Attachment 08 - Mechanical - Part 1 - Drawings.pdf
PDF 14 MB Posted
- Attached to
- 36C77622B0029 - Replace Boilers - Leavenworth - Solicitation Federal contract opportunity
- Solicitation number
- 36C77622B0029
About this file
This solicitation seeks bids for a construction project to replace boilers at the Dwight D. Eisenhower VA Medical Center in Leavenworth, Kansas. The Department of Veterans Affairs, through its Veterans Health Administration Program Contracting Activity Central, will award a firm-fixed-price contract to replace four antiquated water tube boilers with three new energy efficient fire tube boilers. Additional work includes replacing auxiliary systems in Building 39, fuel oil pump sets, condensate piping, a deaerator tank, condensate return tank, adding a continuous blowdown heat recovery package, and asbestos abatement of replaced piping. The solicitation number is 36C77622B0029. Bids are due by the date specified in the solicitation, and the agency aims to subsequently award a single contract.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL
ABBREVIATIONS & SYMBOLS
M-001
JJPJJM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 Revisions: Date:
BID DOCUMENTS
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
Mechanical, Electrical, Plumbing, & Structural Engineering
MR PROJECT NO: 0509-0006
2 3
0.1 0.2 0.3 0.4 0.5 0.8 1
B
A.7
A.6
A.5
A.4
A
MD304
(D)PMP-012
(D)PMP-009
(D)PMP-008
(D)PMP-010
(D)PMP-011
OFFICE AREA
39-1
OFFICE AREA
39-1B
OFFICE
39-1A
BATHROOM
39-1D
STORAGE
39-1E
OFFICE
39-1C
F O R
C O N T
IN
U A T
IO
N
S E
D R A W
IN
G
M D B
CONTRACTOR SHALL COMPLETELY
DEMOLISH ABANDONED PUMPS, PIPING,
VALVES AND APPURTENANCES TO THE
EXTENTS OF THE DEMOLITION SHOWN.
CONTRACTOR SHALL COMPLETELY
DEMOLISH CONDENSATE TO THE
EXTENT OF THE DEMOLITION SHOWN
CONTRACTOR SHALL COMPLETELY
DEMOLISH CONDENSATE PUMPS, PIPING,
VALVES AND APPURTENANCES TO THE
EXTENTS OF THE DEMOLITION SHOWN.
CONTRACTOR SHALL COMPLETELY
DEMOLISH TRANSFER PUMPS, PIPING,
VALVES AND APPURTENANCES TO THE
EXTENTS OF THE DEMOLITION SHOWN.
EXISTING
TUNNEL
(E)1 1/4" LPG
(D)WINDOW UNIT (D)WINDOW UNIT
(D)CONDENSING UNIT
(D)AC UNIT
(D)STEAM UNIT
HEATER
(D)WINDOW UNIT
DEMO FOR NEW FLOW METERS
(D)POPANE
TANK
4" HPS TO BLDG 122
10" HPS TO
BLDG HOSPITAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
OFFICE AREA
/1
/2
:2
:0
P
M
MD101A
MECHANICAL DEMOLITION
OFFICE AREA FLOOR PLAN
0'-0" - 8'-0" AFF
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"
MECHANICAL DEMOLITION OFFICE AREA FLOOR PLAN 0'-0" - 8'-0" AFF
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
KEYED NOTES
1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND
APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION
SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL
FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS
PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY
CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL
THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
SPECIFICATION 099100.
2. CONTRACTOR SHALL CUT AND REMOVE MAKE-UP WATER PIPING, VALVES
AND APPURTENANCES FROM THE WATER SOFTENER SKID TO THE EXTENTS
OF THE DEMOLITION SHOWN. ALL EXISTING DOMESTIC WATER PIPING THAT
PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY CONNECTED
THE BOILERS AND EQUIPMENT, SHALL REMAIN IN PLACE AND IN SERVICE
ALL THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
SPECIFICATION 099100.
3. CONTRACTOR SHALL CUT AND REMOVE PROPANE PIPING, VALVES AND
APPURTENANCES FROM POINT OF DISCONNECT ON FLOOR ABOVE TO EACH
BOILER.
Revisions: Date:
1 3 4 5 6 7
A.7
A.6
A.5
A.4
A
MD304
(D)CU-001
BOILER PLANT
39-2
STORAGE AREA
39-3
STORAGE
39-4
COPNTROL ROOM
39-5
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M D A
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M D C
CONTRACTOR SHALL COMPLETELY
DEMOLISH STEAM THAT IS SERVED
FROM THE MAIN STEAM HEADER TO
THE EXTENTS OF THE DEMOLITION SHOWN.
REFER TO MD304 FOR SELECTIVE DEMOLITION
CONTRACTOR SHALL COMPLETELY
DEMOLISH (4) FOUR CLEAVER-BROOKS
WATER TUBE BOILERS AND ALL APPURTENANCES.
CONTRACTOR SHALL COMPLETELY
DEMOLISH WALL MOUNTED DUCTLESS
SPLIT SYSTEM. REFRIGERANT PIPING, WIRING,
CONDENSING UNIT AND ALL APPURTENANCES.
CONTRACTOR SHALL COMPLETELY
DEMOLISH WATER SOFTENER AND
ALL APPURTENANCES.
CONTRACTOR SHALL COMPLETELY DEMOLISH
FEED WATER PUMPS, PIPING, VALVES AND
APPURTENANCES TO THE EXTENTS OF THE
DEMOLITION SHOWN.
CONTRACTOR SHALL COMPLETELY
DEMOLISH THE CHEMICAL FEED
SYSTEM AND ALL APPURTENANCES.
REFER TO MD401
EXISTING PRV STATION THAT SERVES
EXISTING UNIT HEATERS IN THE ELECTRIC
SHOP AND SPACE 39-4, IS TO BE REMOVED &
REPLACED WITH NEW PRV.
(E)FLASH TANK
(E)1" LPG
(E)8" NG GAS
REMOVE (E)MAXON VALVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
STORAGE
OFFICE AREA
/1
/2
:1
:0
P
M
MD101B
MECHANICAL DEMOLITION
BOILER ROOM WEST FLOOR PLAN
0'-0" - 8'-0" AFF
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"
MECHANICAL DEMOLITION BOILER ROOM WEST FLOOR PLAN 0'-0" - 8'-0" AFF
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
KEYED NOTES
1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND
APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION
SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL
FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS
PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY
CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL
THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
SPECIFICATION 099100.
2. CONTRACTOR SHALL CUT AND REMOVE MAKE-UP WATER PIPING, VALVES
AND APPURTENANCES FROM THE WATER SOFTENER SKID TO THE EXTENTS
OF THE DEMOLITION SHOWN. ALL EXISTING DOMESTIC WATER PIPING THAT
PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY CONNECTED
THE BOILERS AND EQUIPMENT, SHALL REMAIN IN PLACE AND IN SERVICE
ALL THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
SPECIFICATION 099100.
3. CONTRACTOR SHALL CUT AND REMOVE PROPANE PIPING, VALVES AND
APPURTENANCES FROM POINT OF DISCONNECT ON FLOOR ABOVE TO EACH
7 8 9
A.7
A.6
A.5
A.4
A
(D)PMP-003
STORAGE AREA
39-3
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M D B
CONTRACTOR SHALL COMPLETELY DEMOLISH ALL
BOILER BLOWDOWN PIPING FROM THE BOILERS
TO THE UNDERGROUND EXTERIOR TANK.
(E)UNDERGROUND EXTERIOR
BLOWDOWN TANK TO REMAIN
(E)MANHOLE
(E)6" BLOWDOWN
VENT UP
(E)BLOWDOWN
TRENCH
CONTRACTOR SHALL COMPLETELY DEMOLISH
FUEL OIL PUMPS, PIPING AND ALL APPURTENANCES.
CUT & CAP ABANDONED
STEAM & CONDENSATE LINE
1 2
EXISTING
SECURITY
ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
OFFICE AREA
/1
/2
:2
:1
P
M
MD101C
MECHANICAL DEMOLITION
BOILER ROOM EAST FLOOR PLAN
0'-0" - 8'-0" AFF
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"
MECHANICAL DEMOLITION BOILER ROOM EAST FLOOR PLAN 0'-0" - 8'-0" AFF
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
KEYED NOTES
1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND
APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION
SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL
FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS
PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY
CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL
THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
SPECIFICATION 099100.
2. CONTRACTOR SHALL CUT AND REMOVE MAKE-UP WATER PIPING, VALVES
AND APPURTENANCES FROM THE WATER SOFTENER SKID TO THE EXTENTS
OF THE DEMOLITION SHOWN. ALL EXISTING DOMESTIC WATER PIPING THAT
PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY CONNECTED
THE BOILERS AND EQUIPMENT, SHALL REMAIN IN PLACE AND IN SERVICE
ALL THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
SPECIFICATION 099100.
0.1 0.2 0.3 0.4 0.5 0.8 1
A.7
A.6
A.5
A.4
A
OFFICE AREA MEZZ
39-1F
ROOM
39-5
SHOP
39-6
BATHROOM
39-7
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M D B
CONTRACTOR SHALL COMPLETELY
DEMOLISH DEAERATOR, PIPING AND
ALL APPURTENANCES.
CONTRACTOR SHALL COMPLETELY
DEMOLISH CONDENSATE TANK,
PIPING AND ALL APPURTENANCES.
(E)1" LPG
(E)1" LPG
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
ELECTRICAL
SHOP
OFFICE AREA
/1
/2
:2
:1
P
M
MD102A
MECHANICAL DEMOLITION
OFFICE AREA FLOOR PLAN
14'-0" - 24'-0" AFF
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"
MECHANICAL DEMOLITION OFFICE AREA FLOOR PLAN 14'-0" - 24'-0" AFF
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
KEYED NOTES
1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND
APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION
SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL
FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS
PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY
CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL
THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
SPECIFICATION 099100.
2. CONTRACTOR SHALL CUT AND REMOVE MAKE-UP WATER PIPING, VALVES
AND APPURTENANCES FROM THE WATER SOFTENER SKID TO THE EXTENTS
OF THE DEMOLITION SHOWN. ALL EXISTING DOMESTIC WATER PIPING THAT
PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY CONNECTED
THE BOILERS AND EQUIPMENT, SHALL REMAIN IN PLACE AND IN SERVICE
ALL THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
A.7
A.6
A.5
A.4
A
MD304
BOILER PLANT
39-2
STORAGE AREA
39-3
STORAGE
39-4
CONTROL ROOM
39-5
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M D A
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M D C
CONTRACTOR SHALL COMPLETELY
DEMOLISH DEAERATOR, PIPING AND
ALL APPURTENANCES.
CONTRACTOR SHALL CUT & COMPLETELY
DEMOLISH FUEL OIL SUPPLY & RETURN PIPING,
VALVES AND APPURTENANCES FROM THE FUEL
OIL TO THE EXTENTS OF THE DEMOLITION SHOWN.
REFER TO MD401
EXISTING
STACK
(E)1" LPG
(E)2" NG
(D)1" FOR
(D)2 1/2" FOS
(E)8" NG GAS
(E)2" NG 1
(E)3" NG
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
OFFICE AREA
/1
/2
:1
:1
P
M
MD102B
MECHANICAL DEMOLITION
BOILER ROOM WEST FLOOR PLAN
8'-0" - 16'-0" AFF
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"
MECHANICAL DEMOLITION BOILER ROOM WEST FLOOR PLAN 8'-0" - 16'-0" AFF
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
KEYED NOTES
1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND
APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION
SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL
FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS
PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY
CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL
THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
SPECIFICATION 099100.
2. CONTRACTOR SHALL CUT AND REMOVE MAKE-UP WATER PIPING, VALVES
AND APPURTENANCES FROM THE WATER SOFTENER SKID TO THE EXTENTS
OF THE DEMOLITION SHOWN. ALL EXISTING DOMESTIC WATER PIPING THAT
PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY CONNECTED
THE BOILERS AND EQUIPMENT, SHALL REMAIN IN PLACE AND IN SERVICE
ALL THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
7 8 9
A.7
A.6
A.5
A.4
A
STORAGE AREA
39-3
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M D B
CONTRACTOR SHALL COMPLETELY
DEMOLISH STEAM & CONDENSATE PIPING
TO THAT SERVES THE SHOPS
AND ALL APPURTENANCES. PREPARE PIPING
TO BE RECONNECTED TO NEW PIPING.
CONTRACTOR SHALL COMPLETELY
DEMOLISH FUEL OIL PIPING
AND ALL APPURTENANCES
(D)5" HPS
(D)1" HPR
(D)1" FOR
(E)2" NG
(D)2 1/2" FOS
6" VENT FROM
UNDERGROUND
BLOWDOWN TANK
UP & DN
DEMOLISH EXISTING
WALL MOUNTED EXHAUST
FAN. SEE ARCHITECTURAL
FOR WINDOW REPLACEMENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
OFFICE AREA
/1
/2
:2
:2
P
M
MD102C
MECHANICAL DEMOLITION
BOILER ROOM EAST FLOOR PLAN
8'-0" - 20'-0" AFF
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"
MECHANICAL DEMOLITION BOILER ROOM EAST FLOOR PLAN 8'-0" - 20'-0" AFF
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
KEYED NOTES
1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND
APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION
SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL
FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS
PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY
CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL
THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
A.7
A.6
A.5
A.4
A
(D)CONDENSATE
TANK 2
(D)AHU-001
MD304
BOILER PLANT
39-2
STORAGE AREA
39-3
STORAGE
39-4
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M D A
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M D C
CONTRACTOR SHALL COMPLETELY
DEMOLISH STEAM MAKE-UP AIR UNIT
AND ALL APPURTENANCES.
EXISTING
STACK
REFER TO MD401
CONTRACTOR SHALL COMPLETELY
DEMOLISH 30 PSI STEAM UNIT HEATER
AND ALL APPURTENANCES.
CONTRACTOR SHALL COMPLETELY
DEMOLISH UNIT HEATER
AND ALL APPURTENANCES.
EXISTING 30 PSI STEAM UNIT HEATER
& ASSOCIATED PIPING SERVING
SPACE 39-4 TO REMAIN
(E)2" NG
CONTRACTOR TO COMPLETELY
DEMOLISH BOILER BREECHING
CONTRACTOR TO COMPLETELY
DEMOLISH BOILER BREECHING
CONTRACTOR TO COMPLETELY
DEMOLISH BOILER BREECHING
CONTRACTOR TO COMPLETELY
DEMOLISH BOILER BREECHING
(D)1 1/4" FOR
EXISTING VERTICAL 8" NG GAS
TO REMAIN, CUT & CAP @ ELBOW
(D)2" NG
(E)2" NG
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
STORAGE
OFFICE AREA
/1
/2
:1
:2
P
M
MD103B
MECHANICAL DEMOLITION
BOILER ROOM WEST FLOOR PLAN
16'-0" - 24'-0" AFF
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"
MECHANICAL DEMOLITION BOILER ROOM WEST FLOOR PLAN 16'-0" - 24'-0" AFF
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
KEYED NOTES
1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND
APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION
SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL
FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS
PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY
CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL
THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
SPECIFICATION 099100.
2. CONTRACTOR SHALL CUT AND REMOVE MAKE-UP WATER PIPING, VALVES
AND APPURTENANCES FROM THE WATER SOFTENER SKID TO THE EXTENTS
OF THE DEMOLITION SHOWN. ALL EXISTING DOMESTIC WATER PIPING THAT
PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY CONNECTED
THE BOILERS AND EQUIPMENT, SHALL REMAIN IN PLACE AND IN SERVICE
ALL THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
(E)EXHAUST
FAN
(E)EXHAUST
FAN
(E)EXHAUST
FAN
(E)EXHAUST
FAN
(E)EXHAUST
FAN
(D)AHU OA INTAKE
(D)EXHAUST
FAN
(D)EXHAUST
FAN
(D)2" NG VENT
(D)6" VENTS
(D)6" VENTS
(D)6" VENTS
(D)8" VENT
CONTRACTOR SHALL COMPLETELY
DEMOLISH ROOF MOUNTED EXHAUST FAN
AND ALL APPURTENANCES. (TYP 2)
EXISTING
STACK
(D)WALL MOUNTED FAN
STORAGE
BUILDING 39A
BUILDING 39
(D)6"
VENTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BLDG
39A
BOILER
RM EAST
BOILER
RM WEST
STORAGEELECTRICAL
SHOP
OFFICE AREA
STACK
/1
/2
:1
:3
P
M
MD104
MECHANICAL DEMOLITION
ROOF PLAN
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/8" = 1'-0"
MECHANICAL DEMOLITION ROOF PLAN
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
(D)CONDENSATE
TANK 2
(D)SILENCER
(D)AHU-001
(D)BLR-004
(D)BLR-003
(D)BLR-002
(D)BLR-001
(D)DEAERATOR
(D)CONDENSATE
TANK 1
(D)PMP-010(D)PMP-011
(D)PMP-012
(D)PMP-003
(D)BLR-001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/1
/2
:1
:2
P
M
MD301
MECHANICAL EXISTING
INTERIOR 3D VIEWS
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
EXISTING 3D - BOILER ROOM
EXISTING 3D - DEAERATOR & CONDENSATE TANK
EXISTING 3D - SHOP AREA
EXISTING 3D - BOILER 1
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
(E)10" NG
(D)EXHAUST
FAN(D)EXHAUST
FAN
(E)EXHAUST
FAN
(E)EXHAUST
FAN
(E)EXHAUST
FAN
(E)EXHAUST
FAN
(E)EXHAUST
FAN
(D)AC UNIT
(D)PROPANE TANK
(D)AC UNIT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/2
:1
:3
P
M
MD302
MECHANICAL EXISTING
EXTERIOR 3D VIEWS - SOUTH
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
EXISTING 3D - EXTERIOR - SOUTH
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
(D)GRAVITY VENTILATOR
(E)EXHAUST
FAN
(E)EXHAUST
FAN
(E)EXHAUST
FAN(E)EXHAUST
FAN
(E)EXHAUST
FAN
(D)EXHAUST
FAN
(D)EXHAUST
FAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/2
:1
:2
P
M
MD303
MECHANICAL EXISTING
EXTERIOR 3D VIEWS - NORTH
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
EXISTING 3D - EXTERIOR - NORTH
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
LEVEL 1 - BOILER
PLANT
0' - 0"
(D)SILENCER
(D)44"x44"
EA
(D)40"x40"
EA (D)40"x40"
EA
(D)48"x48"
EA
8" HPS TO LAUNDRY
TO REMAIN IN SERVICE
STEAM PIPING TO BE COMPLETELY
REMOVED AFTER VALVE. VALVE TO BE
CLOSED & BLIND FLANGE INSTALLED.
4" HPS TO SHOPS
TO REMAIN IN SERVICE
STEAM PIPING TO BE COMPLETELY
REMOVED AFTER VALVE. VALVE TO BE
CLOSED & BLIND FLANGE INSTALLED.
STEAM PIPING TO BE COMPLETELY
REMOVED AFTER VALVE. VALVE TO BE
CLOSED & BLIND FLANGE INSTALLED.
VALVE TO BE CLOSED AND
BLIND FLANGE INSTALLED.
STEAM HEADER TO REMAIN
THROUGH CONSTRUCTION
GAS PIPING TO
REMAIN IN SERVICE
DISCONNECT SOFTENED
WATER THAT SERVES
BOILER FEED SYSTEM
EXISTING PRV STATION THAT SERVES
EXISTING UNIT HEATERS IN THE ELECTRIC
SHOP AND SPACE 39-4,
IS TO BE DISCONNECTED & REPLACED
CATWALK
13' - 10 1/2"
(E)2" NG
(E)2" NG
(E)2" NG
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/2
:2
:3
P
M
MD304
MECHANICAL DEMOLITION
SECTIONS
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"1
SECTION @ EXISTING HEADER WALL
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
KEYED NOTES
1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND
APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION
SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL
FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS
PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY
CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL
THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER
1 2 3 4 5 6 7 8 9
OPEN TO BELOW
EXISTING
STORAGE
EXISTING
STACK
EXISTING
INCINERATOR
EXISTING
STORAGE SHED
B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-200509-0006 Revisions: Date:
BID DOCUMENTS
MECHANICAL DEMOLITION
GENERATOR ROOM PLAN
BUILDING 39A
MD401
JJPJJM
10" HPS
(REMOVE AFTER
HEADER CHANGEOVER)
10" HPS (EMERGENCY)
10" HPS (TEMPORARY)
FROM RENTAL BOILERS
10" HPS (EMERGENCY)
(E)10" STEAM HEADER
(DEMOLISH AFTER NEW HEADER
IS INSTALLED & TESTED)
NEW 10" STEAM HEADER
(E)8" HPS TO LAUNDRY
ENTRANCE
TO
STORAGE
39-4
LEVEL 1 - BOILER
PLANT
0' - 0"
3 4 5 6 7
LEVEL 1
0' - 2"
LEVEL 2
10' - 7"
(TE)10" HPS
(E)10" HPS
10" HPS
(TO BE DEMOLISHED
AFTER HEADER CHANGEOVER)
10" HPS TO CONNECT
TO TEMPORARY LINE
(BECOMES EMERGENCY
CONNECTION AFTER
HEADER CHANGEOVER)
10" HPS (TEMPORARY)
FROM RENTAL BOILERS
(REMOVE AFTER STEAM
HEADER CHANGEOVER)
(E)8" HPS
TO LAUNDRY
NEW STEAM HEADER
CONNECTIONS
SHOWN AS TAPS
TYP
(E)STEAM HEADER
CONNECTIONS
SHOWN AS TAPS
TYP
CATWALK
13' - 10 1/2"
NEW 10" STEAM HEADER
(E)10" STEAM HEADER
3 4 5 6 7
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/2
:3
:1
P
M
MP011
MECHANICAL PHASING
SECTION & 3D VIEW
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
TEMPORARY HEADER PIPING CONNECTIONS - 3D VIEW
1/4" = 1'-0"
HEADER PHASING SECTION
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
CONSTRUCTION PHASING
CONSTRUCTION PHASING PLAN: PHASE 1 - MOBILE STEAM GENERATION TRAILERS
MECHANICAL
1. PRIOR TO THE DEMOLITION OF THE PIPING SYSTEMS, ALL PIPING AND
MODIFICATIONS REQUIRED FOR THE TEMPORARY BOILER TRAILERS WILL BE
INSTALLED. ALL TEMPORARY/RENTAL EQUIPMENT (I.E. MOBILE STEAM
GENERATION TRAILERS, CONDENSATE PUMPS, FUEL OIL PUMPS, GAS
REGULATORS ETC.) AND TEMPORARY PIPE SUPPORTS REQUIRED DURING
CONSTRUCTION WILL BE PROPERLY INSTALLED AND TESTED.
THIS PROJECT WILL REQUIRE THE USE OF (2) TWO RENTAL MOBILE BOILER
PLANT TRAILERS, ONE OPERATIONAL AND ONE STAND-BY AND A RENTAL
EMERGENCY GENERATOR (SEE ELECTRICAL DRAWINGS). CONTRACTOR SHALL
PROVIDE TWO (2) 1,000 BHP (34,500 PPH EACH) MOBILE BOILER PLANT
TRAILERS AND BE CAPABLE OF GENERATING 32,000 PPH (WINTER) AND
3,040 PPH (SUMMER) AT A STEAM DISTRIBUTION PRESSURE OF 112-115
PSIG. EACH STEAM GENERATION TRAILER MUST BE ABLE TO OPERATE AS
A COMPLETE STEAM GENERATING PLANT AND SUPPLIED WITH THE FOLLOWING
EQUIPMENT:
a. 1,000 BHP STEAM BOILER
b. DEAERATOR
c. FEEDWATER PUMPS
d. CONDENSATE TANK AND DUPLEX TRANSFER PUMPS
(LOCATE IN BUILDING 39).
e. DUPLEX FUEL OIL PUMP ASSEMBLY (LOCATE IN BUILDING 39).
f. PROPANE TANK
g. WATER SOFTENERS
h. BLOWDOWN TANK WITH AFTERCOOLER
i. AIR COMPRESSOR
j. REFRIGERATION DRYER
k. BOILER CHEMICAL FEED SYSTEM
l. INTEGRAL ELECTRIC DISTRIBUTION PANEL TO FEED ALL
SUPPLIED EQUIPMENT
m. BOILER CONTROLS SYSTEM
n. NATURAL GAS REGULATORS
2. THE EXISTING 10" STEAM HEADER WILL BE MODIFIED BY CUTTING THE
EXISTING PIPE CAP OFF AND WELDING A 300# RAISED FACE WELD NECK
FLANGE AT THE END TO ACCOMMODATE THE TEMPORARY 10" STEAM PIPING
FROM THE MOBILE BOILER PLANT TRAILERS.
3. TEMPORARY/EMERGENCY STEAM PIPING: NEW 10” HIGH PRESSURE STEAM
(HPS) PIPING, VALVES, FITTINGS AND APPURTENANCES WILL BE INSTALLED
AS SHOWN ON DRAWINGS MP604 AND MP101. NOTE: WITH THE EXCEPTION
OF THE 10” HPS BRANCH SUPPLYING STEAM TO THE EXISTING STEAM
HEADER, ALL HPS PIPING WITHIN THE CENTRAL PLANT WILL REMAIN
PERMANENT.
4. TEMPORARY/EMERGENCY CONDENSATE PIPING: NEW 4” PUMPED CONDENSATE
(PC) PIPING, VALVES, FITTINGS AND APPURTENANCES WILL BE INSTALLED AS
SHOWN ON DRAWINGS MP604 AND MP601. ALL PC PIPING WITHIN THE
CENTRAL PLANT WILL REMAIN PERMANENT. CONDENSATE RETURN PIPING.
DURING PHASE 1CONSTRUCTION, ALL EXISTING CONDENSATE WILL BE SENT
TO A TEMPORARY CONDENSATE TANK WITH DUPLEX TRANSFER PUMPS. THE
CONDENSATE DISCHARGED FROM THE TRANSFER PUMPS WILL BE SENT BACK
TO THE MOBILE BOILER PLANT TRAILERS THROUGH A TEMPORARY 4"
CONDENSATE RETURN.
5. TEMPORARY NATURAL GAS PIPING: THE EXISTING 10” NATURAL GAS
PRESSURE CURRENTLY SUPPLYING THE CENTRAL BOILER PLANT IS
APPROXIMATELY 15 PSIG. THE RENTAL BOILER VENDOR SHALL PROVIDE
PRESSURE REGULATORS IF REQUIRED BY BOILERS. CONTRACTOR TO TIE-INTO
THE EXISTING NATURAL GAS PIPING AND ROUTE TEMPORARY PIPING, VALVES,
FITTINGS AND APPURTENANCES TO THE MOBILE STEAM GENERATION
TRAILERS.
6. TEMPORARY FUEL OIL PIPING: PROVIDE TEMPORARY DUPLEX FUEL OIL PUMP
PACKAGE. TIE-INTO THE EXISTING 3” FUEL OIL SUPPLY AND RETURN PIPING
LOCATED IN THE CENTRAL BOILER PLANT FUEL OIL PIT. ROUTE TEMPORARY
PIPING, VALVES, FITTINGS AND APPURTENANCES TO AND FROM THE MOBILE
STEAM GENERATION TRAILERS.
7. BOILER MAKE-UP WATER PIPING: PROVIDE REDUCED PRESSURE ZONE (RPZ)
BACKFLOW PREVENTER AND TIE-INTO THE EXISTING POTABLE WATER
SYSTEM. ROUTE TEMPORARY PIPING, VALVES, FITTINGS AND APPURTENANCES
TO THE MOBILE STEAM GENERATION TRAILERS.
8. ALL PIPING SYSTEMS SUBJECT TO FREEZING SHALL BE TRACED WITH STEAM
OR ELECTRIC, INSULATED, AND JACKETED.
9. ALL STEAM AND CONDENSATE PIPING SHALL BE INSULATED AND JACKETED.
10. THE HEALTH FACILITY STEAM SYSTEM OPERATES YEAR-ROUND FOR HVAC
(I.E. BUILDING HEATING AND AC REHEAT), MEDICAL EQUIPMENT
STERILIZATION AND DOMESTIC WATER HEATING. IT IS CRUCIAL THAT ALL
TIE-IN WORK ASSOCIATED WITH THE STEAM AND CONDENSATE SYSTEMS
WILL BE ACCOMPLISHED AND COMPLETED DURING THE WARMER MONTHS
(APPROXIMATELY APRIL 1 THROUGH NOVEMBER 1) TO MINIMIZE CRITICAL
SYSTEM SHUTDOWNS. ALL OTHER WORK CAN BE PERFORMED AT ANY TIME
AS LONG AS A PHASING PLAN IS SUBMITTED TO THE VA. THE CONTRACTOR
SHALL PLAN AND COORDINATE ALL REQUIRED STEAM SHUT-DOWNS WITH
THE VA COR. STEAM SHUT-DOWNS ARE LIMITED TO EIGHT (8)-HOURS
MAXIMUM UNLESS APPROVED BY THE VA COR AND MEDICAL ADMINISTRATION.
THE CONTRACTOR SHALL DEVELOP A PHASING PLAN USING CONTRACTOR
SUPPLIED TEMPORARY MOBILE STEAM PLANT TRAILERS, GENERATOR,
ASSOCIATED PUMPS, TEMPORARY PIPING AND PIPE SUPPORTS TO ALLOW FOR
STEAM DELIVERY TO THE MEDICAL CENTER DURING CONSTRUCTION. THE
PHASING PLAN SHALL INCLUDE THE TIE-IN OF THE TEMPORARY SYSTEMS
AND SHALL INCLUDE USING THE EXISTING/MODIFIED STEAM HEADER; NEW
VALVES AND FABRICATED PIPE SPOOLS TO ACHIEVE THIS OBJECTIVE. ALL
TEMPORARY PIPING SHALL BE INSULATED, ELECTRIC HEAT TRACED (I.E.,
WATER SYSTEMS) AND JACKETED AND ROUTED IN A MANNER TO AVOID
BLOCKAGE OF WALKWAYS AND BUILDING ACCESS. IN THE EVENT THE
TEMPORARY PIPING IS ROUTED ACROSS A SIDEWALK OR ROADWAY,
TEMPORARY PEDESTRIAN RAMPS SHALL BE ADDED AND/OR ADEQUATE
VEHICLE CLEARANCE PROVIDED. THE CONTRACTOR'S PHASING PLAN IS
SUBJECT TO FINAL APPROVAL BY THE VA. FINAL APPROVED PHASING PLAN
SHALL NOT BE GROUNDS FOR A CHANGE ORDER.
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M Q B
EXISTING
TUNNEL
39-CRU-1
SECURITY
ELECTRICAL
HAC
RESTROOM
LOCKERS
SHOWER
ACCESSIBLE TOILET
TOILET
STAIR
CIRCULATION
39-CU-5
39-EF-8
WATER HEATER
(SEE PLUMBING DWGS)
UTILITY
VESTIBULE
104 OFFICE
EXISTING
TUNNEL
39-CU-3
39-CU-1
39-CU-4
39-CU-2
39-ACU-5
39-ACU-6
39-EUH-3
39-ACU-3
39-EH-1
CO
FD
39-EUH-2
CONTROLS
39-ACU-1 39-ACU-2
39-ACU-4
A
B
0.1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
OFFICE AREA
/1
/2
:2
:3
P
M
MQ101A
MECHANICAL NEW WORK
EQUIPMENT ARRANGEMENT
OFFICE AREA FLOOR PLAN
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"
MECHANICAL NEW WORK EQUIPMENT ARRANGEMENT OFFICE AREA FLOOR PLAN
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
CO
HAZARDOUS GAS SENSOR SYMBOL LEGEND
CARBON MONOXIDE SENSOR: MOUNT AT BREATHING LEVEL NEAR THE FRONT
OF EACH BOILER AND WHERE THERE IS EXHAUST VENTILATION.
CH3 COMBUSTABLE GAS SENSOR (NATURAL GAS): MOUNT AT CEILING OF THE
BOILER ROOM ABOVE EACH BOILER.
COMBUSTABLE GAS SENSOR (PROPANE): MOUNT AT LOW POINTS OF THE
BOILER ROOM.
C3H8
5' 8-1/4"
2' - 10-1/8"
FOOTPRINT
OF 39-B-1 FOOTPRINT
OF 39-B-2
FOOTPRINT
OF 39-B-3
OVERHEAD DOOR
(SEE STRUCTURAL &
ARCHITECTURAL DWGS)
19' - 4"19' - 4"30' - 2"
6' - 2" 6' - 2"
1' - 10"
BOILER PLANT
39-2
SURGE TANK
HOUSEKEEPING PAD
(SEE STRUCTURAL DWGS)
DEARATOR
HOUSEKEEPING PAD
(SEE STRUCTURAL DWGS)
BOILER RAILS
(SEE STRUCTURAL
DWGS)
BOILER RAILS
(SEE STRUCTURAL
DWGS)
BOILER RAILS
(SEE STRUCTURAL
DWGS)
T U B E
P U L L
(T Y P
BOILER MASTER
CONTROL PANEL
(CLEAVER BROOKS
HAWK 4000)
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M Q A
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M Q C
CHEMICAL
TREATMENT
SYSTEM
FLOOR DRAIN
TYP
FLOOR DRAIN
TYP
CATWALK
SUPPORT FOOTING
TYP
CATWALK
SUPPORT FOOTING
TYP
PIPE TRENCH
TYP
PIPING TRENCH
TYP
CONTROL ROOM
HAZARDOUS GAS
DETECTION PANEL
2' - 10-1/8"
5' 8-1/4"
FS
FS
FS
FSFS
FSFSFS
FS
1 2 3 4 5 6 7
A
B
39-B-1
CONTROL PANEL
UNISTRUT
SUPPORT LEGS
39-B-2
CONTROL PANEL
UNISTRUT
SUPPORT LEGS
39-B-3
CONTROL PANEL
UNISTRUT
SUPPORT LEG
OVERHEAD DOOR
(SEE STRUCTURAL &
ARCHITECTURAL DWGS)
OVERHEAD DOOR
(SEE STRUCTURAL &
ARCHITECTURAL DWGS)
OVERHEAD DOOR
(SEE STRUCTURAL &
ARCHITECTURAL DWGS)
SAFETY SHOWER
SAFETY SHOWER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
OFFICE AREA
/1
/2
:1
:4
P
M
MQ101B
MECHANICAL NEW WORK
EQUIPMENT ARRANGEMENT
BOILER ROOM WEST LOWER FLOOR PLAN
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"
MECHANICAL NEW WORK EQUIPMENT ARRANGEMENT BOILER ROOM WEST LOWER FLOOR PLAN
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
CO
HAZARDOUS GAS SENSOR SYMBOL LEGEND
CARBON MONOXIDE SENSOR: MOUNT AT BREATHING LEVEL NEAR THE FRONT
OF EACH BOILER AND WHERE THERE IS EXHAUST VENTILATION.
CH3 COMBUSTABLE GAS SENSOR (NATURAL GAS): MOUNT AT CEILING OF THE
BOILER ROOM ABOVE EACH BOILER.
COMBUSTABLE GAS SENSOR (PROPANE): MOUNT AT LOW POINTS OF THE
BOILER ROOM.
R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M Q B
39-CS-1
39-BDS-1
39-UH-4
39-UH-5
(@ 15' AFF)
(@ 15' AFF)
WATER SOFTENER SYSTEM
(SEE PLUMBING DWGS)
39-LVR-3 39-LVR-4 39-LVR-5
CATWALK SUPPORT
FOOTING
TYP
FUEL OIL
INTERCEPTOR
(SEE PLUMBING DWGS)
C3H8
BOILER PLANT
39-2
SCISSOR LIFT SKID
(SEE PLUMBING DWGS)
FD
FD
FS
PUMP PIT
FS
97 8
A
B
39-CRU-2
39-FOP-1
AIR TANK/COMPRESSOR
(SEE PLUMBING DWGS)
AIR TANK/COMPRESSOR
(SEE PLUMBING DWGS)
SUMP PIT
(SEE PLUMBING DWGS)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
OFFICE AREA
/1
/2
:2
:4
P
M
MQ101C
MECHANICAL NEW WORK
EQUIPMENT ARRANGEMENT
BOILER ROOM EAST FLOOR PLAN
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"
MECHANICAL NEW WORK EQUIPMENT ARRANGEMENT BOILER ROOM EAST FLOOR PLAN
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
CO
HAZARDOUS GAS SENSOR SYMBOL LEGEND
CARBON MONOXIDE SENSOR: MOUNT AT BREATHING LEVEL NEAR THE FRONT
OF EACH BOILER AND WHERE THERE IS EXHAUST VENTILATION.
CH3 COMBUSTABLE GAS SENSOR (NATURAL GAS): MOUNT AT CEILING OF THE
BOILER ROOM ABOVE EACH BOILER.
COMBUSTABLE GAS SENSOR (PROPANE): MOUNT AT LOW POINTS OF THE
BOILER ROOM.
39-D/A-1
39-B-339-B-239-B-1
34' - 2"19' - 4"19' - 4"
25' - 6"
30' - 2"
6' - 2"
1' - 10"
BOILER PLANT
39-2
STORAGE
39-4
10' - 0"
T U B E
P U L L
(T Y P
9' - 4"
39-CS-1
CHEMICAL TREATMENT
SYSTEM
39-UH-1 39-UH-2
(@ 15' AFF) (@ 15' AFF)
39-ACU-7
BOILER MASTER
CONTROL PANEL
15' - 0"
39-D/A-1
CONTROL PANEL
FLOOR DRAIN
TYP
CATWALK
SUPPORT FOOTING
TYP
CATWALK
SUPPORT FOOTING
TYP
PIPING TRENCH
TYP
PIPING TRENCH
TYP
SINK
CONTROL ROOM
(E)UNIT HEATER
39-CS-1
CONTROL PANEL
CH3
COCOCO
C3H8
HAZARDOUS GAS
DETECTION SYSTEM
CONTROLLER
CH3CH3
(TYP.)
9' - 4"
1 2 3 4 5 6 7
A
B
39-UH-3
(@ 15' AFF)
AIR TANK/COMPRESSOR
(SEE PLUMBING DWGS)
39-B-1
CONTROL PANEL
39-B-2
CONTROL PANEL
39-B-3
CONTROL PANEL
SAFETY SHOWER
FS
FS
FS
FD
FSFS
FSFS FS
FD
SAFETY SHOWER
OVERHEAD DOOR
(SEE STRUCTURAL &
ARCHITECTURAL DWGS)
OVERHEAD DOOR
(SEE STRUCTURAL &
ARCHITECTURAL DWGS)
OVERHEAD DOOR
(SEE STRUCTURAL &
ARCHITECTURAL DWGS)
OVERHEAD DOOR
(SEE STRUCTURAL &
ARCHITECTURAL DWGS)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
STORAGE
OFFICE AREA
/1
/2
:1
:5
P
M
MQ102B
MECHANICAL NEW WORK
EQUIPMENT ARRANGEMENT
BOILER ROOM WEST UPPER FLOOR PLAN
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"
MECHANICAL NEW WORK EQUIPMENT ARRANGEMENT BOILER ROOM WEST UPPER FLOOR PLAN
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.
CO
HAZARDOUS GAS SENSOR SYMBOL LEGEND
CARBON MONOXIDE SENSOR: MOUNT AT BREATHING LEVEL NEAR THE FRONT
OF EACH BOILER AND WHERE THERE IS EXHAUST VENTILATION.
CH3 COMBUSTABLE GAS SENSOR (NATURAL GAS): MOUNT AT CEILING OF THE
BOILER ROOM ABOVE EACH BOILER.
COMBUSTABLE GAS SENSOR (PROPANE): MOUNT AT LOW POINTS OF THE
BOILER ROOM.
EXISTING
TUNNEL
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M P B
4" HPS TO BLDG 122
10" HPS TO
BLDG HOSPITAL
39-CRU-1
SECURITY
ACCESSIBLE TOILET
SHOWER
LOCKERS
RESTROOM
TOILET
STAIR
CIRCULATION
2 1/2" VT
4" PC
4" HPS
WATER HEATER
(SEE PLUMBING DWGS)
OFFICE
UTILITY
VESTIBULE
2" STRAINER
TYP 3
2" TRIPLE DUTY VALVE
TYP 3
4" CHECK
VALVE
ELECTRICAL
HAC
(E)4" PC
(E)4" PC
4" PC
4" PC
CONTROLS
A
B
0.1
FLOW METER
FLOW METER
FD
2" BALL VALVE
TYP 3
PIPE GUIDE
(SEE STRUCTURAL DWGS)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
OFFICE AREA
/1
/2
:2
:5
P
M
MP101A
MECHANICAL NEW WORK
OFFICE AREA LOWER FLOOR PLAN
REPLACE BOILERS
IN BUILDING 39
DWIGHT D. EISENHOWER VA MEDICAL
CENTER - LEAVENWORTH, KS
589A6-19-204
2022-01-20 JJM JJP0509-0006
BID DOCUMENTS
1/4" = 1'-0"
MECHANICAL NEW WORK OFFICE AREA LOWER FLOOR PLAN
GENERAL SHEET NOTES
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &
SYMBOLS.
39-B-3
39-B-2
39-B-1
39-D/A-1
BOILER PLANT
39-2
STORAGE
39-4
EXISTING
TUNNEL
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M P A
F O R
C O N T
IN
U A T
IO
N
S
A W
IN
G
M P C
BOILER MASTER
CONTROL PANEL
(E)10" STEAM HEADER
REFER TO PHASING PLAN
10" HPS
(E)8" HPS TO
LAUNDRY BLDG
REFER TO M-401
39-CS-1
39-FWP-01
39-FWP-02
39-FWP-03
4" OFL
3" NPW @ 7'-6" AFF
3" SW @ 4'-0" AFF
SEE PLUMBING DWGS
FOR CONTINUATION
3" SW RISE
3" CTPD RISE
2 1/2" CTPD
3" CTPD
(BYPASS)
CATWALK SUPPORT
FOOTING TYP
CATWALK SUPPORT
FOOTING TYP
CATWALK SUPPORT
FOOTING TYP
BY P.C.
3" DCW @ 2'-6" AFF
3" SW @ 3'-6" AFF
SEE PLUMBING DWGS
FOR CONTINUATION
2 1/2" CTPD
3" BFW
3" BFW
FS
FSFSFS
MP303
FD
FS
SEE 2/MP302
FOR 3D VIEW
4" D/A OFL
MP303
CHEMICAL TREATMENT
(SEE PLUMBING DWGS)
8" HPS RISE
FROM BOILER
8" HPS RISE
FROM BOILER
8" HPS RISE
FROM BOILER
24" BOILER
STACK UP
THRU ROOF
24" BOILER
STACK UP
THRU ROOF
24" BOILER
STACK UP
THRU ROOF
2" BD
2" BD
3" PC RISE
10" HPS RISE
8" HPS RISE
300# GATE
VALVE IN VERTICAL
2" BD2" BD 2" BD
SV-1/SV-2
(2)4" VT UP
THRU ROOF
SV-3/SV-4
(2)4" VT UP
THRU ROOF
(E)10" NG DROP
BELOW GRADE
CONTROL ROOM
3" CTPD BYPASS RISE
BY M.C.
4" TANK BYPASS
DRAIN DROP TO FD
FS4" OFL
2" BFW
SEE 3/MP301
FOR 3D VIEW
SEE 1/MP302
FOR 3D VIEW
MP011
39-D/A-1
CONTROL
PANEL
4" HPS
DROP
10" HPS
DROP
10" HPS DROP
4" HPS
DROP
2-1/2" VT
UP THRU ROOF
2-1/2" VT
FROM 39-CRU-1
4" PC FROM
39-CRU-1
4" PC RISE
MP303
MP303
4" HPS
39-CS-1 CONTROL PANEL
4" CS OFL DROP TO FS
SEE 3/MP302
FOR 3D VIEW
HAZARDOUS GAS
DETECTION SYSTEM
CONTROLLER
F O
V A L V
IN
G
S U P P L
IE
D
W
IT
H
B O
IL
E R
1" SBO 1" SBO
1" SBO
SAFETY SHOWER
SAFETY SHOWER
6" VTR
3" SW DROP TO 39-CS-1
4" OFL DROP FROM 39-D/A-1
4" PC DROP TO 39-CS-1
2" V RISE FROM 39-CS-1
1-1/2" CTPD RECIRC
DROP TO 39-CS-1
2" BFW DROP TO 39-CS-1
39-CTP-01
39-CTP-02
(BELOW CS)
(BELOW CS)
MP303
2 1/2" BFW
2 1/2" BFW
(2)2-1/2" BFW DROP
BELOW CATWALK STAIRS
FSFSFS
FD
1-1/2"
FOS & FOR
FUEL OIL
BACK PRESSURE
CONTROL VALVE
1 2 3 4 5 6 7
A
B
FLOW METER
FLOW METER
39-B-1
CONTROL PANEL 39-B-2 CONTROL PANEL
39-B-3
CONTROL PANEL
1 1/2" FOS
1 1/2" FOR
1 1/2" FOR
1 1/2" FOS
1 1/2" FOR
1 1/2" FOS
4" 300#
GATE VALVE
10" 300#
GATE VALVE
BLOWDOWN
VALVING
SUPPLIED
WITH BOILER
BLOWDOWN
VALVING
SUPPLIED
WITH BOILER
BLOWDOWN VALVING
SUPPLIED WITH BOILER
F O
V A L V
IN
G
S U P P L
IE
W
IT
H
B O
IL
E R
MAXON AUTOMATED
NATURAL GAS SHUT-OFF VALVE.
MATCH EXISTING SIZE AND MODEL
4" NG
RISE
N G
T R A
IN
S U P P L
H
B O
IL
E R
N G
T R
P P L
H
B O
IL
E R
N G
T R
P P L
H
B O
IL
E R
4" NG
RISE
4" NG
RISE
F O
V A L V
IN
G
S U P P L
H
B O
IL
E R
1" LPG TO TANKS
SEE M-401 FOR
CONTINUATION
FLOW METER
(IN VERTICAL)
L P G
T R
P P L
H
B O
IL
E R
L P G
T R
P P L
H
B O
IL
E R
L P G
T R
P P L
H
B O
IL
E R
FLOW METER
3/4" LPG
3/4" LPG 3/4" LPG
1" LPG
AIR TANK/COMPRESSOR
(SEE PLUMBING DWGS)
PIPE SUPPORT (TYP)
SEE 11/MP503
SLOPE SLOPESLOPE
SLOPE
S L O P E
S L O P E
S L O P E
(E)8" NG RISE
IN VERTICAL:
(E)2" NG TO INCINERATOR
(E)2" NG TO OLD INCINERATOR
(E)2" NG TO PAINT SHOP
(E)3" NG TO LAUNDRY
PIPE SUPPORT (TYP)
SEE 10/MP503
PIPE SUPPORT (TYP)
SEE 10/MP503
PIPE SUPPORT (TYP)
SEE 11/MP503
T T
T O
U H
T O
E F
T T
T O
U H
T O
E F
T T
T O
U H
T O
E F
T T
T O
U H
T O
E F
(FROM 39-CS-1)
4" PC
(RISE)
SV-5/SV-6
(2)4" VT UP
THRU ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
KEYPLAN
BOILER
RM EAST
BOILER
RM WEST
OFFICE AREA
/1
/…