Attachment 2.3 - Temporary Laydown Area Request.docx

DOCX document 98 KB Posted

Attached to
Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM Federal contract opportunity
Solicitation number
FA485524R0004
Issued by
Department of the Air Force Special Operations Command

About this file

This memorandum outlines the requirements for contractors to obtain a temporary laydown area at Cannon Air Force Base in New Mexico. Prime contractors working under an active contract with the base can apply for a designated storage lot to keep equipment, materials, and vehicles related to that contract. The lot must be kept clean and orderly, with any hazardous materials, excess debris, or inoperable vehicles prohibited. Contractors are responsible for securing their property and will be liable for any damages caused. Upon contract completion, the area must be cleaned and vacated within one day. Failure to comply with the standards may result in loss of future temporary laydown area privileges.

This multiple award basic ordering agreement (BOA) is for construction services at Cannon Air Force Base, New Mexico. The Air Force Special Operations Command will issue task order proposal requests as projects are identified, and contractors can submit proposals to be awarded fixed-price orders under the BOA. Work may include design-build, partial design-build, or construction-only projects involving sustainment, maintenance, repair, alteration, renovation, or minor construction affecting real property. The goal is to expedite task order awards by pre-qualifying contractors.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM, newest first.
File Type Posted
Solicitation Amendment FA485524R00040001 SF 30.pdf PDF
Attachment 0001AA - Questions and Answers.pdf PDF
Attachment 01 - Statement of Work 04 March 2024.pdf PDF
Attachment 2.7 - AF Form 3064 Schedule Template.xlsx XLSX spreadsheet
Attachment 2.10 - AF Form 3000 Material Submittals Template.pdf PDF
Attachment 04 - WD_NM20240007_Heavy_05_Jan_2024.pdf PDF
Attachment 2.13b - HAZMAT Usage Worksheet.pdf PDF
Attachment 02 - CAFB General Specifications.pdf PDF
Attachment 2.2 - CAFB Installation Facilities Standards 2021.pdf PDF
Attachment 2.4 - 27 SOCES Form 103 Work Clearance Request.pdf PDF
Attachment 2.6 - CAFB CAD Standards - Jan 2024.pdf PDF
Attachment 2.8 - AF Form 3065 Progress Report Template.xlsx XLSX spreadsheet
Attachment 2.9 - Comm Call Out Template.pdf PDF
Attachment 07 - Experience_Matrix.pdf PDF
Attachment 2.5 - Mobile District Design Manual.pdf PDF
Attachment 2.11 - Schedule of Material Submittals (SOMS) Template.xlsx XLSX spreadsheet
Attachment 2.13a - HAZMAT Worksheet instructions.pdf PDF
Attachment 05 - WD_NM20240036_Highway_05_Jan_2024.pdf PDF
Solicitation - FA485524R0004.pdf PDF
Attachment 2.1 - Contractor Security Handbook 2021.pdf PDF
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx XLSX spreadsheet
Attachment 2.13 - HAZMAT Worksheet.pdf PDF
Attachment 03 -WD_NM20240016_Building_05_Jan_2024.pdf PDF
Attachment 06 - Informational Only - FY24 Potential Projects.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

27TH SPECIAL OPERATIONS CIVIL ENGINEER SQUADRON (AFSOC)

CANNON AIR FORCE BASE NEW MEXICO

INSERT DATE

MEMORANDUM FOR: INSERT CONTRACTOR’S NAME

FROM: 27 SOCES/CENM

SUBJECT: Base Contractor’s Temporary Work Site Laydown Area Agreement and Disclaimer

1. The purpose of the Contractor Temporary Work Site Laydown Area Agreement is to inform the Prime contractor of Cannon Air Force Base’s expectations for providing a safe and environmentally sound storage location while under an active contract. Therefore, the following items are not authorized:

a. Controlled substances or firearms.

b. Vehicles, trailers, etc; or any other mechanical devices in a non-operating or non-functioning condition.

c. Any used oil, batteries, or any chemicals deemed hazardous by the Hazardous Material Pharmacy (Hazmart Pharmacy).

d. Excess pallets, excess wood, scrap metal, trash, machine or engine parts. Excess wood and pallets shall be defined as those materials not necessary for use during any currently awarded contracts.

e. Vehicles requiring registration or licensing that are not current with the Department of Motor Vehicles and Cannon Air Force Base.

2. Repair work on any type of machinery is not authorized in the contractor’s temporary work site laydown area to eliminate the potential for oil spills or contaminants. If a laydown area has been contaminated, it will be reported as soon as possible to 27 SOCES/CEAN (904-6738) for action/remediation, at the contractor’s expense. All Hazmat materials being used in the execution of the contract shall be stored in approved storage containment with the proper SDS and ESO-MIS paperwork on hand.

3. All vehicles, and trailers shall be maintained in a proper operating condition at all times and must have current insurance coverage. Vehicles, trailers, etc; shall not be stored on jacks or blocks.

4. Each assigned temporary work site laydown area shall have a weather-proof sign posted on the external gate listing the prime contractor in whose name the temporary work site laydown area is assigned, contact information, the current contract number(s), and the expected contract completion date of the contract(s).

5. Areas inside the Contractor’s temporary work site laydown yard must be kept clean and present an orderly configuration. Compliance with CAFB standards with regards to cleanliness inside/outside fence shall include, but is not limited to the removal of tumbleweeds, leaves, grass, weeds, trash, etc. It is recommended that all temporary work site laydown areas be cleaned weekly or more frequently as determined by the 27th SOCES. Failure to properly maintain a clean lot may result in the contractor being removed from the temporary laydown yard at no additional expense to the government and may affect future requests for any temporary work site laydown areas on base. Contractor is responsible for all maintenance within 5 feet of the contractor’s assigned temporary work site laydown area’s perimeter, to include going back and forth to the actual work site. The contractor’s required maintenance shall include the complete interior of the assigned laydown area. Grass shall not exceed 2 inches in height. Demolition debris shall not be stored inside the temporary laydown area.

6. Tarps shall be used for loose / granular material, and secured in a way that will prevent high winds from dislodging material. If the material in question is able to be dislodged by high winds, it must be secured. If loose items are found to be blown around the lot, the items shall be secured with a tarp, rope, or container, as deemed sufficient for protection from the elements.

7. All wood, plumbing pieces, loose cables, metals, etc., shall be stacked in a neat, orderly appearance.

8. Upon contract completion, the Prime contractor shall clean and vacate the assigned storage lot and inform a representative from the 27 SOCES/CENM no later than 1 day after beneficial occupancy/acceptance of the project by the government. Failure to clean the lot properly prior to vacancy may result in the contractor being denied usage of any requested storage lots in the future.

9. All terminations will be given a maximum of 2 days to vacate the assigned contractor’s temporary laydown area.

10. In addition to the expectations above, I, INSERT CONTRACTOR’S NAME, understand that:

a. As long as my company has this active INSERT CONTRACT NUMBER with CAFB, my company and my subcontractors are eligible to place equipment/materials/vehicles in my assigned temporary work site laydown area at no charge.

b. My company may not store items, materials, equipment, etc. for any other contractors unless they are subcontractors for my active contract. My company is not authorized to use any other storage lots/spaces/temporary laydown areas other than the one assigned.

c. It my company’s responsibility to keep my equipment/materials/vehicles or personal property secured or locked at all times. My company also understands that no security is provided for the work site laydown area.

d. My company understands that the Government has the right to confiscate any construction material outside the assigned fenced area or within work site laydown areas that are not signed for by a prime contractor.

e. The United States Air Force, neither CAFB nor its designated officials, will be responsible for any damage or theft to my property or contents thereof as a result of vandalism, weather, and other occupants or by any other means to any equipment/materials/vehicles or personal property and contents that is stored in my Work Site Laydown area.

f. CAFB requires all contractors utilizing the contractor’s temporary work site laydown area to have full comprehensive insurance coverage to provide financial protection in the event of damage or loss of property. My company understands that we can be held liable for any damages in which my employees, guest, and I may cause to any personal or Government property.

g. My company has and will continue to maintain the required insurance coverage. Please initial here_______________.

h. If an additional contractor’s temporary work site laydown area is needed, I am to submit another request through my Contracting Officer for approval from 27 SOCES/CENMP.

i. Failure to comply with this Contractor’s Temporary Work Site Laydown Area Agreement is grounds for removal from the temporary laydown area.

11. Prime Contractor Project Manager: I have read, understand and will comply with all the above requirements in the Contractor Temporary Work Site Laydown area Agreement and Disclaimer. Upon notification of approval, I will perform a check of the assigned area for any existing damage and report it to 27 SOCES/CENM immediately. Within 5 days of approval, I will also post the requested sign as requested above (see page 1).

12. Contractor’s Temporary Work Site Laydown Area is located LAYDOWN YARD LOCATION.

Prime contractor’s acknowledgement:

PRINT NAME: _________________________________________________________

SIGNATURE: ________________________________________ DATE: __________________

Construction Manager’s acknowledgement:

PRINT NAME: _________________________________________________________

SIGNATURE: _________________________________________ DATE: __________________

Contracting Officer or His/Her Representative’s acknowledgement:

PRINT NAME: _________________________________________________________

SIGNATURE: _________________________________________ DATE: _________________

1. SPACE ASSIGNMENT Storage Lot #_______________

Print: POC Last Name, First MI Company

Home Phone Duty Phone

Occupant Signature Date Engineering Flight Rep Signature Date

SUBCONTRACTORS

1.___________________________________________________________________________________

2. ___________________________________________________________________________________

3. ___________________________________________________________________________________

4. ___________________________________________________________________________________

5. ___________________________________________________________________________________

6. ___________________________________________________________________________________

7. ___________________________________________________________________________________

8. ___________________________________________________________________________________

Occupant Signature Date Engineering Flight Rep Signature Date

2. SPACE TERMINATION

INSERT CONTRACTOR’S NAME has cleared Contractor Storage Lot number ___________ on INSERT DATE.

Occupant Signature Date Engineering Flight Rep Signature Date

AIR COMMANDOS