOM 169-87 PLANS 88 91
87.ET601 BUILDING 87, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 89 91
89.ET411 BUILDING 89, LEVEL A, TELECOM ROOM 1215-89 PLANS 90 91
89.ET601 BUILDING 89, SINGLE LINE, BONDING, AND FIBER RISER DIAGRAMS 91 91
5070L
IC
E N
S E D A RC H I T ECT
DA
V ID J . REICHARD
NOR T H CA RO L I NA
FU
TU
R E
EX
PA
N
SI
O N
6, SF
FU
TU
R E
EX
PA
N
SI
O N
6, SF
FU
TU
R E
BU
IL
D
IN
G
,0
S F
D
ET
EN
TI
O N
PO
N
D
T
DEANE + STROLLO, LLC718 Virginia DriveOrlando, FL. 32803T: (407) 423-5355 F: (407) 422-5994
R25'
R188'
R212'
6'
CHAI
N LI
NK
FE
NCE
6'
CHAI
N LI
NK
FE
NCE
" C
U R
B
G U
TT
E
R
" C
U R
B
G U
TT
E
R
2 2
8 86
2 26
52 30
SIGN
NE
FF
P
LA
CE
AL
EX
AN
DE
R
DR
IVE
NE
FF
PL
AC
E
BE
LL
EV
UE
A
VE
NU
E
JO
HN
SO
N
ST
RE
ET
PARKING
PARKING
PARKING
METAL BLDGS.BLDG. 31
BLDG. 32
GAZEBO
BLDG.
68BLDG.
BLDG. 21
LAKE
LEISURE
PARKING
BLDG. 34
SIGN
SIGN
SIGN
STEPS RAMP
PATIO
R A M P
:1
S
LO
P E
R A M P
:1
S
LO
P E
R A M P
:1
S
LO
P E
LA
N D
IN
G
VAN
VAN VAN VAN
RAMP
CONCRETE DITCH
SLAB
NEWPARKING
PARKING #2
PARKING #2
PARKING
PARKING
PARKING #1
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING #6
PARKING #7
PARKING #3
PARKING #4
PARKING #5
PARKING
PARKING #8
LOADING
PARKING
VISITOR'S /
OUTPATIENT
STAFF
SPECIALIST
H.C.
PATIENT /
VISITOR'S
PATIENT /
VISITOR'S
PATIENT /
VISITOR'S
PATIENT /
VISITOR'S
OUTPATIENT
STAFF /
VISITOR'S
STAFF /
VISITOR'S
STAFF /
VISITOR'S
STAFF /
VISITOR'S
STAFF
STAFF /
VISITOR'S
STAFF /
VISITOR'S
STAFF
LOADING
PATIENT/VISITOR'S
PARKING
STAFF /
VISITOR'SSTAFF / VISITOR'S
OUTPATIENT
SOLAR PANELS
PARKING
OUTPATIENT
BLDG.
BLDG. 47
BLDG. 41
BLDG. 63
BLDG. 81
BLDG. 82
BLDG. 71
BLDG. 66
C
OO
LI
NG
T
OW
ER
BLDG. 69
WATER TANK
BLDG. 40
GAZEBO
SUBSTATION
BLDG. 44
BLDG. 62
BLDG. 84
BLDG.
FUEL
TANK
MRI
BLDG.29
ANNEX
New Water Tower Location
New Chiller Plant
BE
LL
EV
UE
R D.
VETERAN'S BLVD. (U.S. HWY 80)
RUSSELL
D
R.
CROWLEY RD.
CROWLE
Y AVENUE
NE
FF
P L.
VERNON ST.
EXECUTIVE OFFICES & ADMIN, BUSINESS OFFICE & HEALTH ADMIN SERVICES
DINING & CANTEEN, AUDITORIUM, CHAPEL, BARBERSHOP
LAB & PATHOLOGY, DENTAL
RADIOLOGY & NUCLEAR MEDICINE, SURGERY
OUTPATIENT CLINIC & EMERGENCY DEPARTMENT, WOMEN'S HEALTH,
MENTAL HEALTH
ADMIN SERVICES, NURSING SERVICES, QUALITY MANAGEMENT, RISK
MANAGEMENT
CLC CARDINAL CIRCLE & FREEDOM LANE, DOMICILIARY
PROSTHETICS, GERIATRICS & EXTENDED CARE (GEC), CHAPLAIN SERVICES,
ICU, COMPENSATION & PENSION
CLC OLD TIMERS’ LODGE, DOMICILIARY
OFFICE OF INFORMATION & TECHNOLOGY (OI&T), AMBULATORY SURGERY
CLC MAGNOLIA LANE, SOCIAL WORK, RESPIRATORY THERAPY
ENDOSCOPY/SURGERY CLINIC
DOMICILIARY, DOMICILIARY ADMIN
PTSD CLINIC, MEDICAL/SURGICAL CARE UNIT
DOMICILIARY
PHYSICAL & OCCUPATIONAL THERAPY, CLC PATRIOTS POINT
CLC PATRIOTS POINT
HOME BASED PRIMARY CARE
ENGINEERING SHOP
BOILER PLANT
CARPENTRY SHOP
ENGINEERING OFFICE
TRANSPORTATION OFFICE, STORAGE
WELLNESS CENTER
HOSPICE CARE UNIT
MENTAL HEALTH
OUTPATIENT PRIMARY CARE & WOMEN'S CLINIC
BUILDINGS IN SCOPE
SITE KEY
BUILDING 5B & PORTION OF
5A TR NOT IN 557-22-700
SOW. SEE SHEET 5.G-110.
BUILDING 40 MCR
NOT IN 577-22-700
SOW
BUILDING 9 LEVEL A TR
NOT IN 557-22-700 SOW
AL
EX
AN
DE
R
DR
IV
E
NEW JO
HNSON STREET W
EST
EX
IS
TI
N
G J
O H
N
SO
N S
TR
EE
T
JOHNSON STREET
BLACKWOOD DRIVE
ALEXANDER DRIVE
TROJAKOWSKI AVENUE
EVANS AVENUE
THOMAS LANE
Engineers Architects Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
5:
:0
PM
C :\U se rs
\a pu lle n\
D oc um en ts \M
S_
-1
-V A
D ub lin E
H R
M _G
EN
_R
_a pu lle nV D
XT
7.
rv t
G-004
CAMPUS PLAN
4 54ANP
EHRM INFRASTRUCTURE
UPGRADES
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027 NOVEMBER 8, 2024
100% BID DOCUMENTS
557-22-70022-192
VARIOUS
DJR
Scale: No Scale1 SITE PLAN LOGISTICS PLAN
NORTH
5070L
IC
E N
S E D A RC H I T ECT
DA
V ID J . REICHARD
NOR T H CA RO L I NA
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
HEPA NEGATIVE
AIR UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V.
I.F
EX
IS
TI
N G
W
AL
L
FLOOR SLAB ABOVE
CEILING
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
G-005
_____5 G-005
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY MATS
(CHANGED END OF
SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
ISOLATE AND COVER ALL
SUPPLY DIFFUSERS NOT
IN OPERATION DURING
PROJECT - COORDINATE
W/ COR
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL STATION
WITH AUDIO /
VISUAL
EXISTING WALL
BARRIER
A.
B.
NOTE:
TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL VERIFY LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM EXHAUST. VERIFY LOCAL JURISDICTION CODE AND VA REQUIREMENTS FOR
DISTANCE PRIOR TO STARTING WORK.
CONTRACTOR TO DETERMINE ROUTING TO EXHAUST 100% OUTSIDE IF WINDOW NOT AVAILABLE.
EXHAUST LOCATION
- SEE NOTE A
FLEX DUCT
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR RENOVATION DUBLIN EHRM
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
1/
2" 1"
1"
1/ 2"
1" 1"
1"
1/ 2"
1"
1/ 2"
1'
0" 1/
2" 1/
2"
EQ.EQ.
ICRA NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
DUST CONTROL PLAN NOTES
ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE
OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE
CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED
CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE
CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN
PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.
PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER
ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE
DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF
DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND
DEBRIS CONTROL
TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED
TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED
TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT
PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND
MATERIALS.
CONTRACTOR SHALL USE TWO CARTS TO TRANSFER
CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - A CLEAN
CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED
BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION
STAGING/PREP AREA.
DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.
EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH
AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF
ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES
SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS
OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE
OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE
BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE
CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF
THE COR.
EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE
INFILTRATION FROM ANY ADJACENT EXCAVATION DUST.
ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS
SHALL BE COVERED AND PROTECTED PRIOR STARTING IN THAT
AREA.
VENTILATION AND ENVIRONMENTAL CONTROLS
AIR SYSTEM FLOW: THE COR TO VERIFY AND ACKNOWLEDGE
WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-
CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS
COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR
MUST FLOW FROM CLEAN TO DIRTY AREAS.
NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION
AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING
AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT
AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE
ENCLOSURE TO REMOVE DUST, AIR SHALL PASS AIR THROUGH AN
INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF
FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN),
OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY
VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR
SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE
EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILING SHALL BE VERIFIED DAILY.
AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN
CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR
IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE
TESTING THROUGHOUT THE PROJECT IN THE FREQUENCY AS
IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND
RELATED AREAS
WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL
BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE
CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G.,
COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED
VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING
BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS
UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND
MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE
MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET
WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE
OR WORK AREA.
POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED
CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL
CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED
AND APPROVED THE CLEANING.
IIILOW Risk Group 1
Class III Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I I
III
MEDIUM Risk Group 2 HIGH Risk Group 3 HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
Removal or replacement of building system component(s).
Removal/installation of drywall partitions.
Invasive large-scale new building construction.
Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
Removal of preexisting floor covering, walls, casework or other building components.
New drywall placement.
Renovation work in a single room.
Nonexisting cable pathway or invasive electrical work above ceilings.
The removal of drywall where a moderate amount of dust and debris is created.
Dry sanding where a moderate amount of dust and debris is created.
Work creating significant vibration and/or noise.
Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
Fan shutdown/startup.
Installation of electrical devices or new flooring that produces minimal dust and debris.
The removal of drywall where minimal dust and debris is created.
Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
Physical Therapy Radiology departments All patient waiting rooms All outpatient clinics Research Areas Respiratory Therapy
Office areas (non-clinical) FES/EMS areas
I Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
Emergency Room Clinical Laboratories (specimen) Same Day Surgery Pharmacy Nutrition and Food Service/Canteen Procedural Areas (GI) Inpatient Mental Health
Any area caring for immunocompromised patients Cardiac Cath Lab/IR Central Sterile Supply Sterile Processing Service Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IV or control procedures are necessary.
CL
AS
S
IV
During Construction Project Upon Completion of Project
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
Includes all activities required by Class III Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management Maintenance and Engineering department before construction begins.
Construct and complete critical barriers meeting NFPA 241 requirements.
Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
Remove or isolate return air diffusers to avoid dust entering the HVAC system.
Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
Contain all trash and debris in the work area.
Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
Worker clothing must be clean and free of visible dust before leaving the work area. HEPA vacuuming of clothing or use of cover suites is acceptable.
Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Medical/Surgical Units Negative pressure isolation rooms Outpatient Chemotherapy Areas Operating rooms Post Anesthesia Care Unit Dialysis Dental
CL
AS
S V
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Includes all activities required by Class IV Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management Maintenance and Engineering department before construction begins.
Construct and complete critical barriers meeting NFPA 241 requirements.
Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
Personnel will be required to wear coveralls at all times during Class V work activities. Coveralls must be removed before leaving the anteroom.
Remove or isolate return air diffusers to avoid dust entering the HVAC system.
Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
If exhaust is directed indoors, then the system must be HEPA filtered.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .