Attachment 13 - Specifications - Volume 1.pdf
PDF 3 MB Posted
- Attached to
- 36C77622B0029 - Replace Boilers - Leavenworth - Solicitation Federal contract opportunity
- Solicitation number
- 36C77622B0029
About this file
This is a solicitation for a firm-fixed-price construction contract to replace boilers at the Dwight D. Eisenhower VA Medical Center in Leavenworth, Kansas. The project involves replacing four existing water tube boilers and associated piping and support systems with three new energy efficient fire tube boilers, as well as replacing auxiliary systems in Building 39, fuel oil pump sets, condensate piping, a deaerator tank, condensate return tank, and adding a continuous blowdown heat recovery package. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin. Bids are due by the date specified in the solicitation, and the contract is expected to be awarded shortly thereafter to the responsible bidder that provides the best value to the government.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID DOCUMENTS
SPECIFICATIONS
REPLACE BOILERS IN BUILDING 39
Project No. 589A6-19-204
Dwight D. Eisenhower VA Medical Center Leavenworth, KS
Miller-Remick LLC 1010 Kings Highway South
Building Two – 2nd Floor Cherry Hill, New Jersey 08034
(856) 429-4000
January 20, 2022
Anthony D. Pacaro, Jr., PE
NJ PE #GE38230
Department of Veterans Affairs Project #589A6-19-204 Leavenworth VA Medical Center Replace Boilers – Building 39 Leavenworth, KS Bid Documents: 01/20/22
12-21-21
00 01 10 - 1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21 01 33 23 Shop Drawings, Product Data, and Samples 06-21 01 33 23.10 Submittal Register 01 35 26 Safety Requirements 11-21 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 45 35.10 Attach A – Schedule 01 45 35.20 Attach B – Special Inspections 01 57 19 Temporary Environmental Controls 01-21 01 74 19 Construction Waste Management 11-21 01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 01-21 02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21 03 35 11 Concrete Finishes
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-21 04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21 04 20 00 Unit Masonry 08-17 04 72 00 Cast Stone Masonry 01-21
00 01 10 - 2
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18 05 31 00 Steel Decking 01-21 05 36 00 Composite Metal Decking 01-21 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 01-21 07 21 13 Thermal Insulation 01-21 07 22 00 Roof and Deck Insulation 01-21 07 31 13 Asphalt Shingles 02-21 07 40 00 Roofing and Siding Panels 01-21 07 54 19 Polyvinyl-Chloride (PVC) Roofing 12-18 07 60 00 Flashing and Sheet Metal 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 33 00 Coiling Doors and Grilles 01-21 08 56 53 Blast Resistant Windows 01-21 08 71 00 Door Hardware 01-21 08 80 00 Glazing 01-21
DIVISION 09 – FINISHES
09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 12-21 09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21 10 23 10 Interior Window Wall
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework 01-21
00 01 10 - 3
SECTION NO. DIVISION AND SECTION TITLES DATE
12 36 00 Countertops 12-18
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components 01-21
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 05 33 Heat Tracing for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 05-21 22 11 23 Domestic Water Pumps 09-15 22 13 00 Facility Sanitary and Vent Piping 09-20 22 13 23 Sanitary Waste Interceptors 09-20 22 14 00 Facility Storm Drainage 09-15 22 14 29 Sump Pumps 09-15 22 15 00 General Service Compressed-Air Systems 09-20 22 31 11 Water Softeners 09-15 22 34 00 Fuel-Fired Domestic Water Heaters 09-20 22 40 00 Plumbing Fixtures 09-15 22 66 00 Chemical-Waste Systems for Laboratory and Healthcare
Facilities 09-20
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 10 Common Work Results for Boiler Plant and Steam
Generation 04-20
23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment
02-20
23 05 51 Noise and Vibration Control for Boiler Plant 04-20 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 02-20 23 08 11 Demonstrations and Tests for Boiler Plant 04-20 23 09 11 Instrumentation and Control for Boiler Plant 08-21 23 10 00 Facility Fuel Systems 04-20 23 11 23 Facility Natural-Gas Piping 04-20 23 21 11 Boiler Plant Piping Systems 09-21
00 01 10 - 4
SECTION NO. DIVISION AND SECTION TITLES DATE
23 22 23 Steam Condensate Pumps 04-20 23 23 00 Refrigerant Piping 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 50 11 Boiler Plant Mechanical Equipment 04-20 23 51 00 Breechings, Chimneys, and Stacks 04-20 23 52 39 Fire Tube Boilers 11-21 23 72 00 Air-to-Air Energy Recovery Equipment 03-20 23 81 43 Air-Source Unitary Heat Pumps 03-20 23 82 00 Convection Heating and Cooling Units 03-20 23 99 99.10 Boiler Safety Device Testing Manual 5th Edition 12-18
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 13 Medium-Voltage Cables 01-17 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 41 Underground Electrical Construction 01-17 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 11 16 Secondary Unit Substations 01-18 26 13 16 Medium-Voltage Fusible Interrupter Switches 01-17 26 22 00 Low-Voltage Transformers 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 32 13 Engine Generators 01-18 26 36 23 Automatic Transfer Switches 01-17 26 41 00 Facility Lightning Protection 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18 26 56 00 Exterior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 31 31 Voice Communications Switching and Routing Equipment -
Extension 06-15
27 51 23 Intercommunications and Program Systems 06-15
00 01 10 - 5
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and
Security 10-18
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 13 16 Physical Access Control System and Database Management 09-11 28 16 00 Intrusion Detection System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 12 16 Asphalt Paving 09-15 32 17 23 Pavement Markings 08-16
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 03-17 33 16 15 Water Storage Tanks
DIVISION 34 – TRANSPORTATION
34 71 13 Passive Vehicle Barriers 04-18
00 01 10 - 6
Page intentionally left blank
05-01-20
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWINGS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI001 COVER SHEET & DRAWING INDEX
HAZARDOUS MATERIALS
HA101 ABATEMENT PLAN
CIVIL
C-101 EXISTING SITE PLAN
C-102 SITE CONSTRUCTION STAGING AREA & DETAILS
STRUCTURAL
S-001 ABBREVIATIONS & NOTES
S-002 NOTES
SD101 DEMOLITION PLAN - BOILER ROOM
SD111 DEMOLITION PLAN - UPPER PLATFORMS
SD112 DEMOLITION PLAN - UPPER CEILING
SD501 DEMOLITION - SECTIONS & DETAILS
SF1B1 FOUNDATION PLAN
SF101 FRAMING PLAN - BOILER ROOM
SF111 FRAMING PLAN - UPPER OFFICE & BOILER
SF112 FRAMING PLAN - PIPE HANGERS UPPER BOILER
SF121 FRAMING PLAN - ROOF
SF122 FRAMING PLAN - ROOF CUPOLA
SF401 ENLARGED PARTIAL FRAMING PLANS & ELEVATIONS
S-301 SECTIONS
S-302 SECTIONS & ELEVATIONS
S-501 FOUNDATIONS SECTIONS & DETAILS
S-510 CONCRETE SLAB SECTIONS & DETAILS
S-511 CONCRETE SLAB SECTIONS & DETAILS
S-512 SECTIONS & DETAILS
S-520 PLATFORMS & MEZZANINE SECTIONS & DETAILS
00 01 15 - 2
S-521 PLATFORMS & MEZZANINE SECTIONS & DETAILS
S-522 SECTIONS & DETAILS
S-530 SITE SECTIONS & DETAILS
S-531 FUEL STORAGE TANK FOUNDATION
S-532 CHIMNEY MODIFICATIONS
ARCHITECTURAL
AD111 FIRST LEVEL DEMOLITION PLAN
AD112 FIRST LEVEL DEMOLITION REFLECTED CEILING PLAN
AD121 SECOND LEVEL DEMOLITION PLAN
AD131 ROOF DEMOLITION PLAN
AD201 EXTERIOR DEMOLTION ELEVATIONS
AE001 NOTES, SYMBOLS & DETAILS
AE002 LIFE SAFETY PLANS
AE111 FIRST LEVEL NEW WORK PLAN
AE112 FIRST LEVEL NEW WORK REFLECTED CEILING PLAN
AE121 SECOND LEVEL NEW WORK PLAN
AE122 SECOND FLOOR NEW WORK REFLECTED CEILING PLAN
AE131 ROOF NEW WORK PLAN
AE201 EXTERIOR ELEVATIONS
AE211 INTERIOR ELEVATIONS
AE212 INTERIOR ELEVATIONS
AE350 BUILDING SECTIONS
AE450 WALL SECTIONS
AE500 STAIR PLANS, SECTIONS, AND DETAILS
AE501 INTERIOR PARTITION ASSEMBLIES, FINISHES, AND ROOM FINISH
SCHEDULE
AE700 DOOR SCHEDULE & DETAILS
AE701 DETAILS
AE702 DETAILS
AI501 BASE CABINET DETAILS
FIRE PROTECTION
FX001 ABBREVIATIONS, NOTES, SYMBOLS & DETAILS
FX111 HAZARD GROUP PLAN LEVEL 1
FX121 HAZARD GROUP PLAN LEVEL 2
FX501 DETAILS
00 01 15 - 3
PLUMBING
P-001 ABBREVIATIONS, NOTES & SYMBOLS
PD101A DEMOLITION OFFICE AREA PLAN 0'-0" - 8'-0" AFF
PD101B DEMOLITION BOILER ROOM WEST PLAN 0'-0" - 8'-0" AFF
PD101C DEMOLITION BOILER ROOM EAST PLAN 0'-0" - 8'-0" AFF
PD102A DEMOLITION OFFICE AREA PLAN 8'-0" - 16'-0" AFF
PD102B DEMOLITION BOILER ROOM WEST PLAN 8'-0" - 16'-0" AFF
PQ101 NEW WORK EQUIPMENT ARRANGEMENT LOWER FLOOR PLAN
PP101A NEW WORK OFFICE AREA LOWER FLOOR PLAN
PP101B NEW WORK BOILER ROOM WEST LOWER FLOOR PLAN
PP101C NEW WORK BOILER ROOM EAST LOWER FLOOR PLAN
PP102A NEW WORK OFFICE AREA UPPER FLOOR PLAN
PP102B NEW WORK BOILER ROOM WEST UPPER FLOOR PLAN
PP102C NEW WORK BOILER ROOM EAST UPPER FLOOR PLAN
PP103 NEW WORK ROOF PLAN
PP401 ENLARGED PLANS
P-501 DETAILS
P-502 DETAILS
P-503 SITE DETAILS
P-504 SITE DETAILS
PP601 MAKE-UP & SOFTENED WATER FLOW DIAGRAMS
PP602 WATER AND AIR FLOW DIAGRAMS
PP603 RISER DIAGRAMS
P-701 SCHEDULES
MECHANICAL
M-001 ABBREVIATIONS, NOTES & SYMBOLS
MD101A DEMOLITION OFFICE AREA FLOOR PLAN 0'-0" - 8'-0" AFF
MD101B DEMOLITION BOILER ROOM WEST FLOOR PLAN 0'-0" - 8'-0" AFF
MD101C DEMOLITION BOILER ROOM EAST FLOOR PLAN 0'-0" - 8'-0" AFF
MD102A DEMOLITION OFFICE AREA FLOOR PLAN 14'-0" - 24'-0" AFF
MD102B DEMOLITION BOILER ROOM WEST FLOOR PLAN 8'-0" - 16'-0" AFF
MD102C DEMOLITION BOILER ROOM EAST FLOOR PLAN 8'-0" - 20'-0" AFF
MD103B DEMOLITION BOILER ROOM WEST FLOOR PLAN 16'-0" - 24'-0" AFF
MD104 DEMOLITION ROOF PLAN
MD301 EXISTING INTERIOR 3D VIEWS
MD302 EXISTING EXTERIOR 3D VIEWS - SOUTH
00 01 15 - 4
MD303 EXISTING EXTERIOR 3D VIEWS - NORTH
MD304 DEMOLITION SECTIONS
MD401 DEMOLITION GENERATOR ROOM PLAN - BUILDING 39A
MP011 PHASING SECTION & 3D VIEW
MQ101A NEW WORK EQUIPMENT ARRANGEMENT OFFICE AREA FLOOR PLAN
MQ101B NEW WORK EQUIPMENT ARRANGEMENT BOILER ROOM WEST LOWER FLOOR
PLAN
MQ101C NEW WORK EQUIPMENT ARRANGEMENT BOILER ROOM EAST FLOOR PLAN
MQ102B NEW WORK EQUIPMENT ARRANGEMENT BOILER ROOM WEST UPPER FLOOR
PLAN
MP101A NEW WORK OFFICE AREA LOWER FLOOR PLAN
MP101B NEW WORK BOILER ROOM WEST LOWER FLOOR PLAN
MP101C NEW WORK BOILER ROOM EAST LOWER FLOOR PLAN
MP102B NEW WORK BOILER ROOM WEST UPPER FLOOR PLAN
MP102C NEW WORK BOILER ROOM EAST UPPER FLOOR PLAN
MP103 NEW WORK ROOF PLAN
MP301 NEW WORK INTERIOR 3D VIEWS
MP302 NEW WORK INTERIOR 3D VIEWS
MP303 NEW WORK SECTIONS
M-401 NEW WORK GENERATOR ROOM PLAN - BUILDING 39A
MP501 STEAM GENERATION DETAILS-1
MP502 STEAM GENERATION DETAILS-2
MP503 STEAM GENERATION DETAILS-2
MP601 STEAM GENERATION FLOW DIAGRAM - BOILERS
MP602 STEAM GENERATION FLOW DIAGRAM - DEAERATOR & SURGE TANK
MP603 STEAM GENERATION - NATURAL GAS AND NO. 2 FUEL OIL FLOW
DIAGRAM
MP604 STEAM GENERATION - TEMPORARY STEAM BOILER SYSTEM PHASE 1
(RENTAL & TEMPORARY)
MP605 STEAM GENERATION - EMERGENCY GENERATOR FUEL OIL FLOW
DIAGRAM
MP701 SCHEDULES
MP702 SCHEDULES
MP703 SCHEDULES
MH101 HVAC OFFICE AREA PLANS
MH601 REFRIGERANT PIPING DIAGRAM
MH602 AIR FLOW & CONTROL DIAGRAM
00 01 15 - 5
M-801 CONTROLS ABBREVIATIONS, NOTES & SYMBOLS
M-802 SEQUENCE OF OPERATIONS
ELECTRICAL
E-001 ABBREVIATIONS, NOTES & SYMBOLS
E-002 NOTES
ES100 SITE PLAN - TEMPORARY WORK & DEMOLITION
ES101 SITE PLAN - NEW WORK
ED101A DEMOLITION PLAN - OFFICE AREA - LOWER FLOOR PLAN
ED101B DEMOLITION PLAN - BOILER ROOM WEST - LOWER FLOOR PLAN
ED101C DEMOLITION PLAN - BOILER ROOM EAST - LOWER FLOOR PLAN
ED102A DEMOLITION PLAN - OFFICE AREA - UPPER FLOOR PLAN
ED102B DEMOLITION PLAN - BOILER ROOM WEST - UPPER FLOOR PLAN
ED102C DEMOLITION PLAN - BOILER ROOM EAST - UPPER FLOOR PLAN
ED103 DEMOLITION PLAN - ROOF
EL101A LIGHTING PLAN - OFFICE AREA - LOWER FLOOR PLAN
EL101B LIGHTING PLAN - BOILER ROOM WEST - LOWER FLOOR PLAN
EL101C LIGHTING PLAN - BOILER ROOM EAST - LOWER FLOOR PLAN
EL102A LIGHTING PLAN - OFFICE AREA - UPPER FLOOR PLAN
EL102B LIGHTING PLAN - BOILER ROOM WEST - UPPER FLOOR PLAN
EL102C LIGHTING PLAN - BOILER ROOM EAST - UPPER FLOOR PLAN
EP101A POWER & SYSTEMS PLAN - OFFICE AREA - LOWER FLOOR PLAN
EP101B POWER & SYSTEMS PLAN - BOILER ROOM WEST - LOWER FLOOR PLAN
EP101C POWER & SYSTEMS PLAN - BOILER ROOM EAST - LOWER FLOOR PLAN
EP102A POWER & SYSTEMS PLAN - OFFICE AREA - UPPER FLOOR PLAN
EP102B POWER & SYSTEMS PLAN - BOILER ROOM WEST - UPPER FLOOR PLAN
EP102C POWER & SYSTEMS PLAN - BOILER ROOM EAST - UPPER FLOOR PLAN
EP103 POWER & SYSTEMS PLAN - ROOF
E-401 POWER & SYSTEMS PLAN - ENLARGED PLANS
E-402 POWER & SYSTEMS PLAN - TRANSFORMER & GENERATOR ROOMS
E-403 WATER STORAGE TANK & GENERATOR FUEL OIL STORAGE TANK
E-501 DETAILS
E-502 DETAILS
E-503 DETAILS
E-504 DETAILS
E-600 TEMPORARY WORK - SINGLE LINE DIAGRAM
E-601 DEMOLITION - SINGLE LINE DIAGRAM
00 01 15 - 6
E-602 NEW WORK - SINGLE LINE DIAGRAM
E-603 TELECOM RISER DIAGRAM
E-604 FIRE ALARM RISER DIAGRAM
E-701 PANELBOARD SCHEDULES
E-702 PANELBOARD SCHEDULES
E-703 LIGHTING FIXTURE SCHEDULE & LIGHTING CONTROL SCHEDULE
SECURITY ELECTRONICS
T-001 SYMBOLS AND GENERAL NOTES
TD101A DEMOLITION - OFFICE AREA LOWER FLOOR PLAN
TD101B DEMOLITION - BOILER ROOM WEST LOWER FLOOR PLAN
TD101C DEMOLITION - BOILER ROOM EAST LOWER FLOOR PLAN
TD102A DEMOLITION - OFFICE AREA UPPER FLOOR PLAN
TD102B DEMOLITION - BOILER ROOM WEST UPPER FLOOR PLAN
TD102C DEMOLITION - BOILER ROOM EAST UPPER FLOOR PLAN
TY010 SITE PLAN
TY101A OFFICE AREA LOWER FLOOR PLAN
TY101B BOILER ROOM WEST LOWER FLOOR PLAN
TY101C BOILER ROOM EAST LOWER FLOOR PLAN
TY102A OFFICE AREA UPPER FLOOR PLAN
TY102B BOILER ROOM WEST UPPER FLOOR PLAN
TY102C BOILER ROOM EAST UPPER FLOOR PLAN
T-501 PHYSICAL ACCESS CONTROL SYSTEM DOOR CONTROL DETAILS I
T-502 PHYSICAL ACCESS CONTROL SYSTEM DOOR CONTROL DETAILS II
T-503 VIDEO SURVEILLANCE SYSTEM CAMERA MOUNTING DETAILS
T-601 PHYSICAL ACCESS CONTROL SYSTEM RISER DIAGRAM I
T-602 PHYSICAL ACCESS CONTROL SYSTEM RISER DIAGRAM II
T-603 PHYSICAL ACCESS CONTROL SYSTEM RISER DIAGRAM III
T-604 INTRUSION DETECTION/INTERCOM SYSTEMS RISER DIAGRAMS
T-605 VIDEO SURVEILLANCE RISER DIAGRAM
- - - E N D - - -
11-01-21
01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the “Replace
Boilers in Building 39” at the Dwight D. Eisenhower VA Medical
Center located in Leavenworth, KS as required by drawings and specifications.
B. Visits to the site by Bidders shall be made in accordance with the solicitation.
C. Offices of Miller-Remick, LLC, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. All testing shall be done in accordance with Specification 01 45
29, Testing Laboratory Services.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
F. Contractor shall plan and schedule their workdays in according to the following:
1. Normal working hours for this contract will be from 7:00AM to 4:30PM
(local time) Monday through Friday except for weekends and established Federal Holidays.
01 00 00 - 2
2. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I: All work as required by drawings and specifications, including general construction, demolition, modification and renovation of the existing Central Boiler Plant (Building 39).
This project includes but is not limited to the following general outline of the project and shall be worked with all drawings included with the contract documents:
1. The health facility steam system operates year-round for HVAC
(i.e., building heating and ac reheat), medical equipment sterilization and domestic water heating. It is crucial that all tie-in work associated with the steam and condensate systems will be accomplished and completed during the warmer months (approximately April 1 through November 1) to minimize critical system shutdowns. All other work can be performed at any time as long as a phasing plan is submitted to the VA. The contractor shall plan and coordinate all required steam shut-downs with the VA COR. Steam shut-downs are limited to eight
(8)-hours maximum unless approved by the VA COR and medical administration. The contractor shall develop a phasing plan using contractor supplied temporary mobile steam plant trailers, generator, associated pumps, temporary piping and pipe supports to allow for steam delivery to the Medical
Center during construction. The phasing plan shall include the tie-in of the temporary systems and shall include using the existing/modified steam header; new valves and fabricated pipe spools to achieve this objective. All temporary piping shall be insulated, electric heat traced (i.e., water systems) and jacketed and routed in a manner to avoid blockage of walkways
01 00 00 - 3 and building access. In the event the temporary piping is routed across a sidewalk or roadway, temporary pedestrian ramps shall be added and/or adequate vehicle clearance provided. The contractor's phasing plan is subject to final approval by the VA. Final approved phasing plan shall not be grounds for a change order. Provide a trailer for use as a temporary boiler control room. The trailer shall have as a minimum; (1) office; (1) conference room; (1) bathroom with
(1) water closet, (1) urinal and (1) lavatory and shall be equipped with heating and air conditioning. The trailer shall also be equipped with black water and gray water holding tanks and shall be maintained by the contractor. Provide temporary electric heat traced potable water line and electric to the trailer.
2. Provide temporary enclosed walkways and stairs which will connect the temporary control room trailer with the temporary boilers.
3. Based upon the brittle nature of cast iron, the VA prohibits the use of cast iron or malleable fittings and components in high and medium pressure steam systems (15psi or above). All new construction or repairs must not use cast iron fittings and components or malleable fittings anywhere in the high-pressure and medium pressure steam system (15psi or above).
All new construction or repairs must use cast steel or forged steel fittings only.
4. Prior to the start of demolition, the contractor shall coordinate with the facility all equipment that will be retained by the owner.
5. Modify the existing steam header to accommodate temporary steam piping during construction.
6. Remove steam piping, valves and appurtenances as shown in the contract documents.
01 00 00 - 4
7. Remove condensate return piping, valves and appurtenances as shown in the contract documents.
8. Remove three (3) 30,000 PPH water tube boilers and one (1)
25,000 PPH boiler.
9. Remove two (2) deaerators, feed water pumps, piping valves and appurtenances.
10. Remove one (1) condensate tank, transfer pumps, piping and appurtenances.
11. Remove two (2) fuel oil pump skids, piping, valves, and appurtenances.
12. Remove two (2) air compressors, piping, valves, and appurtenances.
13. Remove roof-mounted exhaust fans.
14. Remove make-up air unit, all ductwork, piping and appurtenances.
15. Remove incinerator, piping and appurtenances.
16. Remove natural gas piping to the existing boilers. Note: The existing natural gas system also supplies gas to other buildings and must not be interrupted.
17. Remove platforms, mezzanine, associated steel and stairs indicated in the contract documents.
18. Remove walls and doors indicated on the drawings.
19. Provide new breakroom mezzanine.
20. Provide new finished walls, finished offices/rooms, and finished boiler control room.
21. Provide renovations to the first-floor bathroom.
22. Provide four (4) blast-resistant overhead doors or approved equivalent.
23. Provide blast-resistant windows.
24. Provide a fully enclosed walkway to the emergency generator building (Building 39A).
25. Provide blast-resistant air intake louvers.
01 00 00 - 5
26. Provide roof-mounted exhaust fans.
27. Provide three (3) 700 BHP, dual fuel, four-pass, wet-back fire tube boilers, exhaust stacks and boiler controls. Note: Burner shall be manufactured and tested by the boiler manufacturer.
28. Provide deaerator and skid assembly with three (3) feed water pumps and controls.
29. Provide condensate tank and skid assembly with two (2) transfer pumps and controls.
30. Provide all required piping, valves, and appurtenances.
31. Provide coordination drawings prior to installation.
32. Provide a pipe stress analysis, signed, and sealed by a professional engineer with a current license in the state of
Pennsylvania for any section(s) of the piping systems that were altered or changed in addition to any alternative to component(s) originally specified within the contract design documents. The contractor will also be responsible for locating all supports, guides, expansion compensation and anchors.
33. Provide a new wireless steam trap monitoring system to all new steam traps. The new steam trap monitoring system shall include all necessary steam trap transmitters, batteries, signal repeaters, wireless trap monitor gateway, steam trap monitoring analytics software, and system training.
34. Provide hazardous gas detection (carbon monoxide; propane & natural gas) and monitoring system.
35. Provide exhaust and HVAC systems.
36. Provide all required access platforms and catwalks.
37. Remove small metal sided building located on the north side of
Building 39.
38. Provide temporary equipment: MV transformer, fused switch, generator, fuel tank, ATS, distribution panel, step down transformers and panelboards.
01 00 00 - 6
39. Remove existing MV transformer and adjacent low voltage switch gear located in the existing Electrical Room.
40. Remove existing motor control center and all panelboards within the Boiler Plant.
41. Remove existing lighting fixtures, power devices, telecom outlets and fire alarm devices.
42. Relocate the existing generator enclosure (with Generator), ATS and quick connect box to Building 41.
43. Provide a new standby diesel Generator, day tank, bypass isolation ATS and 3-way MTS.
44. Provide a new unit Substation to include an MV transformer and duplex HVLcc switches.
45. Provide distribution panels, step-down transformers and panel boards.
46. All new equipment shall be rated NEMA 3R or 4X as indicated on the drawings.
47. Provide new LED lighting throughout the Boiler plant and existing Incinerator Room. Provide a new lighting control system.
48. Provide connections to all new and existing to remain equipment within the Boiler plant.
49. Provide a new fire alarm system tied into the existing fire alarm fiber optic network.
50. Provide new telecom outlets and WAPS connected to existing IT equipment (data rack).
51. Provide 60,000-gallon emergency water storage tank and appurtenances.
52. Provide duplex emergency water pump assembly, appurtenances and heated, weather-proof enclosure.
53. Leave existing 2” cold water site entrance a north wall, use for temporary services to existing fire protection in incinerator and for 2nd floor bathrooms
01 00 00 - 7
54. Supply domestic water to existing bathroom room on 2nd floor
55. Supply domestic heater for existing bathroom on 2nd floor
56. Remove existing Domestic water heater.
57. Remove existing cold water back to existing south water entrance.
58. Remove south water entrance back to site and cap.
59. Remove existing water softener and brine tank and all associated piping and valves.
60. Provide new water entrance for domestic water and all pipes and valves
61. Provide new natural gas domestic hot water heater
62. Provide domestic hot water recirculation pump
63. Provide domestic cold water recirculation pump
64. Relocate existing air compressor
65. Provide new air compressor
66. Provide new piping and valves, etc. for compressed air
67. Provide new water softener, brine tank and salt scissor lift
68. Provide new fuel oil interceptor
69. Provide new sanitary piping and connect to existing site.
70. Provide new fire protection water entrance and connection to site system.
71. Shore existing roof truss, demolish existing south wall, and install new structural steel columns.
72. Retain Professional Engineer registered in the State of Kansas to design temporary shoring.
73. Provide new south façade wall.
74. Provide new concrete foundations.
75. Retain Professional Engineer registered in the State of Kansas to determine existing allowable bearing capacity.
76. Provide design and detailing for metal stairs.
77. Provide design and detailing for metal railings.
78. Provide design and detailing for structural steel connections.
01 00 00 - 8
79. Demolish existing concrete slab.
80. Provide new concrete slab.
81. Provide a final valve list and identify all installed valves with brass medallions with embossed identifier.
B. Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at the Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without an appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises
01 00 00 - 9 in the event of a national emergency. The General Contractor may return to the site only with the written approval of the
Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See
Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting
Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of
Contracting Officer.
01 00 00 - 10
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the
VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted
24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for
General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center
Facility Manager.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
01 00 00 - 11
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the
Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the
Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the
Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as shown on the drawings.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
01 00 00 - 12
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by
Department of Veterans Affairs in quantities sufficient for not more than two work-days. Provide unobstructed access to
Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
All such actions shall be coordinated with the COR or Utility
Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
I. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with
01 00 00 - 13 milestone subtasks. The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the
Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to the COR and Contractor, as follows:
J. Building No. 39 will be occupied during performance of work; but immediate areas of alterations will be vacated.
1. Certain areas of Building No. 39 will be occupied by facility personnel for various periods.
2. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical
Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by
Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
3. Immediate areas of alterations not mentioned in preceding
Subparagraph 1 will be temporarily vacated while alterations are performed.
01 00 00 - 14
K. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m
(seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum
375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.
L. When a building and/or construction site is turned over to
Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C
(40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company
(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
M. Utilities Services: Maintain existing utility services for
Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications
01 00 00 - 15 systems may be interrupted without prior approval of the COR.
Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the
Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11
REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical
Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
01 00 00 - 16
N. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
O. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
P. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply
Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:
01 00 00 - 17
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of the COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by
Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS"
(FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by
Contractor to such flooring and other surfaces, despite protection measures; and will form basis for determining
01 00 00 - 18 extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled, and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by the COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs
01 00 00 - 19 during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The
Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
01 00 00 - 20
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant
Discharge Elimination System (NPDES) permit is required for this project. The Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:
1. Designating areas for equipment maintenance and repair;
2. Providing waste receptacles at convenient locations and provide regular collection of wastes;
3. Locating equipment wash down areas on site, and provide appropriate control of wash-waters;
4. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials;
and
5. Providing adequately maintained sanitary facilities.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work
01 00 00 - 21 without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and…