Attachment 3 - Drawings Cover Sheet.pdf

PDF 3 MB Posted

Attached to
Y1DA--Emergency Department Specialty Care Addition (VA-21-00011344)
Solicitation number
36C77621B0003
Issued by

About this file

This notice provides details for an upcoming federal contract opportunity to design and construct an emergency department expansion at the Cleveland VA Medical Center. The Department of Veterans Affairs will solicit bids and award a firm-fixed-price contract for the project, which includes a two-story 27,000 square foot addition with a full basement, renovation of approximately 10,000 square feet of existing emergency department space, and associated site work. Bids are due in February 2021 and work must be completed within 695 calendar days of the notice to proceed. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses and has an estimated value between $10-20 million.

View the file

Other files

File Type Posted
Emergency Dept Expansion - Pre-Bid Site Visit Attendance Roster.pdf PDF
Emergency Dept Expansion - ADDENDUM 2 - Description.pdf PDF
WebEx Information.pdf PDF
Emergency Dept Expansion - ADDENDUM 1 - Description.pdf PDF
S06 - 36C77621B0003_1 0001 - CLE ER.docx DOCX document
Emergency Dept Expansion - ADDENDUM 2 - Specifications.pdf PDF
Emergency Dept Expansion - ADDENDUM 1 - Drawings.pdf PDF
Emergency Dept Expansion - ADDENDUM 1 - Specifications.pdf PDF
Emergency Dept Expansion - ADDENDUM 2 - Drawings.pdf PDF
Emergency Dept Expansion - Pre-Bid RFIs and Responses Apr 16 2021.pdf PDF
Attachment 8 - Plumbing-Electrical-Fire Protection.pdf PDF
Attachment 4 - Architectural - Part 1.pdf PDF
Attachment 12 - Site Visit Building Map.pdf PDF
Attachment 5 - Architectural - Part 2.pdf PDF
Attachment 7 - Structural-Mechanical.pdf PDF
Attachment 9 - HVAC Pretesting.pdf PDF
Attachment 1 - Specs Vol 1.pdf PDF
Attachment 6 - Civil-Landscape.pdf PDF
36C77621B0003_1.docx DOCX document
Attachment 2 - Specs Vol 2.pdf PDF
Attachment 13 - CONTRACTOR SAFETY AND ENVIRONMENTAL RECORD EVALUATION FORM.docx DOCX document
Attachment 10 - J and A - redacted.pdf PDF
Attachment 11 - Wage Determination - Cuyahoga 02.12.2021.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

CIVIL/MECH./ELEC./PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

LANDSCAPE ARCHITECTURE:

JAMES S. MCKNIGHT

P.O. BOX 14158

CLEVELAND, OH 44114

P. 216.952.2408

C U s e rs

\d a v e

\D o c u m e n ts

\E x p a n d E m e rg e n c y D e p t_

R d a k a p la n

.r v t

/1

/2

:4

:1

A

M

BID ISSUE SUBMISSION

GI-1

TITLE SHEET & DRAWING INDEX EMERGENCY DEPARTMENT

EXPANSION

10701 EAST BLVD. CLEVELAND, OHIO

541-370

2.9.21 CJK DAK

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK

EMERGENCY DEPARTMENT EXPANSION

10701 EAST BLVD. CLEVELAND, OH 44106

PROJECT NO. 541-370

Cleveland Veterans Affairs Medical Center

SCOPE OF WORK

GROUND LEVEL

NORTH

CODE INFORMATION:

I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER

10701 EAST BLVD.

CLEVELAND, OHIO

II. DESCRIPTION & USER GROUP CLASSIFICATION OF BUILDING

A. NATURE OF PROJECT: TWO-STORY ADDITION TO AND INTERIOR RENOVATIONS OF

EXISTING 1ST FLOOR EMERGENCY DEPARTMENT, 2ND FLOOR

SPECIALTY CARE DEPARTMENT, AND BASEMENT LEVEL

MECHANICAL ROOM/PHARMACY CACHE

B. DESIGN CODES: 2018 NFPA LIFE SAFETY CODE 101, IBC 2018, IMC 2018, IPC 2018,

IECC 2018, ABAAS & VA BARRIER-FREE GUIDELINES

C. USE GROUP: 1ST & 2ND FLOORS: B - AMBULATORY CARE FACILITY

(EXISTING)

BASEMENT LEVEL: S - STORAGE

D. CONSTRUCTION TYPE: TYPE I-332, IA - NON-COMBUSTIBLE, PROTECTED

FIRE RATED CONSTRUCTION (LSC A.8.2.1.1)

EXTERIOR BEARING WALLS 3 HRS

INTERIOR BEARING WALLS 3 HRS

STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)

2 HRS (SUPPORTING 1 FLOOR ONLY)

2 HRS (SUPPORTING ROOF ONLY)

DRAWING INDEX:

BID ISSUE SUBMISSION

2.9.21

GI-1 TITLE SHEET & DRAWING INDEX

ARCHITECTURAL

LS-0.1 BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I

LS-1.1 FIRST FLOOR LIFE SAFETY PLAN - PHASE I

LS-1.2 FIRST FLOOR LIFE SAFETY PLAN - PHASE II

LS-1.3 FIRST FLOOR LIFE SAFETY PLAN - PHASE III

LS-2.1 SECOND FLOOR LIFE SAFETY PLAN - PHASE I

LS-2.2 SECOND FLOOR LIFE SAFETY PLAN - PHASE II

AS-X-0.0 1ST FLOOR EMERGENCY DEPT. - PRE-CONSTRUCTION PLANS

AS-X-0.1 BASEMENT LEVEL EXISTING CONDITIONS PLAN

AS-D-0.1 BASEMENT LEVEL - DEMOLITION PLAN - PHASE I

AS-0.1 BASEMENT LEVEL PROPOSED IMPROVEMENT/ADDITION PLAN - PHASE I

AS-C-0.1 BASEMENT LEVEL - REFLECTED CEILING PLAN - PHASE I

AS-X-1.1 1ST FLOOR EMERG. DEPT. - EXISTING CONDITIONS PLAN - PHASE I

AS-D-1.1 1ST FLOOR EMERG. DEPT. - DEMOLITION PLAN - PHASE I

AS-DC-1.1 1ST FLOOR EMERG. DEPT. - CEILING DEMOLITION PLAN - PHASE I

AS-1.1A 1ST FLOOR EMERG. DEPT. - PROPOSED IMPROVEMENT/ADDITION PLAN - PHASE I

AS-1.1 1ST FLOOR EMERG. DEPT. - PROPOSED IMPROVEMENT/INTERIORS PLAN - PHASE I

AS-C-1.1 1ST FLOOR EMERG. DEPT. - REFLECTED CEILING PLAN - PHASE I

AS-C-1.1A 1ST FLOOR CANOPY - REFLECTED CEILING PLAN - PHASE I

AS-X-1.2 1ST FLOOR EMERG. GEPT. - EXISTING CONDITIONS PLAN - PHASES II & III

AS-D-1.2 1ST FLOOR EMERG. DEPT. - DEMOLITION PLAN - PHASE II

AS-DC-1.2 1ST FLOOR EMERG. DEPT. - CEILING DEMOLITION PLAN - PHASE II

AS-1.2 1ST FLOOR EMERG. DEPT. IMPROVEMENT PLAN - PHASE II

AS-C-1.2 1ST FLOOR EMERG. DEPT. - REFLECTED CEILING PLAN - PHASE II

AS-D-1.3 1ST FLOOR EMERG. DEPT. - DEMOLITION PLAN - PHASE III

AS-DC-1.3 1ST FLOOR EMERG. DEPT. - CEILING DEMOLITION PLAN - PHASE III

AS-1.3 1ST FLOOR EMERG. DEPT. IMPROVEMENT PLAN - PHASE III

AS-C-1.3 1ST FLOOR EMERG. DEPT. - REFLECTED CEILING PLAN - PHASE III

AS-X-2.1 2ND FLOOR SPECIALTY CARE DEPT. - EXISTING CONDITIONS PLAN

AS-D-2.1 2ND FLOOR SPECIALTY CARE DEPT. - DEMOLITION PLAN PHASE I

AS-DC-2.1 2ND FLOOR SPECIALTY CARE DEPT. - CEILING DEMOLITION PLAN - PHASE I

AS-2.1A 2ND FLOOR SPECIALTY CARE DEPT. - PROPOSED IMPROVEMENT/ADDITION PLAN - PHASE I AS-2.1 2ND FLOOR SPECIALTY CARE DEPT. - PROPOSED IMPROVEMENT/INTERIORS PLAN - PHASE I

AS-2.1B 2ND FLOOR SPECIALTY CARE DEPT. - DEDUCT ALTERNATE 1 & 2 PLANS

AS-C-2.1 2ND FLOOR SPECIALTY CARE DEPT. - REFLECTED CEILING PLAN - PHASE I

AS-C-2.1B 2ND FLOOR SPECIALTY CARE DEPT. - DEDUCT ALTERNATE 1 & 2 CEILING PLANS

AS-D-2.2 2ND FLOOR SPECIALTY CARE DEPT. - DEMOLITION PLAN - PHASE II

AS-DC-2.2 2ND FLOOR SPECIALTY CARE DEPT. - CEILING DEMOLITION PLAN - PHASE II

AS-2.2 2ND FLOOR SPECIALTY CARE DEPT. - PROPOSED IMPROVEMENT/INTERIORS PLAN - PHASE II

AS-C-2.2 2ND FLOOR SPECIALTY CARE DEPT. - REFLECTED CEILING PLAN - PHASE II

AS-3.1 THIRD FLOOR/NEW ADDITION ROOF PLAN - PHASE I

AS-200 NEW ADDITION EXTERIOR ELEVATIONS

AS-201 WALL SECTIONS

AS-202 WALL SECTIONS

AS-203 WALL SECTIONS

AS-204 WALL SECTIONS

AS-300 ENLARGED PLANS & INTERIOR ELEVATIONS

AS-301 ENLARGED PLANS & INTERIOR ELEVATIONS

AS-302 INTERIOR ELEVATIONS

AS-303 ENLARGED PLANS & INTERIOR ELEVATIONS

AS-304 INTERIOR ELEVATIONS

AS-305 ENLARGED PLANS & INTERIOR ELEVATIONS

AS-306 MILLWORK DETAILS

AS-307 ENLARGED CT SCANNER SUITE PLANS & ELEVATIONS

AS-400 ENLARGED PLAN DETAILS

AS-401 ENLARGED PLAN DETAILS

AS-402 ENLARGED SECTION DETAILS

AS-403 ENLARGED SECTION DETAILS

AS-500 INTERIOR ELEVATIONS

AS-501 INTERIOR ELEVATIONS

AS-502 INTERIOR ELEVATIONS

AS-503 INTERIOR ELEVATIONS

AS-600 WINDOW TYPES

AS-601 WALL TYPES

AS-700 DOOR SCHEDULE AND DETAILS

AS-700A HEAD & JAMB DETAILS

AS-701 1ST FLOOR MASTER FINISH PLAN - PHASE I

AS-702 1ST FLOOR MASTER FINISH PLAN - PHASES II & III

AS-703 2ND FLOOR MASTER FINISH PLAN - PHASE I

AS-704 FINISH SCHEDULE AND DETAILS

MECHANICAL/HVAC

H-001 HVAC GENERAL NOTES AND SYMBOL LEGEND

H-002 HVAC DETAILS

H-003 HVAC DETAILS

H-004 HVAC DETAILS

H-005 HVAC FLOW DIAGAM AND AHU SECTIONS

H-006 HVAC TEMPERATURE CONTROLS

H-007 HVAC TEMPERATURE CONTROLS

H-008 HVAC SCHEDULES

H-009 HVAC SCHEDULES

H-D-0-1 BASEMENT LEVEL PHASE I HVAC DEMOLITION PLAN

H-D-1-1 FIRST FLOOR LEVEL PHASE I HVAC DEMOLITION PLAN

H-D-1-2 FIRST FLOOR LEVEL PHASE II HVAC DEMOLITION PLAN

H-D-1-3 FIRST FLOOR LEVEL PHASE III HVAC DEMOLITION PLAN

H-D-2-1 SECOND FLOOR LEVEL PHASE I HVAC DEMOLITION PLAN

H-B.2-1 SUB-BASEMENT LEVEL PHASE I HVAC PIPING IMPROVEMENT PLAN

H-0.1.-1 BASEMENT LEVEL PHASE I HVAC DUCTWORK IMPROVEMENT PLAN

H-0.2-1 BASEMENT LEVEL PHASE I HVAC PIPING IMPROVEMENT PLAN

H-1.1-1 FIRST FLOOR LEVEL PHASE I HVAC DUCTWORK IMPROVEMENT PLAN

H-1.1-2 FIRST FLOOR LEVEL PHASE II HVAC DUCTWORK IMPROVEMENT PLAN

H-1.1-3 FIRST FLOOR LEVEL PHASE III HVAC DUCTWORK IMPROVEMENT PLAN

H-1.2-1 FIRST FLOOR LEVEL PHASE I HVAC PIPING IMPROVEMENT PLAN

H-1.2-2 FIRST FLOOR LEVEL PHASE II HVAC PIPING IMPROVEMENT PLAN

H-1.2-3 FIRST FLOOR LEVEL PHASE III HVAC PIPING IMPROVEMENT PLAN

H-2.1-1 SECOND FLOOR LEVEL PHASE I HVAC DUCTWORK IMPROVEMENT PLAN

H-2.2-1 SECOND FLOOR LEVEL PHASE I HVAC PIPING IMPROVEMENT PLAN

H-3.1-1 ROOF PLAN PHASE I HVAC IMPROVEMENT PLAN

STRUCTURAL

S-0.1 GENERAL NOTES

S-0.2 GENERAL NOTES

S-0.3 GENERAL NOTES

S-1.0 FOUNDATION PLAN

S-1.1 SITE WALL AND FOUNDATION PLAN

S-2.0 FIRST FLOOR PLAN

S-2.1 FIRST FLOOR SLAB BOTTOM REINFORCING PLAN

S-2.2 FIRST FLOOR SLAB TOP REINFORCING PLAN

S-3.0 SECOND FLOOR PLAN

S-3.1 SECOND FLOOR SLAB BOTTOM REINFORCING PLAN

S-3.2 SECOND FLOOR SLAB TOP REINFORCING PLAN

S-4.0 ROOF (FUTURE THIRD FLOOR) PLAN

S-4.1 ROOF (FUTURE THIRD FLOOR) SLAB BOTTOM REINFORCING PLAN

S-4.2 ROOF (FUTURE THIRD FLOOR) SLAB TOP REINFORCING PLAN

S-5.0 FOUNDATION TYPICAL DETAILS

S-5.1 MASONRY & FOUNDATION DETAILS

S-5.2 FOUNDATION SECTIONS AND DETAILS

S-6.0 FRAMING SECTIONS & DETAILS

S-7.0 CONCRETE TYPICAL DETAILS

S-7.1 FRAMING SECTIONS AND DETAILS

S-8.0 SECTIONS AND DETAILS

S-9.0 SECTIONS AND DETAILS

S-9.1 SECTIONS AND DETAILS

S-9.2 SECTIONS AND DETAILS

S-9.3 SECTIONS AND DETAILS

S-9.4 SECTIONS AND DETAILS

CIVIL

GS-0 EXISTING SITE SURVEY

GS-1 SYMBOL LEGEND AND GENERAL NOTES

GS-2 CLEARING AND DEMOLITION PLAN

GS-3 SITE UTILITY AND GRADING PLAN

GS-4 SITE PAVING PLAN

GS-5 EROSION CONTROL NARRATIVE

GS-6 SITE DETAILS

GS-6.1 SITE DETAILS

GS-7 SPOT GRADE PLAN

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND

E-002 LIGHTING FIXTURE SCHEDULE - ELECTRICAL

E-003 PANELBOARD SCHEDULES - ELECTRICAL

E-004 MECHANICAL EQUIPMENT SCHEDULE - ELECTRICAL

E-005 ONE-LINE DIAGRAM - ELECTRICAL

E-006 ELECTRICAL DETAILS - ELECTRICAL

E-007 ELECTRICAL DETAILS - ELECTRICAL

E-007A SECURITY SYSTEM DETAILS - ELECTRICAL

E-008 TELECOM DETAILS - ELECTRICAL

E-009 CT SCANNER DETAILS

ES-1 CLEARING AND DEMOLITON PLAN - SITE ELECTRICAL

ES-2 SITE ELECTRICAL IMPROVEMENT PLAN

E-D-1-1 DEMOLITION - FIRST FLOOR LEVEL PHASE I FLOOR PLAN - ELECTRICAL

E-D-1-2 DEMOLITION - FIRST FLOOR LEVEL PHASE II FLOOR PLAN - ELECTRICAL

E-D-1-3 DEMOLITION - FIRST FLOOR LEVEL PHASE III FLOOR PLAN - ELECTRICAL

E-D-2-1 DEMOLITION - SECOND FLOOR LEVEL PHASE I FLOOR PLAN - ELECTRICAL

E-D-2-2 DEMOLITION - SECOND FLOOR LEVEL PHASE II FLOOR PLAN - ELECTRICAL

E-0.1-1 LIGHTING - BASEMENT LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-0.2-1 POWER - BASEMENT LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-0.3-1 SYSTEMS - BASEMENT LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-0.4-1 TELECOM - BASEMENT LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-1.1-1 LIGHTING - FIRST FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-1.2-1 POWER - FIRST FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-1.3-1 SYSTEMS - FIRST FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-1.4-1 TELECOM - FIRST FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-1.1-2 LIGHTING - FIRST FLOOR LEVEL PHASE II IMPROVEMENT PLAN - ELECTRICAL

E-1.2-2 POWER - FIRST FLOOR LEVEL PHASE II IMPROVEMENT PLAN - ELECTRICAL

E-1.3-2 SYSTEMS - FIRST FLOOR LEVEL PHASE II IMPROVEMENT PLAN - ELECTRICAL

E-1.4-2 TELECOM - FIRST FLOOR LEVEL PHASE II IMPROVEMENT PLAN - ELECTRICAL

E-1.1-3 LIGHTING - FIRST FLOOR LEVEL PHASE III IMPROVEMENT PLAN - ELECTRICAL

E-1.2-3 POWER - FIRST FLOOR LEVEL PHASE III IMPROVEMENT PLAN - ELECTRICAL

E-1.3-3 SYSTEMS - FIRST FLOOR LEVEL PHASE III IMPROVEMENT PLAN - ELECTRICAL

E-1.4-3 TELECOM - FIRST FLOOR LEVEL PHASE III IMPROVEMENT PLAN - ELECTRICAL

E-2.1-1 LIGHTING - SECOND FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-2.1-2 LIGHTING - SECOND FLOOR LEVEL DEDUCT ALTERNATE PLANS - ELECTRICAL

E-2.2-1 POWER - SECOND FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-2.2-2 POWER - SECOND FLOOR LEVEL DEDUCT ALTERNATE PLANS - ELECTRICAL

E-2.3-1 SYSTEMS - SECOND FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-2.3-2 SYSTEMS - SECOND FLOOR LEVEL DEDUCT ALTERNATE PLANS - ELECTRICAL

E-2.4-1 TELECOM - SECOND FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-2.4-2 TELECOM - SECOND FLOOR LEVEL DEDUCT ALTERNATE PLANS - ELECTRICAL

E-3.2-2 ROOF PLAN PHASE I ELECTRICAL IMPROVEMENT PLAN

PLUMBING

P-001 PLUMBING GENERAL NOTES, SCHEDULES, DETAILS, AND SYMBOL LEGEND

P-D-0-1 BASEMENT LEVEL PHASE I PLUMBING DEMOLITION PLAN

P-D-0-2 BASEMENT LEVEL PHASE II PLUMBING DEMOLITION PLAN

P-D-0-3 BASEMENT LEVEL PHASE III PLUMBING DEMOLITION PLAN

P-D-1-1 FIRST FLOOR LEVEL PHASE I PLUMBING DEMOLITION PLAN

P-D-1-2 FIRST FLOOR LEVEL PHASE II PLUMBING DEMOLITION PLAN

P-D-1-3 FIRST FLOOR LEVEL PHASE III PLUMBING DEMOLITION PLAN

P-D-2-1 SECOND FLOOR LEVEL PHASE I PLUMBING DEMOLITION PLAN

P-0.1-1 BASEMENT LEVEL PHASE I PLUMBING PIPING IMPROVEMENT PLAN

P-0.2-1 BASEMENT LEVEL PHASE I PLUMBING WASTE IMPROVEMENT PLAN

P-0.2-2 BASEMENT LEVEL PHASE II PLUMBING WASTE IMPROVEMENT PLAN

P-0.2-3 BASEMENT LEVEL PHASE III PLUMBING WASTE IMPROVEMENT PLAN

P-1.1-1 FIRST FLOOR LEVEL PHASE I PLUMBING PIPING IMPROVEMENT PLAN

P-1.2-1 FIRST FLOOR LEVEL PHASE I PLUMBING WASTE IMPROVEMENT PLAN

P-1.1-2 FIRST FLOOR LEVEL PHASE II PLUMBING PIPING IMPROVEMENT PLAN

P-1.2-2 FIRST FLOOR LEVEL PHASE II PLUMBING WASTE IMPROVEMENT PLAN

P-1.1-3 FIRST FLOOR LEVEL PHASE III PLUMBING PIPING IMPROVEMENT PLAN

P-1.2-3 FIRST FLOOR LEVEL PHASE III PLUMBING WASTE IMPROVEMENT PLAN

P-2.1-1 SECOND FLOOR LEVEL PHASE I PLUMBING PIPING IMPROVEMENT PLAN

P-2.2-1 SECOND FLOOR LEVEL PHASE I PLUMBING WASTE IMPROVEMENT PLAN

P-3.2-1 ROOF PLAN PHASE I PLUMBING WASTE IMPROVEMENT PLAN

P-002-2 PLUMBING ISOMETRICS - PHASE I & II

P-002-3 PLUMBING ISOMETRICS - PHASE III

FIRE PROTECTION

FP-001 FIRE PROTECTION NOTES, DETAILS, AND SYMBOL LEGEND

FP-0-1 BASEMENT LEVEL PHASE I FIRE PROTECTION IMPROVEMENT PLAN

FP-1-1 FIRST FLOOR LEVEL PHASE I FIRE PROTECTION IMPROVEMENT PLAN

FP-1-2 FIRST FLOOR LEVEL PHASE II FIRE PROTECTION IMPROVEMENT PLAN

FP-1-3 FIRST FLOOR LEVEL PHASE III FIRE PROTECTION IMPROVEMENT PLAN

FP-2-1 SECOND FLOOR LEVEL PHASE I FIRE PROTECTION IMPROVEMENT PLAN

LANDSCAPE

MSP-01 MASTER SITE IMPROVEMENT PLAN

MSP-02 ENLARGED SITE IMPROVEMENT PLAN - SOUTH

MSP-03 ENLARGED SITE IMPROVEMENT PLAN - NORTH

MSP-04 SITE PHASING PLAN

L-01 PLANTING PLAN

L-02 IRRIGATION PLAN

BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING WALLS)

FLOOR-CEILING ASSEMBLIES 2 HRS

ROOF-CEILING ASSEMBLIES 1-1/2 HRS

INTERIOR NON-BEARING WALLS 0 HRS

EXTERIOR NON-BEARING WALLS 0 HRS

WALL ASSEMBLIES

FIRE PARTITIONS 1 HR

SMOKE BARRIERS 1 HR

STAIR ENCLOSURES 2 HRS

SHAFT ENCLOSURES 2 HRS

E. FIRE RATED ASSEMBLIES: ALL NEW STRUCTURAL STEEL (CANOPY - BEAMS, ROOF DECK) IS TO RECEIVE MIN. 90 MIN.

RATED FIREPROOF SPRAY ASSEMBLY PER UL DES P719 (OR EQUAL)

F. PROJECT AREA: BASEMENT LEVEL: 0 SF INTERIOR RENOVATION + 9,184 GSF ADDITON

FIRST FLOOR: 8,785 SF INTERIOR RENOVATION + 9,307 GSF ADDITION

SECOND FLOOR: 346 SF INTERIOR RENOVATION + 9,245 GSF ADDITION + 2,459 SF CANOPY

TOTAL: 9,131 SF INTERIOR RENOVATION + 27,736 GSF ADDITION + 2,459 SF CANOPY

G. PROJECT AREA OCCUPANT LOAD: BASEMENT LEVEL: 28

FIRST FLOOR: 181

SECOND FLOOR: 96

H. FIRE PROTECTION: FULLY SPRINKLED - EXISTING AND ADDITION. EXISTING FIRE PROTECTION SYSTEM TO BE

MODIFIED AS REQUIRED FOR NEW IMPROVEMENTS. DESIGN SHALL BE COMPLETED

SEPARATELY BY A LICENSED FIRE PROTECTIONS SYSTEM DESIGNER.

NEW ADDITION

REFERENCE POINT:

LOCATION OF

MECH. ROOM BA109

W/UNITS AC-51, 52,

& 53 (BASEMENT

LEVEL)

Revisions: Date:

SCHEM. DESIGN SUBMISSION 10.21.19

DESIGN DEV. SUBMISSION 12.9.19

65% CD's SUBMISSION 1.28.20

90% CD's SUBMISSION 5.13.20

100% CD's SUBMISSION 6.26.20

FINAL CD's SUBMISSION 9.11.20

BID ISSUE SUBMISSION 2.9.21

DESIGN MANUALS, GUIDELINES, & STANDARDS

ARCHITECTURAL

• VA ARCHITECTURAL DESIGN MANUAL

• AIA/FGI – GUIDELINES FOR DESIGN AND

CONSTRUCTION OF HEALTHCARE FACILITIES

• VA SPACE PLANNING CRITERIA:

1. CHAPTER 110 - MENTAL HEALTH & BEHAVIORAL

PATIENT CARE UNITS

2. CHAPTER 256 - EMERGENCY DEPARTMENT AND

URGENT CARE CLINIC

3. CHAPTER 268 - PHARMACY SERVICE

• MENTAL HEALTH ENVIRONMENT OF CARE CHECKLIST

(MHEOCC)

• VA PHYSICAL SECURITY AND RESILIENCY DESIGN

MANUAL

STRUCTURAL

• SEISMIC DESIGN REQUIREMENTS H-18-8 REVISED

MAY 1, 2020

• STRUCTURAL DESIGN MANUAL FOR HOSPITAL

PROJECTS

SITE/CIVIL

• VA SITE DEVELOPMENT DESIGN MANUAL

MECHANICAL/PLUMBING

• NFPA 13

• VA AMBULATORY CARE DESIGN GUIDE

• VA HVAC DESIGN MANUAL

• VA PLUMBING DESIGN MANUAL

• VA FIRE PROTECTION DESIGN MANUAL

• ASHRAE 90.1

• ASHRAE 62.1

ELECTRICAL/TECHNOLOGY

• NFPA 70

• VA AMBULATORY CARE DESIGN GUIDE

• VA DESIGN MANUALS – LIGHTING DESIGN

• VA WHOLE BUILDING DESIGN GUIDE

• VA ELECTRICAL DESIGN MANUAL

• VA OFFICE OF INFORMATION TECHNOLOGY -

INFRASTRUCTURE STANDARDS FOR

TELECOMMUNICATIONS SPACES – VERSION 2.2 –

APRIL 10, 2019

• VA OFFICE OF INFORMATION TECHNOLOGY – IT

OPERATIONS AND SERVICES SOLUTION DELIVERY –

CFM/OIT DESIGN GUIDE TEMPLATES FOR CRITICAL

TELECOMMUNICATIONS SPACES IN CLINICAL AND

NON-CLINICAL ENVIRONMENTS – PRINT DATE:

2018-12-27