Attachment 3 - MAHG171095 Renovate Stennis Hall - MSS.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
MAHG 17-1095 Stennis Hall
Solicitation number
FA301026R0010
Issued by

About this file

This is a Material Submittals Schedule (Attachment 3) for the MAHG171095 Renovate Stennis Hall project under Air Force solicitation FA301026R0010. The document is a template designed to track the submission, review, and approval of required materials and documentation throughout the renovation project execution.

The schedule requires contractors to submit 82 line items organized by construction specification sections, including environmental documentation (HazMat questionnaires, MSDS sheets, reporting forms), quality control and indoor air quality plans, and detailed technical submittals for concrete work, structural steel, waterproofing, finishes, mechanical systems (HVAC, plumbing, fire protection), electrical systems, and site work. Most submittals are due 14 days prior to the start date, with environmental and quality control documents due 5 days prior to start. The template provides designated columns for tracking required submission dates, receipt dates, dates forwarded to Civil Engineering for review, return suspense dates, submittal numbers, contractor notifications, resubmittals, approval dates, and final approval status. Number of copies required and remarks sections allow for project-specific modifications. Submittals include shop drawings, samples, color selections, manufacturer's recommendations, warranties, catalog data, test reports, and field reports as applicable to each line item. This administrative tool facilitates coordination between the contractor, contracting officer, and civil engineering throughout the construction phase to ensure compliance with project specifications and timely material approvals.

View the file

Other files

File Type Posted
Solicitation Amendment - FA301026R00100003.pdf PDF
Solicitation Amendment FA301026R00100003 SF 30.pdf PDF
Attachment 12 - MAHG171095 Renovate Stennis Hall - HVAC Chiller JA.pdf PDF
Solicitation Amendment - FA301026R00100002.pdf PDF
Attachment 10 - MAHG171095 Renovate Stennis Hall - Spec 01 91 00.15 20.pdf PDF
Solicitation Amendment FA301026R00100002 SF 30.pdf PDF
Attachment 11 - MAHG171095 Renovate Stennis Hall - Additional QA.pdf PDF
Attachment 6 - MAH171095 Renovate Stennis Hall - QAs.pdf PDF
Solicitation Amendment - FA301026R00100001.pdf PDF
Attachment 9 - MAHG171095 Renovate Stennis Hall - Hazmat Survey .pdf PDF
Attachment 7 - MAHG171095 Renovate Stennis Hall - Revised Specifications .pdf PDF
Attachment 8 - MAHG171095 Renovate Stennis Hall - Additional Specifications .pdf PDF
Solicitation Amendment FA301026R00100001 SF 30.pdf PDF
Pre-Bid Site Visit - Sign In Sheet - MAHG171095 Renovate Stennis Hall.pdf PDF
L-01 MAHG171095 Renovate Stennis Hall - Past Performance Reference List.pdf PDF
Attachment 2 - MAHG171095 Renovate Stennis Hall - Drawings.pdf PDF
Attachment 1 - MAHG171095 Renovate Stennis Hall - Specifications.pdf PDF
Attachment 4 - MAHG171095 Renovate Stennis Hall - Wage Determination MS20260050.pdf PDF
L-02 MAHG171095 Renovate Stennis Hall - Past Performance Questionnaire.pdf PDF
Solicitation - FA301026R0010.pdf PDF
Attachment 5 - MAHG171095 Renovate Stennis Hall - Submittal Procedures.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Material Submittals Schedule

Project Number:
MAHG171095Project Title:
Renovate Stennis HallSolicitation / Contract Number:

FA301026R0010 - Attachment #3

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)(To be completed by Contractor)
Number of Copies Required (if not electronically submitted)Remarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationWarranty-Manufacturer and/or WorkmanshipCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Submmittal Status fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Return Suspense Date fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Submittal Numbers fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Date Contractor

Notified

(O) Contractor Resubmittal fergusog: Enter Resubmittal Number Approval by fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter the due date from the Contractor (MM/DD/YY) fergusog: Enter the date received from the Contractor. (MM/DD/YY) fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) fergusog: Enter the date the submittal is due back from CE fergusog: Enter the Submittal Number fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

fergusog: Enter the date received from the Contractor. (MM/DD/YY) fergusog: Enter the date received from the Contractor. (MM/DD/YY) fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

1HazMat Questionnaire15 Days Prior to Start Date(K)(L)(M)(N)(P)(Q)Provide the documents as required per the Environmental packet provided by Keesler AFB.
2HazMat MSDS115 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
3Hazmat Reporting Entry Form1115 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
4Recycling and Landfill Report11End of ContractProvide the documents as required per the Environmental packet provided by Keesler AFB.
5Warranty (Manufacturer's)1End of Contract
61-Year Warranty (Contractor)1End of Contract
701 45 00.00 20Conastruction Quality Control Plan, 1.2115 Days Prior to Start Date
801 45 00.00 20Indoor Air Quality Management Plan, 1.2115 Days Prior to Start Date
901 91 00.15 20Test Report, 1.711115 Days Prior to Start Date
1002 41 00Existing Conditions, 1.915 Days Prior to Start Date
1102 41 00Demolition Plan, 1.2.1114 Days Prior to Start Date
1202 41 00Notification, 1.7.1114 Days Prior to Start Date
1303 30 00Reinforcing Steel, 1.6.2.1114 Days Prior to Start Date
1403 30 00Formwork, 2.4.5114 Days Prior to Start Date
1503 30 00Curing Materials, 2.3.7114 Days Prior to Start Date
1603 30 00Joint Sealants, 2.3.10114 Days Prior to Start Date
1703 30 00Joint Filler, 2.3.9114 Days Prior to Start Date
1803 30 00Aggregate Materials, 1.7114 Days Prior to Start Date
1903 30 00Cement, 2.3.1114 Days Prior to Start Date
2003 30 00Ready-mix concrete, 2.2.2114 Days Prior to Start Date
2103 30 00Water-vapor barrier subgrade cover, 2.3.6.1114 Days Prior to Start Date
2203 30 00Bonding Materials, 2.5114 Days Prior to Start Date
2303 30 00Floor Finish Materials, 2.6114 Days Prior to Start Date
2403 30 00Liquid Chemical Floor Hardener, 2.6.1114 Days Prior to Start Date
2503 30 00Mix Design, 2.2.1, 1.6.4.11114 Days Prior to Start Date
2603 30 00Compressive strength tests, 3.10.2.3114 Days Prior to Start Date
2703 30 00Unit Weight of Structural Lightweight Concrete, 3.10.2.5114 Days Prior to Start Date
2803 30 00Air Content, 3.10.2.4114 Days Prior to Start Date
2903 30 00Slump, 2.7.4114 Days Prior to Start Date
3003 30 00Air Entrainment, 2.7.1114 Days Prior to Start Date
3103 30 00Curing concrete element, 1.6.3.1114 Days Prior to Start Date
3203 30 00Finishing plan, 1.6.3.3114 Days Prior to Start Date
3303 30 00Fly Ash114 Days Prior to Start Date
3403 30 00Ground Granulated Blast-furnace slag114 Days Prior to Start Date
3503 30 00Steel bar114 Days Prior to Start Date
3605 12 00Erection Plan, 1.4.2.1114 Days Prior to Start Date
3705 12 00Fabrication Drawings, 1.4.1114 Days Prior to Start Date
3805 12 00Shop primer, 2.4114 Days Prior to Start Date
3905 12 00Welding electrodes and rods, 2.3.1114 Days Prior to Start Date
4005 12 00Class B Coating, 2.4114 Days Prior to Start Date
4105 12 00Bolts, Nuts, and Washers, 2.2114 Days Prior to Start Date
4205 12 00Welding procedures and qualifications, 1.4.2.2114 Days Prior to Start Date
4306 10 00Self-adhering/Liquid Applied Membrane114 Days Prior to Start Date
4406 10 00Liquid Applied Membrane Adhesives114 Days Prior to Start Date
4506 20 00Detail Drawings, 1.311114 Days Prior to Start Date
4606 20 00Plastic Laminate, 2.2.11114 Days Prior to Start Date
4706 61 16Solid Polymer Material, 2.1111114 Days Prior to Start Date
4807 92 00Sealant1111114 Days Prior to Start Date
4909 51 00Acoustical Ceiling, 1.2, 2.1, 2.1.111111114 Days Prior to Start Date
5010 21 13Toilet Compartments11111111114 Days Prior to Start Date
5110 28 13Toilet Accessories11111114 Days Prior to Start Date
5214 24 00Passenger Elevator1111111114 Days Prior to Start Date
5321 13 13Sprinkler - QFPE, Designer, Installer114 Days Prior to Start Date
5421 13 13System and Accessories1111111111114 Days Prior to Start Date
5522 00 00Plumbing Systems111111114 Days Prior to Start Date
5622 00 00Tests, Flushing and Disinfection114 Days Prior to Start Date
5722 07 19.00 40Plumbing piping Insulation11114 Days Prior to Start Date
5823 05 15Common Piping of HVAC11111111114 Days Prior to Start Date
5923 05 15Coordination Drawings, 1.2114 Days Prior to Start Date
6023 05 48.19Bracing for HVAC1111114 Days Prior to Start Date
6123 05 93TAB for HVAC111114 Days Prior to Start Date
6223 07 00HVAC insulation111114 Days Prior to Start Date
6323 08 00.00 20Commissioning of HVAC & Plumbing Systems111114 Days Prior to Start Date
6423 09 00Instrumentation and control for HVAC11114 Days Prior to Start Date
6523 09 00BACNET DDC111114 Days Prior to Start Date
6623 21 23Pumps1111111114 Days Prior to Start Date
6723 23 00Piping System111111114 Days Prior to Start Date
6823 30 00HVAC Air Distribution1111111111114 Days Prior to Start Date
6923 30 00HVACDuctwork1111111114 Days Prior to Start Date
7023 64 10Water Chillers1111111114 Days Prior to Start Date
7123 64 26Chilled Water Piping111111111114 Days Prior to Start Date
7223 73 13.00 40Modular Indoor AHU11111114 Days Prior to Start Date
7323 81 23CRAC Units11111114 Days Prior to Start Date
7425 05 11Cybersecurity11111114 Days Prior to Start Date
7526 05 71.00 40Low Voltage111114 Days Prior to Start Date
7626 20 00Interior Distribution System111111114 Days Prior to Start Date
7726 24 13Switchboards1111114 Days Prior to Start Date
7826 28 01.00 10Coordinated Power System Protection1114 Days Prior to Start Date
7926 29 23ASD Systems111114 Days Prior to Start Date
8028 31 76Fire Alarm & Mass Notification111111111114 Days Prior to Start Date
8131 00 0 0Earthwork1114 Days Prior to Start Date
8232 93 23Sodding111114 Days Prior to Start Date
83
84
85
86
87
88

&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).

&P of &N

File details come from the government source that posted it. Updated .