Attachment 3 - Drawings Cover Sheet.pdf
PDF 3 MB Posted
- Solicitation number
- 36C77621B0003
About this file
This notice provides details for an upcoming federal contract opportunity to design and construct an emergency department expansion at the Cleveland VA Medical Center. The Department of Veterans Affairs will solicit bids and award a firm-fixed-price contract for the project, which includes a two-story 27,000 square foot addition with a full basement, renovation of approximately 10,000 square feet of existing emergency department space, and associated site work. Bids are due in February 2021 and work must be completed within 695 calendar days of the notice to proceed. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses and has an estimated value between $10-20 million.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
CIVIL/MECH./ELEC./PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY.
UNIONTOWN, OH 44111
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
LANDSCAPE ARCHITECTURE:
JAMES S. MCKNIGHT
P.O. BOX 14158
CLEVELAND, OH 44114
P. 216.952.2408
C U s e rs
\d a v e
\D o c u m e n ts
\E x p a n d E m e rg e n c y D e p t_
R d a k a p la n
.r v t
/1
/2
:4
:1
A
M
BID ISSUE SUBMISSION
GI-1
TITLE SHEET & DRAWING INDEX EMERGENCY DEPARTMENT
EXPANSION
10701 EAST BLVD. CLEVELAND, OHIO
541-370
2.9.21 CJK DAK
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK
EMERGENCY DEPARTMENT EXPANSION
10701 EAST BLVD. CLEVELAND, OH 44106
PROJECT NO. 541-370
Cleveland Veterans Affairs Medical Center
SCOPE OF WORK
GROUND LEVEL
NORTH
CODE INFORMATION:
I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER
10701 EAST BLVD.
CLEVELAND, OHIO
II. DESCRIPTION & USER GROUP CLASSIFICATION OF BUILDING
A. NATURE OF PROJECT: TWO-STORY ADDITION TO AND INTERIOR RENOVATIONS OF
EXISTING 1ST FLOOR EMERGENCY DEPARTMENT, 2ND FLOOR
SPECIALTY CARE DEPARTMENT, AND BASEMENT LEVEL
MECHANICAL ROOM/PHARMACY CACHE
B. DESIGN CODES: 2018 NFPA LIFE SAFETY CODE 101, IBC 2018, IMC 2018, IPC 2018,
IECC 2018, ABAAS & VA BARRIER-FREE GUIDELINES
C. USE GROUP: 1ST & 2ND FLOORS: B - AMBULATORY CARE FACILITY
(EXISTING)
BASEMENT LEVEL: S - STORAGE
D. CONSTRUCTION TYPE: TYPE I-332, IA - NON-COMBUSTIBLE, PROTECTED
FIRE RATED CONSTRUCTION (LSC A.8.2.1.1)
EXTERIOR BEARING WALLS 3 HRS
INTERIOR BEARING WALLS 3 HRS
STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)
2 HRS (SUPPORTING 1 FLOOR ONLY)
2 HRS (SUPPORTING ROOF ONLY)
DRAWING INDEX:
BID ISSUE SUBMISSION
2.9.21
GI-1 TITLE SHEET & DRAWING INDEX
ARCHITECTURAL
LS-0.1 BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I
LS-1.1 FIRST FLOOR LIFE SAFETY PLAN - PHASE I
LS-1.2 FIRST FLOOR LIFE SAFETY PLAN - PHASE II
LS-1.3 FIRST FLOOR LIFE SAFETY PLAN - PHASE III
LS-2.1 SECOND FLOOR LIFE SAFETY PLAN - PHASE I
LS-2.2 SECOND FLOOR LIFE SAFETY PLAN - PHASE II
AS-X-0.0 1ST FLOOR EMERGENCY DEPT. - PRE-CONSTRUCTION PLANS
AS-X-0.1 BASEMENT LEVEL EXISTING CONDITIONS PLAN
AS-D-0.1 BASEMENT LEVEL - DEMOLITION PLAN - PHASE I
AS-0.1 BASEMENT LEVEL PROPOSED IMPROVEMENT/ADDITION PLAN - PHASE I
AS-C-0.1 BASEMENT LEVEL - REFLECTED CEILING PLAN - PHASE I
AS-X-1.1 1ST FLOOR EMERG. DEPT. - EXISTING CONDITIONS PLAN - PHASE I
AS-D-1.1 1ST FLOOR EMERG. DEPT. - DEMOLITION PLAN - PHASE I
AS-DC-1.1 1ST FLOOR EMERG. DEPT. - CEILING DEMOLITION PLAN - PHASE I
AS-1.1A 1ST FLOOR EMERG. DEPT. - PROPOSED IMPROVEMENT/ADDITION PLAN - PHASE I
AS-1.1 1ST FLOOR EMERG. DEPT. - PROPOSED IMPROVEMENT/INTERIORS PLAN - PHASE I
AS-C-1.1 1ST FLOOR EMERG. DEPT. - REFLECTED CEILING PLAN - PHASE I
AS-C-1.1A 1ST FLOOR CANOPY - REFLECTED CEILING PLAN - PHASE I
AS-X-1.2 1ST FLOOR EMERG. GEPT. - EXISTING CONDITIONS PLAN - PHASES II & III
AS-D-1.2 1ST FLOOR EMERG. DEPT. - DEMOLITION PLAN - PHASE II
AS-DC-1.2 1ST FLOOR EMERG. DEPT. - CEILING DEMOLITION PLAN - PHASE II
AS-1.2 1ST FLOOR EMERG. DEPT. IMPROVEMENT PLAN - PHASE II
AS-C-1.2 1ST FLOOR EMERG. DEPT. - REFLECTED CEILING PLAN - PHASE II
AS-D-1.3 1ST FLOOR EMERG. DEPT. - DEMOLITION PLAN - PHASE III
AS-DC-1.3 1ST FLOOR EMERG. DEPT. - CEILING DEMOLITION PLAN - PHASE III
AS-1.3 1ST FLOOR EMERG. DEPT. IMPROVEMENT PLAN - PHASE III
AS-C-1.3 1ST FLOOR EMERG. DEPT. - REFLECTED CEILING PLAN - PHASE III
AS-X-2.1 2ND FLOOR SPECIALTY CARE DEPT. - EXISTING CONDITIONS PLAN
AS-D-2.1 2ND FLOOR SPECIALTY CARE DEPT. - DEMOLITION PLAN PHASE I
AS-DC-2.1 2ND FLOOR SPECIALTY CARE DEPT. - CEILING DEMOLITION PLAN - PHASE I
AS-2.1A 2ND FLOOR SPECIALTY CARE DEPT. - PROPOSED IMPROVEMENT/ADDITION PLAN - PHASE I AS-2.1 2ND FLOOR SPECIALTY CARE DEPT. - PROPOSED IMPROVEMENT/INTERIORS PLAN - PHASE I
AS-2.1B 2ND FLOOR SPECIALTY CARE DEPT. - DEDUCT ALTERNATE 1 & 2 PLANS
AS-C-2.1 2ND FLOOR SPECIALTY CARE DEPT. - REFLECTED CEILING PLAN - PHASE I
AS-C-2.1B 2ND FLOOR SPECIALTY CARE DEPT. - DEDUCT ALTERNATE 1 & 2 CEILING PLANS
AS-D-2.2 2ND FLOOR SPECIALTY CARE DEPT. - DEMOLITION PLAN - PHASE II
AS-DC-2.2 2ND FLOOR SPECIALTY CARE DEPT. - CEILING DEMOLITION PLAN - PHASE II
AS-2.2 2ND FLOOR SPECIALTY CARE DEPT. - PROPOSED IMPROVEMENT/INTERIORS PLAN - PHASE II
AS-C-2.2 2ND FLOOR SPECIALTY CARE DEPT. - REFLECTED CEILING PLAN - PHASE II
AS-3.1 THIRD FLOOR/NEW ADDITION ROOF PLAN - PHASE I
AS-200 NEW ADDITION EXTERIOR ELEVATIONS
AS-201 WALL SECTIONS
AS-202 WALL SECTIONS
AS-203 WALL SECTIONS
AS-204 WALL SECTIONS
AS-300 ENLARGED PLANS & INTERIOR ELEVATIONS
AS-301 ENLARGED PLANS & INTERIOR ELEVATIONS
AS-302 INTERIOR ELEVATIONS
AS-303 ENLARGED PLANS & INTERIOR ELEVATIONS
AS-304 INTERIOR ELEVATIONS
AS-305 ENLARGED PLANS & INTERIOR ELEVATIONS
AS-306 MILLWORK DETAILS
AS-307 ENLARGED CT SCANNER SUITE PLANS & ELEVATIONS
AS-400 ENLARGED PLAN DETAILS
AS-401 ENLARGED PLAN DETAILS
AS-402 ENLARGED SECTION DETAILS
AS-403 ENLARGED SECTION DETAILS
AS-500 INTERIOR ELEVATIONS
AS-501 INTERIOR ELEVATIONS
AS-502 INTERIOR ELEVATIONS
AS-503 INTERIOR ELEVATIONS
AS-600 WINDOW TYPES
AS-601 WALL TYPES
AS-700 DOOR SCHEDULE AND DETAILS
AS-700A HEAD & JAMB DETAILS
AS-701 1ST FLOOR MASTER FINISH PLAN - PHASE I
AS-702 1ST FLOOR MASTER FINISH PLAN - PHASES II & III
AS-703 2ND FLOOR MASTER FINISH PLAN - PHASE I
AS-704 FINISH SCHEDULE AND DETAILS
MECHANICAL/HVAC
H-001 HVAC GENERAL NOTES AND SYMBOL LEGEND
H-002 HVAC DETAILS
H-003 HVAC DETAILS
H-004 HVAC DETAILS
H-005 HVAC FLOW DIAGAM AND AHU SECTIONS
H-006 HVAC TEMPERATURE CONTROLS
H-007 HVAC TEMPERATURE CONTROLS
H-008 HVAC SCHEDULES
H-009 HVAC SCHEDULES
H-D-0-1 BASEMENT LEVEL PHASE I HVAC DEMOLITION PLAN
H-D-1-1 FIRST FLOOR LEVEL PHASE I HVAC DEMOLITION PLAN
H-D-1-2 FIRST FLOOR LEVEL PHASE II HVAC DEMOLITION PLAN
H-D-1-3 FIRST FLOOR LEVEL PHASE III HVAC DEMOLITION PLAN
H-D-2-1 SECOND FLOOR LEVEL PHASE I HVAC DEMOLITION PLAN
H-B.2-1 SUB-BASEMENT LEVEL PHASE I HVAC PIPING IMPROVEMENT PLAN
H-0.1.-1 BASEMENT LEVEL PHASE I HVAC DUCTWORK IMPROVEMENT PLAN
H-0.2-1 BASEMENT LEVEL PHASE I HVAC PIPING IMPROVEMENT PLAN
H-1.1-1 FIRST FLOOR LEVEL PHASE I HVAC DUCTWORK IMPROVEMENT PLAN
H-1.1-2 FIRST FLOOR LEVEL PHASE II HVAC DUCTWORK IMPROVEMENT PLAN
H-1.1-3 FIRST FLOOR LEVEL PHASE III HVAC DUCTWORK IMPROVEMENT PLAN
H-1.2-1 FIRST FLOOR LEVEL PHASE I HVAC PIPING IMPROVEMENT PLAN
H-1.2-2 FIRST FLOOR LEVEL PHASE II HVAC PIPING IMPROVEMENT PLAN
H-1.2-3 FIRST FLOOR LEVEL PHASE III HVAC PIPING IMPROVEMENT PLAN
H-2.1-1 SECOND FLOOR LEVEL PHASE I HVAC DUCTWORK IMPROVEMENT PLAN
H-2.2-1 SECOND FLOOR LEVEL PHASE I HVAC PIPING IMPROVEMENT PLAN
H-3.1-1 ROOF PLAN PHASE I HVAC IMPROVEMENT PLAN
STRUCTURAL
S-0.1 GENERAL NOTES
S-0.2 GENERAL NOTES
S-0.3 GENERAL NOTES
S-1.0 FOUNDATION PLAN
S-1.1 SITE WALL AND FOUNDATION PLAN
S-2.0 FIRST FLOOR PLAN
S-2.1 FIRST FLOOR SLAB BOTTOM REINFORCING PLAN
S-2.2 FIRST FLOOR SLAB TOP REINFORCING PLAN
S-3.0 SECOND FLOOR PLAN
S-3.1 SECOND FLOOR SLAB BOTTOM REINFORCING PLAN
S-3.2 SECOND FLOOR SLAB TOP REINFORCING PLAN
S-4.0 ROOF (FUTURE THIRD FLOOR) PLAN
S-4.1 ROOF (FUTURE THIRD FLOOR) SLAB BOTTOM REINFORCING PLAN
S-4.2 ROOF (FUTURE THIRD FLOOR) SLAB TOP REINFORCING PLAN
S-5.0 FOUNDATION TYPICAL DETAILS
S-5.1 MASONRY & FOUNDATION DETAILS
S-5.2 FOUNDATION SECTIONS AND DETAILS
S-6.0 FRAMING SECTIONS & DETAILS
S-7.0 CONCRETE TYPICAL DETAILS
S-7.1 FRAMING SECTIONS AND DETAILS
S-8.0 SECTIONS AND DETAILS
S-9.0 SECTIONS AND DETAILS
S-9.1 SECTIONS AND DETAILS
S-9.2 SECTIONS AND DETAILS
S-9.3 SECTIONS AND DETAILS
S-9.4 SECTIONS AND DETAILS
CIVIL
GS-0 EXISTING SITE SURVEY
GS-1 SYMBOL LEGEND AND GENERAL NOTES
GS-2 CLEARING AND DEMOLITION PLAN
GS-3 SITE UTILITY AND GRADING PLAN
GS-4 SITE PAVING PLAN
GS-5 EROSION CONTROL NARRATIVE
GS-6 SITE DETAILS
GS-6.1 SITE DETAILS
GS-7 SPOT GRADE PLAN
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND
E-002 LIGHTING FIXTURE SCHEDULE - ELECTRICAL
E-003 PANELBOARD SCHEDULES - ELECTRICAL
E-004 MECHANICAL EQUIPMENT SCHEDULE - ELECTRICAL
E-005 ONE-LINE DIAGRAM - ELECTRICAL
E-006 ELECTRICAL DETAILS - ELECTRICAL
E-007 ELECTRICAL DETAILS - ELECTRICAL
E-007A SECURITY SYSTEM DETAILS - ELECTRICAL
E-008 TELECOM DETAILS - ELECTRICAL
E-009 CT SCANNER DETAILS
ES-1 CLEARING AND DEMOLITON PLAN - SITE ELECTRICAL
ES-2 SITE ELECTRICAL IMPROVEMENT PLAN
E-D-1-1 DEMOLITION - FIRST FLOOR LEVEL PHASE I FLOOR PLAN - ELECTRICAL
E-D-1-2 DEMOLITION - FIRST FLOOR LEVEL PHASE II FLOOR PLAN - ELECTRICAL
E-D-1-3 DEMOLITION - FIRST FLOOR LEVEL PHASE III FLOOR PLAN - ELECTRICAL
E-D-2-1 DEMOLITION - SECOND FLOOR LEVEL PHASE I FLOOR PLAN - ELECTRICAL
E-D-2-2 DEMOLITION - SECOND FLOOR LEVEL PHASE II FLOOR PLAN - ELECTRICAL
E-0.1-1 LIGHTING - BASEMENT LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL
E-0.2-1 POWER - BASEMENT LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL
E-0.3-1 SYSTEMS - BASEMENT LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL
E-0.4-1 TELECOM - BASEMENT LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL
E-1.1-1 LIGHTING - FIRST FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL
E-1.2-1 POWER - FIRST FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL
E-1.3-1 SYSTEMS - FIRST FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL
E-1.4-1 TELECOM - FIRST FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL
E-1.1-2 LIGHTING - FIRST FLOOR LEVEL PHASE II IMPROVEMENT PLAN - ELECTRICAL
E-1.2-2 POWER - FIRST FLOOR LEVEL PHASE II IMPROVEMENT PLAN - ELECTRICAL
E-1.3-2 SYSTEMS - FIRST FLOOR LEVEL PHASE II IMPROVEMENT PLAN - ELECTRICAL
E-1.4-2 TELECOM - FIRST FLOOR LEVEL PHASE II IMPROVEMENT PLAN - ELECTRICAL
E-1.1-3 LIGHTING - FIRST FLOOR LEVEL PHASE III IMPROVEMENT PLAN - ELECTRICAL
E-1.2-3 POWER - FIRST FLOOR LEVEL PHASE III IMPROVEMENT PLAN - ELECTRICAL
E-1.3-3 SYSTEMS - FIRST FLOOR LEVEL PHASE III IMPROVEMENT PLAN - ELECTRICAL
E-1.4-3 TELECOM - FIRST FLOOR LEVEL PHASE III IMPROVEMENT PLAN - ELECTRICAL
E-2.1-1 LIGHTING - SECOND FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL
E-2.1-2 LIGHTING - SECOND FLOOR LEVEL DEDUCT ALTERNATE PLANS - ELECTRICAL
E-2.2-1 POWER - SECOND FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL
E-2.2-2 POWER - SECOND FLOOR LEVEL DEDUCT ALTERNATE PLANS - ELECTRICAL
E-2.3-1 SYSTEMS - SECOND FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL
E-2.3-2 SYSTEMS - SECOND FLOOR LEVEL DEDUCT ALTERNATE PLANS - ELECTRICAL
E-2.4-1 TELECOM - SECOND FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL
E-2.4-2 TELECOM - SECOND FLOOR LEVEL DEDUCT ALTERNATE PLANS - ELECTRICAL
E-3.2-2 ROOF PLAN PHASE I ELECTRICAL IMPROVEMENT PLAN
PLUMBING
P-001 PLUMBING GENERAL NOTES, SCHEDULES, DETAILS, AND SYMBOL LEGEND
P-D-0-1 BASEMENT LEVEL PHASE I PLUMBING DEMOLITION PLAN
P-D-0-2 BASEMENT LEVEL PHASE II PLUMBING DEMOLITION PLAN
P-D-0-3 BASEMENT LEVEL PHASE III PLUMBING DEMOLITION PLAN
P-D-1-1 FIRST FLOOR LEVEL PHASE I PLUMBING DEMOLITION PLAN
P-D-1-2 FIRST FLOOR LEVEL PHASE II PLUMBING DEMOLITION PLAN
P-D-1-3 FIRST FLOOR LEVEL PHASE III PLUMBING DEMOLITION PLAN
P-D-2-1 SECOND FLOOR LEVEL PHASE I PLUMBING DEMOLITION PLAN
P-0.1-1 BASEMENT LEVEL PHASE I PLUMBING PIPING IMPROVEMENT PLAN
P-0.2-1 BASEMENT LEVEL PHASE I PLUMBING WASTE IMPROVEMENT PLAN
P-0.2-2 BASEMENT LEVEL PHASE II PLUMBING WASTE IMPROVEMENT PLAN
P-0.2-3 BASEMENT LEVEL PHASE III PLUMBING WASTE IMPROVEMENT PLAN
P-1.1-1 FIRST FLOOR LEVEL PHASE I PLUMBING PIPING IMPROVEMENT PLAN
P-1.2-1 FIRST FLOOR LEVEL PHASE I PLUMBING WASTE IMPROVEMENT PLAN
P-1.1-2 FIRST FLOOR LEVEL PHASE II PLUMBING PIPING IMPROVEMENT PLAN
P-1.2-2 FIRST FLOOR LEVEL PHASE II PLUMBING WASTE IMPROVEMENT PLAN
P-1.1-3 FIRST FLOOR LEVEL PHASE III PLUMBING PIPING IMPROVEMENT PLAN
P-1.2-3 FIRST FLOOR LEVEL PHASE III PLUMBING WASTE IMPROVEMENT PLAN
P-2.1-1 SECOND FLOOR LEVEL PHASE I PLUMBING PIPING IMPROVEMENT PLAN
P-2.2-1 SECOND FLOOR LEVEL PHASE I PLUMBING WASTE IMPROVEMENT PLAN
P-3.2-1 ROOF PLAN PHASE I PLUMBING WASTE IMPROVEMENT PLAN
P-002-2 PLUMBING ISOMETRICS - PHASE I & II
P-002-3 PLUMBING ISOMETRICS - PHASE III
FIRE PROTECTION
FP-001 FIRE PROTECTION NOTES, DETAILS, AND SYMBOL LEGEND
FP-0-1 BASEMENT LEVEL PHASE I FIRE PROTECTION IMPROVEMENT PLAN
FP-1-1 FIRST FLOOR LEVEL PHASE I FIRE PROTECTION IMPROVEMENT PLAN
FP-1-2 FIRST FLOOR LEVEL PHASE II FIRE PROTECTION IMPROVEMENT PLAN
FP-1-3 FIRST FLOOR LEVEL PHASE III FIRE PROTECTION IMPROVEMENT PLAN
FP-2-1 SECOND FLOOR LEVEL PHASE I FIRE PROTECTION IMPROVEMENT PLAN
LANDSCAPE
MSP-01 MASTER SITE IMPROVEMENT PLAN
MSP-02 ENLARGED SITE IMPROVEMENT PLAN - SOUTH
MSP-03 ENLARGED SITE IMPROVEMENT PLAN - NORTH
MSP-04 SITE PHASING PLAN
L-01 PLANTING PLAN
L-02 IRRIGATION PLAN
BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING WALLS)
FLOOR-CEILING ASSEMBLIES 2 HRS
ROOF-CEILING ASSEMBLIES 1-1/2 HRS
INTERIOR NON-BEARING WALLS 0 HRS
EXTERIOR NON-BEARING WALLS 0 HRS
WALL ASSEMBLIES
FIRE PARTITIONS 1 HR
SMOKE BARRIERS 1 HR
STAIR ENCLOSURES 2 HRS
SHAFT ENCLOSURES 2 HRS
E. FIRE RATED ASSEMBLIES: ALL NEW STRUCTURAL STEEL (CANOPY - BEAMS, ROOF DECK) IS TO RECEIVE MIN. 90 MIN.
RATED FIREPROOF SPRAY ASSEMBLY PER UL DES P719 (OR EQUAL)
F. PROJECT AREA: BASEMENT LEVEL: 0 SF INTERIOR RENOVATION + 9,184 GSF ADDITON
FIRST FLOOR: 8,785 SF INTERIOR RENOVATION + 9,307 GSF ADDITION
SECOND FLOOR: 346 SF INTERIOR RENOVATION + 9,245 GSF ADDITION + 2,459 SF CANOPY
TOTAL: 9,131 SF INTERIOR RENOVATION + 27,736 GSF ADDITION + 2,459 SF CANOPY
G. PROJECT AREA OCCUPANT LOAD: BASEMENT LEVEL: 28
FIRST FLOOR: 181
SECOND FLOOR: 96
H. FIRE PROTECTION: FULLY SPRINKLED - EXISTING AND ADDITION. EXISTING FIRE PROTECTION SYSTEM TO BE
MODIFIED AS REQUIRED FOR NEW IMPROVEMENTS. DESIGN SHALL BE COMPLETED
SEPARATELY BY A LICENSED FIRE PROTECTIONS SYSTEM DESIGNER.
NEW ADDITION
REFERENCE POINT:
LOCATION OF
MECH. ROOM BA109
W/UNITS AC-51, 52,
& 53 (BASEMENT
LEVEL)
Revisions: Date:
SCHEM. DESIGN SUBMISSION 10.21.19
DESIGN DEV. SUBMISSION 12.9.19
65% CD's SUBMISSION 1.28.20
90% CD's SUBMISSION 5.13.20
100% CD's SUBMISSION 6.26.20
FINAL CD's SUBMISSION 9.11.20
BID ISSUE SUBMISSION 2.9.21
DESIGN MANUALS, GUIDELINES, & STANDARDS
ARCHITECTURAL
• VA ARCHITECTURAL DESIGN MANUAL
• AIA/FGI – GUIDELINES FOR DESIGN AND
CONSTRUCTION OF HEALTHCARE FACILITIES
• VA SPACE PLANNING CRITERIA:
1. CHAPTER 110 - MENTAL HEALTH & BEHAVIORAL
PATIENT CARE UNITS
2. CHAPTER 256 - EMERGENCY DEPARTMENT AND
URGENT CARE CLINIC
3. CHAPTER 268 - PHARMACY SERVICE
• MENTAL HEALTH ENVIRONMENT OF CARE CHECKLIST
(MHEOCC)
• VA PHYSICAL SECURITY AND RESILIENCY DESIGN
MANUAL
STRUCTURAL
• SEISMIC DESIGN REQUIREMENTS H-18-8 REVISED
MAY 1, 2020
• STRUCTURAL DESIGN MANUAL FOR HOSPITAL
PROJECTS
SITE/CIVIL
• VA SITE DEVELOPMENT DESIGN MANUAL
MECHANICAL/PLUMBING
• NFPA 13
• VA AMBULATORY CARE DESIGN GUIDE
• VA HVAC DESIGN MANUAL
• VA PLUMBING DESIGN MANUAL
• VA FIRE PROTECTION DESIGN MANUAL
• ASHRAE 90.1
• ASHRAE 62.1
ELECTRICAL/TECHNOLOGY
• NFPA 70
• VA AMBULATORY CARE DESIGN GUIDE
• VA DESIGN MANUALS – LIGHTING DESIGN
• VA WHOLE BUILDING DESIGN GUIDE
• VA ELECTRICAL DESIGN MANUAL
• VA OFFICE OF INFORMATION TECHNOLOGY -
INFRASTRUCTURE STANDARDS FOR
TELECOMMUNICATIONS SPACES – VERSION 2.2 –
APRIL 10, 2019
• VA OFFICE OF INFORMATION TECHNOLOGY – IT
OPERATIONS AND SERVICES SOLUTION DELIVERY –
CFM/OIT DESIGN GUIDE TEMPLATES FOR CRITICAL
TELECOMMUNICATIONS SPACES IN CLINICAL AND
NON-CLINICAL ENVIRONMENTS – PRINT DATE:
2018-12-27
File details come from the government source that posted it. Updated .