This document is a technology plan drawing for the Carl Vinson VA Medical Center's infrastructure upgrades, specifically for Building 40, Level A, Computer Room technology plans. The drawing provides detailed technical specifications for fiber optic cabling, cable trays, and telecommunications room (TR) modifications. Key details include provisions for installing new 12-144 port fiber patch panels in MDA-A and MDA-B cabinets, extending circuit "A" backbone fiber optic cabling, providing 30' service loops for future MDA relocation, and installing a new 18" wide x 4" deep wire basket cable tray. The plan also includes demolition requirements such as removing unused conduits and cabling, maintaining fire alarm services, and coordinating work between disciplines while ensuring rated assembly penetrations are properly repaired.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DZ--EHRM Infrastructure Upgrades Dublin, GA Project 557-22-700, newest first.
File Type Posted
Atch 1 - PreBid RFIs 7.30.2025.xlsx XLSX spreadsheet
36C77625B0013 0004.docx DOCX document
Atch 1 - PreBid RFIs 7.24.2025.xlsx XLSX spreadsheet
36C77625B0013 0003.docx DOCX document
Atch 9 - 22-192 Existing Cable Counts by TR - Dublin - 557-22-700.xlsx XLSX spreadsheet
Atch 7 - 028333.13 Lead Based Paint - Dublin - 557-22-700.pdf PDF
Atch 8 - Dublin EHRM_ACM_Matrix - Dublin - 557-22-700.xlsx XLSX spreadsheet
Atch 6 - 013323 Shop Drawings - Dublin - 557-22-700.pdf PDF
Atch 5 - 013216.15 Project Sched_Small - Dublin - 557-22-700.pdf PDF
Atch 4 - Virtual Bid Opening Information - Dublin - 557-22-700.pdf PDF
Atch 3 - ICRALevel_Department - Dublin - 557-22-700.pdf PDF
Atch 2 - Annual Hydrant Flow Report_9JUL25 - Dublin - 557-22-700.xlsx XLSX spreadsheet
36C77625B0013 0002.docx DOCX document
Atch 1 - PreBid RFIs.xlsx XLSX spreadsheet
Attachment 1 - Site Visit Sign-in Sheet - Dublin EHRM.pdf PDF
36C77625B0013 0001.docx DOCX document
Attachment 2 - Site Visit Agenda - Dublin EHRM.pdf PDF
Attachment 14 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 9 - SOW Atch 2 EUD Requirements.pdf PDF
Attachment 6 - Site Visit Instructions.docx DOCX document
Attachment 1 - Specifications - Dublin GA - EHRM.pdf PDF
Attachment 10 - SOW Atch 3 Elec Panel Labeling.pdf PDF
Attachment 13 - VAAR LOS Construction.docx DOCX document
Attachment 11 - SOW Atch 4 Specifications.pdf PDF
Attachment 8 - SOW Atch 1 Design Guide Telecom Spaces.pdf PDF
Attachment 5 - Drawings 4 of 4 - Dublin GA - EHRM.pdf PDF
Attachment 3 - Drawings 2 of 4 - Dublin GA - EHRM.pdf PDF
Attachment 12 - Wage Rates - GA20250095 02072025.pdf PDF
Attachment 7 - SOW - Dublin GA - EHRM.pdf PDF
Attachment 4 - Drawings 3 of 4 - Dublin GA - EHRM.pdf PDF
Attachment 2 - Drawings 1 of 4 - Dublin GA - EHRM.pdf PDF
36C77625B0013.docx DOCX document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE

OFFICE

OFFICE

VESTIBULE

TELEPHONE

SWITCH RM

INFO MGMT

COMP ROOM

MDA-A

A-06

MDA-A

A-05

MDA-A

A-04

MDA-B

A-03

MDA-A

B-07

HDA-A

B-08

MDA-A

B-06

MDA-A

B-05

MDA-A

B-04

B-03

MDA-A

B-02

HDA-B

B-01

SERVER

SERVER

SERVER

SERVER

SERVER

SERVER MDA-A

C-02

C-03

MDA-A

C-04

C-05

C-06

SERVER

C-07

HDA-B

C-08

HDA-A

C-01

SERVER

SERVER

SERVER

SERVER

SERVER

6 7

EXISTING

BASKET

TRAY

MDA-B

A-02

MDA-B

A-01

Engineers Architects

# NEW KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

5/

/2

:0 1:

P

M C

:\U se rs \n ju si

\D oc um en ts \E

_2 2-

2-

VA

D ub lin

E H

R M

-B ld g

_R

_n ju si .rv t

40.ET412

BUILDING 40, LEVEL A, COMPUTER

ROOM 106 TECHNOLOGY PLANS

82 91PDN

EHRM INFRASTRUCTURE

UPGRADES

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD

DUBLIN, GA 31027 NOVEMBER 8, 2024

100% BID DOCUMENTS

557-22-70022-192

KTK

Scale: 1/4" = 1'-0"1 TECHNOLOGY PLAN 0 2 4 8

NORTH

A. ALL EXISTING CONDITIONS, CONDUITS

AND DEVICES ARE BASED ON THE BEST

AVAILABLE INFORMATION AT THE TIME OF

SURVEY AND VISUAL INSPECTION. VERIFY

EXISTING CONDITIONS.

B. DEVICES SHOWN WITH LIGHT GRAY LINES ARE

EXISTING TO REMAIN. DEVICES SHOWN WITH

DARK, DASHED LINES ARE EXISTING TO BE

DEMOLISHED. DEMOLITION SHALL INCLUDE BUT

NOT BE LIMITED TO THOSE DEVICES AND

SYSTEMS SHOWN. COORDINATE WITH ALL

OTHER DISCIPLINES.

C. AT ALL TIMES, FIRE ALARM SERVICES ARE TO

REMAIN ACTIVE OUTSIDE THE DESIGNATED

DEMOLITION AREA NOTED ON OTHER PLANS.

D. REMOVE ALL UNUSED CONDUIT AND CABLING.

E. WHERE CONDUIT IS REMOVED FROM AN

EXISTING RATED ASSEMBLY NOT SUBJECT TO

DEMOLITION, THE REMAINING PENETRATION

SHALL BE PATCHED/REPAIRED TO MAINTAIN THE

RATING OF THE ASSEMBLY.

F. COORDINATE ALL WORK BETWEEN DISCIPLINES.

1 SEE SHEET 00.TS101 FOR CONTINUATION.

2 SEE SHEET 00.T-601 FOR FIBER CABLE COUNT.

3 FIBER CABLING CONTINUES TO MDA-A.

4 FIBER CABLING CONTINUES TO MDA-B.

5 PROVIDE 9 FIRE/SMOKE SLEEVE ASSEMBLIES.

REFERENCE DETAIL 2/00.ET501 FOR MORE

INFORMATION.

6 MCR MDA TO TR FIBER IS FIELD TERMINATED

WITH FUSION SPLICED SPLICE CASSETTES AT

BOTH ENDS, NOT TO MPO CONNECTORS.

7 EACH CAMPUS FIBER BACKBONE CABLE

INSTALLED TO BE PROVIDED WITH A 30' SERVICE

LOOP ON THE DATA CENTER END FOR FUTURE

MDA RELOCATION AND RE-TERMINATION OF THE

BACKBONE.

8 PROVIDE NEW 18" WIDE X 4" DEEP WIRE BASKET

CABLE TRAY TO CONNECT TO EXISTING. PROVIDE

OPENING IN EXISTING TRAY TO OPEN PATHWAY

FROM NEW TO EXISTING.

9 EXTEND NEW CIRCUIT "A" BACKBONE FIBER

OPTIC CABLING TO MDA-A CABINET A-02.

11 PROVIDE 12-144 PORT FIBER PATCH PANELS FOR

CIRCUIT "A" FIBER IN CABINET MDA-A.

12 PROVIDE 12-144 PORT FIBER PATCH PANELS FOR

CIRCUIT "B" FIBER IN CABINET MDA-B.

13 REMOVE EXISTING 2 POST RACKS FOLLOWING

EQUIPMENT MIGRATION BY VA AND DEMOLITION

OF CAMPUS FIBER BACKBONE BY CONTRACTOR.

INSTALL TWO CABINETS AND CHIMNEYS FOR

MDA-B TO BE FURNISHED BY VA AND INSTALLED

BY CONTRACTOR. INCLUDE WORK TO CONNECT

TO EXISTING OVERHEAD DUCTWORK. WORK TO

BE COMPLETED AFTER ALL NEW TR ’S ARE

OPERATIONAL ON THE NEW A-SIDE FIBER.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 ADDENDUM 1 Date 1