This document is a technology plan drawing for the Carl Vinson VA Medical Center's infrastructure upgrades, specifically for Building 40, Level A, Computer Room technology plans. The drawing provides detailed technical specifications for fiber optic cabling, cable trays, and telecommunications room (TR) modifications. Key details include provisions for installing new 12-144 port fiber patch panels in MDA-A and MDA-B cabinets, extending circuit "A" backbone fiber optic cabling, providing 30' service loops for future MDA relocation, and installing a new 18" wide x 4" deep wire basket cable tray. The plan also includes demolition requirements such as removing unused conduits and cabling, maintaining fire alarm services, and coordinating work between disciplines while ensuring rated assembly penetrations are properly repaired.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFICE
OFFICE
OFFICE
VESTIBULE
TELEPHONE
SWITCH RM
INFO MGMT
COMP ROOM
MDA-A
A-06
MDA-A
A-05
MDA-A
A-04
MDA-B
A-03
MDA-A
B-07
HDA-A
B-08
MDA-A
B-06
MDA-A
B-05
MDA-A
B-04
B-03
MDA-A
B-02
HDA-B
B-01
SERVER
SERVER
SERVER
SERVER
SERVER
SERVER MDA-A
C-02
C-03
MDA-A
C-04
C-05
C-06
SERVER
C-07
HDA-B
C-08
HDA-A
C-01
SERVER
SERVER
SERVER
SERVER
SERVER
6 7
EXISTING
BASKET
TRAY
MDA-B
A-02
MDA-B
A-01
Engineers Architects
# NEW KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
5/
/2
:0 1:
P
M C
:\U se rs \n ju si
\D oc um en ts \E
_2 2-
2-
VA
D ub lin
E H
R M
-B ld g
_R
_n ju si .rv t
40.ET412
BUILDING 40, LEVEL A, COMPUTER
ROOM 106 TECHNOLOGY PLANS
82 91PDN
EHRM INFRASTRUCTURE
UPGRADES
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD
DUBLIN, GA 31027 NOVEMBER 8, 2024
100% BID DOCUMENTS
557-22-70022-192
KTK
Scale: 1/4" = 1'-0"1 TECHNOLOGY PLAN 0 2 4 8
NORTH
A. ALL EXISTING CONDITIONS, CONDUITS
AND DEVICES ARE BASED ON THE BEST
AVAILABLE INFORMATION AT THE TIME OF
SURVEY AND VISUAL INSPECTION. VERIFY
EXISTING CONDITIONS.
B. DEVICES SHOWN WITH LIGHT GRAY LINES ARE
EXISTING TO REMAIN. DEVICES SHOWN WITH
DARK, DASHED LINES ARE EXISTING TO BE
DEMOLISHED. DEMOLITION SHALL INCLUDE BUT
NOT BE LIMITED TO THOSE DEVICES AND
SYSTEMS SHOWN. COORDINATE WITH ALL
OTHER DISCIPLINES.
C. AT ALL TIMES, FIRE ALARM SERVICES ARE TO
REMAIN ACTIVE OUTSIDE THE DESIGNATED
DEMOLITION AREA NOTED ON OTHER PLANS.
D. REMOVE ALL UNUSED CONDUIT AND CABLING.
E. WHERE CONDUIT IS REMOVED FROM AN
EXISTING RATED ASSEMBLY NOT SUBJECT TO
DEMOLITION, THE REMAINING PENETRATION
SHALL BE PATCHED/REPAIRED TO MAINTAIN THE
RATING OF THE ASSEMBLY.
F. COORDINATE ALL WORK BETWEEN DISCIPLINES.
1 SEE SHEET 00.TS101 FOR CONTINUATION.
2 SEE SHEET 00.T-601 FOR FIBER CABLE COUNT.
3 FIBER CABLING CONTINUES TO MDA-A.
4 FIBER CABLING CONTINUES TO MDA-B.
5 PROVIDE 9 FIRE/SMOKE SLEEVE ASSEMBLIES.
REFERENCE DETAIL 2/00.ET501 FOR MORE
INFORMATION.
6 MCR MDA TO TR FIBER IS FIELD TERMINATED
WITH FUSION SPLICED SPLICE CASSETTES AT
BOTH ENDS, NOT TO MPO CONNECTORS.
7 EACH CAMPUS FIBER BACKBONE CABLE
INSTALLED TO BE PROVIDED WITH A 30' SERVICE
LOOP ON THE DATA CENTER END FOR FUTURE
MDA RELOCATION AND RE-TERMINATION OF THE
BACKBONE.
8 PROVIDE NEW 18" WIDE X 4" DEEP WIRE BASKET
CABLE TRAY TO CONNECT TO EXISTING. PROVIDE
OPENING IN EXISTING TRAY TO OPEN PATHWAY
FROM NEW TO EXISTING.
9 EXTEND NEW CIRCUIT "A" BACKBONE FIBER
OPTIC CABLING TO MDA-A CABINET A-02.
11 PROVIDE 12-144 PORT FIBER PATCH PANELS FOR
CIRCUIT "A" FIBER IN CABINET MDA-A.
12 PROVIDE 12-144 PORT FIBER PATCH PANELS FOR
CIRCUIT "B" FIBER IN CABINET MDA-B.
13 REMOVE EXISTING 2 POST RACKS FOLLOWING
EQUIPMENT MIGRATION BY VA AND DEMOLITION
OF CAMPUS FIBER BACKBONE BY CONTRACTOR.
INSTALL TWO CABINETS AND CHIMNEYS FOR
MDA-B TO BE FURNISHED BY VA AND INSTALLED
BY CONTRACTOR. INCLUDE WORK TO CONNECT
TO EXISTING OVERHEAD DUCTWORK. WORK TO
BE COMPLETED AFTER ALL NEW TR ’S ARE
OPERATIONAL ON THE NEW A-SIDE FIBER.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 ADDENDUM 1 Date 1
File details come from the government source that posted it. Updated .