Attachment 4 - Architectural - Part 1.pdf
PDF 24 MB Posted
- Solicitation number
- 36C77621B0003
About this file
This document provides details for a federal contract solicitation for an Emergency Department expansion project at the Cleveland VA Medical Center. The solicitation will be issued as an Invitation for Bid for a firm-fixed-price construction contract by the Department of Veterans Affairs, Veterans Health Administration, Program Contracting Activity Central. The project scope includes construction of a 27,000 square foot, two-story addition and 10,000 square foot renovation of existing space to expand emergency department facilities and add mental health outpatient clinics and specialty care clinics. Work encompasses general construction, alterations, mechanical, electrical and plumbing systems integration. The solicitation will be set aside as a total Service-Disabled Veteran-Owned Small Business set-aside and issued on or around February 26, 2021. The period of performance is approximately 695 calendar days from notice to proceed. The magnitude of construction is valued between $10-20 million.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
F E
C
FEC
F
E C
CG-1
CG-1C
G
-1
CG-1
E
Stair 3
BS3
Office
BA109C
Corridor
BAC328
F E
FE
FE
F E
FE
FE
F E
97'-3" +/- COMMON PATH
OF TRAVEL (100' MAX.
PER CODE)
39'-3" DEAD END
80'-6" +/- COMMON PATH
OF TRAVEL
E
P H
A S
E I S
C O
P E
B O
U N
D A
R Y
P H
A S
E I S
C O
P E
B O
U N
D A
R Y
PHASE I SCOPE BOUNDARY
PHASE I SCOPE BOUNDARY
HVAC
BAC241
TeleComm
BA149
Electrical
BA148
Corridor
BA150B
IT Work Offices
BAC266
4 Person Office
BAC265
2 Person Office
BAC269
Break Area/ Pantry
BAC270A
Collaboration Area
BAC270B
Open Student Offices
BAC270C
Reception/ Waiting
BAC260
Regulatory/ Fiscal Office
BAC261
2 Person Office
BAC262
Storage
BAC264
Director Office
BAC271
Office
BAC272
Office
BAC273
2 Person Office
BAC274
2 Person Office
BAC275
Passage
BAC260B
Copy/ Work Passage
BAC268
Corridor
BA150A
Passage
BAC260C
Passage
BAC260A
Anti-Coagulation Clinic Open Office
BAC280
Corridor
BAC284
Office
BAC281
Storage, File Room
BAC285
Copy File/Work
BAC282
Break Room
BAC283
Waiting
BAC250Triage
BAC251
Exam
BAC252
Exam
BAC253
Exam
BAC254
Exam
BAC255 Records
BAC256
Passage
BAC250B
Stair 4
BS4
Closet
BAC298A
Main Electrical Room
BA151
Outside Air Enclosure
BAC241A
Relief Areawell
BA153A
Mechanical Room
BA153
Secure Storage
BA152A Pharmacy Drug Cache
BA152
Corridor
BA150C
6'-0" +/-
CONSTRUCTION AREA (NEW
ADDITION)
PROVIDE TEMP. CONST.
BARRIER IN CORRIDOR DURING
NEW WALL OPENING
DEMOLITION/CONNECTION
WORK. LOCATE PARTITION TO
MAINTAIN ACCESS INTO EX.
DOUBLE DOORS AS SHOWN
LIFE SAFETY LEGEND:
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA
SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF
CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR
EXISTING/NEW 2 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED SMOKE BARRIER
EXISTING/NEW O HOUR RATED SMOKE PARTITION
E EXIT
FE
FIRE EXTINGUISHER
EXIT SIGN LOCATION
LIFE SAFETY GENERAL NOTES:
1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW
AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS
3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)
4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.
5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE
TO MATCH EXISTING
6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE
FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)
PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT
ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.
GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE
AS DICTATED BY THE ASSEMBLY.
7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND
COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY
DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY
STANDARDS.
HAZARDOUS ROOM
EXISTING/NEW 2 HOUR RATED SMOKE BARRIER
FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"
SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON
COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON
REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "TEMPORARY CONSTRUCTION BARRIER"
TYPICAL PARTITION DETAIL ON SHEET AS-601. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY
BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE
APPROVED BY THE COR.
SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT
CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE
SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BE ONE-HOUR FIRE RATED.
PROJECT SCOPE BOUNDARY
SOLID WHITE AREA INDICATES
CONSTRUCTION AREA WITHIN SCOPE
OF WORK
# PROJECT AREA OCCUPANT LOAD
GRAY HATCHED AREA INDICATES AREA
OUTSIDE OF SCOPE OF WORK
PHASING DURATION & CONSTRUCTION TIMEFRAMES:
THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING
HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:
PRE-CONSTRUCTION: 60 DAYS
PHASE I: 365 DAYS
VA ACTIVATION OF PHASE I: 45 DAYS
PHASE II: 60 DAYS
VA ACTIVATION OF PHASE II: 15 DAYS (NOTE: GC IS PERMITTED TO CONSTRUCT TEMP. WALLS FOR PHASE III
DURING THIS TIME)
PHASE III: 150 DAYS
TOTAL TIMEFRAME: 695 DAYS
THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:
CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, INCLUDING CONSTRUCTION OF THE ADDITION. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH
ACTIVITIES WITH EMERGENCY AND SPECIALTY CARE DEPARTMENT STAFF AND VA COR.
THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS
APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:
• UTILITY SHUTDOWNS
• EXISTING MEP SYSTEM SHUTDOWNS
• WORK IN PUBLIC CORRIDORS/WAITING AREAS
• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING
• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING
PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF EXISTING
FINISHES
• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS
WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.
REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS
INFECTION CONTROL CLASS & SAFETY MEASURES:
THE WORK IDENTIFIED IN THIS PROJECT IS ASSIGNED A CLASS IV INFECTION CONTROL CLASS AND SHALL APPLY TO THIS PROJECT THROUGHOUT THE ENTIRETY OF CONSTRUCTION. ALL CONTRACTORS AND CONSTRUCTION WORKERS ARE REQUIRED TO VACUUM THEIR CLOTHING FULLY IN THE TEMPORARY CONSTRUCTION ANTEROOMS IDENTIFIED ON THE DRAWINGS PRIOR TO ENTERING OCCUPIED PORTIONS OF THE
BUILDING.
ANTEROOMS SHALL BE INCLUDED AS A PART OF ALL TEMPORARY CONSTRUCTION BARRIERS AND ARE DEPICTED IN THE DRAWINGS. ANTEROOMS SHALL MAINTAIN NEGATIVE PRESSURE FROM SURROUNDING AREAS
AT ALL TIMES.
REFER TO DEMOLITION PLANS FOR SCOPE OF TEMPORARY CONSTRUCTION BARRIERS REQUIRED FOR THE PROJECT. REFER TO AND FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS" 01 35 26
THROUGHOUT THE ENTIRETY OF THE PROJECT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
CIVIL/MECH./ELEC./PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY.
UNIONTOWN, OH 44111
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
LANDSCAPE ARCHITECTURE:
JAMES S. MCKNIGHT
P.O. BOX 14158
CLEVELAND, OH 44114
P. 216.952.2408
C U s e rs
\d a v e
\D o c u m e n ts
\E x p a n d E m e rg e n c y D e p t_
R d a k a p la n
.r v t
/8
/2
:0
:0
P M
BID ISSUE SUBMISSION
LS-0.1
BASEMENT LEVEL LIFE SAFETY PLAN - PHASE
I
EMERGENCY DEPARTMENT
EXPANSION
10701 EAST BLVD. CLEVELAND, OHIO
541-370
2.9.21 CJK DAK
SCALE: 1/8" = 1'-0"
BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I
NORTH
Revisions: Date:
SCHEM. DESIGN SUBMISSION 10.21.19
DESIGN DEV. SUBMISSION 12.9.19
65% CD's SUBMISSION 1.28.20
90% CD's SUBMISSION 5.13.20
100% CD's SUBMISSION 6.26.20
FINAL CD's SUBMISSION 9.11.20
BID ISSUE SUBMISSION 2.9.21
FEC
R E
F
R E
F
F E
C
F E
C
FEC
CG-1
E
Womens
1A156
Lead Techs Work Room
X1A157
Exam/Treatment Room
X1A159
Exam/Treatment Room
X1A161
Exam/Treatment Room
X1A163
Exam/Treatment Room
X1A165
Stair 3
1S3
On-Call Room
X1A169
Program Support Ass't
X1A170
Nurse Manager
X1A171
Staff Toilet
1A157A
Corridor
1A100E
Corridor
X1A100F
Corridor
X1A100G
Waiting Room
X1AC220
Reception
X1AC221 Toilet
X1AC222
Radiology 1
X1AC223
Telecomm
X1A181
Womens
X1A214
Hospitality
1A215
Vending
1A216
Director's Office
1A142 Precepting Room
1A143
Exam/Treatment Room
1A145
Storage
1A149
Corridor
1A100I
Electrical
X1A182
Mens
X1A212 Radiology 2
X1AC224
Dressing
X1AC225
Office
X1AC226
Office
X1AC227
Storage
X1AC228
Processing
X1AC229
Meds Room
X1AC232PCAS
X1AC234
Exam 1
X1AC241
Exam 2
X1AC242
Exam 3
X1AC243
Exam 4
X1AC244
Exam 5
X1AC245
Point of Care
X1AC246
Soiled Utility
X1AC247
Exam 6
X1AC251
Exam 7
X1AC252
Exam 8
X1AC253
Exam 9
X1AC254
Exam Room 10
X1AC255
Exam 10
X1AC256
Exam 11
X1AC257
Nourishment
X1AC270
Restroom
X1AC272Sub-Waiting
X1AC274
HAC
X1AC276
Clean Utility
X1AC275
ECG
X1AC277
Triage
X1AC279
Telecomm
X1AC262
Electrical
X1AC264
Stair 4
1S4
Lobby/Waiting
X1A211
Restroom Alcove
X1A213
Corridor
X1AC280
Corridor
X1AC240
Nurse First
X1AC281
Registration 2
X1AC282
Fast Track Exam
X1AC285
Fast Track Exam
X1AC286
Toilet
X1AC287
Fast Track Exam
X1AC288
Fast Track Exam
X1AC290
Staff Lounge
X1AC289B
Staff Lounge
X1AC289B
Corridor
X1AC291
Registration 1
X1AC284
Corridor
X1AC220A
Clean Linen
X1AC266
AOD
X1AC268
Registration
1AC224
Triage 1
1AC222
Triage 2
1AC221
Exam Room 1/Decontamination
Room
1AC201
Anteroom
1AC200
Patient Storage
1AC223
Nurse Asst.
Manager Office
1AC204
Clean Supply / Equip.
1AC203
Exam Room 2
1AC205
Exam Room 3
1AC206
Corridor
1AC200A Exam Room 4
1AC207
Exam Room 5
1AC208
Exam Room 6
1AC209
Exam Room 7
1AC210
Staff Work Room
1AC211
Exam Room 8
1AC212
Exam Room 9
1AC213
Med. Storage
1AC233
Exam Room 18
1AC234
Exam Room 20
1AC236
Team Work Area
1AC214
Soiled Utility
1AC215Clean Utility
1AC216
Nurse Manager Office
1AC217
Team Work Area
1AC219
Gurney Alcove
1AC218
Patient Toilet
1AC226
OA Shaft
1AC227
Exam Room 13
1AC229
Exam Room 12
1AC230
Exam Room 11
1AC231
Exam Room 10
1AC232Alcove
1AC228
Corridor
1AC200B
Corridor
1AC200C
Corridor
1AC200D
Corridor
1AC200E
Main Entry Vestibule
1A208
Exam Room 19
1AC235
Nurse Station
X1AC235
Corridor
X1AC260
Docs
X1AC231
Lobby/Waiting
1AC225
Decon. Restroom
1AC201A
Escort Room
X1B351
FE
F E
F E
E
F E
FE
P H
A S
E I S
C O
P E
B O
U N
D A
R Y
P H
A S
E I S
C O
P E
B O
U N
D A
R Y
PHASE I SCOPE BOUNDARY
PHASE I SCOPE BOUNDARY
E
TEMPORARY
EMERG. DEPT.
ENTRY
S M
O K
E C
O M
P A
R T
M E
N T
'A
S M
O K
E C
O M
P A
R T
M E
N T
'B
SMOKE
COMPARTMENT 'B'
SMOKE
COMPARTMENT 'C'
ANTEROOM
STAIR DOOR SHALL
REMAIN AS A MEANS OF
EGRESS FROM UPPER
FLOORS. DO NOT BLOCK
OR OBSTRUCT EGRESS
PATH AT ANY TIME
TEMPORARY EMERGENCY
DEPARTMENT ENTRY SHALL
BE CONSTRUCTED AND IN
USE AHEAD OF PHASE I
CONSTRUCTION. REFER TO
PRE-CONSTRUCTION PLANS
FOR SCOPE OF WORK
CONST.
ENTRIES
NOTE: EXISTING EMERGENCY
DEPARTMENT AND
RADIOLOGY DEPARTMENT
SHALL REMAIN IN FULL
OPERATION THROUGHOUT
THE ENTIRETY OF PHASE I
CONSTRUCTION
EXISTING FIRE STAIR DOOR SHALL REMAIN IN USE AND
ACCESSIBLE AT ALL TIMES. REFER TO SITEWORK FOR
IMPROVEMENTS OUTSIDE OF DOOR. GC SHALL COORD.
INTERIM LIFE SAFETY MEASURES REQUIRED AT ALL
TIMES WHEN DOOR ACCESS IS LIMITED OR CANNOT BE
PROVIDED DURING SITEWORK IMPROVEMENTS
MIN.
R 6' - 0"
TEMP. WALL/DOOR
Point-Of-Care
1AC220
Alcove
1AC202
Alcove
1AC200Ca
2 HR
RATED
SHAFT
E
E
Fire Alarm
1AC228A
LIFE SAFETY LEGEND:
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA
SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF
CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR
EXISTING/NEW 2 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED SMOKE BARRIER
EXISTING/NEW O HOUR RATED SMOKE PARTITION
E EXIT
FE
FIRE EXTINGUISHER
EXIT SIGN LOCATION
LIFE SAFETY GENERAL NOTES:
1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW
AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS
3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)
4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.
5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE
TO MATCH EXISTING
6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE
FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)
PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT
ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.
GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE
AS DICTATED BY THE ASSEMBLY.
7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND
COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY
DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY
STANDARDS.
HAZARDOUS ROOM
EXISTING/NEW 2 HOUR RATED SMOKE BARRIER
FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"
SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON
COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON
REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "TEMPORARY CONSTRUCTION BARRIER"
TYPICAL PARTITION DETAIL ON SHEET AS-601. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY
BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE
APPROVED BY THE COR.
SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT
CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE
SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BE ONE-HOUR FIRE RATED.
PROJECT SCOPE BOUNDARY
SOLID WHITE AREA INDICATES
CONSTRUCTION AREA WITHIN SCOPE
OF WORK
# PROJECT AREA OCCUPANT LOAD
GRAY HATCHED AREA INDICATES AREA
OUTSIDE OF SCOPE OF WORK
PHASING DURATION & CONSTRUCTION TIMEFRAMES:
THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING
HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:
PRE-CONSTRUCTION: 60 DAYS
PHASE I: 365 DAYS
VA ACTIVATION OF PHASE I: 45 DAYS
PHASE II: 60 DAYS
VA ACTIVATION OF PHASE II: 15 DAYS (NOTE: GC IS PERMITTED TO CONSTRUCT TEMP. WALLS FOR PHASE III
DURING THIS TIME)
PHASE III: 150 DAYS
TOTAL TIMEFRAME: 695 DAYS
THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:
CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, INCLUDING CONSTRUCTION OF THE ADDITION. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH
ACTIVITIES WITH EMERGENCY AND SPECIALTY CARE DEPARTMENT STAFF AND VA COR.
THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS
APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:
• UTILITY SHUTDOWNS
• EXISTING MEP SYSTEM SHUTDOWNS
• WORK IN PUBLIC CORRIDORS/WAITING AREAS
• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING
• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING
PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF EXISTING
FINISHES
• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS
WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.
REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS
INFECTION CONTROL CLASS & SAFETY MEASURES:
THE WORK IDENTIFIED IN THIS PROJECT IS ASSIGNED A CLASS IV INFECTION CONTROL CLASS AND SHALL APPLY TO THIS PROJECT THROUGHOUT THE ENTIRETY OF CONSTRUCTION. ALL CONTRACTORS AND CONSTRUCTION WORKERS ARE REQUIRED TO VACUUM THEIR CLOTHING FULLY IN THE TEMPORARY CONSTRUCTION ANTEROOMS IDENTIFIED ON THE DRAWINGS PRIOR TO ENTERING OCCUPIED PORTIONS OF THE
BUILDING.
ANTEROOMS SHALL BE INCLUDED AS A PART OF ALL TEMPORARY CONSTRUCTION BARRIERS AND ARE DEPICTED IN THE DRAWINGS. ANTEROOMS SHALL MAINTAIN NEGATIVE PRESSURE FROM SURROUNDING AREAS
AT ALL TIMES.
REFER TO DEMOLITION PLANS FOR SCOPE OF TEMPORARY CONSTRUCTION BARRIERS REQUIRED FOR THE PROJECT. REFER TO AND FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS" 01 35 26
THROUGHOUT THE ENTIRETY OF THE PROJECT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
CIVIL/MECH./ELEC./PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY.
UNIONTOWN, OH 44111
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
LANDSCAPE ARCHITECTURE:
JAMES S. MCKNIGHT
P.O. BOX 14158
CLEVELAND, OH 44114
P. 216.952.2408
C U s e rs
\d a v e
\D o c u m e n ts
\E x p a n d E m e rg e n c y D e p t_
R d a k a p la n
.r v t
/8
/2
:0
:1
P M
BID ISSUE SUBMISSION
LS-1.1
1ST FLOOR LIFE SAFETY PLAN - PHASE I EMERGENCY DEPARTMENT
EXPANSION
10701 EAST BLVD. CLEVELAND, OHIO
541-370
2.9.21 CJK DAK
SCALE: 1/8" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN - PHASE I
NORTH
Revisions: Date:
SCHEM. DESIGN SUBMISSION 10.21.19
DESIGN DEV. SUBMISSION 12.9.19
65% CD's SUBMISSION 1.28.20
90% CD's SUBMISSION 5.13.20
100% CD's SUBMISSION 6.26.20
E
F
R E
F
F E
C
F E
C
FEC
FEC
S T
A
AIR
B A
T
SV
INJ
Isocenter
WS
H S
R
H S
R
PDU
CG-1
LIFE SAFETY LEGEND:
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA
SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF
CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR
EXISTING/NEW 2 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED SMOKE BARRIER
EXISTING/NEW O HOUR RATED SMOKE PARTITION
E EXIT
FE
FIRE EXTINGUISHER
EXIT SIGN LOCATION
LIFE SAFETY GENERAL NOTES:
1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW
AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS
3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)
4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.
5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE
TO MATCH EXISTING
6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE
FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)
PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT
ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.
GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE
AS DICTATED BY THE ASSEMBLY.
7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND
COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY
DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY
STANDARDS.
HAZARDOUS ROOM
EXISTING/NEW 2 HOUR RATED SMOKE BARRIER
FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"
SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON
COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON
REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "TEMPORARY CONSTRUCTION BARRIER"
TYPICAL PARTITION DETAIL ON SHEET AS-601. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY
BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE
APPROVED BY THE COR.
SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT
CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE
SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BE ONE-HOUR FIRE RATED.
PROJECT SCOPE BOUNDARY
SOLID WHITE AREA INDICATES
CONSTRUCTION AREA WITHIN SCOPE
OF WORK
# PROJECT AREA OCCUPANT LOAD
GRAY HATCHED AREA INDICATES AREA
OUTSIDE OF SCOPE OF WORK
PHASING DURATION & CONSTRUCTION TIMEFRAMES:
THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING
HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:
PRE-CONSTRUCTION: 60 DAYS
PHASE I: 365 DAYS
VA ACTIVATION OF PHASE I: 45 DAYS
PHASE II: 60 DAYS
VA ACTIVATION OF PHASE II: 15 DAYS (NOTE: GC IS PERMITTED TO CONSTRUCT TEMP. WALLS FOR PHASE III
DURING THIS TIME)
PHASE III: 150 DAYS
TOTAL TIMEFRAME: 695 DAYS
THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:
CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, INCLUDING CONSTRUCTION OF THE ADDITION. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH
ACTIVITIES WITH EMERGENCY AND SPECIALTY CARE DEPARTMENT STAFF AND VA COR.
THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS
APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:
• UTILITY SHUTDOWNS
• EXISTING MEP SYSTEM SHUTDOWNS
• WORK IN PUBLIC CORRIDORS/WAITING AREAS
• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING
• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING
PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF EXISTING
FINISHES
• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS
WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.
REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS
E
FE
F E
E
F E
FE
PHASE II SCOPE BOUNDARY
PHASE II SCOPE BOUNDARY
P H
A S
E
II
S C
O P
E B
O U
N D
A R
Y
F E
CT Equip.
1AC280A
Office
1AC278
Office
1AC277
Corridor
1AC272A
ED/PAOC Conf.
Room
1AC283
E
CONST.
ENTRIES
CONST.
ENTRY6
CONST.
ENTRY
S M
O K
E C
O M
P A
R T
M E
N T
'A
S M
O K
E C
O M
P A
R T
M E
N T
'B
SMOKE
COMPARTMENT 'B'
SMOKE
COMPARTMENT 'C'
On-Call Toilet Room
1AC282A
On-Call Room
1AC282
Police/Security
1AC281
Storage
1AC281A
Corridor
X1B200M
Alcove
1AC255A
CT Scanner
1AC280
CT Control Room
1AC279
ANTEROOM
CONST.
ENTRY
Womens
1A156
Lead Techs Work Room
X1A157
Exam/Treatment Room
X1A159
Exam/Treatment Room
X1A161
Exam/Treatment Room
X1A163
Exam/Treatment Room
X1A165
Stair 3
1S3
On-Call Room
X1A169
Program Support Ass't
X1A170
Nurse Manager
X1A171
Staff Toilet
1A157A
Corridor
X1A100F
Corridor
X1A100G
Waiting Room
1AC272
Reception
1AC273 Toilet
1AC274
Radiology 1
1AC275
Telecomm
X1A181
Electrical
X1A182
Mens
X1A212
Womens
X1A214
Hospitality
1A215
Vending
1A216
Director's Office
1A142
Precepting Room
1A143
Exam/Treatment Room
1A145
Storage
1A149
Corridor
1A100I
Exam 1
X1AC241
Exam 2
X1AC242
Exam 3
X1AC243
Exam 4
X1AC244
Exam 5
X1AC245
Point of Care
X1AC246
Soiled Utility
X1AC247
Exam 6
X1AC251
Exam 7
X1AC252
Exam 8
X1AC253
Exam 10
X1AC256
Exam 11
X1AC257
Nourishment
X1AC270
Restroom
X1AC272
Sub-Waiting
X1AC274
HAC
X1AC276
Clean Utility
X1AC275
ECG
X1AC277
Triage
X1AC279
Telecomm
X1AC262
Electrical
X1AC264
Stair 4
1S4
Lobby
X1A211
Restroom Alcove
X1A213
Corridor
X1AC280
Corridor
X1AC240
Nurse First
X1AC281
Registration 2
X1AC282
Fast Track Exam
X1AC285
Fast Track Exam
X1AC286
Toilet
X1AC287
Fast Track Exam
X1AC288
Fast Track Exam
X1AC290
Staff Lounge
X1AC289B
Staff Lounge
X1AC289B
Corridor
X1AC291
Registration 1
X1AC284
Clean Linen
X1AC266
AOD
X1AC268
Registration
1AC234
Triage 1
1AC232
Triage 2
1AC231
Exam Room 1/Decontamination
Room
1AC201
Anteroom
1AC200
Patient Storage
1AC233
Nurse Asst.
Manager Office
1AC204
Clean Supply/Equip.
1AC203
Exam Room 2
1AC205
Exam Room 3
1AC206
Corridor
1AC200A
Exam Room 4
1AC207
Exam Room 5
1AC208
Exam Room 6
1AC209
Exam Room 7
1AC210
Staff Work Room
1AC211
Exam Room 8
1AC212
Exam Room 9
1AC213
Med. Storage
1AC233
Exam Room 18
1AC234
Exam Room 20
1AC236
Team Work Area
1AC214Soiled Utility
1AC215Clean Utility
1AC216
Nurse Manager Office
1AC217
Team Work Area
1AC219
Gurney Alcove
1AC218
Patient Toilet
1AC226
OA Shaft
1AC227
Exam Room 13
1AC229
Exam Room 12
1AC230
Exam Room 11
1AC231
Exam Room 10
1AC232
Alcove
1AC228
Corridor
1AC200B
Corridor
1AC200C
Corridor
1AC200D
Corridor
1AC200E
Main Entry Vestibule
1A208
Exam Room 19
1AC235
Nurse Station
X1AC235
Corridor
X1AC260
Docs
X1AC231
Lobby/Waiting
1AC225
CT Equip.
1AC238
Dressing
1AC276
Patient Toilet
1AC247
CONST.
ENTRY
ANTEROOM
GC SHALL ENSURE THAT
EX. ELEC. & TELECOMM
ROOMS ARE ACCESSIBLE
TO VA STAFF AT ALL TIMES
DURING CONSTRUCTION
E
EXISTING CORRIDOR SHALL SERVE AS ANTEROOM
FOR CONST. GC SHALL FULLY SEAL THREE (3)
DOORS ON NORTH WALL, WHICH SHALL REMAIN
CLOSED. EX. ELEC./TELE. DOOR SHALL BE
SEALED BUT REMAIN OPERABLE FOR ACCESS
FULLY SEAL DOUBLE
DOORS - SHALL REMAIN
CLOSED AT ALL TIMES
DURING
CONSTRUCTION
EXISTING NORTH RADIOLOGY
ROOM SHALL REMAIN ACCESSIBLE
AND IN FULL OPERATION DURING
CONSTRUCTION
7'-1" +/-
Decon. Restroom
1AC201A
Point-of-Care
1AC220
Clean Linen
1AC248
Corridor
1AC272B
8'-7" +/-
Nourishment
1AC255B
Alcove
1AC202
Alcove
1AC200Ca
NOTE: PHASE I EMERGENCY
DEPARTMENT, EXISTING
EMERGENCY DEPARTMENT
AND RADIOLOGY
DEPARTMENT SHALL REMAIN
IN FULL OPERATION
THROUGHOUT THE ENTIRETY
OF PHASE II CONSTRUCTION
FE
TEMP. BARRIER
NOTE: INTENT AT
THESE LOCATIONS
IS TO CONSTRUCT
THE FINAL WALL
ASSEMBLIES AND
HAVE THEM SERVE
AS CONST.
BARRIER. SEE
IMPROVEMENT
PLAN FOR
DIMENSIONS
MAIN CORRIDORS
SHALL REMAIN IN
USE DURING
PHASE II
CONSTRUCTION
FLOORING REPLACEMENT NOTE: GC SHALL
COORD. SCHEDULING/SEQUENCING OF
FLOORING REPLACEMENT WITH COR TO
ENSURE THAT EGRESS DOOR CAN REMAIN
ACCESSIBLE FOR USE, OR, TO ENSURE
THAT INTERIM LIFE SAFETY MEASURES
ARE IN PLACE DURING TIMES WHICH DOOR
IS NOT ACCESSIBLE
'-0
6'-0" +/-
TEMP. BARRIER NOTE FOR FLOORING
REPLACEMENT/FINISHES IN EXISTING LOBBY
X1A211 : IT IS INTENDED THAT THE FLOORING
DEMO/REPLACEMENT AND FINISHES SCOPE BE
SCHEDULED TO OCCUR TOWARDS THE END OF
PHASE II TO PERMIT USE OF THE MAIN
CORRIDOR AND RESTROOMS FOR AS LONG AS
POSSIBLE. FLOORING DEMO AND
REPLACEMENT WORK SHALL BE PERFORMED
AFTER HOURS OR ON WEEKENDS ONLY. GC
SHALL COORDINATE ALL SCHEDULING WITH VA
SPECIAL PHASING NOTE: GC SHALL BE
AWARE THAT EGRESS FROM STAIR AND
EXIT PATH TO MAIN ENTRY VESTIBULE
MUST BE MAINTAINED. FLOORING/FINISH
WORK IN THIS AREA SHOWN IN PLAN
SHALL BE COORD. WITH VA & SAFETY
DEPT. TO ENSURE SAFETY AND
PROTECTIVE MEASURES ARE IN PLACE,
AND TO MAINTAIN SAFE EGRESS FOR
THE BUILDING WITH MINIMAL SHUTDOWN
4'-6 1/2"
6'-0"
Fire Alarm
2AC228A
INFECTION CONTROL CLASS & SAFETY MEASURES:
THE WORK IDENTIFIED IN THIS PROJECT IS ASSIGNED A CLASS IV INFECTION CONTROL CLASS AND SHALL APPLY TO THIS PROJECT THROUGHOUT THE ENTIRETY OF CONSTRUCTION. ALL CONTRACTORS AND CONSTRUCTION WORKERS ARE REQUIRED TO VACUUM THEIR CLOTHING FULLY IN THE TEMPORARY CONSTRUCTION ANTEROOMS IDENTIFIED ON THE DRAWINGS PRIOR TO ENTERING OCCUPIED PORTIONS OF THE
BUILDING.
ANTEROOMS SHALL BE INCLUDED AS A PART OF ALL TEMPORARY CONSTRUCTION BARRIERS AND ARE DEPICTED IN THE DRAWINGS. ANTEROOMS SHALL MAINTAIN NEGATIVE PRESSURE FROM SURROUNDING AREAS
AT ALL TIMES.
REFER TO DEMOLITION PLANS FOR SCOPE OF TEMPORARY CONSTRUCTION BARRIERS REQUIRED FOR THE PROJECT. REFER TO AND FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS" 01 35 26
THROUGHOUT THE ENTIRETY OF THE PROJECT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
CIVIL/MECH./ELEC./PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY.
UNIONTOWN, OH 44111
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
LANDSCAPE ARCHITECTURE:
JAMES S. MCKNIGHT
P.O. BOX 14158
CLEVELAND, OH 44114
P. 216.952.2408
C U s e rs
\d a v e
\D o c u m e n ts
\E x p a n d E m e rg e n c y D e p t_
R d a k a p la n
.r v t
/8
/2
:0
:2
P M
BID ISSUE SUBMISSION
LS-1.2
1ST FLOOR LIFE SAFETY PLAN - PHASE II EMERGENCY DEPARTMENT
EXPANSION
10701 EAST BLVD. CLEVELAND, OHIO
541-370
2.9.21 CJK DAK
SCALE: 1/8" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN - PHASE II
NORTH
Revisions: Date:
SCHEM. DESIGN SUBMISSION 10.21.19
DESIGN DEV. SUBMISSION 12.9.19
65% CD's SUBMISSION 1.28.20
90% CD's SUBMISSION 5.13.20
100% CD's SUBMISSION 6.26.20
E
F
F E
C
FEC
FEC
FEC
F
E C
REF.
FEC
FEC
REF.
S T
A
AIR
B A
T
SV
INJ
Isocenter
WS
H S
R
H S
R
PDU
C G
-4
C G
-3
CG-1
CG-1
LIFE SAFETY LEGEND:
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA
SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF
CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR
EXISTING/NEW 2 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED SMOKE BARRIER
EXISTING/NEW O HOUR RATED SMOKE PARTITION
E EXIT
FE
FIRE EXTINGUISHER
EXIT SIGN LOCATION
LIFE SAFETY GENERAL NOTES:
1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW
AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS
3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)
4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.
5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE
TO MATCH EXISTING
6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE
FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)
PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT
ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.
GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE
AS DICTATED BY THE ASSEMBLY.
7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND
COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY
DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY
STANDARDS.
HAZARDOUS ROOM
EXISTING/NEW 2 HOUR RATED SMOKE BARRIER
FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"
SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON
COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON
REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "TEMPORARY CONSTRUCTION BARRIER"
TYPICAL PARTITION DETAIL ON SHEET AS-601. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY
BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE
APPROVED BY THE COR.
SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT
CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE
SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BE ONE-HOUR FIRE RATED.
PROJECT SCOPE BOUNDARY
SOLID WHITE AREA INDICATES
CONSTRUCTION AREA WITHIN SCOPE
OF WORK
# PROJECT AREA OCCUPANT LOAD
GRAY HATCHED AREA INDICATES AREA
OUTSIDE OF SCOPE OF WORK
PHASING DURATION & CONSTRUCTION TIMEFRAMES:
THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING
HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:
PRE-CONSTRUCTION: 60 DAYS
PHASE I: 365 DAYS
VA ACTIVATION OF PHASE I: 45 DAYS
PHASE II: 60 DAYS
VA ACTIVATION OF PHASE II: 15 DAYS (NOTE: GC IS PERMITTED TO CONSTRUCT TEMP. WALLS FOR PHASE III
DURING THIS TIME)
PHASE III: 150 DAYS
TOTAL TIMEFRAME: 695 DAYS
THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:
CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, INCLUDING CONSTRUCTION OF THE ADDITION. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH
ACTIVITIES WITH EMERGENCY AND SPECIALTY CARE DEPARTMENT STAFF AND VA COR.
THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS
APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:
• UTILITY SHUTDOWNS
• EXISTING MEP SYSTEM SHUTDOWNS
• WORK IN PUBLIC CORRIDORS/WAITING AREAS
• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING
• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING
PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF EXISTING
FINISHES
• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS
WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.
REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS
Nurse Manager
1A171
Program Support Ass't
1A170
On-Call Room
1A169
Staff Toilet
1A157A
Mental Health Consult.
1A167
Mental Health Consult.
1A166
Mental Health Consult.
1A165
Mental Health Consult./Diabetes
Education
1A164
Soiled Holding
1A153
Exam/Treatment Room
1A146
Corridor
1A100I
Storage
1A152
Stair 3
1S3
Corridor
1A100F
Corridor
1A100G
Exam/Treatment Room
1A145
Precepting Room
1A143
Director's Office
1A142
Check-Out
1A137D
E
FE
F E
E
F E
FE
Womens
1A156
Clean Utility
1A157
Waiting Room
1AC272
Reception
1AC273 Toilet
1AC274
Radiology 1
1AC275
Telecomm
X1A181
Electrical
X1A182
Telecomm
X1AC262
Electrical
X1AC264
Stair 4
1S4
Mens
1A212
Restroom Alcove
1A213
Womens
1A214
Hospitality
1A215
Vending
1A216
Corridor
1AC272A
OA Shaft
1AC227
Alcove
1AC228
Exam Room 13
1AC229
Exam Room 12
1AC230
Exam Room 11
1AC231
Exam Room 10
1AC232
Med. Storage
1AC233
Exam Room 18
1AC234
Exam Room 19
1AC235
Exam Room 20
1AC236
Corridor
1AC200E
Soiled Utility
1AC246
CT. Equip
1AC238
Patient Toilet
1AC247
Exam Room 23
1AC253
Medication
1AC256
Anteroom
1AC257
Patient Changing
1AC258
Interview Room
1AC259
PAOC Exam 1
1AC260
PAOC Exam 2
1AC261
PAOC Exam 3
1AC265
Patient Toilet
1AC263
Break Room
1AC269
Women's Changing
1AC270A
Men's Changing
1AC270B
PAOC Office
1AC271
PAOC Work Area
1AC268
Corridor
1AC200H
Corridor
1AC200J
CT Equip.
1AC280A
PAOC Soiled Holding
1AC250
Office
1AC278
Office
1AC277
ED/PAOC
Conference
Room
1AC283
Storage
1AC281A
Registration
1AC234
Triage 1
1AC232
Triage 2
1AC231
Exam Room 1/Decontamination
Room
1AC201
Anteroom
1AC200
Patient Storage
1AC233
Nurse Asst.
Manager Office
1AC204
Exam Room 2
1AC205
Exam Room 3
1AC206
Corridor
1AC200A Exam Room 4
1AC207
Exam Room 5
1AC208
Exam Room 6
1AC209
Exam Room 7
1AC210
Staff Work Room
1AC211
Exam Room 8
1AC212
Exam Room 9
1AC213
Team Work Area
1AC214Soiled Utility
1AC215Clean Utility
1AC216
Nurse Manager Office
1AC217
Team Work Area
1AC219
Gurney Alcove
1AC218
Patient Toilet
1AC236
Corridor
1AC200B
Corridor
1AC200C
Corridor
1AC200D
On-Call Toilet Room
1AC282A
P H
A S
E I
II
S
C O
P E
B O
U N
D A
R Y
PHASE III SCOPE BOUNDARY
P H
A S
E I
II
S
C O
P E
B O
U N
D A
R Y
PAOC Exam 4
1AC266
Pantry
1AC269A
MAT. STO.
1AC267
Exam Room 21
1AC239
EMS Closet
1AC237
Team Work Area
1AC240
Clean Utility
1AC245Team Work Area
1AC252
Corridor
1AC200F
Corridor
1AC200G
Corridor
1AC200I
Exam Room 14
1AC244
Exam Room 15
1AC243
Exam Room 16
1AC242
Exam Room 17
1AC241
Staff Locker Room
1AC270
Lobby
1A211
6'-0" MIN.
FE
FE
FE
F E
FE
CONST.
ENTRY
CONST.
ENTRY
EXISTING SLIDING DOORS
TO BE TEMPORARILY
DEACTIVATED - NOT IN USE
DURING CONSTRUCTION.
CONSTRUCT TEMP. BARRIER
TO THE NORTH AS SHOWN
S M
O K
E C
O M
P A
R T
M E
N T
'A
S M
O K
E C
O M
P A
R T
M E
N T
'B
SMOKE
COMPARTMENT 'B'
SMOKE
COMPARTMENT 'C'
On-Call Room
1AC282
Police/Security
1AC281
CT Scanner
1AC280
CT Control Room
1AC279
Exam Room 24
1AC254
Exam Room 22
1AC249
E
EGRESS FROM
STAIR DOOR
SHALL BE
MAINTAINED
AT ALL TIMES
SEE DEMOLITION PLAN
FOR SPECIAL PHASING
REGARDING THE
CONSTRUCTION OF
EAST TEMP. CONST.
BARRIERS
ANTEROOM
CONST.
ENTRY
TEMP. BARRIER NOTE: INTENT AT THIS
LOCATION IS TO CONSTRUCT THE FINAL
WALL ASSEMBLY AND HAVE IT SERVE AS
CONST. BARRIER. SEE IMPROVEMENT PLAN
FOR DIMENSIONS
ALIGN
CONST.
ENTRY
ANTE-
ROOM
TEMP. BARRIER NOTE: INTENT AT
THESE LOCATIONS IS TO CONSTRUCT
THE FINAL WALL ASSEMBLIES AND HAVE
THEM SERVE AS CONST. BARRIER. SEE
IMPROVEMENT PLAN FOR DIMENSIONS
PROVIDE 42" W TEMP.
DOOR HERE TO MATCH
DOOR SIZE TO BE
INSTALLED AS A PART OF
PHASE III
M
IN
8'-7"
Decon. Restroom
1AC201A
Alcove
1AC202
Clean Supply/Equip.
1AC203
Alcove
1AC255A
Nourishment
1AC255B
Clean Linen
1AC248
Staff Toilet
1AC251
Main Entry Vestibule
1A208
Lobby/Waiting
1AC225
Corridor
1AC272B
Dressing
1AC276
Point-of-Care
1AC220
Alcove
1AC200Ca
MIN.
6'-0"
NOTE: PHASE I EMERGENCY
DEPARTMENT SHALL REMAIN
IN FULL OPERATION
THROUGHOUT THE ENTIRETY
OF PHASE III CONSTRUCTION
NOTE: RADIOLOGY
DEPARTMENT SHALL REMAIN
IN FULL OPERATION
THROUGHOUT THE ENTIRETY
OF PHASE III CONSTRUCTION
E
FLOORING/BASE REPLACEMENT
NOTE - MAIN CORRIDOR: GC SHALL
PERFORM ALL FLOORING/FINISH
REMOVAL AND REPLACEMENT OVER
A WEEKEND. IT IS THE INTENT TO
MAINTAIN ACCESS TO THE
RADIOLOGY DEPARTMENT DURING
CONSTRUCTION FOR AS LONG AS
POSSIBLE. GC SHALL COORD.
SCHEDULING WITH VA ACCORDINGLY,
AND PROVIDE TEMP. BARRIERS
AROUND AREAS IN COORD. W/VA
SAFETY DEPT.
COORDINATE PHASING OF
FLOORING REPLACEMENT AT
CONNECTING DOORS TO
ATRIUM W/VA SAFETY DEPT.
63'-3"
COMMON
PATH OF
TRAVEL
Fire Alarm
1AC228A
INFECTION CONTROL CLASS & SAFETY MEASURES:
THE WORK IDENTIFIED IN THIS PROJECT IS ASSIGNED A CLASS IV INFECTION CONTROL CLASS AND SHALL APPLY TO THIS PROJECT THROUGHOUT THE ENTIRETY OF CONSTRUCTION. ALL CONTRACTORS AND CONSTRUCTION WORKERS ARE REQUIRED TO VACUUM THEIR CLOTHING FULLY IN THE TEMPORARY CONSTRUCTION ANTEROOMS IDENTIFIED ON THE DRAWINGS PRIOR TO ENTERING OCCUPIED PORTIONS OF THE
BUILDING.
ANTEROOMS SHALL BE INCLUDED AS A PART OF ALL TEMPORARY CONSTRUCTION BARRIERS AND ARE DEPICTED IN THE DRAWINGS. ANTEROOMS SHALL MAINTAIN NEGATIVE PRESSURE FROM SURROUNDING AREAS
AT ALL TIMES.
REFER TO DEMOLITION PLANS FOR SCOPE OF TEMPORARY CONSTRUCTION BARRIERS REQUIRED FOR THE PROJECT. REFER TO AND FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS" 01 35 26
THROUGHOUT THE ENTIRETY OF THE PROJECT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
CIVIL/MECH./ELEC./PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY.
UNIONTOWN, OH 44111
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
LANDSCAPE ARCHITECTURE:
JAMES S. MCKNIGHT
P.O. BOX 14158
CLEVELAND, OH 44114
P. 216.952.2408
C U s e rs
\d a v e
\D o c u m e n ts
\E x p a n d E m e rg e n c y D e p t_
R d a k a p la n
.r v t
/8
/2
:0
:3
P M
BID ISSUE SUBMISSION
LS-1.3
1ST FLOOR LIFE SAFETY PLAN - PHASE III EMERGENCY DEPARTMENT
EXPANSION
10701 EAST BLVD. CLEVELAND, OHIO
541-370
2.9.21 CJK DAK
SCALE: 1/8" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN - PHASE III
NORTH
Revisions: Date:
SCHEM. DESIGN SUBMISSION 10.21.19
DESIGN DEV. SUBMISSION 12.9.19
65% CD's SUBMISSION 1.28.20
90% CD's SUBMISSION 5.13.20
100% CD's SUBMISSION 6.26.20
CG-1CG-1
CG-1CG-1 CG-1
R E
F
F E
C
FEC
FEC
R
E F
C G
-1
C G
-2
C G
-1
Office
2A217
Office
2A216
Exam/Treatment Room
2A214
Exam/Treatment Room
2A213
Exam/Treatment Room
2A143
Cast Room
2A170
Linen Room
2A171
Conference
2A172
Toilet
2A173
Ortho Exam
2A174Ortho Exam
2A176
Ortho Exam
2A177
Ortho Exam
2A178
POD Exam
2A179
POD Exam
2A180
POD Exam
2A181
POD Work Room
2A182
POD Exam
2A183
POD Exam
2A184
POD Exam
2A185
Comm Clos
2A186
Elec Clos
2A187
POD Exam
2A188
HAC
2A189
Stair 4
2S4
Lobby
2A191
Corridor
2A100N
Womens
2A192
Reception
2A193
Waiting
2A196
HAC
2A198
Storage Room
2A142
Stair 3
2S3
HAC
2A146
Storage
2A147 ENT Exam
2A148
Exam/Treatment Room
2A149
Exam/Treatment Room
2A150
Exam/Treatment Room
2A151Conference
2A152
Exam/Treatment Room
2A153
Exam/Treatment Room
2A154
MOH's Procedure
2A155 Exam/Treatment
Room
2A156
Comm
2A157
Closet, Electrical
2A158
Utlity Room, Clean
2A159
Utlity Room, Soiled
2A160 Derm. Exam
2A161
ENT Exam
2A162
ENT Exam
2A163
Reception
2A191
ENT Exam
2A165
ENT Exam
2A166 ENT Exam
2A167
Copy/Storage
2A168
HAC
2A169
Ortho Storage
2A170A
Corridor
2A100L
Corridor
2A100M
Corridor
2A100K
Toilet
2A156A
Corridor
2A100H
Passage
2A100J Exam/Treatment
Room
2A146B
Treatment
2A131E
Treatment
2A131F
Exam/Treatment Room
2A146A
Soiled
2A131H
Agent Prep
2A131I
Work Area
2A131J
Medication Prep
2A131
Exam
2A155A
ENT Exam
2A167A
Exam/Treatment
2A146C
Waiting Room
2AC200A
Registration
2AC201
Podiatry Exam Room 4
2AC202
Podiatry Exam Room 3
2AC203
Podiatry Exam Room 2
2AC204
Podiatry Exam Room 1
2AC205
Podiatry Team Hub
2AC206
Podiatry Exam Room 5
2AC208
Podiatry Exam Room 6
2AC209
Patient Toilet
2AC227
Podiatry Exam Room 7
2AC210
Ortho Exam Room 2
2AC226
Podiatry Exam Room 8
2AC211
Ortho Exam Room 3
2AC225
Ortho Exam Room 1
2AC212
Ortho Cast Room
2AC213
Ortho Exam Room 4
2AC224
RME Clean Utility
2AC214
EMS Closet
2AC223
Clean Supply
2AC222
ENT Exam Room
2AC221
ENT Exam Room
2AC220
ENT Exam Room
2AC219
Ortho Exam Room 7
2AC218
Ortho Exam Room 6
2AC217
Nurse Office
2AC216
Ortho Exam Room 5
2AC215
Shared Conference
Room
2AC236
Soft Goods Storage
2AC235
Storage
2AC236A
Ortho Team Hub
2AC233
Shared Break Room
2AC234
Staff Toilet
2AC231Medication Room
2AC230
Clean Supplies
2AC207
Corridor
2AC200C
Corridor
2AC200B
Corridor
2AC200E
Corridor
2AC200D
Corridor
2AC200F
Corridor
2AC200G
FE
FE
FE
P H
A S
E I S
C O
P E
B O
U N
D A
R Y
P H
A S
E I S
C O
P E
B O
U N
D A
R Y
PHASE I SCOPE BOUNDARY
PHASE I SCOPE BOUNDARY
F E
FE
FE
DASHED LINE INDICATES
164'-3" EXIT TRAVEL
DISTANCE PATH LENGTH
PHASING NOTE: EXTERIOR WALL
DEMOLITION SHALL NOT OCCUR
UNTIL AFTER THE NEW PHASE I
ADDITION IS BUILT (I.E. AT THE END
OF PHASE I.) THE VA SHALL
MAINTAIN USE OF ALL INTERIOR
SPACES WITHIN THE SPECIALTY
CLINIC FOR AS LONG AS POSSIBLE.
TEMP. CONST. BARRIER SHALL BE
CONSTRUCTED AS SHOWN JUST
PRIOR TO DEMOLITION
PHASING NOTE: INTERIOR DEMOLITION
SHALL NOT OCCUR UNTIL AFTER THE NEW
PHASE I ADDITION IS BUILT (I.E. AT THE END
OF PHASE I.) THE VA SHALL MAINTAIN USE
OF ALL INTERIOR SPACES WITHIN THE
SPECIALTY CLINIC FOR AS LONG AS
POSSIBLE. TEMP. CONST. BARRIER SHALL BE
CONSTRUCTED AS SHOWN JUST PRIOR TO
INTERIOR DEMOLITION
S M
O K
E
C O
M P
B
SMOKE
COMPARTMENT 'C'
S M
O
M P
A
SMOKE
COMP. 'A'
SMOKE
COMPARTMENT 'B'
2 HR RATED
SHAFT
Fume Hood
2AC229
Soiled Utility
2AC232
GC ACCESS
DOOR
6'-0"
EXISTING EGRESS PATHS IN
SPECIALTY CARE TO REMAIN
UNAFFECTED FOR PHASE I
FE
Work Room
2A175
Lobby
2A191
EX. LOW
ROOF AREA
E
E
E
EXISTING ROOF
AREA
2 HR RATED
SHAFT
Alcove
2AC200Ca
Alcove
2AC200Ea
Alcove
2AC200Eb
Corridor
2AC200H
Fire Alarm
2AC200Cb
LIFE SAFETY LEGEND:
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA
SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF
CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR
EXISTING/NEW 2 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED SMOKE BARRIER
EXISTING/NEW O HOUR RATED SMOKE PARTITION
E EXIT
FE
FIRE EXTINGUISHER
EXIT SIGN LOCATION
LIFE SAFETY GENERAL NOTES:
1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW
AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS
3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)
4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.
5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE
TO MATCH EXISTING
6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE
FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)
PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT
ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.
GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE
AS DICTATED BY THE ASSEMBLY.
7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION.
This is the start of the file's text. The full file is on GovTribe.