Attachment 2.13 - HAZMAT Worksheet.pdf
PDF 3 MB Posted
- Attached to
- Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM Federal contract opportunity
- Solicitation number
- FA485524R0004
About this file
This document provides details for a Multiple Award Basic Ordering Agreement (BOA) solicitation for construction services at Cannon Air Force Base in New Mexico. The BOA would require contractors to accomplish a broad range of sustainment, maintenance, repair, alteration, renovation, and minor construction projects affecting real property at the base. Work may require multiple construction trades as well as detailed engineering design by licensed professionals. The goal is to expedite order award by reducing design work and acquisition time. Projects would fall under design-build, partial design-build, or construction-only categories as defined in each Task Order Proposal Request. As projects are identified, the base would issue proposal requests describing requirements. Projects would then be awarded as orders against the basic agreement. Interested offerors should refer to solicitation FA485524R0004 and associated attachments for proposal and submission instructions.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1
CAFB & MAFR Contractor
HAZMAT Worksheet
1. Contractor Information
Contractor Name:
Contract Number:
Project Number:
Estimated Start Date:
Estimated Completion Date:
Assigned Shop Code, if known:
2. Material Information
Material Name (from SDS):
Material Stock No. (MSN), or National Stock No.
(NSN), or Local Stock No. (LSN), enter if known:
Container Type (check one):
Box
Bag Tube
Bottle Can
Drum
Container Volume or Weight (check one):
Weight Oz. GramsPounds Tons
Quarts
Gallons
Other(Specify):
Total No. of Containers: Container Size: Total HAZMAT
Quantity:
3. Process Information
Process Type:
Process Description:
4. Engine ering
Describe process engineering controls:
5. Personal Protective Equipment (PPE)
Describe process PPE:
6. Location Information
Process will be performed on/at (check all that apply):
Existing Facility Aircraft Outdoors
E quipment New Facility
Other (Specify):
Physical location of process:
Staging location of HAZMAT:
Other (Specify)
Kilograms Fluid Oz Pints
Cartridge
ATTACHMENT A-1
Cannon AFB & Melrose AFR
Contractor HAZMAT
IAW FAR 52.223-3/AFI 32-7086 3.4.1; All HAZMAT brought onto an installation for use shall be authorized via the process described in this section.
NOTE: Manufacturer’s Safety Data Sheet (SDS) is required for every worksheet
The information submitted is complete. The HAZMAT noted above may enter Cannon AFB and/or Melrose AFR
The information submitted is incomplete and/or erroneous. Please follow the instruction below and resubmit.
7. Additional Information
Will a hazardous waste be generated (circle one)?
Yes No TBD Describe method(s) of waste management, transport, and disposal:
8. Contractor Signature Block
Title Phone Number
Printed Name Date
Signature
9. Environmental Approval Signature Block
Title Phone Number
Printed Name Date
Signature
| Contractor Name: |
| Contract Number: |
| Project Number: |
| Estimated Start Date: |
| Estimated Completion Date: |
| Assigned Shop Code if known: |
| Material Name from SDS: |
| Material Stock No MSN or National Stock No NSN or Local Stock No LSN enter if known: |
| Weight Oz Pounds Tons Grams Kilograms Fluid Oz Pints Quarts Gallons Other SpecifyTotal No of Containers: |
| Container Size: |
| Total HAZMAT Quantity: |
| Process Type: |
| Process Description: |
| Describe process engineering controls: |
| Describe process PPE: |
| Other Specify: |
| Describe methods of waste management transport and disposal: |
| Title: |
| Phone Number: |
| Printed Name: |
| Date: |
| Title_2: |
| Phone Number_2: |
| Printed Name_2: |
| Date_2: |
| Specify: |
| Location: |
| Staging location of HAZMAT: |
| Group11: Off |
| Group12: Off |
| Group13: Off |
| Clear Form: |
| Group4: Off |
| Check Box1: Off |
| Dropdown9: [N/A] |
| Text10: |
| Check Box11: Off |
File details come from the government source that posted it. Updated .