Attachment 08 - Mechanical - Part 1 - Drawings.pdf

PDF 14 MB Posted

Attached to
36C77622B0029 - Replace Boilers - Leavenworth - Solicitation Federal contract opportunity
Solicitation number
36C77622B0029
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation seeks bids for a construction project to replace boilers at the Dwight D. Eisenhower VA Medical Center in Leavenworth, Kansas. The Department of Veterans Affairs, through its Veterans Health Administration Program Contracting Activity Central, will award a firm-fixed-price contract to replace four antiquated water tube boilers with three new energy efficient fire tube boilers. Additional work includes replacing auxiliary systems in Building 39, fuel oil pump sets, condensate piping, a deaerator tank, condensate return tank, adding a continuous blowdown heat recovery package, and asbestos abatement of replaced piping. The solicitation number is 36C77622B0029. Bids are due by the date specified in the solicitation, and the agency aims to subsequently award a single contract.

View the file

Other files for this federal contract opportunity

Other files attached to 36C77622B0029 - Replace Boilers - Leavenworth - Solicitation, newest first.
File Type Posted
36C77622B0029 0003.pdf PDF
Attachment 26 - RFIs - Technical Questions and Responses - REVISED.pdf PDF
36C77622B0029 0002.pdf PDF
Attachment 21 - Asbestos Report.pdf PDF
Attachment 25 - Site Visit Attendance Sheet.pdf PDF
Attachment 24 - RFIs - Technical Questions and Responses.pdf PDF
Attachment 22 - DDC for HVAC.pdf PDF
Attachment 23 - S-532 Drawing Sheet.pdf PDF
36C77622B0029 0001.pdf PDF
36C77622B0029_1.pdf PDF
Attachment 06 - Fire Protection - Drawings.pdf PDF
Attachment 09 - Mechanical - Part 2 - Drawings.pdf PDF
Attachment 12 - Security - Drawings.pdf PDF
Attachment 03 - Civil - Drawings.pdf PDF
Attachment 04 - Structural - Drawings.pdf PDF
Attachment 05 - Architectural - Drawings.pdf PDF
Attachment 10 - Electrical - Part 1 - Drawings.pdf PDF
Attachment 01 - General Information - Drawings.pdf PDF
Attachment 11 - Electrical - Part 2 - Drawings.pdf PDF
Attachment 15 - Specifications - Volume 3.pdf PDF
Attachment 16 - Boiler Plant - Drawing Sheet - M001.pdf PDF
Attachment 18 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 19 - Wage Rates - Leavenworth KS 5-21-2022.pdf PDF
Attachment 20 - VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx DOCX document
Attachment 02 - Hazardous Materials - Drawings.pdf PDF
Attachment 07 - Plumbing - Drawings.pdf PDF
Attachment 13 - Specifications - Volume 1.pdf PDF
Attachment 14 - Specifications - Volume 2.pdf PDF
Attachment 17 - Limitations on Subcontracting - Construction.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL

ABBREVIATIONS & SYMBOLS

M-001

JJPJJM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 Revisions: Date:

BID DOCUMENTS

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

Mechanical, Electrical, Plumbing, & Structural Engineering

MR PROJECT NO: 0509-0006

2 3

0.1 0.2 0.3 0.4 0.5 0.8 1

B

A.7

A.6

A.5

A.4

A

MD304

(D)PMP-012

(D)PMP-009

(D)PMP-008

(D)PMP-010

(D)PMP-011

OFFICE AREA

39-1

OFFICE AREA

39-1B

OFFICE

39-1A

BATHROOM

39-1D

STORAGE

39-1E

OFFICE

39-1C

F O R

C O N T

IN

U A T

IO

N

S E

D R A W

IN

G

M D B

CONTRACTOR SHALL COMPLETELY

DEMOLISH ABANDONED PUMPS, PIPING,

VALVES AND APPURTENANCES TO THE

EXTENTS OF THE DEMOLITION SHOWN.

CONTRACTOR SHALL COMPLETELY

DEMOLISH CONDENSATE TO THE

EXTENT OF THE DEMOLITION SHOWN

CONTRACTOR SHALL COMPLETELY

DEMOLISH CONDENSATE PUMPS, PIPING,

VALVES AND APPURTENANCES TO THE

EXTENTS OF THE DEMOLITION SHOWN.

CONTRACTOR SHALL COMPLETELY

DEMOLISH TRANSFER PUMPS, PIPING,

VALVES AND APPURTENANCES TO THE

EXTENTS OF THE DEMOLITION SHOWN.

EXISTING

TUNNEL

(E)1 1/4" LPG

(D)WINDOW UNIT (D)WINDOW UNIT

(D)CONDENSING UNIT

(D)AC UNIT

(D)STEAM UNIT

HEATER

(D)WINDOW UNIT

DEMO FOR NEW FLOW METERS

(D)POPANE

TANK

4" HPS TO BLDG 122

10" HPS TO

BLDG HOSPITAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

OFFICE AREA

/1

/2

:2

:0

P

M

MD101A

MECHANICAL DEMOLITION

OFFICE AREA FLOOR PLAN

0'-0" - 8'-0" AFF

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"

MECHANICAL DEMOLITION OFFICE AREA FLOOR PLAN 0'-0" - 8'-0" AFF

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

KEYED NOTES

1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND

APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION

SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL

FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS

PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY

CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL

THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

SPECIFICATION 099100.

2. CONTRACTOR SHALL CUT AND REMOVE MAKE-UP WATER PIPING, VALVES

AND APPURTENANCES FROM THE WATER SOFTENER SKID TO THE EXTENTS

OF THE DEMOLITION SHOWN. ALL EXISTING DOMESTIC WATER PIPING THAT

PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY CONNECTED

THE BOILERS AND EQUIPMENT, SHALL REMAIN IN PLACE AND IN SERVICE

ALL THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

SPECIFICATION 099100.

3. CONTRACTOR SHALL CUT AND REMOVE PROPANE PIPING, VALVES AND

APPURTENANCES FROM POINT OF DISCONNECT ON FLOOR ABOVE TO EACH

BOILER.

Revisions: Date:

1 3 4 5 6 7

A.7

A.6

A.5

A.4

A

MD304

(D)CU-001

BOILER PLANT

39-2

STORAGE AREA

39-3

STORAGE

39-4

COPNTROL ROOM

39-5

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M D A

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M D C

CONTRACTOR SHALL COMPLETELY

DEMOLISH STEAM THAT IS SERVED

FROM THE MAIN STEAM HEADER TO

THE EXTENTS OF THE DEMOLITION SHOWN.

REFER TO MD304 FOR SELECTIVE DEMOLITION

CONTRACTOR SHALL COMPLETELY

DEMOLISH (4) FOUR CLEAVER-BROOKS

WATER TUBE BOILERS AND ALL APPURTENANCES.

CONTRACTOR SHALL COMPLETELY

DEMOLISH WALL MOUNTED DUCTLESS

SPLIT SYSTEM. REFRIGERANT PIPING, WIRING,

CONDENSING UNIT AND ALL APPURTENANCES.

CONTRACTOR SHALL COMPLETELY

DEMOLISH WATER SOFTENER AND

ALL APPURTENANCES.

CONTRACTOR SHALL COMPLETELY DEMOLISH

FEED WATER PUMPS, PIPING, VALVES AND

APPURTENANCES TO THE EXTENTS OF THE

DEMOLITION SHOWN.

CONTRACTOR SHALL COMPLETELY

DEMOLISH THE CHEMICAL FEED

SYSTEM AND ALL APPURTENANCES.

REFER TO MD401

EXISTING PRV STATION THAT SERVES

EXISTING UNIT HEATERS IN THE ELECTRIC

SHOP AND SPACE 39-4, IS TO BE REMOVED &

REPLACED WITH NEW PRV.

(E)FLASH TANK

(E)1" LPG

(E)8" NG GAS

REMOVE (E)MAXON VALVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

STORAGE

OFFICE AREA

/1

/2

:1

:0

P

M

MD101B

MECHANICAL DEMOLITION

BOILER ROOM WEST FLOOR PLAN

0'-0" - 8'-0" AFF

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"

MECHANICAL DEMOLITION BOILER ROOM WEST FLOOR PLAN 0'-0" - 8'-0" AFF

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

KEYED NOTES

1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND

APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION

SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL

FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS

PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY

CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL

THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

SPECIFICATION 099100.

2. CONTRACTOR SHALL CUT AND REMOVE MAKE-UP WATER PIPING, VALVES

AND APPURTENANCES FROM THE WATER SOFTENER SKID TO THE EXTENTS

OF THE DEMOLITION SHOWN. ALL EXISTING DOMESTIC WATER PIPING THAT

PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY CONNECTED

THE BOILERS AND EQUIPMENT, SHALL REMAIN IN PLACE AND IN SERVICE

ALL THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

SPECIFICATION 099100.

3. CONTRACTOR SHALL CUT AND REMOVE PROPANE PIPING, VALVES AND

APPURTENANCES FROM POINT OF DISCONNECT ON FLOOR ABOVE TO EACH

7 8 9

A.7

A.6

A.5

A.4

A

(D)PMP-003

STORAGE AREA

39-3

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M D B

CONTRACTOR SHALL COMPLETELY DEMOLISH ALL

BOILER BLOWDOWN PIPING FROM THE BOILERS

TO THE UNDERGROUND EXTERIOR TANK.

(E)UNDERGROUND EXTERIOR

BLOWDOWN TANK TO REMAIN

(E)MANHOLE

(E)6" BLOWDOWN

VENT UP

(E)BLOWDOWN

TRENCH

CONTRACTOR SHALL COMPLETELY DEMOLISH

FUEL OIL PUMPS, PIPING AND ALL APPURTENANCES.

CUT & CAP ABANDONED

STEAM & CONDENSATE LINE

1 2

EXISTING

SECURITY

ROOM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

OFFICE AREA

/1

/2

:2

:1

P

M

MD101C

MECHANICAL DEMOLITION

BOILER ROOM EAST FLOOR PLAN

0'-0" - 8'-0" AFF

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"

MECHANICAL DEMOLITION BOILER ROOM EAST FLOOR PLAN 0'-0" - 8'-0" AFF

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

KEYED NOTES

1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND

APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION

SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL

FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS

PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY

CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL

THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

SPECIFICATION 099100.

2. CONTRACTOR SHALL CUT AND REMOVE MAKE-UP WATER PIPING, VALVES

AND APPURTENANCES FROM THE WATER SOFTENER SKID TO THE EXTENTS

OF THE DEMOLITION SHOWN. ALL EXISTING DOMESTIC WATER PIPING THAT

PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY CONNECTED

THE BOILERS AND EQUIPMENT, SHALL REMAIN IN PLACE AND IN SERVICE

ALL THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

SPECIFICATION 099100.

0.1 0.2 0.3 0.4 0.5 0.8 1

A.7

A.6

A.5

A.4

A

OFFICE AREA MEZZ

39-1F

ROOM

39-5

SHOP

39-6

BATHROOM

39-7

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M D B

CONTRACTOR SHALL COMPLETELY

DEMOLISH DEAERATOR, PIPING AND

ALL APPURTENANCES.

CONTRACTOR SHALL COMPLETELY

DEMOLISH CONDENSATE TANK,

PIPING AND ALL APPURTENANCES.

(E)1" LPG

(E)1" LPG

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

ELECTRICAL

SHOP

OFFICE AREA

/1

/2

:2

:1

P

M

MD102A

MECHANICAL DEMOLITION

OFFICE AREA FLOOR PLAN

14'-0" - 24'-0" AFF

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"

MECHANICAL DEMOLITION OFFICE AREA FLOOR PLAN 14'-0" - 24'-0" AFF

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

KEYED NOTES

1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND

APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION

SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL

FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS

PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY

CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL

THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

SPECIFICATION 099100.

2. CONTRACTOR SHALL CUT AND REMOVE MAKE-UP WATER PIPING, VALVES

AND APPURTENANCES FROM THE WATER SOFTENER SKID TO THE EXTENTS

OF THE DEMOLITION SHOWN. ALL EXISTING DOMESTIC WATER PIPING THAT

PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY CONNECTED

THE BOILERS AND EQUIPMENT, SHALL REMAIN IN PLACE AND IN SERVICE

ALL THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

A.7

A.6

A.5

A.4

A

MD304

BOILER PLANT

39-2

STORAGE AREA

39-3

STORAGE

39-4

CONTROL ROOM

39-5

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M D A

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M D C

CONTRACTOR SHALL COMPLETELY

DEMOLISH DEAERATOR, PIPING AND

ALL APPURTENANCES.

CONTRACTOR SHALL CUT & COMPLETELY

DEMOLISH FUEL OIL SUPPLY & RETURN PIPING,

VALVES AND APPURTENANCES FROM THE FUEL

OIL TO THE EXTENTS OF THE DEMOLITION SHOWN.

REFER TO MD401

EXISTING

STACK

(E)1" LPG

(E)2" NG

(D)1" FOR

(D)2 1/2" FOS

(E)8" NG GAS

(E)2" NG 1

(E)3" NG

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

OFFICE AREA

/1

/2

:1

:1

P

M

MD102B

MECHANICAL DEMOLITION

BOILER ROOM WEST FLOOR PLAN

8'-0" - 16'-0" AFF

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"

MECHANICAL DEMOLITION BOILER ROOM WEST FLOOR PLAN 8'-0" - 16'-0" AFF

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

KEYED NOTES

1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND

APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION

SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL

FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS

PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY

CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL

THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

SPECIFICATION 099100.

2. CONTRACTOR SHALL CUT AND REMOVE MAKE-UP WATER PIPING, VALVES

AND APPURTENANCES FROM THE WATER SOFTENER SKID TO THE EXTENTS

OF THE DEMOLITION SHOWN. ALL EXISTING DOMESTIC WATER PIPING THAT

PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY CONNECTED

THE BOILERS AND EQUIPMENT, SHALL REMAIN IN PLACE AND IN SERVICE

ALL THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

7 8 9

A.7

A.6

A.5

A.4

A

STORAGE AREA

39-3

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M D B

CONTRACTOR SHALL COMPLETELY

DEMOLISH STEAM & CONDENSATE PIPING

TO THAT SERVES THE SHOPS

AND ALL APPURTENANCES. PREPARE PIPING

TO BE RECONNECTED TO NEW PIPING.

CONTRACTOR SHALL COMPLETELY

DEMOLISH FUEL OIL PIPING

AND ALL APPURTENANCES

(D)5" HPS

(D)1" HPR

(D)1" FOR

(E)2" NG

(D)2 1/2" FOS

6" VENT FROM

UNDERGROUND

BLOWDOWN TANK

UP & DN

DEMOLISH EXISTING

WALL MOUNTED EXHAUST

FAN. SEE ARCHITECTURAL

FOR WINDOW REPLACEMENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

OFFICE AREA

/1

/2

:2

:2

P

M

MD102C

MECHANICAL DEMOLITION

BOILER ROOM EAST FLOOR PLAN

8'-0" - 20'-0" AFF

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"

MECHANICAL DEMOLITION BOILER ROOM EAST FLOOR PLAN 8'-0" - 20'-0" AFF

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

KEYED NOTES

1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND

APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION

SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL

FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS

PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY

CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL

THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

A.7

A.6

A.5

A.4

A

(D)CONDENSATE

TANK 2

(D)AHU-001

MD304

BOILER PLANT

39-2

STORAGE AREA

39-3

STORAGE

39-4

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M D A

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M D C

CONTRACTOR SHALL COMPLETELY

DEMOLISH STEAM MAKE-UP AIR UNIT

AND ALL APPURTENANCES.

EXISTING

STACK

REFER TO MD401

CONTRACTOR SHALL COMPLETELY

DEMOLISH 30 PSI STEAM UNIT HEATER

AND ALL APPURTENANCES.

CONTRACTOR SHALL COMPLETELY

DEMOLISH UNIT HEATER

AND ALL APPURTENANCES.

EXISTING 30 PSI STEAM UNIT HEATER

& ASSOCIATED PIPING SERVING

SPACE 39-4 TO REMAIN

(E)2" NG

CONTRACTOR TO COMPLETELY

DEMOLISH BOILER BREECHING

CONTRACTOR TO COMPLETELY

DEMOLISH BOILER BREECHING

CONTRACTOR TO COMPLETELY

DEMOLISH BOILER BREECHING

CONTRACTOR TO COMPLETELY

DEMOLISH BOILER BREECHING

(D)1 1/4" FOR

EXISTING VERTICAL 8" NG GAS

TO REMAIN, CUT & CAP @ ELBOW

(D)2" NG

(E)2" NG

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

STORAGE

OFFICE AREA

/1

/2

:1

:2

P

M

MD103B

MECHANICAL DEMOLITION

BOILER ROOM WEST FLOOR PLAN

16'-0" - 24'-0" AFF

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"

MECHANICAL DEMOLITION BOILER ROOM WEST FLOOR PLAN 16'-0" - 24'-0" AFF

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

KEYED NOTES

1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND

APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION

SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL

FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS

PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY

CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL

THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

SPECIFICATION 099100.

2. CONTRACTOR SHALL CUT AND REMOVE MAKE-UP WATER PIPING, VALVES

AND APPURTENANCES FROM THE WATER SOFTENER SKID TO THE EXTENTS

OF THE DEMOLITION SHOWN. ALL EXISTING DOMESTIC WATER PIPING THAT

PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY CONNECTED

THE BOILERS AND EQUIPMENT, SHALL REMAIN IN PLACE AND IN SERVICE

ALL THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

(E)EXHAUST

FAN

(E)EXHAUST

FAN

(E)EXHAUST

FAN

(E)EXHAUST

FAN

(E)EXHAUST

FAN

(D)AHU OA INTAKE

(D)EXHAUST

FAN

(D)EXHAUST

FAN

(D)2" NG VENT

(D)6" VENTS

(D)6" VENTS

(D)6" VENTS

(D)8" VENT

CONTRACTOR SHALL COMPLETELY

DEMOLISH ROOF MOUNTED EXHAUST FAN

AND ALL APPURTENANCES. (TYP 2)

EXISTING

STACK

(D)WALL MOUNTED FAN

STORAGE

BUILDING 39A

BUILDING 39

(D)6"

VENTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BLDG

39A

BOILER

RM EAST

BOILER

RM WEST

STORAGEELECTRICAL

SHOP

OFFICE AREA

STACK

/1

/2

:1

:3

P

M

MD104

MECHANICAL DEMOLITION

ROOF PLAN

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/8" = 1'-0"

MECHANICAL DEMOLITION ROOF PLAN

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

(D)CONDENSATE

TANK 2

(D)SILENCER

(D)AHU-001

(D)BLR-004

(D)BLR-003

(D)BLR-002

(D)BLR-001

(D)DEAERATOR

(D)CONDENSATE

TANK 1

(D)PMP-010(D)PMP-011

(D)PMP-012

(D)PMP-003

(D)BLR-001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

/1

/2

:1

:2

P

M

MD301

MECHANICAL EXISTING

INTERIOR 3D VIEWS

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

EXISTING 3D - BOILER ROOM

EXISTING 3D - DEAERATOR & CONDENSATE TANK

EXISTING 3D - SHOP AREA

EXISTING 3D - BOILER 1

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

(E)10" NG

(D)EXHAUST

FAN(D)EXHAUST

FAN

(E)EXHAUST

FAN

(E)EXHAUST

FAN

(E)EXHAUST

FAN

(E)EXHAUST

FAN

(E)EXHAUST

FAN

(D)AC UNIT

(D)PROPANE TANK

(D)AC UNIT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

/2

:1

:3

P

M

MD302

MECHANICAL EXISTING

EXTERIOR 3D VIEWS - SOUTH

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

EXISTING 3D - EXTERIOR - SOUTH

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

(D)GRAVITY VENTILATOR

(E)EXHAUST

FAN

(E)EXHAUST

FAN

(E)EXHAUST

FAN(E)EXHAUST

FAN

(E)EXHAUST

FAN

(D)EXHAUST

FAN

(D)EXHAUST

FAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

/2

:1

:2

P

M

MD303

MECHANICAL EXISTING

EXTERIOR 3D VIEWS - NORTH

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

EXISTING 3D - EXTERIOR - NORTH

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

LEVEL 1 - BOILER

PLANT

0' - 0"

(D)SILENCER

(D)44"x44"

EA

(D)40"x40"

EA (D)40"x40"

EA

(D)48"x48"

EA

8" HPS TO LAUNDRY

TO REMAIN IN SERVICE

STEAM PIPING TO BE COMPLETELY

REMOVED AFTER VALVE. VALVE TO BE

CLOSED & BLIND FLANGE INSTALLED.

4" HPS TO SHOPS

TO REMAIN IN SERVICE

STEAM PIPING TO BE COMPLETELY

REMOVED AFTER VALVE. VALVE TO BE

CLOSED & BLIND FLANGE INSTALLED.

STEAM PIPING TO BE COMPLETELY

REMOVED AFTER VALVE. VALVE TO BE

CLOSED & BLIND FLANGE INSTALLED.

VALVE TO BE CLOSED AND

BLIND FLANGE INSTALLED.

STEAM HEADER TO REMAIN

THROUGH CONSTRUCTION

GAS PIPING TO

REMAIN IN SERVICE

DISCONNECT SOFTENED

WATER THAT SERVES

BOILER FEED SYSTEM

EXISTING PRV STATION THAT SERVES

EXISTING UNIT HEATERS IN THE ELECTRIC

SHOP AND SPACE 39-4,

IS TO BE DISCONNECTED & REPLACED

CATWALK

13' - 10 1/2"

(E)2" NG

(E)2" NG

(E)2" NG

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

/2

:2

:3

P

M

MD304

MECHANICAL DEMOLITION

SECTIONS

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"1

SECTION @ EXISTING HEADER WALL

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

KEYED NOTES

1. CONTRACTOR SHALL CUT AND REMOVE NATURAL GAS PIPING, VALVES AND

APPURTENANCES FROM THE BOILERS TO THE EXTENTS OF THE DEMOLITION

SHOWN. REFER TO DRAWINGS MP-603, NATURAL GAS AND NO. 2 FUEL OIL

FLOW DIAGRAM - EXISTING CONDITIONS AND DEMOLITION. ALL EXISTING GAS

PIPING THAT PASSES THROUGH THE BOILER PLANT AND IS NOT DIRECTLY

CONNECTED THE BOILERS, SHALL REMAIN IN PLACE AND IN SERVICE, ALL

THROUGH CONSTRUCTION. EXISTING PIPING TO BE REPAINTED PER

1 2 3 4 5 6 7 8 9

OPEN TO BELOW

EXISTING

STORAGE

EXISTING

STACK

EXISTING

INCINERATOR

EXISTING

STORAGE SHED

B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-200509-0006 Revisions: Date:

BID DOCUMENTS

MECHANICAL DEMOLITION

GENERATOR ROOM PLAN

BUILDING 39A

MD401

JJPJJM

10" HPS

(REMOVE AFTER

HEADER CHANGEOVER)

10" HPS (EMERGENCY)

10" HPS (TEMPORARY)

FROM RENTAL BOILERS

10" HPS (EMERGENCY)

(E)10" STEAM HEADER

(DEMOLISH AFTER NEW HEADER

IS INSTALLED & TESTED)

NEW 10" STEAM HEADER

(E)8" HPS TO LAUNDRY

ENTRANCE

TO

STORAGE

39-4

LEVEL 1 - BOILER

PLANT

0' - 0"

3 4 5 6 7

LEVEL 1

0' - 2"

LEVEL 2

10' - 7"

(TE)10" HPS

(E)10" HPS

10" HPS

(TO BE DEMOLISHED

AFTER HEADER CHANGEOVER)

10" HPS TO CONNECT

TO TEMPORARY LINE

(BECOMES EMERGENCY

CONNECTION AFTER

HEADER CHANGEOVER)

10" HPS (TEMPORARY)

FROM RENTAL BOILERS

(REMOVE AFTER STEAM

HEADER CHANGEOVER)

(E)8" HPS

TO LAUNDRY

NEW STEAM HEADER

CONNECTIONS

SHOWN AS TAPS

TYP

(E)STEAM HEADER

CONNECTIONS

SHOWN AS TAPS

TYP

CATWALK

13' - 10 1/2"

NEW 10" STEAM HEADER

(E)10" STEAM HEADER

3 4 5 6 7

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

/2

:3

:1

P

M

MP011

MECHANICAL PHASING

SECTION & 3D VIEW

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

TEMPORARY HEADER PIPING CONNECTIONS - 3D VIEW

1/4" = 1'-0"

HEADER PHASING SECTION

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

CONSTRUCTION PHASING

CONSTRUCTION PHASING PLAN: PHASE 1 - MOBILE STEAM GENERATION TRAILERS

MECHANICAL

1. PRIOR TO THE DEMOLITION OF THE PIPING SYSTEMS, ALL PIPING AND

MODIFICATIONS REQUIRED FOR THE TEMPORARY BOILER TRAILERS WILL BE

INSTALLED. ALL TEMPORARY/RENTAL EQUIPMENT (I.E. MOBILE STEAM

GENERATION TRAILERS, CONDENSATE PUMPS, FUEL OIL PUMPS, GAS

REGULATORS ETC.) AND TEMPORARY PIPE SUPPORTS REQUIRED DURING

CONSTRUCTION WILL BE PROPERLY INSTALLED AND TESTED.

THIS PROJECT WILL REQUIRE THE USE OF (2) TWO RENTAL MOBILE BOILER

PLANT TRAILERS, ONE OPERATIONAL AND ONE STAND-BY AND A RENTAL

EMERGENCY GENERATOR (SEE ELECTRICAL DRAWINGS). CONTRACTOR SHALL

PROVIDE TWO (2) 1,000 BHP (34,500 PPH EACH) MOBILE BOILER PLANT

TRAILERS AND BE CAPABLE OF GENERATING 32,000 PPH (WINTER) AND

3,040 PPH (SUMMER) AT A STEAM DISTRIBUTION PRESSURE OF 112-115

PSIG. EACH STEAM GENERATION TRAILER MUST BE ABLE TO OPERATE AS

A COMPLETE STEAM GENERATING PLANT AND SUPPLIED WITH THE FOLLOWING

EQUIPMENT:

a. 1,000 BHP STEAM BOILER

b. DEAERATOR

c. FEEDWATER PUMPS

d. CONDENSATE TANK AND DUPLEX TRANSFER PUMPS

(LOCATE IN BUILDING 39).

e. DUPLEX FUEL OIL PUMP ASSEMBLY (LOCATE IN BUILDING 39).

f. PROPANE TANK

g. WATER SOFTENERS

h. BLOWDOWN TANK WITH AFTERCOOLER

i. AIR COMPRESSOR

j. REFRIGERATION DRYER

k. BOILER CHEMICAL FEED SYSTEM

l. INTEGRAL ELECTRIC DISTRIBUTION PANEL TO FEED ALL

SUPPLIED EQUIPMENT

m. BOILER CONTROLS SYSTEM

n. NATURAL GAS REGULATORS

2. THE EXISTING 10" STEAM HEADER WILL BE MODIFIED BY CUTTING THE

EXISTING PIPE CAP OFF AND WELDING A 300# RAISED FACE WELD NECK

FLANGE AT THE END TO ACCOMMODATE THE TEMPORARY 10" STEAM PIPING

FROM THE MOBILE BOILER PLANT TRAILERS.

3. TEMPORARY/EMERGENCY STEAM PIPING: NEW 10” HIGH PRESSURE STEAM

(HPS) PIPING, VALVES, FITTINGS AND APPURTENANCES WILL BE INSTALLED

AS SHOWN ON DRAWINGS MP604 AND MP101. NOTE: WITH THE EXCEPTION

OF THE 10” HPS BRANCH SUPPLYING STEAM TO THE EXISTING STEAM

HEADER, ALL HPS PIPING WITHIN THE CENTRAL PLANT WILL REMAIN

PERMANENT.

4. TEMPORARY/EMERGENCY CONDENSATE PIPING: NEW 4” PUMPED CONDENSATE

(PC) PIPING, VALVES, FITTINGS AND APPURTENANCES WILL BE INSTALLED AS

SHOWN ON DRAWINGS MP604 AND MP601. ALL PC PIPING WITHIN THE

CENTRAL PLANT WILL REMAIN PERMANENT. CONDENSATE RETURN PIPING.

DURING PHASE 1CONSTRUCTION, ALL EXISTING CONDENSATE WILL BE SENT

TO A TEMPORARY CONDENSATE TANK WITH DUPLEX TRANSFER PUMPS. THE

CONDENSATE DISCHARGED FROM THE TRANSFER PUMPS WILL BE SENT BACK

TO THE MOBILE BOILER PLANT TRAILERS THROUGH A TEMPORARY 4"

CONDENSATE RETURN.

5. TEMPORARY NATURAL GAS PIPING: THE EXISTING 10” NATURAL GAS

PRESSURE CURRENTLY SUPPLYING THE CENTRAL BOILER PLANT IS

APPROXIMATELY 15 PSIG. THE RENTAL BOILER VENDOR SHALL PROVIDE

PRESSURE REGULATORS IF REQUIRED BY BOILERS. CONTRACTOR TO TIE-INTO

THE EXISTING NATURAL GAS PIPING AND ROUTE TEMPORARY PIPING, VALVES,

FITTINGS AND APPURTENANCES TO THE MOBILE STEAM GENERATION

TRAILERS.

6. TEMPORARY FUEL OIL PIPING: PROVIDE TEMPORARY DUPLEX FUEL OIL PUMP

PACKAGE. TIE-INTO THE EXISTING 3” FUEL OIL SUPPLY AND RETURN PIPING

LOCATED IN THE CENTRAL BOILER PLANT FUEL OIL PIT. ROUTE TEMPORARY

PIPING, VALVES, FITTINGS AND APPURTENANCES TO AND FROM THE MOBILE

STEAM GENERATION TRAILERS.

7. BOILER MAKE-UP WATER PIPING: PROVIDE REDUCED PRESSURE ZONE (RPZ)

BACKFLOW PREVENTER AND TIE-INTO THE EXISTING POTABLE WATER

SYSTEM. ROUTE TEMPORARY PIPING, VALVES, FITTINGS AND APPURTENANCES

TO THE MOBILE STEAM GENERATION TRAILERS.

8. ALL PIPING SYSTEMS SUBJECT TO FREEZING SHALL BE TRACED WITH STEAM

OR ELECTRIC, INSULATED, AND JACKETED.

9. ALL STEAM AND CONDENSATE PIPING SHALL BE INSULATED AND JACKETED.

10. THE HEALTH FACILITY STEAM SYSTEM OPERATES YEAR-ROUND FOR HVAC

(I.E. BUILDING HEATING AND AC REHEAT), MEDICAL EQUIPMENT

STERILIZATION AND DOMESTIC WATER HEATING. IT IS CRUCIAL THAT ALL

TIE-IN WORK ASSOCIATED WITH THE STEAM AND CONDENSATE SYSTEMS

WILL BE ACCOMPLISHED AND COMPLETED DURING THE WARMER MONTHS

(APPROXIMATELY APRIL 1 THROUGH NOVEMBER 1) TO MINIMIZE CRITICAL

SYSTEM SHUTDOWNS. ALL OTHER WORK CAN BE PERFORMED AT ANY TIME

AS LONG AS A PHASING PLAN IS SUBMITTED TO THE VA. THE CONTRACTOR

SHALL PLAN AND COORDINATE ALL REQUIRED STEAM SHUT-DOWNS WITH

THE VA COR. STEAM SHUT-DOWNS ARE LIMITED TO EIGHT (8)-HOURS

MAXIMUM UNLESS APPROVED BY THE VA COR AND MEDICAL ADMINISTRATION.

THE CONTRACTOR SHALL DEVELOP A PHASING PLAN USING CONTRACTOR

SUPPLIED TEMPORARY MOBILE STEAM PLANT TRAILERS, GENERATOR,

ASSOCIATED PUMPS, TEMPORARY PIPING AND PIPE SUPPORTS TO ALLOW FOR

STEAM DELIVERY TO THE MEDICAL CENTER DURING CONSTRUCTION. THE

PHASING PLAN SHALL INCLUDE THE TIE-IN OF THE TEMPORARY SYSTEMS

AND SHALL INCLUDE USING THE EXISTING/MODIFIED STEAM HEADER; NEW

VALVES AND FABRICATED PIPE SPOOLS TO ACHIEVE THIS OBJECTIVE. ALL

TEMPORARY PIPING SHALL BE INSULATED, ELECTRIC HEAT TRACED (I.E.,

WATER SYSTEMS) AND JACKETED AND ROUTED IN A MANNER TO AVOID

BLOCKAGE OF WALKWAYS AND BUILDING ACCESS. IN THE EVENT THE

TEMPORARY PIPING IS ROUTED ACROSS A SIDEWALK OR ROADWAY,

TEMPORARY PEDESTRIAN RAMPS SHALL BE ADDED AND/OR ADEQUATE

VEHICLE CLEARANCE PROVIDED. THE CONTRACTOR'S PHASING PLAN IS

SUBJECT TO FINAL APPROVAL BY THE VA. FINAL APPROVED PHASING PLAN

SHALL NOT BE GROUNDS FOR A CHANGE ORDER.

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M Q B

EXISTING

TUNNEL

39-CRU-1

SECURITY

ELECTRICAL

HAC

RESTROOM

LOCKERS

SHOWER

ACCESSIBLE TOILET

TOILET

STAIR

CIRCULATION

39-CU-5

39-EF-8

WATER HEATER

(SEE PLUMBING DWGS)

UTILITY

VESTIBULE

104 OFFICE

EXISTING

TUNNEL

39-CU-3

39-CU-1

39-CU-4

39-CU-2

39-ACU-5

39-ACU-6

39-EUH-3

39-ACU-3

39-EH-1

CO

FD

39-EUH-2

CONTROLS

39-ACU-1 39-ACU-2

39-ACU-4

A

B

0.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

OFFICE AREA

/1

/2

:2

:3

P

M

MQ101A

MECHANICAL NEW WORK

EQUIPMENT ARRANGEMENT

OFFICE AREA FLOOR PLAN

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"

MECHANICAL NEW WORK EQUIPMENT ARRANGEMENT OFFICE AREA FLOOR PLAN

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

CO

HAZARDOUS GAS SENSOR SYMBOL LEGEND

CARBON MONOXIDE SENSOR: MOUNT AT BREATHING LEVEL NEAR THE FRONT

OF EACH BOILER AND WHERE THERE IS EXHAUST VENTILATION.

CH3 COMBUSTABLE GAS SENSOR (NATURAL GAS): MOUNT AT CEILING OF THE

BOILER ROOM ABOVE EACH BOILER.

COMBUSTABLE GAS SENSOR (PROPANE): MOUNT AT LOW POINTS OF THE

BOILER ROOM.

C3H8

5' 8-1/4"

2' - 10-1/8"

FOOTPRINT

OF 39-B-1 FOOTPRINT

OF 39-B-2

FOOTPRINT

OF 39-B-3

OVERHEAD DOOR

(SEE STRUCTURAL &

ARCHITECTURAL DWGS)

19' - 4"19' - 4"30' - 2"

6' - 2" 6' - 2"

1' - 10"

BOILER PLANT

39-2

SURGE TANK

HOUSEKEEPING PAD

(SEE STRUCTURAL DWGS)

DEARATOR

HOUSEKEEPING PAD

(SEE STRUCTURAL DWGS)

BOILER RAILS

(SEE STRUCTURAL

DWGS)

BOILER RAILS

(SEE STRUCTURAL

DWGS)

BOILER RAILS

(SEE STRUCTURAL

DWGS)

T U B E

P U L L

(T Y P

BOILER MASTER

CONTROL PANEL

(CLEAVER BROOKS

HAWK 4000)

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M Q A

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M Q C

CHEMICAL

TREATMENT

SYSTEM

FLOOR DRAIN

TYP

FLOOR DRAIN

TYP

CATWALK

SUPPORT FOOTING

TYP

CATWALK

SUPPORT FOOTING

TYP

PIPE TRENCH

TYP

PIPING TRENCH

TYP

CONTROL ROOM

HAZARDOUS GAS

DETECTION PANEL

2' - 10-1/8"

5' 8-1/4"

FS

FS

FS

FSFS

FSFSFS

FS

1 2 3 4 5 6 7

A

B

39-B-1

CONTROL PANEL

UNISTRUT

SUPPORT LEGS

39-B-2

CONTROL PANEL

UNISTRUT

SUPPORT LEGS

39-B-3

CONTROL PANEL

UNISTRUT

SUPPORT LEG

OVERHEAD DOOR

(SEE STRUCTURAL &

ARCHITECTURAL DWGS)

OVERHEAD DOOR

(SEE STRUCTURAL &

ARCHITECTURAL DWGS)

OVERHEAD DOOR

(SEE STRUCTURAL &

ARCHITECTURAL DWGS)

SAFETY SHOWER

SAFETY SHOWER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

OFFICE AREA

/1

/2

:1

:4

P

M

MQ101B

MECHANICAL NEW WORK

EQUIPMENT ARRANGEMENT

BOILER ROOM WEST LOWER FLOOR PLAN

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"

MECHANICAL NEW WORK EQUIPMENT ARRANGEMENT BOILER ROOM WEST LOWER FLOOR PLAN

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

CO

HAZARDOUS GAS SENSOR SYMBOL LEGEND

CARBON MONOXIDE SENSOR: MOUNT AT BREATHING LEVEL NEAR THE FRONT

OF EACH BOILER AND WHERE THERE IS EXHAUST VENTILATION.

CH3 COMBUSTABLE GAS SENSOR (NATURAL GAS): MOUNT AT CEILING OF THE

BOILER ROOM ABOVE EACH BOILER.

COMBUSTABLE GAS SENSOR (PROPANE): MOUNT AT LOW POINTS OF THE

BOILER ROOM.

R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M Q B

39-CS-1

39-BDS-1

39-UH-4

39-UH-5

(@ 15' AFF)

(@ 15' AFF)

WATER SOFTENER SYSTEM

(SEE PLUMBING DWGS)

39-LVR-3 39-LVR-4 39-LVR-5

CATWALK SUPPORT

FOOTING

TYP

FUEL OIL

INTERCEPTOR

(SEE PLUMBING DWGS)

C3H8

BOILER PLANT

39-2

SCISSOR LIFT SKID

(SEE PLUMBING DWGS)

FD

FD

FS

PUMP PIT

FS

97 8

A

B

39-CRU-2

39-FOP-1

AIR TANK/COMPRESSOR

(SEE PLUMBING DWGS)

AIR TANK/COMPRESSOR

(SEE PLUMBING DWGS)

SUMP PIT

(SEE PLUMBING DWGS)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

OFFICE AREA

/1

/2

:2

:4

P

M

MQ101C

MECHANICAL NEW WORK

EQUIPMENT ARRANGEMENT

BOILER ROOM EAST FLOOR PLAN

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"

MECHANICAL NEW WORK EQUIPMENT ARRANGEMENT BOILER ROOM EAST FLOOR PLAN

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

CO

HAZARDOUS GAS SENSOR SYMBOL LEGEND

CARBON MONOXIDE SENSOR: MOUNT AT BREATHING LEVEL NEAR THE FRONT

OF EACH BOILER AND WHERE THERE IS EXHAUST VENTILATION.

CH3 COMBUSTABLE GAS SENSOR (NATURAL GAS): MOUNT AT CEILING OF THE

BOILER ROOM ABOVE EACH BOILER.

COMBUSTABLE GAS SENSOR (PROPANE): MOUNT AT LOW POINTS OF THE

BOILER ROOM.

39-D/A-1

39-B-339-B-239-B-1

34' - 2"19' - 4"19' - 4"

25' - 6"

30' - 2"

6' - 2"

1' - 10"

BOILER PLANT

39-2

STORAGE

39-4

10' - 0"

T U B E

P U L L

(T Y P

9' - 4"

39-CS-1

CHEMICAL TREATMENT

SYSTEM

39-UH-1 39-UH-2

(@ 15' AFF) (@ 15' AFF)

39-ACU-7

BOILER MASTER

CONTROL PANEL

15' - 0"

39-D/A-1

CONTROL PANEL

FLOOR DRAIN

TYP

CATWALK

SUPPORT FOOTING

TYP

CATWALK

SUPPORT FOOTING

TYP

PIPING TRENCH

TYP

PIPING TRENCH

TYP

SINK

CONTROL ROOM

(E)UNIT HEATER

39-CS-1

CONTROL PANEL

CH3

COCOCO

C3H8

HAZARDOUS GAS

DETECTION SYSTEM

CONTROLLER

CH3CH3

(TYP.)

9' - 4"

1 2 3 4 5 6 7

A

B

39-UH-3

(@ 15' AFF)

AIR TANK/COMPRESSOR

(SEE PLUMBING DWGS)

39-B-1

CONTROL PANEL

39-B-2

CONTROL PANEL

39-B-3

CONTROL PANEL

SAFETY SHOWER

FS

FS

FS

FD

FSFS

FSFS FS

FD

SAFETY SHOWER

OVERHEAD DOOR

(SEE STRUCTURAL &

ARCHITECTURAL DWGS)

OVERHEAD DOOR

(SEE STRUCTURAL &

ARCHITECTURAL DWGS)

OVERHEAD DOOR

(SEE STRUCTURAL &

ARCHITECTURAL DWGS)

OVERHEAD DOOR

(SEE STRUCTURAL &

ARCHITECTURAL DWGS)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

STORAGE

OFFICE AREA

/1

/2

:1

:5

P

M

MQ102B

MECHANICAL NEW WORK

EQUIPMENT ARRANGEMENT

BOILER ROOM WEST UPPER FLOOR PLAN

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"

MECHANICAL NEW WORK EQUIPMENT ARRANGEMENT BOILER ROOM WEST UPPER FLOOR PLAN

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

2. REFERENCE ALL OTHER DRAWINGS IN THIS PACKAGE FOR COORDINATION.

CO

HAZARDOUS GAS SENSOR SYMBOL LEGEND

CARBON MONOXIDE SENSOR: MOUNT AT BREATHING LEVEL NEAR THE FRONT

OF EACH BOILER AND WHERE THERE IS EXHAUST VENTILATION.

CH3 COMBUSTABLE GAS SENSOR (NATURAL GAS): MOUNT AT CEILING OF THE

BOILER ROOM ABOVE EACH BOILER.

COMBUSTABLE GAS SENSOR (PROPANE): MOUNT AT LOW POINTS OF THE

BOILER ROOM.

EXISTING

TUNNEL

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M P B

4" HPS TO BLDG 122

10" HPS TO

BLDG HOSPITAL

39-CRU-1

SECURITY

ACCESSIBLE TOILET

SHOWER

LOCKERS

RESTROOM

TOILET

STAIR

CIRCULATION

2 1/2" VT

4" PC

4" HPS

WATER HEATER

(SEE PLUMBING DWGS)

OFFICE

UTILITY

VESTIBULE

2" STRAINER

TYP 3

2" TRIPLE DUTY VALVE

TYP 3

4" CHECK

VALVE

ELECTRICAL

HAC

(E)4" PC

(E)4" PC

4" PC

4" PC

CONTROLS

A

B

0.1

FLOW METER

FLOW METER

FD

2" BALL VALVE

TYP 3

PIPE GUIDE

(SEE STRUCTURAL DWGS)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

OFFICE AREA

/1

/2

:2

:5

P

M

MP101A

MECHANICAL NEW WORK

OFFICE AREA LOWER FLOOR PLAN

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

589A6-19-204

2022-01-20 JJM JJP0509-0006

BID DOCUMENTS

1/4" = 1'-0"

MECHANICAL NEW WORK OFFICE AREA LOWER FLOOR PLAN

GENERAL SHEET NOTES

1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES &

SYMBOLS.

39-B-3

39-B-2

39-B-1

39-D/A-1

BOILER PLANT

39-2

STORAGE

39-4

EXISTING

TUNNEL

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M P A

F O R

C O N T

IN

U A T

IO

N

S

A W

IN

G

M P C

BOILER MASTER

CONTROL PANEL

(E)10" STEAM HEADER

REFER TO PHASING PLAN

10" HPS

(E)8" HPS TO

LAUNDRY BLDG

REFER TO M-401

39-CS-1

39-FWP-01

39-FWP-02

39-FWP-03

4" OFL

3" NPW @ 7'-6" AFF

3" SW @ 4'-0" AFF

SEE PLUMBING DWGS

FOR CONTINUATION

3" SW RISE

3" CTPD RISE

2 1/2" CTPD

3" CTPD

(BYPASS)

CATWALK SUPPORT

FOOTING TYP

CATWALK SUPPORT

FOOTING TYP

CATWALK SUPPORT

FOOTING TYP

BY P.C.

3" DCW @ 2'-6" AFF

3" SW @ 3'-6" AFF

SEE PLUMBING DWGS

FOR CONTINUATION

2 1/2" CTPD

3" BFW

3" BFW

FS

FSFSFS

MP303

FD

FS

SEE 2/MP302

FOR 3D VIEW

4" D/A OFL

MP303

CHEMICAL TREATMENT

(SEE PLUMBING DWGS)

8" HPS RISE

FROM BOILER

8" HPS RISE

FROM BOILER

8" HPS RISE

FROM BOILER

24" BOILER

STACK UP

THRU ROOF

24" BOILER

STACK UP

THRU ROOF

24" BOILER

STACK UP

THRU ROOF

2" BD

2" BD

3" PC RISE

10" HPS RISE

8" HPS RISE

300# GATE

VALVE IN VERTICAL

2" BD2" BD 2" BD

SV-1/SV-2

(2)4" VT UP

THRU ROOF

SV-3/SV-4

(2)4" VT UP

THRU ROOF

(E)10" NG DROP

BELOW GRADE

CONTROL ROOM

3" CTPD BYPASS RISE

BY M.C.

4" TANK BYPASS

DRAIN DROP TO FD

FS4" OFL

2" BFW

SEE 3/MP301

FOR 3D VIEW

SEE 1/MP302

FOR 3D VIEW

MP011

39-D/A-1

CONTROL

PANEL

4" HPS

DROP

10" HPS

DROP

10" HPS DROP

4" HPS

DROP

2-1/2" VT

UP THRU ROOF

2-1/2" VT

FROM 39-CRU-1

4" PC FROM

39-CRU-1

4" PC RISE

MP303

MP303

4" HPS

39-CS-1 CONTROL PANEL

4" CS OFL DROP TO FS

SEE 3/MP302

FOR 3D VIEW

HAZARDOUS GAS

DETECTION SYSTEM

CONTROLLER

F O

V A L V

IN

G

S U P P L

IE

D

W

IT

H

B O

IL

E R

1" SBO 1" SBO

1" SBO

SAFETY SHOWER

SAFETY SHOWER

6" VTR

3" SW DROP TO 39-CS-1

4" OFL DROP FROM 39-D/A-1

4" PC DROP TO 39-CS-1

2" V RISE FROM 39-CS-1

1-1/2" CTPD RECIRC

DROP TO 39-CS-1

2" BFW DROP TO 39-CS-1

39-CTP-01

39-CTP-02

(BELOW CS)

(BELOW CS)

MP303

2 1/2" BFW

2 1/2" BFW

(2)2-1/2" BFW DROP

BELOW CATWALK STAIRS

FSFSFS

FD

1-1/2"

FOS & FOR

FUEL OIL

BACK PRESSURE

CONTROL VALVE

1 2 3 4 5 6 7

A

B

FLOW METER

FLOW METER

39-B-1

CONTROL PANEL 39-B-2 CONTROL PANEL

39-B-3

CONTROL PANEL

1 1/2" FOS

1 1/2" FOR

1 1/2" FOR

1 1/2" FOS

1 1/2" FOR

1 1/2" FOS

4" 300#

GATE VALVE

10" 300#

GATE VALVE

BLOWDOWN

VALVING

SUPPLIED

WITH BOILER

BLOWDOWN

VALVING

SUPPLIED

WITH BOILER

BLOWDOWN VALVING

SUPPLIED WITH BOILER

F O

V A L V

IN

G

S U P P L

IE

W

IT

H

B O

IL

E R

MAXON AUTOMATED

NATURAL GAS SHUT-OFF VALVE.

MATCH EXISTING SIZE AND MODEL

4" NG

RISE

N G

T R A

IN

S U P P L

H

B O

IL

E R

N G

T R

P P L

H

B O

IL

E R

N G

T R

P P L

H

B O

IL

E R

4" NG

RISE

4" NG

RISE

F O

V A L V

IN

G

S U P P L

H

B O

IL

E R

1" LPG TO TANKS

SEE M-401 FOR

CONTINUATION

FLOW METER

(IN VERTICAL)

L P G

T R

P P L

H

B O

IL

E R

L P G

T R

P P L

H

B O

IL

E R

L P G

T R

P P L

H

B O

IL

E R

FLOW METER

3/4" LPG

3/4" LPG 3/4" LPG

1" LPG

AIR TANK/COMPRESSOR

(SEE PLUMBING DWGS)

PIPE SUPPORT (TYP)

SEE 11/MP503

SLOPE SLOPESLOPE

SLOPE

S L O P E

S L O P E

S L O P E

(E)8" NG RISE

IN VERTICAL:

(E)2" NG TO INCINERATOR

(E)2" NG TO OLD INCINERATOR

(E)2" NG TO PAINT SHOP

(E)3" NG TO LAUNDRY

PIPE SUPPORT (TYP)

SEE 10/MP503

PIPE SUPPORT (TYP)

SEE 10/MP503

PIPE SUPPORT (TYP)

SEE 11/MP503

T T

T O

U H

T O

E F

T T

T O

U H

T O

E F

T T

T O

U H

T O

E F

T T

T O

U H

T O

E F

(FROM 39-CS-1)

4" PC

(RISE)

SV-5/SV-6

(2)4" VT UP

THRU ROOF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

BOILER

RM EAST

BOILER

RM WEST

OFFICE AREA

/1

/…