Attachment 4 - Architectural - Part 1.pdf

PDF 24 MB Posted

Attached to
Y1DA--Emergency Department Specialty Care Addition (VA-21-00011344)
Solicitation number
36C77621B0003
Issued by

About this file

This document provides details for a federal contract solicitation for an Emergency Department expansion project at the Cleveland VA Medical Center. The solicitation will be issued as an Invitation for Bid for a firm-fixed-price construction contract by the Department of Veterans Affairs, Veterans Health Administration, Program Contracting Activity Central. The project scope includes construction of a 27,000 square foot, two-story addition and 10,000 square foot renovation of existing space to expand emergency department facilities and add mental health outpatient clinics and specialty care clinics. Work encompasses general construction, alterations, mechanical, electrical and plumbing systems integration. The solicitation will be set aside as a total Service-Disabled Veteran-Owned Small Business set-aside and issued on or around February 26, 2021. The period of performance is approximately 695 calendar days from notice to proceed. The magnitude of construction is valued between $10-20 million.

View the file

Other files

File Type Posted
Emergency Dept Expansion - Pre-Bid Site Visit Attendance Roster.pdf PDF
Emergency Dept Expansion - ADDENDUM 2 - Description.pdf PDF
WebEx Information.pdf PDF
Emergency Dept Expansion - ADDENDUM 1 - Description.pdf PDF
S06 - 36C77621B0003_1 0001 - CLE ER.docx DOCX document
Emergency Dept Expansion - ADDENDUM 2 - Specifications.pdf PDF
Emergency Dept Expansion - ADDENDUM 1 - Drawings.pdf PDF
Emergency Dept Expansion - ADDENDUM 1 - Specifications.pdf PDF
Emergency Dept Expansion - ADDENDUM 2 - Drawings.pdf PDF
Emergency Dept Expansion - Pre-Bid RFIs and Responses Apr 16 2021.pdf PDF
Attachment 8 - Plumbing-Electrical-Fire Protection.pdf PDF
Attachment 12 - Site Visit Building Map.pdf PDF
Attachment 3 - Drawings Cover Sheet.pdf PDF
Attachment 5 - Architectural - Part 2.pdf PDF
Attachment 7 - Structural-Mechanical.pdf PDF
Attachment 9 - HVAC Pretesting.pdf PDF
Attachment 1 - Specs Vol 1.pdf PDF
Attachment 6 - Civil-Landscape.pdf PDF
36C77621B0003_1.docx DOCX document
Attachment 2 - Specs Vol 2.pdf PDF
Attachment 13 - CONTRACTOR SAFETY AND ENVIRONMENTAL RECORD EVALUATION FORM.docx DOCX document
Attachment 10 - J and A - redacted.pdf PDF
Attachment 11 - Wage Determination - Cuyahoga 02.12.2021.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

F E

C

FEC

F

E C

CG-1

CG-1C

G

-1

CG-1

E

Stair 3

BS3

Office

BA109C

Corridor

BAC328

F E

FE

FE

F E

FE

FE

F E

97'-3" +/- COMMON PATH

OF TRAVEL (100' MAX.

PER CODE)

39'-3" DEAD END

80'-6" +/- COMMON PATH

OF TRAVEL

E

P H

A S

E I S

C O

P E

B O

U N

D A

R Y

P H

A S

E I S

C O

P E

B O

U N

D A

R Y

PHASE I SCOPE BOUNDARY

PHASE I SCOPE BOUNDARY

HVAC

BAC241

TeleComm

BA149

Electrical

BA148

Corridor

BA150B

IT Work Offices

BAC266

4 Person Office

BAC265

2 Person Office

BAC269

Break Area/ Pantry

BAC270A

Collaboration Area

BAC270B

Open Student Offices

BAC270C

Reception/ Waiting

BAC260

Regulatory/ Fiscal Office

BAC261

2 Person Office

BAC262

Storage

BAC264

Director Office

BAC271

Office

BAC272

Office

BAC273

2 Person Office

BAC274

2 Person Office

BAC275

Passage

BAC260B

Copy/ Work Passage

BAC268

Corridor

BA150A

Passage

BAC260C

Passage

BAC260A

Anti-Coagulation Clinic Open Office

BAC280

Corridor

BAC284

Office

BAC281

Storage, File Room

BAC285

Copy File/Work

BAC282

Break Room

BAC283

Waiting

BAC250Triage

BAC251

Exam

BAC252

Exam

BAC253

Exam

BAC254

Exam

BAC255 Records

BAC256

Passage

BAC250B

Stair 4

BS4

Closet

BAC298A

Main Electrical Room

BA151

Outside Air Enclosure

BAC241A

Relief Areawell

BA153A

Mechanical Room

BA153

Secure Storage

BA152A Pharmacy Drug Cache

BA152

Corridor

BA150C

6'-0" +/-

CONSTRUCTION AREA (NEW

ADDITION)

PROVIDE TEMP. CONST.

BARRIER IN CORRIDOR DURING

NEW WALL OPENING

DEMOLITION/CONNECTION

WORK. LOCATE PARTITION TO

MAINTAIN ACCESS INTO EX.

DOUBLE DOORS AS SHOWN

LIFE SAFETY LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA

SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

EXISTING/NEW 2 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW

AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE

TO MATCH EXISTING

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE

FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT

ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.

GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE

AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND

COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY

DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY

STANDARDS.

HAZARDOUS ROOM

EXISTING/NEW 2 HOUR RATED SMOKE BARRIER

FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"

SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON

REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "TEMPORARY CONSTRUCTION BARRIER"

TYPICAL PARTITION DETAIL ON SHEET AS-601. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY

BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE

APPROVED BY THE COR.

SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT

CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE

SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BE ONE-HOUR FIRE RATED.

PROJECT SCOPE BOUNDARY

SOLID WHITE AREA INDICATES

CONSTRUCTION AREA WITHIN SCOPE

OF WORK

# PROJECT AREA OCCUPANT LOAD

GRAY HATCHED AREA INDICATES AREA

OUTSIDE OF SCOPE OF WORK

PHASING DURATION & CONSTRUCTION TIMEFRAMES:

THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING

HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:

PRE-CONSTRUCTION: 60 DAYS

PHASE I: 365 DAYS

VA ACTIVATION OF PHASE I: 45 DAYS

PHASE II: 60 DAYS

VA ACTIVATION OF PHASE II: 15 DAYS (NOTE: GC IS PERMITTED TO CONSTRUCT TEMP. WALLS FOR PHASE III

DURING THIS TIME)

PHASE III: 150 DAYS

TOTAL TIMEFRAME: 695 DAYS

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, INCLUDING CONSTRUCTION OF THE ADDITION. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH

ACTIVITIES WITH EMERGENCY AND SPECIALTY CARE DEPARTMENT STAFF AND VA COR.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS

APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:

• UTILITY SHUTDOWNS

• EXISTING MEP SYSTEM SHUTDOWNS

• WORK IN PUBLIC CORRIDORS/WAITING AREAS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING

PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF EXISTING

FINISHES

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS

WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.

REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS

INFECTION CONTROL CLASS & SAFETY MEASURES:

THE WORK IDENTIFIED IN THIS PROJECT IS ASSIGNED A CLASS IV INFECTION CONTROL CLASS AND SHALL APPLY TO THIS PROJECT THROUGHOUT THE ENTIRETY OF CONSTRUCTION. ALL CONTRACTORS AND CONSTRUCTION WORKERS ARE REQUIRED TO VACUUM THEIR CLOTHING FULLY IN THE TEMPORARY CONSTRUCTION ANTEROOMS IDENTIFIED ON THE DRAWINGS PRIOR TO ENTERING OCCUPIED PORTIONS OF THE

BUILDING.

ANTEROOMS SHALL BE INCLUDED AS A PART OF ALL TEMPORARY CONSTRUCTION BARRIERS AND ARE DEPICTED IN THE DRAWINGS. ANTEROOMS SHALL MAINTAIN NEGATIVE PRESSURE FROM SURROUNDING AREAS

AT ALL TIMES.

REFER TO DEMOLITION PLANS FOR SCOPE OF TEMPORARY CONSTRUCTION BARRIERS REQUIRED FOR THE PROJECT. REFER TO AND FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS" 01 35 26

THROUGHOUT THE ENTIRETY OF THE PROJECT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

CIVIL/MECH./ELEC./PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

LANDSCAPE ARCHITECTURE:

JAMES S. MCKNIGHT

P.O. BOX 14158

CLEVELAND, OH 44114

P. 216.952.2408

C U s e rs

\d a v e

\D o c u m e n ts

\E x p a n d E m e rg e n c y D e p t_

R d a k a p la n

.r v t

/8

/2

:0

:0

P M

BID ISSUE SUBMISSION

LS-0.1

BASEMENT LEVEL LIFE SAFETY PLAN - PHASE

I

EMERGENCY DEPARTMENT

EXPANSION

10701 EAST BLVD. CLEVELAND, OHIO

541-370

2.9.21 CJK DAK

SCALE: 1/8" = 1'-0"

BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I

NORTH

Revisions: Date:

SCHEM. DESIGN SUBMISSION 10.21.19

DESIGN DEV. SUBMISSION 12.9.19

65% CD's SUBMISSION 1.28.20

90% CD's SUBMISSION 5.13.20

100% CD's SUBMISSION 6.26.20

FINAL CD's SUBMISSION 9.11.20

BID ISSUE SUBMISSION 2.9.21

FEC

R E

F

R E

F

F E

C

F E

C

FEC

CG-1

E

Womens

1A156

Lead Techs Work Room

X1A157

Exam/Treatment Room

X1A159

Exam/Treatment Room

X1A161

Exam/Treatment Room

X1A163

Exam/Treatment Room

X1A165

Stair 3

1S3

On-Call Room

X1A169

Program Support Ass't

X1A170

Nurse Manager

X1A171

Staff Toilet

1A157A

Corridor

1A100E

Corridor

X1A100F

Corridor

X1A100G

Waiting Room

X1AC220

Reception

X1AC221 Toilet

X1AC222

Radiology 1

X1AC223

Telecomm

X1A181

Womens

X1A214

Hospitality

1A215

Vending

1A216

Director's Office

1A142 Precepting Room

1A143

Exam/Treatment Room

1A145

Storage

1A149

Corridor

1A100I

Electrical

X1A182

Mens

X1A212 Radiology 2

X1AC224

Dressing

X1AC225

Office

X1AC226

Office

X1AC227

Storage

X1AC228

Processing

X1AC229

Meds Room

X1AC232PCAS

X1AC234

Exam 1

X1AC241

Exam 2

X1AC242

Exam 3

X1AC243

Exam 4

X1AC244

Exam 5

X1AC245

Point of Care

X1AC246

Soiled Utility

X1AC247

Exam 6

X1AC251

Exam 7

X1AC252

Exam 8

X1AC253

Exam 9

X1AC254

Exam Room 10

X1AC255

Exam 10

X1AC256

Exam 11

X1AC257

Nourishment

X1AC270

Restroom

X1AC272Sub-Waiting

X1AC274

HAC

X1AC276

Clean Utility

X1AC275

ECG

X1AC277

Triage

X1AC279

Telecomm

X1AC262

Electrical

X1AC264

Stair 4

1S4

Lobby/Waiting

X1A211

Restroom Alcove

X1A213

Corridor

X1AC280

Corridor

X1AC240

Nurse First

X1AC281

Registration 2

X1AC282

Fast Track Exam

X1AC285

Fast Track Exam

X1AC286

Toilet

X1AC287

Fast Track Exam

X1AC288

Fast Track Exam

X1AC290

Staff Lounge

X1AC289B

Staff Lounge

X1AC289B

Corridor

X1AC291

Registration 1

X1AC284

Corridor

X1AC220A

Clean Linen

X1AC266

AOD

X1AC268

Registration

1AC224

Triage 1

1AC222

Triage 2

1AC221

Exam Room 1/Decontamination

Room

1AC201

Anteroom

1AC200

Patient Storage

1AC223

Nurse Asst.

Manager Office

1AC204

Clean Supply / Equip.

1AC203

Exam Room 2

1AC205

Exam Room 3

1AC206

Corridor

1AC200A Exam Room 4

1AC207

Exam Room 5

1AC208

Exam Room 6

1AC209

Exam Room 7

1AC210

Staff Work Room

1AC211

Exam Room 8

1AC212

Exam Room 9

1AC213

Med. Storage

1AC233

Exam Room 18

1AC234

Exam Room 20

1AC236

Team Work Area

1AC214

Soiled Utility

1AC215Clean Utility

1AC216

Nurse Manager Office

1AC217

Team Work Area

1AC219

Gurney Alcove

1AC218

Patient Toilet

1AC226

OA Shaft

1AC227

Exam Room 13

1AC229

Exam Room 12

1AC230

Exam Room 11

1AC231

Exam Room 10

1AC232Alcove

1AC228

Corridor

1AC200B

Corridor

1AC200C

Corridor

1AC200D

Corridor

1AC200E

Main Entry Vestibule

1A208

Exam Room 19

1AC235

Nurse Station

X1AC235

Corridor

X1AC260

Docs

X1AC231

Lobby/Waiting

1AC225

Decon. Restroom

1AC201A

Escort Room

X1B351

FE

F E

F E

E

F E

FE

P H

A S

E I S

C O

P E

B O

U N

D A

R Y

P H

A S

E I S

C O

P E

B O

U N

D A

R Y

PHASE I SCOPE BOUNDARY

PHASE I SCOPE BOUNDARY

E

TEMPORARY

EMERG. DEPT.

ENTRY

S M

O K

E C

O M

P A

R T

M E

N T

'A

S M

O K

E C

O M

P A

R T

M E

N T

'B

SMOKE

COMPARTMENT 'B'

SMOKE

COMPARTMENT 'C'

ANTEROOM

STAIR DOOR SHALL

REMAIN AS A MEANS OF

EGRESS FROM UPPER

FLOORS. DO NOT BLOCK

OR OBSTRUCT EGRESS

PATH AT ANY TIME

TEMPORARY EMERGENCY

DEPARTMENT ENTRY SHALL

BE CONSTRUCTED AND IN

USE AHEAD OF PHASE I

CONSTRUCTION. REFER TO

PRE-CONSTRUCTION PLANS

FOR SCOPE OF WORK

CONST.

ENTRIES

NOTE: EXISTING EMERGENCY

DEPARTMENT AND

RADIOLOGY DEPARTMENT

SHALL REMAIN IN FULL

OPERATION THROUGHOUT

THE ENTIRETY OF PHASE I

CONSTRUCTION

EXISTING FIRE STAIR DOOR SHALL REMAIN IN USE AND

ACCESSIBLE AT ALL TIMES. REFER TO SITEWORK FOR

IMPROVEMENTS OUTSIDE OF DOOR. GC SHALL COORD.

INTERIM LIFE SAFETY MEASURES REQUIRED AT ALL

TIMES WHEN DOOR ACCESS IS LIMITED OR CANNOT BE

PROVIDED DURING SITEWORK IMPROVEMENTS

MIN.

R 6' - 0"

TEMP. WALL/DOOR

Point-Of-Care

1AC220

Alcove

1AC202

Alcove

1AC200Ca

2 HR

RATED

SHAFT

E

E

Fire Alarm

1AC228A

LIFE SAFETY LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA

SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

EXISTING/NEW 2 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW

AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE

TO MATCH EXISTING

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE

FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT

ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.

GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE

AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND

COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY

DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY

STANDARDS.

HAZARDOUS ROOM

EXISTING/NEW 2 HOUR RATED SMOKE BARRIER

FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"

SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON

REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "TEMPORARY CONSTRUCTION BARRIER"

TYPICAL PARTITION DETAIL ON SHEET AS-601. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY

BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE

APPROVED BY THE COR.

SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT

CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE

SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BE ONE-HOUR FIRE RATED.

PROJECT SCOPE BOUNDARY

SOLID WHITE AREA INDICATES

CONSTRUCTION AREA WITHIN SCOPE

OF WORK

# PROJECT AREA OCCUPANT LOAD

GRAY HATCHED AREA INDICATES AREA

OUTSIDE OF SCOPE OF WORK

PHASING DURATION & CONSTRUCTION TIMEFRAMES:

THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING

HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:

PRE-CONSTRUCTION: 60 DAYS

PHASE I: 365 DAYS

VA ACTIVATION OF PHASE I: 45 DAYS

PHASE II: 60 DAYS

VA ACTIVATION OF PHASE II: 15 DAYS (NOTE: GC IS PERMITTED TO CONSTRUCT TEMP. WALLS FOR PHASE III

DURING THIS TIME)

PHASE III: 150 DAYS

TOTAL TIMEFRAME: 695 DAYS

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, INCLUDING CONSTRUCTION OF THE ADDITION. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH

ACTIVITIES WITH EMERGENCY AND SPECIALTY CARE DEPARTMENT STAFF AND VA COR.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS

APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:

• UTILITY SHUTDOWNS

• EXISTING MEP SYSTEM SHUTDOWNS

• WORK IN PUBLIC CORRIDORS/WAITING AREAS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING

PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF EXISTING

FINISHES

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS

WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.

REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS

INFECTION CONTROL CLASS & SAFETY MEASURES:

THE WORK IDENTIFIED IN THIS PROJECT IS ASSIGNED A CLASS IV INFECTION CONTROL CLASS AND SHALL APPLY TO THIS PROJECT THROUGHOUT THE ENTIRETY OF CONSTRUCTION. ALL CONTRACTORS AND CONSTRUCTION WORKERS ARE REQUIRED TO VACUUM THEIR CLOTHING FULLY IN THE TEMPORARY CONSTRUCTION ANTEROOMS IDENTIFIED ON THE DRAWINGS PRIOR TO ENTERING OCCUPIED PORTIONS OF THE

BUILDING.

ANTEROOMS SHALL BE INCLUDED AS A PART OF ALL TEMPORARY CONSTRUCTION BARRIERS AND ARE DEPICTED IN THE DRAWINGS. ANTEROOMS SHALL MAINTAIN NEGATIVE PRESSURE FROM SURROUNDING AREAS

AT ALL TIMES.

REFER TO DEMOLITION PLANS FOR SCOPE OF TEMPORARY CONSTRUCTION BARRIERS REQUIRED FOR THE PROJECT. REFER TO AND FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS" 01 35 26

THROUGHOUT THE ENTIRETY OF THE PROJECT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

CIVIL/MECH./ELEC./PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

LANDSCAPE ARCHITECTURE:

JAMES S. MCKNIGHT

P.O. BOX 14158

CLEVELAND, OH 44114

P. 216.952.2408

C U s e rs

\d a v e

\D o c u m e n ts

\E x p a n d E m e rg e n c y D e p t_

R d a k a p la n

.r v t

/8

/2

:0

:1

P M

BID ISSUE SUBMISSION

LS-1.1

1ST FLOOR LIFE SAFETY PLAN - PHASE I EMERGENCY DEPARTMENT

EXPANSION

10701 EAST BLVD. CLEVELAND, OHIO

541-370

2.9.21 CJK DAK

SCALE: 1/8" = 1'-0"

FIRST FLOOR LIFE SAFETY PLAN - PHASE I

NORTH

Revisions: Date:

SCHEM. DESIGN SUBMISSION 10.21.19

DESIGN DEV. SUBMISSION 12.9.19

65% CD's SUBMISSION 1.28.20

90% CD's SUBMISSION 5.13.20

100% CD's SUBMISSION 6.26.20

E

F

R E

F

F E

C

F E

C

FEC

FEC

S T

A

AIR

B A

T

SV

INJ

Isocenter

WS

H S

R

H S

R

PDU

CG-1

LIFE SAFETY LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA

SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

EXISTING/NEW 2 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW

AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE

TO MATCH EXISTING

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE

FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT

ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.

GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE

AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND

COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY

DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY

STANDARDS.

HAZARDOUS ROOM

EXISTING/NEW 2 HOUR RATED SMOKE BARRIER

FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"

SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON

REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "TEMPORARY CONSTRUCTION BARRIER"

TYPICAL PARTITION DETAIL ON SHEET AS-601. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY

BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE

APPROVED BY THE COR.

SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT

CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE

SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BE ONE-HOUR FIRE RATED.

PROJECT SCOPE BOUNDARY

SOLID WHITE AREA INDICATES

CONSTRUCTION AREA WITHIN SCOPE

OF WORK

# PROJECT AREA OCCUPANT LOAD

GRAY HATCHED AREA INDICATES AREA

OUTSIDE OF SCOPE OF WORK

PHASING DURATION & CONSTRUCTION TIMEFRAMES:

THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING

HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:

PRE-CONSTRUCTION: 60 DAYS

PHASE I: 365 DAYS

VA ACTIVATION OF PHASE I: 45 DAYS

PHASE II: 60 DAYS

VA ACTIVATION OF PHASE II: 15 DAYS (NOTE: GC IS PERMITTED TO CONSTRUCT TEMP. WALLS FOR PHASE III

DURING THIS TIME)

PHASE III: 150 DAYS

TOTAL TIMEFRAME: 695 DAYS

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, INCLUDING CONSTRUCTION OF THE ADDITION. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH

ACTIVITIES WITH EMERGENCY AND SPECIALTY CARE DEPARTMENT STAFF AND VA COR.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS

APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:

• UTILITY SHUTDOWNS

• EXISTING MEP SYSTEM SHUTDOWNS

• WORK IN PUBLIC CORRIDORS/WAITING AREAS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING

PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF EXISTING

FINISHES

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS

WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.

REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS

E

FE

F E

E

F E

FE

PHASE II SCOPE BOUNDARY

PHASE II SCOPE BOUNDARY

P H

A S

E

II

S C

O P

E B

O U

N D

A R

Y

F E

CT Equip.

1AC280A

Office

1AC278

Office

1AC277

Corridor

1AC272A

ED/PAOC Conf.

Room

1AC283

E

CONST.

ENTRIES

CONST.

ENTRY6

CONST.

ENTRY

S M

O K

E C

O M

P A

R T

M E

N T

'A

S M

O K

E C

O M

P A

R T

M E

N T

'B

SMOKE

COMPARTMENT 'B'

SMOKE

COMPARTMENT 'C'

On-Call Toilet Room

1AC282A

On-Call Room

1AC282

Police/Security

1AC281

Storage

1AC281A

Corridor

X1B200M

Alcove

1AC255A

CT Scanner

1AC280

CT Control Room

1AC279

ANTEROOM

CONST.

ENTRY

Womens

1A156

Lead Techs Work Room

X1A157

Exam/Treatment Room

X1A159

Exam/Treatment Room

X1A161

Exam/Treatment Room

X1A163

Exam/Treatment Room

X1A165

Stair 3

1S3

On-Call Room

X1A169

Program Support Ass't

X1A170

Nurse Manager

X1A171

Staff Toilet

1A157A

Corridor

X1A100F

Corridor

X1A100G

Waiting Room

1AC272

Reception

1AC273 Toilet

1AC274

Radiology 1

1AC275

Telecomm

X1A181

Electrical

X1A182

Mens

X1A212

Womens

X1A214

Hospitality

1A215

Vending

1A216

Director's Office

1A142

Precepting Room

1A143

Exam/Treatment Room

1A145

Storage

1A149

Corridor

1A100I

Exam 1

X1AC241

Exam 2

X1AC242

Exam 3

X1AC243

Exam 4

X1AC244

Exam 5

X1AC245

Point of Care

X1AC246

Soiled Utility

X1AC247

Exam 6

X1AC251

Exam 7

X1AC252

Exam 8

X1AC253

Exam 10

X1AC256

Exam 11

X1AC257

Nourishment

X1AC270

Restroom

X1AC272

Sub-Waiting

X1AC274

HAC

X1AC276

Clean Utility

X1AC275

ECG

X1AC277

Triage

X1AC279

Telecomm

X1AC262

Electrical

X1AC264

Stair 4

1S4

Lobby

X1A211

Restroom Alcove

X1A213

Corridor

X1AC280

Corridor

X1AC240

Nurse First

X1AC281

Registration 2

X1AC282

Fast Track Exam

X1AC285

Fast Track Exam

X1AC286

Toilet

X1AC287

Fast Track Exam

X1AC288

Fast Track Exam

X1AC290

Staff Lounge

X1AC289B

Staff Lounge

X1AC289B

Corridor

X1AC291

Registration 1

X1AC284

Clean Linen

X1AC266

AOD

X1AC268

Registration

1AC234

Triage 1

1AC232

Triage 2

1AC231

Exam Room 1/Decontamination

Room

1AC201

Anteroom

1AC200

Patient Storage

1AC233

Nurse Asst.

Manager Office

1AC204

Clean Supply/Equip.

1AC203

Exam Room 2

1AC205

Exam Room 3

1AC206

Corridor

1AC200A

Exam Room 4

1AC207

Exam Room 5

1AC208

Exam Room 6

1AC209

Exam Room 7

1AC210

Staff Work Room

1AC211

Exam Room 8

1AC212

Exam Room 9

1AC213

Med. Storage

1AC233

Exam Room 18

1AC234

Exam Room 20

1AC236

Team Work Area

1AC214Soiled Utility

1AC215Clean Utility

1AC216

Nurse Manager Office

1AC217

Team Work Area

1AC219

Gurney Alcove

1AC218

Patient Toilet

1AC226

OA Shaft

1AC227

Exam Room 13

1AC229

Exam Room 12

1AC230

Exam Room 11

1AC231

Exam Room 10

1AC232

Alcove

1AC228

Corridor

1AC200B

Corridor

1AC200C

Corridor

1AC200D

Corridor

1AC200E

Main Entry Vestibule

1A208

Exam Room 19

1AC235

Nurse Station

X1AC235

Corridor

X1AC260

Docs

X1AC231

Lobby/Waiting

1AC225

CT Equip.

1AC238

Dressing

1AC276

Patient Toilet

1AC247

CONST.

ENTRY

ANTEROOM

GC SHALL ENSURE THAT

EX. ELEC. & TELECOMM

ROOMS ARE ACCESSIBLE

TO VA STAFF AT ALL TIMES

DURING CONSTRUCTION

E

EXISTING CORRIDOR SHALL SERVE AS ANTEROOM

FOR CONST. GC SHALL FULLY SEAL THREE (3)

DOORS ON NORTH WALL, WHICH SHALL REMAIN

CLOSED. EX. ELEC./TELE. DOOR SHALL BE

SEALED BUT REMAIN OPERABLE FOR ACCESS

FULLY SEAL DOUBLE

DOORS - SHALL REMAIN

CLOSED AT ALL TIMES

DURING

CONSTRUCTION

EXISTING NORTH RADIOLOGY

ROOM SHALL REMAIN ACCESSIBLE

AND IN FULL OPERATION DURING

CONSTRUCTION

7'-1" +/-

Decon. Restroom

1AC201A

Point-of-Care

1AC220

Clean Linen

1AC248

Corridor

1AC272B

8'-7" +/-

Nourishment

1AC255B

Alcove

1AC202

Alcove

1AC200Ca

NOTE: PHASE I EMERGENCY

DEPARTMENT, EXISTING

EMERGENCY DEPARTMENT

AND RADIOLOGY

DEPARTMENT SHALL REMAIN

IN FULL OPERATION

THROUGHOUT THE ENTIRETY

OF PHASE II CONSTRUCTION

FE

TEMP. BARRIER

NOTE: INTENT AT

THESE LOCATIONS

IS TO CONSTRUCT

THE FINAL WALL

ASSEMBLIES AND

HAVE THEM SERVE

AS CONST.

BARRIER. SEE

IMPROVEMENT

PLAN FOR

DIMENSIONS

MAIN CORRIDORS

SHALL REMAIN IN

USE DURING

PHASE II

CONSTRUCTION

FLOORING REPLACEMENT NOTE: GC SHALL

COORD. SCHEDULING/SEQUENCING OF

FLOORING REPLACEMENT WITH COR TO

ENSURE THAT EGRESS DOOR CAN REMAIN

ACCESSIBLE FOR USE, OR, TO ENSURE

THAT INTERIM LIFE SAFETY MEASURES

ARE IN PLACE DURING TIMES WHICH DOOR

IS NOT ACCESSIBLE

'-0

6'-0" +/-

TEMP. BARRIER NOTE FOR FLOORING

REPLACEMENT/FINISHES IN EXISTING LOBBY

X1A211 : IT IS INTENDED THAT THE FLOORING

DEMO/REPLACEMENT AND FINISHES SCOPE BE

SCHEDULED TO OCCUR TOWARDS THE END OF

PHASE II TO PERMIT USE OF THE MAIN

CORRIDOR AND RESTROOMS FOR AS LONG AS

POSSIBLE. FLOORING DEMO AND

REPLACEMENT WORK SHALL BE PERFORMED

AFTER HOURS OR ON WEEKENDS ONLY. GC

SHALL COORDINATE ALL SCHEDULING WITH VA

SPECIAL PHASING NOTE: GC SHALL BE

AWARE THAT EGRESS FROM STAIR AND

EXIT PATH TO MAIN ENTRY VESTIBULE

MUST BE MAINTAINED. FLOORING/FINISH

WORK IN THIS AREA SHOWN IN PLAN

SHALL BE COORD. WITH VA & SAFETY

DEPT. TO ENSURE SAFETY AND

PROTECTIVE MEASURES ARE IN PLACE,

AND TO MAINTAIN SAFE EGRESS FOR

THE BUILDING WITH MINIMAL SHUTDOWN

4'-6 1/2"

6'-0"

Fire Alarm

2AC228A

INFECTION CONTROL CLASS & SAFETY MEASURES:

THE WORK IDENTIFIED IN THIS PROJECT IS ASSIGNED A CLASS IV INFECTION CONTROL CLASS AND SHALL APPLY TO THIS PROJECT THROUGHOUT THE ENTIRETY OF CONSTRUCTION. ALL CONTRACTORS AND CONSTRUCTION WORKERS ARE REQUIRED TO VACUUM THEIR CLOTHING FULLY IN THE TEMPORARY CONSTRUCTION ANTEROOMS IDENTIFIED ON THE DRAWINGS PRIOR TO ENTERING OCCUPIED PORTIONS OF THE

BUILDING.

ANTEROOMS SHALL BE INCLUDED AS A PART OF ALL TEMPORARY CONSTRUCTION BARRIERS AND ARE DEPICTED IN THE DRAWINGS. ANTEROOMS SHALL MAINTAIN NEGATIVE PRESSURE FROM SURROUNDING AREAS

AT ALL TIMES.

REFER TO DEMOLITION PLANS FOR SCOPE OF TEMPORARY CONSTRUCTION BARRIERS REQUIRED FOR THE PROJECT. REFER TO AND FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS" 01 35 26

THROUGHOUT THE ENTIRETY OF THE PROJECT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

CIVIL/MECH./ELEC./PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

LANDSCAPE ARCHITECTURE:

JAMES S. MCKNIGHT

P.O. BOX 14158

CLEVELAND, OH 44114

P. 216.952.2408

C U s e rs

\d a v e

\D o c u m e n ts

\E x p a n d E m e rg e n c y D e p t_

R d a k a p la n

.r v t

/8

/2

:0

:2

P M

BID ISSUE SUBMISSION

LS-1.2

1ST FLOOR LIFE SAFETY PLAN - PHASE II EMERGENCY DEPARTMENT

EXPANSION

10701 EAST BLVD. CLEVELAND, OHIO

541-370

2.9.21 CJK DAK

SCALE: 1/8" = 1'-0"

FIRST FLOOR LIFE SAFETY PLAN - PHASE II

NORTH

Revisions: Date:

SCHEM. DESIGN SUBMISSION 10.21.19

DESIGN DEV. SUBMISSION 12.9.19

65% CD's SUBMISSION 1.28.20

90% CD's SUBMISSION 5.13.20

100% CD's SUBMISSION 6.26.20

E

F

F E

C

FEC

FEC

FEC

F

E C

REF.

FEC

FEC

REF.

S T

A

AIR

B A

T

SV

INJ

Isocenter

WS

H S

R

H S

R

PDU

C G

-4

C G

-3

CG-1

CG-1

LIFE SAFETY LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA

SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

EXISTING/NEW 2 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW

AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE

TO MATCH EXISTING

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE

FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT

ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.

GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE

AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND

COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY

DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY

STANDARDS.

HAZARDOUS ROOM

EXISTING/NEW 2 HOUR RATED SMOKE BARRIER

FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"

SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON

REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "TEMPORARY CONSTRUCTION BARRIER"

TYPICAL PARTITION DETAIL ON SHEET AS-601. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY

BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE

APPROVED BY THE COR.

SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT

CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE

SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BE ONE-HOUR FIRE RATED.

PROJECT SCOPE BOUNDARY

SOLID WHITE AREA INDICATES

CONSTRUCTION AREA WITHIN SCOPE

OF WORK

# PROJECT AREA OCCUPANT LOAD

GRAY HATCHED AREA INDICATES AREA

OUTSIDE OF SCOPE OF WORK

PHASING DURATION & CONSTRUCTION TIMEFRAMES:

THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING

HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:

PRE-CONSTRUCTION: 60 DAYS

PHASE I: 365 DAYS

VA ACTIVATION OF PHASE I: 45 DAYS

PHASE II: 60 DAYS

VA ACTIVATION OF PHASE II: 15 DAYS (NOTE: GC IS PERMITTED TO CONSTRUCT TEMP. WALLS FOR PHASE III

DURING THIS TIME)

PHASE III: 150 DAYS

TOTAL TIMEFRAME: 695 DAYS

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, INCLUDING CONSTRUCTION OF THE ADDITION. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH

ACTIVITIES WITH EMERGENCY AND SPECIALTY CARE DEPARTMENT STAFF AND VA COR.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS

APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:

• UTILITY SHUTDOWNS

• EXISTING MEP SYSTEM SHUTDOWNS

• WORK IN PUBLIC CORRIDORS/WAITING AREAS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING

PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF EXISTING

FINISHES

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS

WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.

REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS

Nurse Manager

1A171

Program Support Ass't

1A170

On-Call Room

1A169

Staff Toilet

1A157A

Mental Health Consult.

1A167

Mental Health Consult.

1A166

Mental Health Consult.

1A165

Mental Health Consult./Diabetes

Education

1A164

Soiled Holding

1A153

Exam/Treatment Room

1A146

Corridor

1A100I

Storage

1A152

Stair 3

1S3

Corridor

1A100F

Corridor

1A100G

Exam/Treatment Room

1A145

Precepting Room

1A143

Director's Office

1A142

Check-Out

1A137D

E

FE

F E

E

F E

FE

Womens

1A156

Clean Utility

1A157

Waiting Room

1AC272

Reception

1AC273 Toilet

1AC274

Radiology 1

1AC275

Telecomm

X1A181

Electrical

X1A182

Telecomm

X1AC262

Electrical

X1AC264

Stair 4

1S4

Mens

1A212

Restroom Alcove

1A213

Womens

1A214

Hospitality

1A215

Vending

1A216

Corridor

1AC272A

OA Shaft

1AC227

Alcove

1AC228

Exam Room 13

1AC229

Exam Room 12

1AC230

Exam Room 11

1AC231

Exam Room 10

1AC232

Med. Storage

1AC233

Exam Room 18

1AC234

Exam Room 19

1AC235

Exam Room 20

1AC236

Corridor

1AC200E

Soiled Utility

1AC246

CT. Equip

1AC238

Patient Toilet

1AC247

Exam Room 23

1AC253

Medication

1AC256

Anteroom

1AC257

Patient Changing

1AC258

Interview Room

1AC259

PAOC Exam 1

1AC260

PAOC Exam 2

1AC261

PAOC Exam 3

1AC265

Patient Toilet

1AC263

Break Room

1AC269

Women's Changing

1AC270A

Men's Changing

1AC270B

PAOC Office

1AC271

PAOC Work Area

1AC268

Corridor

1AC200H

Corridor

1AC200J

CT Equip.

1AC280A

PAOC Soiled Holding

1AC250

Office

1AC278

Office

1AC277

ED/PAOC

Conference

Room

1AC283

Storage

1AC281A

Registration

1AC234

Triage 1

1AC232

Triage 2

1AC231

Exam Room 1/Decontamination

Room

1AC201

Anteroom

1AC200

Patient Storage

1AC233

Nurse Asst.

Manager Office

1AC204

Exam Room 2

1AC205

Exam Room 3

1AC206

Corridor

1AC200A Exam Room 4

1AC207

Exam Room 5

1AC208

Exam Room 6

1AC209

Exam Room 7

1AC210

Staff Work Room

1AC211

Exam Room 8

1AC212

Exam Room 9

1AC213

Team Work Area

1AC214Soiled Utility

1AC215Clean Utility

1AC216

Nurse Manager Office

1AC217

Team Work Area

1AC219

Gurney Alcove

1AC218

Patient Toilet

1AC236

Corridor

1AC200B

Corridor

1AC200C

Corridor

1AC200D

On-Call Toilet Room

1AC282A

P H

A S

E I

II

S

C O

P E

B O

U N

D A

R Y

PHASE III SCOPE BOUNDARY

P H

A S

E I

II

S

C O

P E

B O

U N

D A

R Y

PAOC Exam 4

1AC266

Pantry

1AC269A

MAT. STO.

1AC267

Exam Room 21

1AC239

EMS Closet

1AC237

Team Work Area

1AC240

Clean Utility

1AC245Team Work Area

1AC252

Corridor

1AC200F

Corridor

1AC200G

Corridor

1AC200I

Exam Room 14

1AC244

Exam Room 15

1AC243

Exam Room 16

1AC242

Exam Room 17

1AC241

Staff Locker Room

1AC270

Lobby

1A211

6'-0" MIN.

FE

FE

FE

F E

FE

CONST.

ENTRY

CONST.

ENTRY

EXISTING SLIDING DOORS

TO BE TEMPORARILY

DEACTIVATED - NOT IN USE

DURING CONSTRUCTION.

CONSTRUCT TEMP. BARRIER

TO THE NORTH AS SHOWN

S M

O K

E C

O M

P A

R T

M E

N T

'A

S M

O K

E C

O M

P A

R T

M E

N T

'B

SMOKE

COMPARTMENT 'B'

SMOKE

COMPARTMENT 'C'

On-Call Room

1AC282

Police/Security

1AC281

CT Scanner

1AC280

CT Control Room

1AC279

Exam Room 24

1AC254

Exam Room 22

1AC249

E

EGRESS FROM

STAIR DOOR

SHALL BE

MAINTAINED

AT ALL TIMES

SEE DEMOLITION PLAN

FOR SPECIAL PHASING

REGARDING THE

CONSTRUCTION OF

EAST TEMP. CONST.

BARRIERS

ANTEROOM

CONST.

ENTRY

TEMP. BARRIER NOTE: INTENT AT THIS

LOCATION IS TO CONSTRUCT THE FINAL

WALL ASSEMBLY AND HAVE IT SERVE AS

CONST. BARRIER. SEE IMPROVEMENT PLAN

FOR DIMENSIONS

ALIGN

CONST.

ENTRY

ANTE-

ROOM

TEMP. BARRIER NOTE: INTENT AT

THESE LOCATIONS IS TO CONSTRUCT

THE FINAL WALL ASSEMBLIES AND HAVE

THEM SERVE AS CONST. BARRIER. SEE

IMPROVEMENT PLAN FOR DIMENSIONS

PROVIDE 42" W TEMP.

DOOR HERE TO MATCH

DOOR SIZE TO BE

INSTALLED AS A PART OF

PHASE III

M

IN

8'-7"

Decon. Restroom

1AC201A

Alcove

1AC202

Clean Supply/Equip.

1AC203

Alcove

1AC255A

Nourishment

1AC255B

Clean Linen

1AC248

Staff Toilet

1AC251

Main Entry Vestibule

1A208

Lobby/Waiting

1AC225

Corridor

1AC272B

Dressing

1AC276

Point-of-Care

1AC220

Alcove

1AC200Ca

MIN.

6'-0"

NOTE: PHASE I EMERGENCY

DEPARTMENT SHALL REMAIN

IN FULL OPERATION

THROUGHOUT THE ENTIRETY

OF PHASE III CONSTRUCTION

NOTE: RADIOLOGY

DEPARTMENT SHALL REMAIN

IN FULL OPERATION

THROUGHOUT THE ENTIRETY

OF PHASE III CONSTRUCTION

E

FLOORING/BASE REPLACEMENT

NOTE - MAIN CORRIDOR: GC SHALL

PERFORM ALL FLOORING/FINISH

REMOVAL AND REPLACEMENT OVER

A WEEKEND. IT IS THE INTENT TO

MAINTAIN ACCESS TO THE

RADIOLOGY DEPARTMENT DURING

CONSTRUCTION FOR AS LONG AS

POSSIBLE. GC SHALL COORD.

SCHEDULING WITH VA ACCORDINGLY,

AND PROVIDE TEMP. BARRIERS

AROUND AREAS IN COORD. W/VA

SAFETY DEPT.

COORDINATE PHASING OF

FLOORING REPLACEMENT AT

CONNECTING DOORS TO

ATRIUM W/VA SAFETY DEPT.

63'-3"

COMMON

PATH OF

TRAVEL

Fire Alarm

1AC228A

INFECTION CONTROL CLASS & SAFETY MEASURES:

THE WORK IDENTIFIED IN THIS PROJECT IS ASSIGNED A CLASS IV INFECTION CONTROL CLASS AND SHALL APPLY TO THIS PROJECT THROUGHOUT THE ENTIRETY OF CONSTRUCTION. ALL CONTRACTORS AND CONSTRUCTION WORKERS ARE REQUIRED TO VACUUM THEIR CLOTHING FULLY IN THE TEMPORARY CONSTRUCTION ANTEROOMS IDENTIFIED ON THE DRAWINGS PRIOR TO ENTERING OCCUPIED PORTIONS OF THE

BUILDING.

ANTEROOMS SHALL BE INCLUDED AS A PART OF ALL TEMPORARY CONSTRUCTION BARRIERS AND ARE DEPICTED IN THE DRAWINGS. ANTEROOMS SHALL MAINTAIN NEGATIVE PRESSURE FROM SURROUNDING AREAS

AT ALL TIMES.

REFER TO DEMOLITION PLANS FOR SCOPE OF TEMPORARY CONSTRUCTION BARRIERS REQUIRED FOR THE PROJECT. REFER TO AND FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS" 01 35 26

THROUGHOUT THE ENTIRETY OF THE PROJECT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

CIVIL/MECH./ELEC./PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

LANDSCAPE ARCHITECTURE:

JAMES S. MCKNIGHT

P.O. BOX 14158

CLEVELAND, OH 44114

P. 216.952.2408

C U s e rs

\d a v e

\D o c u m e n ts

\E x p a n d E m e rg e n c y D e p t_

R d a k a p la n

.r v t

/8

/2

:0

:3

P M

BID ISSUE SUBMISSION

LS-1.3

1ST FLOOR LIFE SAFETY PLAN - PHASE III EMERGENCY DEPARTMENT

EXPANSION

10701 EAST BLVD. CLEVELAND, OHIO

541-370

2.9.21 CJK DAK

SCALE: 1/8" = 1'-0"

FIRST FLOOR LIFE SAFETY PLAN - PHASE III

NORTH

Revisions: Date:

SCHEM. DESIGN SUBMISSION 10.21.19

DESIGN DEV. SUBMISSION 12.9.19

65% CD's SUBMISSION 1.28.20

90% CD's SUBMISSION 5.13.20

100% CD's SUBMISSION 6.26.20

CG-1CG-1

CG-1CG-1 CG-1

R E

F

F E

C

FEC

FEC

R

E F

C G

-1

C G

-2

C G

-1

Office

2A217

Office

2A216

Exam/Treatment Room

2A214

Exam/Treatment Room

2A213

Exam/Treatment Room

2A143

Cast Room

2A170

Linen Room

2A171

Conference

2A172

Toilet

2A173

Ortho Exam

2A174Ortho Exam

2A176

Ortho Exam

2A177

Ortho Exam

2A178

POD Exam

2A179

POD Exam

2A180

POD Exam

2A181

POD Work Room

2A182

POD Exam

2A183

POD Exam

2A184

POD Exam

2A185

Comm Clos

2A186

Elec Clos

2A187

POD Exam

2A188

HAC

2A189

Stair 4

2S4

Lobby

2A191

Corridor

2A100N

Womens

2A192

Reception

2A193

Waiting

2A196

HAC

2A198

Storage Room

2A142

Stair 3

2S3

HAC

2A146

Storage

2A147 ENT Exam

2A148

Exam/Treatment Room

2A149

Exam/Treatment Room

2A150

Exam/Treatment Room

2A151Conference

2A152

Exam/Treatment Room

2A153

Exam/Treatment Room

2A154

MOH's Procedure

2A155 Exam/Treatment

Room

2A156

Comm

2A157

Closet, Electrical

2A158

Utlity Room, Clean

2A159

Utlity Room, Soiled

2A160 Derm. Exam

2A161

ENT Exam

2A162

ENT Exam

2A163

Reception

2A191

ENT Exam

2A165

ENT Exam

2A166 ENT Exam

2A167

Copy/Storage

2A168

HAC

2A169

Ortho Storage

2A170A

Corridor

2A100L

Corridor

2A100M

Corridor

2A100K

Toilet

2A156A

Corridor

2A100H

Passage

2A100J Exam/Treatment

Room

2A146B

Treatment

2A131E

Treatment

2A131F

Exam/Treatment Room

2A146A

Soiled

2A131H

Agent Prep

2A131I

Work Area

2A131J

Medication Prep

2A131

Exam

2A155A

ENT Exam

2A167A

Exam/Treatment

2A146C

Waiting Room

2AC200A

Registration

2AC201

Podiatry Exam Room 4

2AC202

Podiatry Exam Room 3

2AC203

Podiatry Exam Room 2

2AC204

Podiatry Exam Room 1

2AC205

Podiatry Team Hub

2AC206

Podiatry Exam Room 5

2AC208

Podiatry Exam Room 6

2AC209

Patient Toilet

2AC227

Podiatry Exam Room 7

2AC210

Ortho Exam Room 2

2AC226

Podiatry Exam Room 8

2AC211

Ortho Exam Room 3

2AC225

Ortho Exam Room 1

2AC212

Ortho Cast Room

2AC213

Ortho Exam Room 4

2AC224

RME Clean Utility

2AC214

EMS Closet

2AC223

Clean Supply

2AC222

ENT Exam Room

2AC221

ENT Exam Room

2AC220

ENT Exam Room

2AC219

Ortho Exam Room 7

2AC218

Ortho Exam Room 6

2AC217

Nurse Office

2AC216

Ortho Exam Room 5

2AC215

Shared Conference

Room

2AC236

Soft Goods Storage

2AC235

Storage

2AC236A

Ortho Team Hub

2AC233

Shared Break Room

2AC234

Staff Toilet

2AC231Medication Room

2AC230

Clean Supplies

2AC207

Corridor

2AC200C

Corridor

2AC200B

Corridor

2AC200E

Corridor

2AC200D

Corridor

2AC200F

Corridor

2AC200G

FE

FE

FE

P H

A S

E I S

C O

P E

B O

U N

D A

R Y

P H

A S

E I S

C O

P E

B O

U N

D A

R Y

PHASE I SCOPE BOUNDARY

PHASE I SCOPE BOUNDARY

F E

FE

FE

DASHED LINE INDICATES

164'-3" EXIT TRAVEL

DISTANCE PATH LENGTH

PHASING NOTE: EXTERIOR WALL

DEMOLITION SHALL NOT OCCUR

UNTIL AFTER THE NEW PHASE I

ADDITION IS BUILT (I.E. AT THE END

OF PHASE I.) THE VA SHALL

MAINTAIN USE OF ALL INTERIOR

SPACES WITHIN THE SPECIALTY

CLINIC FOR AS LONG AS POSSIBLE.

TEMP. CONST. BARRIER SHALL BE

CONSTRUCTED AS SHOWN JUST

PRIOR TO DEMOLITION

PHASING NOTE: INTERIOR DEMOLITION

SHALL NOT OCCUR UNTIL AFTER THE NEW

PHASE I ADDITION IS BUILT (I.E. AT THE END

OF PHASE I.) THE VA SHALL MAINTAIN USE

OF ALL INTERIOR SPACES WITHIN THE

SPECIALTY CLINIC FOR AS LONG AS

POSSIBLE. TEMP. CONST. BARRIER SHALL BE

CONSTRUCTED AS SHOWN JUST PRIOR TO

INTERIOR DEMOLITION

S M

O K

E

C O

M P

B

SMOKE

COMPARTMENT 'C'

S M

O

M P

A

SMOKE

COMP. 'A'

SMOKE

COMPARTMENT 'B'

2 HR RATED

SHAFT

Fume Hood

2AC229

Soiled Utility

2AC232

GC ACCESS

DOOR

6'-0"

EXISTING EGRESS PATHS IN

SPECIALTY CARE TO REMAIN

UNAFFECTED FOR PHASE I

FE

Work Room

2A175

Lobby

2A191

EX. LOW

ROOF AREA

E

E

E

EXISTING ROOF

AREA

2 HR RATED

SHAFT

Alcove

2AC200Ca

Alcove

2AC200Ea

Alcove

2AC200Eb

Corridor

2AC200H

Fire Alarm

2AC200Cb

LIFE SAFETY LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA

SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

EXISTING/NEW 2 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW

AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE

TO MATCH EXISTING

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE

FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT

ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.

GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE

AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION.