Attachment 05 - Architectural - Drawings.pdf

PDF 15 MB Posted

Attached to
36C77622B0029 - Replace Boilers - Leavenworth - Solicitation Federal contract opportunity
Solicitation number
36C77622B0029
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation seeks bids to replace boilers and associated systems at the Dwight D. Eisenhower VA Medical Center in Leavenworth, Kansas. The Department of Veterans Affairs, through its Veterans Health Administration Program Contracting Activity Central, will award a single firm-fixed-price contract to replace four antiquated water tube boilers with three new energy efficient fire tube boilers. Additional work includes replacing auxiliary systems in Building 39, fuel oil pump sets, condensate piping, deaerator tank, condensate return tank, and adding a Continuous Blowdown Heat Recovery Package, with asbestos abatement of replaced piping. The solicitation number is 36C77622B0029.

View the file

Other files for this federal contract opportunity

Other files attached to 36C77622B0029 - Replace Boilers - Leavenworth - Solicitation, newest first.
File Type Posted
Attachment 26 - RFIs - Technical Questions and Responses - REVISED.pdf PDF
36C77622B0029 0003.pdf PDF
Attachment 24 - RFIs - Technical Questions and Responses.pdf PDF
Attachment 21 - Asbestos Report.pdf PDF
Attachment 25 - Site Visit Attendance Sheet.pdf PDF
36C77622B0029 0002.pdf PDF
Attachment 22 - DDC for HVAC.pdf PDF
Attachment 23 - S-532 Drawing Sheet.pdf PDF
36C77622B0029 0001.pdf PDF
Attachment 01 - General Information - Drawings.pdf PDF
Attachment 11 - Electrical - Part 2 - Drawings.pdf PDF
Attachment 15 - Specifications - Volume 3.pdf PDF
Attachment 16 - Boiler Plant - Drawing Sheet - M001.pdf PDF
Attachment 18 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 19 - Wage Rates - Leavenworth KS 5-21-2022.pdf PDF
Attachment 20 - VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx DOCX document
Attachment 03 - Civil - Drawings.pdf PDF
Attachment 04 - Structural - Drawings.pdf PDF
Attachment 10 - Electrical - Part 1 - Drawings.pdf PDF
36C77622B0029_1.pdf PDF
Attachment 06 - Fire Protection - Drawings.pdf PDF
Attachment 08 - Mechanical - Part 1 - Drawings.pdf PDF
Attachment 09 - Mechanical - Part 2 - Drawings.pdf PDF
Attachment 12 - Security - Drawings.pdf PDF
Attachment 02 - Hazardous Materials - Drawings.pdf PDF
Attachment 07 - Plumbing - Drawings.pdf PDF
Attachment 13 - Specifications - Volume 1.pdf PDF
Attachment 14 - Specifications - Volume 2.pdf PDF
Attachment 17 - Limitations on Subcontracting - Construction.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIPE

TUNNEL

1 1 4 43 2 55 5

1 1 1

UP

UP

UP

UP

UP

8 88

15 15

0.1 0.2 0.3 0.4 0.5 0.8 1 3 4 5 6 7 8 9

B

A.7

A.6

A.5

A.4

A

(ABOVE)

AD201D6

AD201

B1

AD201 D1

+/- 113' - 4 1/8"

3' - 6"

MEZZANINE

OPEN-GRATE

FLOOR ABOVE

12 8

B U

IL

D

IN

G

N O

T

IN

S C

O P

E

2323 815

9 24

9 2525

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

PLAN

NORTH

ACTUAL

NORTH

KEYPLAN

589A6-16-204

BLDG

39A

BOILER

RM EAST

BOILER

RM WEST

STORAGEELECTRICAL

SHOP

OFFICE AREA

STACK

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:5

P

M

AD111

FIRST LEVEL DEMOLITION PLAN REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM JTK0509-0006

BID DOCUMENTS

1/8" = 1'-0"E1 LEVEL 1 DEMOLITION PLAN

DEMOLITION GENERAL NOTES

1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, & STRUCTURAL DRAWINGS FOR

ADDITIONAL DEMOLITION REQUIREMENTS.

2. DRAWINGS ARE DIAGRAMMATIC IN NATURE. DETAIL OF EXISTING CONDITIONS

MAY VARY FROM THOSE INDICATED. VERIFY EXISTING CONDITIONS PRIOR TO

BEGINNING DEMOLITION ACTIVITIES.

3. PROTECT EXISTING CONSTRUCTION INDICATED TO REMAIN FROM DAMAGE DUE TO

DEMOLITION ACTIVITIES. PATCH AND REPAIR EXISTING IMPROVEMENTS DAMAGED

BY PERFORMANCE OF THE WORK TO ORIGINAL CONDITION.

4. IF POTENTIALLY HAZARDOUS MATERIALS ARE ENCOUNTERED, CEASE WORK

IMMEDIATELY, PREVENT FURTHER DISTURBANCE, SECURE THE AREA AND NOTIFY

THE COR.

5. REMOVE DEMOLISHED MATERIALS FROM SITE AND DISPOSE OF IN LAWFUL

MANNER.

6. PREVENT DUST FROM INFILTRATING OCCUPIED AREAS.

7. REFERENCE CIVIL DRAWINGS FOR DEMOLITION OUTSIDE OF EXISTING BOILER

BUILDING FOOTPRINT.

8. COORDINATE SCHEDULE WITH COR PRIOR TO COMMENCING DEMOLITION WORK

THAT MAY INTERRUPT SERVICES. SCHEDULE WORK AND PROVIDE TEMPORARY

CONNECTIONS OR NEW SERVICES AS NECESSARY TO ELIMINATE DISRUPTIONS

AFFECTING THE OWNER'S OPERATIONS.

KEYED NOTES

1 DEMO WINDOW.

2 DEMO DOOR AND FRAME.

3 DEMO OVERHEAD DOOR.

4 DEMO STOREFRONT AND ASSOCIATED COMPONENTS.

5 DEMO INDICATED PORTION OF BEARING WALL. RE: STRUCTURAL.

6 DEMO WALL.

7 DEMO CHAINLINK PARTITION.

8 DEMO MECHANICAL EQUIPMENT. RE: MECHANICAL.

9 DEMO PLUMBING FIXTURE. RE: PLUMBING.

10 DEMO MEZZANINE AND ASSOCIATED COMPONENTS. RE: STRUCTURAL.

11 DEMO CATWALK AND ASSOCIATED COMPONENTS. RE: STRUCTURAL.

12 DEMO STAIR.

13 DEMO TOILET PARTITION AND DOOR.

14 DEMO GENERATOR. RE: ELECTRICAL.

15 DEMO ELECTRICAL EQUIPMENT. RE: ELECTRICAL.

18 DEMO ELECTRICAL EQUIPMENT. RE: ELECTRICAL.

23 DEMO PORTION OF WALL ABOVE OPENING. SEE NEW WORK FOR ADDITIONAL

INFORMATION.

24 DEMO CASEWORK AND COUNTERTOP.

25 DEMO CONC SLAB ON GRADE. RE: STRUCTURAL.

N

Revisions: Date:

WH

16 17 16 17

16 17

0.1 0.2 0.3 0.4 0.5 0.8 1 3 4 5 6 7 8 9

C

B

A.7

A.6

A.5

A.4

A

16 17

AD201D6

AD201

B1

AD201 D1

B U

IL

D

IN

G

N O

T

IN

S C

O P

E12

10 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

589A6-16-204

BLDG

39A

BOILER

RM EAST

BOILER

RM WEST

STORAGEELECTRICAL

SHOP

OFFICE AREA

STACK

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:5

P

M

AD112

FIRST LEVEL DEMOLITION REFLECTED

CEILING PLAN

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM JTK0509-0006

BID DOCUMENTS

1/8" = 1'-0"E1 LEVEL 1 DEMOLITION RCP

DEMOLITION GENERAL NOTES

1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, & STRUCTURAL DRAWINGS FOR

ADDITIONAL DEMOLITION REQUIREMENTS.

2. DRAWINGS ARE DIAGRAMMATIC IN NATURE. DETAIL OF EXISTING CONDITIONS

MAY VARY FROM THOSE INDICATED. VERIFY EXISTING CONDITIONS PRIOR TO

BEGINNING DEMOLITION ACTIVITIES.

3. PROTECT EXISTING CONSTRUCTION INDICATED TO REMAIN FROM DAMAGE DUE TO

DEMOLITION ACTIVITIES. PATCH AND REPAIR EXISTING IMPROVEMENTS DAMAGED

BY PERFORMANCE OF THE WORK TO ORIGINAL CONDITION.

4. IF POTENTIALLY HAZARDOUS MATERIALS ARE ENCOUNTERED, CEASE WORK

IMMEDIATELY, PREVENT FURTHER DISTURBANCE, SECURE THE AREA AND NOTIFY

THE COR.

5. REMOVE DEMOLISHED MATERIALS FROM SITE AND DISPOSE OF IN LAWFUL

MANNER.

6. PREVENT DUST FROM INFILTRATING OCCUPIED AREAS.

7. REFERENCE CIVIL DRAWINGS FOR DEMOLITION OUTSIDE OF EXISTING BOILER

BUILDING FOOTPRINT.

8. COORDINATE SCHEDULE WITH COR PRIOR TO COMMENCING DEMOLITION WORK

THAT MAY INTERRUPT SERVICES. SCHEDULE WORK AND PROVIDE TEMPORARY

CONNECTIONS OR NEW SERVICES AS NECESSARY TO ELIMINATE DISRUPTIONS

AFFECTING THE OWNER'S OPERATIONS.

KEYED NOTES

10 DEMO MEZZANINE AND ASSOCIATED COMPONENTS. RE: STRUCTURAL.

12 DEMO STAIR.

16 DEMO CEILING AND ASSOCIATED COMPONENTS.

17 DEMO LIGHT FIXTURES. RE: ELECTRICAL.

23 DEMO PORTION OF WALL ABOVE OPENING. SEE NEW WORK FOR ADDITIONAL

INFORMATION.

+/- 33' - 4 3/4"

/4

DN

DN

DN

303 SF

CONFERENCE

ROOM

1378 SF

ELECTRIC SHOP

139 SF

TOILETS

131 SF

ELECTRICAL ROOM

305 SF

OFFICE

181 SF

STORAGE

183 SF

STORAGE

178 SF

OFFICE

180 SF

OFFICE

200 SF

CORRIDOR

DN

D5

0.1 0.2 0.3 0.4 0.5 0.8 1 3 4 5 6 7 8 9

C

B

A.7

A.6

A.5

A.4

A

AD201

AD201

E1

AD201

B1

AD201 D1

NOT IN SCOPE

N O

T

IN

S C

O P

E

NOT IN SCOPE

81010

1 1 1

11 11 11

AD201

F5

F1

1 1

F6

(ABOVE)

(ABOVE)

(ABOVE)

(ABOVE)

9 24

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

589A6-16-204

BLDG

39A

BOILER

RM EAST

BOILER

RM WEST

STORAGEELECTRICAL

SHOP

OFFICE AREA

STACK

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:5

P

M

AD121

SECOND LEVEL DEMOLITION PLAN REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM JTK0509-0006

BID DOCUMENTS

1/8" = 1'-0"E1 LEVEL 2 DEMOLITION PLAN

DEMOLITION GENERAL NOTES

1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, & STRUCTURAL DRAWINGS FOR

ADDITIONAL DEMOLITION REQUIREMENTS.

2. DRAWINGS ARE DIAGRAMMATIC IN NATURE. DETAIL OF EXISTING CONDITIONS

MAY VARY FROM THOSE INDICATED. VERIFY EXISTING CONDITIONS PRIOR TO

BEGINNING DEMOLITION ACTIVITIES.

3. PROTECT EXISTING CONSTRUCTION INDICATED TO REMAIN FROM DAMAGE DUE TO

DEMOLITION ACTIVITIES. PATCH AND REPAIR EXISTING IMPROVEMENTS DAMAGED

BY PERFORMANCE OF THE WORK TO ORIGINAL CONDITION.

4. IF POTENTIALLY HAZARDOUS MATERIALS ARE ENCOUNTERED, CEASE WORK

IMMEDIATELY, PREVENT FURTHER DISTURBANCE, SECURE THE AREA AND NOTIFY

THE COR.

5. REMOVE DEMOLISHED MATERIALS FROM SITE AND DISPOSE OF IN LAWFUL

MANNER.

6. PREVENT DUST FROM INFILTRATING OCCUPIED AREAS.

7. REFERENCE CIVIL DRAWINGS FOR DEMOLITION OUTSIDE OF EXISTING BOILER

BUILDING FOOTPRINT.

8. COORDINATE SCHEDULE WITH COR PRIOR TO COMMENCING DEMOLITION WORK

THAT MAY INTERRUPT SERVICES. SCHEDULE WORK AND PROVIDE TEMPORARY

CONNECTIONS OR NEW SERVICES AS NECESSARY TO ELIMINATE DISRUPTIONS

AFFECTING THE OWNER'S OPERATIONS.

KEYED NOTES

1 DEMO WINDOW.

3 DEMO OVERHEAD DOOR.

5 DEMO INDICATED PORTION OF BEARING WALL. RE: STRUCTURAL.

6 DEMO WALL.

8 DEMO MECHANICAL EQUIPMENT. RE: MECHANICAL.

9 DEMO PLUMBING FIXTURE. RE: PLUMBING.

10 DEMO MEZZANINE AND ASSOCIATED COMPONENTS. RE: STRUCTURAL.

11 DEMO CATWALK AND ASSOCIATED COMPONENTS. RE: STRUCTURAL.

12 DEMO STAIR.

15 DEMO ELECTRICAL EQUIPMENT. RE: ELECTRICAL.

19 DEMO CONC SLAB AND FOUNDATION.

20 DEMO CANOPY ROOF, STRUCTURE, AND ASSOCIATED COMPONENTS.

24 DEMO CASEWORK AND COUNTERTOP.

0.1 0.2 0.3 0.4 0.5 0.8 1 3 4 5 6 7 8 9

C

B

A.7

A.6

A.5

A.4

A

DEMO GUTTER

+/- 18' - 1"

D E

M O

G U

T T

E R

DEMO SHINGLES

25' - 0"

D E

M O

S H

IN

G

L E

S

AD201D6

AD201

E1

AD201

B1

AD201 D1

AD201

F5

F1F1

8 8

26 26 26 26

F6 AE201F6 AE201

F5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

589A6-16-204

BLDG

39A

BOILER

RM EAST

BOILER

RM WEST

STORAGEELECTRICAL

SHOP

OFFICE AREA

STACK

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:5

P

M

AD131

ROOF DEMOLITION PLAN REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM JTK0509-0006

BID DOCUMENTS

1/8" = 1'-0"E1 ROOF DEMOLITION PLAN

DEMOLITION GENERAL NOTES

1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, & STRUCTURAL DRAWINGS FOR

ADDITIONAL DEMOLITION REQUIREMENTS.

2. DRAWINGS ARE DIAGRAMMATIC IN NATURE. DETAIL OF EXISTING CONDITIONS

MAY VARY FROM THOSE INDICATED. VERIFY EXISTING CONDITIONS PRIOR TO

BEGINNING DEMOLITION ACTIVITIES.

3. PROTECT EXISTING CONSTRUCTION INDICATED TO REMAIN FROM DAMAGE DUE TO

DEMOLITION ACTIVITIES. PATCH AND REPAIR EXISTING IMPROVEMENTS DAMAGED

BY PERFORMANCE OF THE WORK TO ORIGINAL CONDITION.

4. IF POTENTIALLY HAZARDOUS MATERIALS ARE ENCOUNTERED, CEASE WORK

IMMEDIATELY, PREVENT FURTHER DISTURBANCE, SECURE THE AREA AND NOTIFY

THE COR.

5. REMOVE DEMOLISHED MATERIALS FROM SITE AND DISPOSE OF IN LAWFUL

MANNER.

6. PREVENT DUST FROM INFILTRATING OCCUPIED AREAS.

7. REFERENCE CIVIL DRAWINGS FOR DEMOLITION OUTSIDE OF EXISTING BOILER

BUILDING FOOTPRINT.

8. COORDINATE SCHEDULE WITH COR PRIOR TO COMMENCING DEMOLITION WORK

THAT MAY INTERRUPT SERVICES. SCHEDULE WORK AND PROVIDE TEMPORARY

CONNECTIONS OR NEW SERVICES AS NECESSARY TO ELIMINATE DISRUPTIONS

AFFECTING THE OWNER'S OPERATIONS.

KEYED NOTES

8 DEMO MECHANICAL EQUIPMENT. RE: MECHANICAL.

20 DEMO CANOPY ROOF, STRUCTURE, AND ASSOCIATED COMPONENTS.

21 DEMO INDICATED PORTION OF GUTTER.

22 DEMO ASPHALT SHINGLES AND UNDERLAY (HATCHED AREA). ROOF DECK TO

REMAIN.

26 DEMO INDICATED PORTION OF ROOF. RE: MECHANICAL.

OFFICE LEVEL 1

0' - 3 3/4"

OFFICE LEVEL 2

11' - 1 5/8"

T.O. CLERESTORY

42' - 8"

BOILERS LEVEL 2

15' - 1 1/2"

B.O. TRUSS

22' - 10 1/2"

OFFICE LEVEL 2

11' - 1 5/8"

T.O. CLERESTORY

42' - 8"

BOILERS LEVEL 1

0' - 0"

B.O. TRUSS

22' - 10 1/2"

1 1

11 1

1 1 1

55 55

113' - 4"

OFFICE LEVEL 2

11' - 1 5/8"

T.O. CLERESTORY

42' - 8"

BOILERS LEVEL 2

15' - 1 1/2"

B.O. TRUSS

22' - 10 1/2"

OFFICE LEVEL 2

11' - 1 5/8"

T.O. CLERESTORY

42' - 8"

BOILERS LEVEL 1

0' - 0"

BOILERS LEVEL 2

15' - 1 1/2"

B.O. TRUSS

22' - 10 1/2"

OUTLINE OF

ADJACENT BUILDING

1 1

BOILERS LEVEL 2

15' - 1 1/2"

B.O. TRUSS

22' - 10 1/2"

8 8 8 8

+/- 4' - 0 3/4"

+/- 4' - 4 1/8"

+/- 3' - 4 3/4"

XFMR FLOOR

13' - 5 3/8"

XFMR FLOOR

13' - 5 3/8"

+/- 4' - 8"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

589A6-16-204

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:0

P

M

AD201

EXTERIOR DEMOLITION ELEVATIONS REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM JTK0509-0006

BID DOCUMENTS

1/8" = 1'-0"D1 WEST ELEVATION DEMOLITION

1/8" = 1'-0"B1 SOUTH ELEVATION DEMOLITION

1/8" = 1'-0"E1 NORTH ELEVATION DEMOLITION

1/8" = 1'-0"D6 EAST ELEVATION DEMOLITION

KEYED NOTES

1 DEMO WINDOW.

2 DEMO DOOR AND FRAME.

3 DEMO OVERHEAD DOOR.

4 DEMO STOREFRONT AND ASSOCIATED COMPONENTS.

5 DEMO INDICATED PORTION OF BEARING WALL. RE:

STRUCTURAL.

8 DEMO MECHANICAL EQUIPMENT. RE: MECHANICAL.

15 DEMO ELECTRICAL EQUIPMENT. RE: ELECTRICAL.

19 DEMO CONC SLAB AND FOUNDATION.

20 DEMO CANOPY ROOF, STRUCTURE, AND ASSOCIATED

COMPONENTS.

21 DEMO INDICATED PORTION OF GUTTER.

22 DEMO ASPHALT SHINGLES AND UNDERLAY (HATCHED

AREA). ROOF DECK TO REMAIN.

1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, &

STRUCTURAL DRAWINGS FOR ADDITIONAL DEMOLITION

REQUIREMENTS.

2. DRAWINGS ARE DIAGRAMMATIC IN NATURE. DETAIL OF

EXISTING CONDITIONS MAY VARY FROM THOSE INDICATED.

VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING

DEMOLITION ACTIVITIES.

3. PROTECT EXISTING CONSTRUCTION INDICATED TO REMAIN

FROM DAMAGE DUE TO DEMOLITION ACTIVITIES. PATCH

AND REPAIR EXISTING IMPROVEMENTS DAMAGED BY

PERFORMANCE OF THE WORK TO ORIGINAL CONDITION.

4. IF POTENTIALLY HAZARDOUS MATERIALS ARE

ENCOUNTERED, CEASE WORK IMMEDIATELY, PREVENT

FURTHER DISTURBANCE, SECURE THE AREA AND NOTIFY

THE COR.

5. REMOVE DEMOLISHED MATERIALS FROM SITE AND DISPOSE

OF IN LAWFUL MANNER.

6. PREVENT DUST FROM INFILTRATING OCCUPIED AREAS.

7. REFERENCE CIVIL DRAWINGS FOR DEMOLITION OUTSIDE OF

EXISTING BOILER BUILDING FOOTPRINT.

8. COORDINATE SCHEDULE WITH COR PRIOR TO COMMENCING

DEMOLITION WORK THAT MAY INTERRUPT SERVICES.

SCHEDULE WORK AND PROVIDE TEMPORARY CONNECTIONS

OR NEW SERVICES AS NECESSARY TO ELIMINATE

DISRUPTIONS AFFECTING THE OWNER'S OPERATIONS.

DEMOLITION GENERAL NOTES

1/8" = 1'-0"F1 DEMOLITION NORTH ELEVATION AT BOILERS

1/8" = 1'-0"F5 STACK INFILL ELEVATION

1/8" = 1'-0"F6 INCINERATOR INFILL ELEVATION

PULL

PULL

RADIOLOGY

RECORDS

RECOVERY

RECEPTION

M

MAINT

MECH

MACH MACHINE ROOM

MALE

MAINTENANCE

RECD

RECP

RECOV

RAD

ROOM

STAFF

REHABILITATION

SHOWER

SUPPLY

STAFF TOILET

SOILED UTILITY

SECRETARY

STAIRS

SUPPORT

STATION

STERILIZER

SERVICE

SWITCHGEAR

SUPERVISOR

SURGERY/ ICAL

STORAGE

MGR

MED

MRI

OFF

OR

ORTHO

OH

OB/GYN

OPERATING ROOM

MANAGER

OFFICE

MEDICATION/ MEDICAL

ORTHOPEDICS

OBSTETRICS/ GYNECOLOGY

ORAL HYGIENIST

MAGNETIC RESONANCE

IMAGING

SWGR

ST

STA

RM

S TLT

SVCE

SHR

S

STOR

SUPVR

SPRT

SPLY

SOIL

SECY

REHAB

STER

SURG

MECHANIC(AL)

EDUCATION

ELEVATOR

ELECTRIC(AL)

ED

ELEV

EMG

ELEC

ADMIN

ASSY

AUD

AMB

ASSEMBLY

ADMINISTRATION(OR)

AMBULATORY

AUDIOLOGY

"DN"

S

SIMILARSIM

SPEC

SF

SOUTH/ SINK

SQUARE FEET/ STOREFRONT

(NON - NCS ABBREVIATIONS ARE SHOWN

UNDERLINED) EXAMPLE:

ENDOSCOPY

EQUIPMENT

EXECUTIVE

ENDO

ENT

EQUIP

EXEC

FREEZER

FEMALE

FRZ

F

BALCONYBALC

CHEMICALCHEM

CHGN

CLASSCL

CHIRO CHIROPRACTOR

CHARGE NURSE

GENERAL

GYMNASIUM

GEN

GYM

HEAD

HOUSEKEEPINGHSKPG

HD

ICCU

HAZ MAT

CLERICAL

CLN

CLER

CLOSETCLO

CLRM CLASSROOM

CLEAN (ING)/ CLEAN UTILITY

COMM

CONF

CORRIDORCORR

COPY

COMMUNICATIONS

CONFERENCE

COPY/ WORK ROOM

COMMANDER/ COMMANDCMD

SQUARESQ

SST

STEEL

STC

STL

TREADT

THROUGHTHRU

TEMP

SOUND TRANSMISSION CLASS

STAINLESS STEEL

TEMPERATURE/ TEMPORARY

TOP OF

TOC

TO

TOF

TOM

TYPICALTYP

U

UC

TOS

HEAT TRANSFER COEFFICIENT

TOP OF FOOTING

TOP OF CONCRETE (CURB)

UNDERCUT

TOP OF MASONRY

TOP OF STEEL

SPECIFICATION(S)

HAZARDOUS MATERIALS

EAR NOSE THROAT

ELECTROMYOGRAPHY

INTENSIVE CARDIAC CARE UNIT

TECHNICIAN

TELEPHONE

TOILET

URINAL

TREATMENT

WAITING

WAREHOUSE

WATER CLOSET

WEIGHTS AND MEASURES

WEIGHT

WORK STATION, WORK ROOM

EXECUTIVE OFFICER

VESTIBULE

P

PHAR

PHYS

PEDS

PO

PSRDM

PRIN

PREP

POST OFFICE

PRINCIPAL

PHARMACY

PATIENT

PREPARATION

PEDIATRICS

PHYSICAL

PHYSICAL SECURITY RISK MITIGATION DESIGN

PROCTO

PROC

PUB

PT/OT

PULMO

PUBLIC

PHYSICAL / OCCUPATIONAL

THERAPY

PROCTOLOGY

PROCEDURE

PULMONARY

PARKINGPRKG

WT

WHSE

WAIT

VEST

UR

WORK

TRT

TECH

XO

WC

W & M

TEL

TLT

INFORMATION

ISOLATION

INJECTION

INFO

ICU

ISO

INJ

JANITOR

KITCHEN

JAN

JC

KIT

CSR

CT

CONTROLCTRL

CENTRAL STERILE ROOM

CAT SCAN

DRESSING

DEPT

D

DIRECTOR

DICTATION

DIR

DICT

DEPARTMENT

LAUNDRY

LABORATORY

LAU

LAB

LDRP

LCPO

LIBRARY

LOCKER

LIT/ FORMS

LIB

LPO

LKR

L/W

L/F

DOCTORDR

DOR

DRK

DTR

DARKROOM

DENTAL TREATMENT ROOM

DENTAL OPERATORY ROOM

DISP DISPENSING

UL

U/C/B

VACUUMV

U0N

VARIESVAR

VCT

VERTICAL

VTR

VERT

VENT THRU ROOF

UNLESS OTHERWISE NOTED

UNDERWRITERS LABORATORY

VINYL COMPOSITION TILE

UNDER COUNTER BASE

W

WITHW/

W

WITHOUT

WOOD

W/0

WD

WEIGHTWT

WP

WH WALL HUNG/ WATER HEATER

WEST /WATT

WATERPROOF / WORKING POINT

WIDTH /WIDE FLANGE

VWC VINYL WALL COVERING

WWF WELDED WIRE FABRIC

JANITOR'S CLOSET

LABOR DELIVERY RECOVERY POST PARTUM

LEADING CHIEF PETTY OFFICER

LEADING PETTY OFFICER

LITTER WHEELCHAIR

INTENSIVE CARE UNIT

KILOPASCAL

POUND

ANGLE

KPA

L

LB

EACH

ELEVATION

EACH END

EXPANSION JOINT

EA

EJ

EL

EE

AND&

DOLLAR (USD)

@ AT

NUMBER / POUND

NATIONAL CAD STANDARD ABBREVIATIONS

LINEAR FEET

METERS

MAXIMUM

LF

M

MAX

MINIMUM

MILLIMETERS

MISCELLANEOUS

MASONRY OPENING

MIN

MM

MISC

MO

ET CETERA

EQUAL

EYE WASH STATION

ELECTRIC WATER COOLER

EXISTING

FILLER

NORTH

NOT APPLICABLE

NUMBER

NOT IN CONTRACT

NA

N

NO

NIC

NOT TO SCALE

OXYGEN

ON CENTER

NTS

OC

O

NOMINALNOM

FACSIMILE

FIRE EXTINGUISHER

FINISHED FLOOR

FIRE EXTINGUISHER CABINET

FLOOR

FACE OF

FIBERGLASS REINFORCED POLYMER

FACE OF SLAB (STUD)

FIRE HOSE CABINET

EQ

F

A/C

A/E

ADA

ACT

AHJ

AHU

AFF

ALUM

AUTHORITY HAVING JURISDICTION

AMERICANS WITH DISABILITY ACT

ACOUSTICAL CEILING TILE

ABOVE FINISHED FLOOR

AIR HANDLING UNIT

ALUMINUM

ARCHITECT-ENGINEER

AIR CONDITIONED

FE

FF

FLR

FO

FRP

BEAM

BLDG

BM

BOS

BO

CG

CCT

CL

CJ

BUILDING

BOTTOM OF STEEL

CENTER LINE

CONTROL/ CONSTRUCTION JOINT

CORNER GUARD

BY OWNER/ BOTTOM OF

CUBICLE CURTAIN TRACK

FOS

FAX

EWS

ETC

FEC

FHC

EXIST

EWC

OPPOSITE HAND

OUTSIDE DIAMETER

PLATE

OPENING

OPH

OD

PL

OPNG

PAIR

PLASTIC LAMINATEPLAM

PR

PSI

PSF

GAS

GRAB BAR

GALVANIZED

GAGE

HIGH

GYPSUM BOARD

GENERAL CONTRACTOR

QUANTITY

PTS

QTY

RISER/RADIUS

REQUIRED

ROUGH OPENING

RENOVATE(TION)

R

RAL

RO

REQ

RENOHARDWARE

HOUR

HOLLOW METAL

INTERCOM

INTRAVENOUS

INCH(ES)

INSIDE DIAMETER

PT

HANDICAP

G

GB

GA

GC

H

CLL

CLG

CM

CMU

CLR CLEAR

CONC

CO2

CONT

CTJ

CENTIMETER

CONCRETE

COLUMN LINE

CONTINUED (OUS)

CONCRETE MASONRY UNIT

CEILING

CONTRACTION JOINT

CARBON DIOXIDE

HM

HR

ID

IC

IV

INCTR

DBA

D

DEG

DIA

DR

DWG

DN DOWN

DEGREE

UNIT OF SOUND

CENTER

DEEP/ DEPTH

DIAMETER

DOOR/

DRAWING(S)

COORDINATECOORD

HC

HDW

GALV

GYP BD

ROICC

JOINTJT

DWR DRAWER

PAINT

POUNDS/SQUARE FOOT

POUNDS/SQUARE INCH

RESIDENT OFFICER IN CHARGE

OF CONST

FEDERAL COLOR PALETTE

PNEUMATIC TUBE STATION VOL VOLUNTEER

ASSISTANTAST

COMPUTERCOMP

COORD COORDINATOR

CLIN CLINIC (AL)

PERSONNELPERS

MANAGEMENTMGNT

ANALYSISTANLST

COMPR COMPTROLLER

CUBICLESCBCL

DEGREE(S)°

AIR

A

/ DIVIDE BY, PER

EQUALS, EQUAL TO

' FOOT, FEET

> GREATER THAN

> GREATER THAN OR EQUAL TO

INCH(ES)"

MINUS, NEGATIVE

< LESS THAN

LESS THAN OR EQUAL TO

MULTIPLY BY, BYX

% PERCENT

PLUS

+/- PLUS OR MINUS

NATIONAL CAD STANDARD ROOM NAME ABBREVIATIONS

"DN"

(NON - NCS ABBREVIATIONS ARE SHOWN

UNDERLINED) EXAMPLE:

FOOT/FEETFT

TELEVISIONT.V.

P.T. PRESSURE TREATED

MOUNTEDMNTD

FIRE RETARDANTF.R.

SS STAINLESS STEEL

WHEELCHAIRW/C

FIRE TREATEDF.T.

ABA ARCHITECTURAL BARRIERS ACT

SAB SOUND ATTENUATION BATTS

EXPOSEDEXP

VERIFY IN FIELDVIF

VERIFY IN FIELDVIF

PYSCH PSYCHOLOGY

A101

SIM

A101

SIM

A101

SIM

BUILDING ELEVATION/SECTIONDetail No.

Sheet No.

Reference Label

Detail No.

Sheet No.

Reference Label

Detail No.

Sheet No.

Reference Label

Room No.

Room Area

Door/Room No.

Partition Configuration

Partition Configuration

Key Note No.

ALIGN

WALL SECTION

DETAIL SECTION/CALLOUT

ROOM TAG

DOOR TAG

PARTITION TAG

KEYNOTE

ALIGNED SURFACES

Room Name

Area

AREA TAG

Area NameArea Name

150 SF

WL

2S 86

SCOPE OF PROJECT

Project Limit Line

Grid No.

CENTERLINE

COLUMN GRID LINE

SPOT ELEVATIONSpot Elevation AFF

Level/Datum Elevation AFF

LEVEL MARKER

Level/Datum Name

Window Type WINDOW TYPE TAG01

CL

Highpoint @ Tail SLOPE INDICATOR

Starting Point @ Center DIMENSION CROSSHAIR

NORTH ARROW

Plan North Reference Label

Name Elevation

Revision Reference Number

Revision Cloud Depicting Area Revised

REVISION

CEILING TAG1'-0" Clg Height

? Finish FINISH TAG

Casework / Furniture

CASEWORK TAG1i

FURNITURE TAG

Room Name

150 SF

WAL-1

BAS-1

FLR-1

Room Wall Finish

Room Wall Base

Room Floor Finish

ROOM FINISH TAG

FIRE

EXTINGUISHER

WALL MOUNTED

CABINET

FIRE ALARM

PULL BOX

M A

X

IM

U M

M A

X

IM

U M

M A

X

IM

U M

FIRE

EXTINGUISHER

WALL HUNG

FIRE

EXTINGUISHER

IN RECESSED

CABINET

FIRE EXTINGUISHER

AND FIRE HOSE

VALVE IN RECESSED

CABINET

FIRE EXTINGUISHER,

FIRE HOSE VALVE

AND FIRE

DEPARTMENT VALVE

IN RECESSED

CABINET

FIRE DEPARTMENT

VALVE IN

RECESSED

CABINET

FIREFIGHTERS

HANDSET

FH

0' - 10 1/2"

M

A X

8" 8"7

AUDIO/VISUAL

FIRE ALARM

EXIT SIGN WALL

SWITCH

WALL

PHONE

JACK

FIRE ALARM

PULL STATION

(GENERALLY

LOCATE UNDER

A/V ALARM)

W

IT

H O

W N

E R

C O

O R

D

IN

A T

E0' - 8"

COMBINATION

POWER/SIGNAL/OUTLET

FOR WALL MOUNTED

TELEVISION OR

MONITOR

CLOCK

(PLACED ON WALL

WITH NO VISUAL

BOARDS

MOUNTED BELOW)

DOUBLE-SIDED

PROJECTED

CLOCK

M

IN

C E

IL

IN

G H

E I G

H T

U

.N .O

S

P A

C E

S W

IT

H

T.V./DATA/

PHONE

POWER

RECEPTACLES

LIGHT

SWITCHES

DOME

LIGHT

OCCUPANCY

SENSOR

CARD

READER

THERMOSTAT

POWER

DISCONNECT

REMOTE DOOR

RELEASE

D/V L

TV

D/V

TV E

E

ED/V

L L OS CR T DR

AREA OF

REFUGE

INTERCOM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:0

P

M

AE001

ARCHITECTURAL NOTES, SYMBOLS, &

DETAILS

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM JTK0509-0006

BID DOCUMENTS

ABBREVIATIONS PLAN SYMBOLS

FIRE PROTECTION EQUIPMENT

ELECTRICAL CONTROL DEVICES

REF.

PATH

ID'S:

PATH

A

PATH

ID'S:

PATH

B

PATH

ID'S:

PATH

D

PATH

ID'S:

PATH

C

B U

IL

D

IN

G

N O

T

IN

S C

O P

E

EXISTING EQUIVALENT

1-HOUR RATING**

F.E.

F.E.

F.E.

F.E.

PATH

ID'S:

PATH

E

AREA LEGEND

B - BUSINESS

S - STORAGE

UNOCCUPIED

F.E.

F.E.

F.E.

F.E.

EXISTING EQUIVALENT

1-HOUR RATING**

PATH OF TRAVEL (FEET)

PATH TAG

EXIT SIGN

(COORDINATE W/ ELECTRICAL)

PORTABLE FIRE EXTINGUISHER

DRY-CHEMICAL EXTRA HAZZARD - CLASS B

(COORDINATE W/ FIRE MARSHAL)

TWO HOUR FIRE BARRIER

CONSTRUCTION

PATH

ID'S:

X# X# X# X#

FE

ONE HOUR FIRE BARRIER

CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

589A6-16-204

BLDG

39A

BOILER

RM EAST

BOILER

RM WEST

STORAGEELECTRICAL

SHOP

OFFICE AREA

STACK

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:2

P

M

AE002

LIFE SAFETY PLANS REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM MT0509-0006

BID DOCUMENTS

APPLICABLE CODES

2018 INTERNATIONAL BUILDING CODE (IBC)(ONLY WHEN SPECIFICALLY

REFERENCED IN VA DESIGN DOCUMENTS)

2018 EDITION NFPA 101 LIFE SAFETY CODE

VA FIRE PROTECTION DESIGN MANUAL 8TH EDITION; JUNE 2021

2018 NFPA NATIONAL FIRE CODE (EXCEPTION OF NFPA 5000 AND NFPA 900)

2020 NATIONAL ELECTRICAL CODE (NEC)

2018 INTERNATIONAL PLUMBING CODE (IPC)

ENERGY POLICY ACT OF 2005 (EPACT)

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:

MEMORANDUM OF UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY,

AND TRANSPORTATION MANAGEMENT

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNAGE

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD

62.1 -2004

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)

NFPA 85: BOILER AND COMBUSTION SYSTEMS HAZARD CODE

ASME B31.1 POWER PIPING

UNIFIED FACILITIES CRITERIA (UFC3-430-08N) CENTRAL HEATING PLANTS

NFPA 780, STANDARD FOR THE INSTALLATION OF LIGHTNING PROTECTION

SYSTEMS, 2020 EDITION

BUILDING HEIGHT AND AREA LIMITATIONS (IBC CHAPTER 5):

USE & OCCUPANCY CLASSIFICATION: F1 - MOD. HZD. INDUSTRIAL

TYPE OF CONSTRUCTION: V-B / TYPE-V (000)

ALLOWABLE HT IN FEET (TABLE 504.3): 60' (S)

ACTUAL HEIGHT ABOVE GRADE: 42'-6"

ALLOWABLE STORIES ABOVE GRADE (TABLE 504.): 2 (S)

ACTUAL STORIES ABOVE GRADE: 1

ALOWABLE AREA (TABLE 506.2): 34,000 sqft (S1)

ACTUAL AREA: 14,369 sqft

PER IBC CHAPTER 5: TYPE 5B, FULLY SPRINKLERED BUILDING WITH AN F1

MODERATE HAZARD INDUSTRIAL OCCUPANCY IS PERMITTED TO BE UP TO 60’

TALL, THREE STORIES, WITH 34,000 SQFT OF ALLOWABLE AREA.

AS DEFINED BY TABLE 601 THE BUILDING ELEMENTS ARE REQUIRED TO

CARRY THE FOLLOWING FIRE RESISTANCE RATINGS IN TYPE V-B

CONSTRUCTION:

PRIMARY STRUCTURAL FRAME: 0 HRS

EXTERIOR BEARING WALLS: 0 HRS

INTERIOR BEARING WALLS: 0 HRS

EXTERIOR NON-BEARING WALLS: 0 HRS

INTERIOR NON-BEARING WALLS: 0 HRS

FLOOR CONSTRUCTION AND

SECONDARY MEMBERS: 0 HRS

ROOF CONSTRUCTION AND

SECONDARY MEMBERS: 0 HRS

NFPA 101 OCCUPANCY & ASSOCIATED CHAPTER

• BOILER BUILDING, MAIN LEVEL : INDUSTRIAL OCCUPANCY (NFPA 101 : 2018,

CHAPTER 40)

• BOILER BUILDING, CATWALK LEVEL : INDUSTRIAL OCCUPANCY (NFPA 101 :

2018, CHAPTER 40)

• OFFICE / CONTROL AREAS ASSUMED TO BE NON-SEPARATED, ANCILLARY

FACILITIES PER PROVISIONS OF (A.6.1.14.1.3)

• STORAGE UTILITY AREAS ASSUMED TO BE NON-SEPERATED, ANCILLARY

FACILITIES PER PROVISIONS OF (A.6.1.14.1.3)

40.2.5.3.1 INDUSTRIAL EQUIPMENT ACCESS DIMENSIONAL CRITERIA:

MINIMUM HORIZONTAL DIMENSION OF ANY WALKWAY: 22” CLEAR

MINIMUM STAIR OR RAMP WIDTH: 22” @ RAILS

MINIMUM TREAD WIDTH: 22” CLEAR

MINIMUM TREAD DEPTH: 10”

MAXIMUM RISER HEIGHT: 9”

MAX HT. BETWEEN LANDINGS: 12’-0”

MINIMUM HEADROOM: 6’-8”

MINIMUM WIDTH OF DOOR OPENINGS: 22”

LIFE SAFETY LEGEND

GENERAL SHEET NOTES

1. THE MINIMUM WIDTH OF EACH DOOR OPENING TO BE

SUFFICIENT FOR THE OCCUPANT LOAD THEREOF AND

PROVIDE A CLEAR WIDTH OF NOT LESS THAN 32 INCHES. THE

HEIGHT OF DOORS SHALL NOT BE LESS THAN 80 INCHES.

2. EGRESS DOORS TO BE READILY OPERABLE FROM THE

EGRESS SIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL

KNOWLEDGE OR EFFORT. ALL EGRESS DOORS TO HAVE

PANIC HARDWARE. PANIC HARDWARE TO NOT REQUIRE

TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST.

FORCE REQUIRED TO ACTIVATE OPERABLE PARTS TO BE 5

POUNDS MAXIMUM.

3. THE MEANS OF EGRESS, AND EXIT DISCHARGE, SHALL BE

ILLUMINATED AT ANY TIME THE BUILDING IS OCCUPIED WITH

A LIGHT INTENSITY OF NOT LESS THAN 1 FOOT-CANDLE AT

THE WALKING SURFACE LEVEL.

4. THE EGRESS PATH TO REMAIN FREE AND CLEAR OF ALL

OBSTRUCTIONS AT ALL TIMES. NO STORAGE IS PERMITTED

IN ANY EGRESS PATHS.

5. PER DIRECTION OF THE PROJECT CONTRACTING OFFICER ,

AND PER GUIDANCE OF ABAAS SCOPING REQUIREMNTS

(F203.6 MACHINERY SPACES) PORTIONS OF THE PLAN

INCLUDING DEDICATED MECHANICAL SPACES AND LOCKER

AND BREAK ROOM FACILITIES ACCESSED ONLY BY PLANT

OPERATIONS PERSONNEL ARE NOT REQUIRED TO BE

REACHABLE BY CONTINUOUS ACCESSIBLE PATHS.

6. CONTRACTOR TO SUBMIT TEMPORARY LIFE SAFETY PLANS

IN THE EVENT REQUIRED EXITS ARE BLOCKED DURING

CONSTRUCTION.

PROJECT CODE SUMMARY

OCCUPANT LOAD (40.1.7):

• "MAXIMUM PROBABLE NUMBER OF OCCUPANTS PRESENT

AT ANY TIME" PER TABLE 7.3.1.2 - NO PRESCRIPTIVE

OCCUPANCY CALCULATION BASED ON AREA:

• ASSUMED UTILITY OCCUPANCY PER DIRECTION FROM END

USER IS NO GREATER THAN 10 OCCUPANTS.

TRAVEL DISTANCE (40.2.6.1) AND

COMMON PATH OF TRAVEL (40.2.5.1):

INDUSTRIAL (EXISTING):

MAX TRAVEL DISTANCE:

FULLY SPRINKLERED 400' - 0"

MAX COMMON PATH OF TRAVEL:

FULLY SPRINKLERED = 100' - 0"

1" = 10'-0"C1 LEVEL 1 OCCUPANCY / EGRESS PLAN

1" = 10'-0"F1 LEVEL 2 OCCUPANCY / EGRESS PLAN

OCCUPANCY LEGEND

OCCUPANCY SCHEDULE

NAME AREA

LOAD

FACTOR

OCCUPANCY

PRESCRIPTIVE CALCULATED

B - BUSINESS 1197 SF 150 SF 0 8

S - STORAGE 1969 SF 0 3

U - UTILITY 7393 SF 10 0

UNOCCUPIED 856 SF 0 SF 0 0

: 11 11415 SF 10 11

TRAVEL DISTANCES

Path ID Travel Distance

PATH A 55' - 5"

PATH B 77' - 5"

PATH C 103' - 11"

PATH D 107' - 11"

PATH E 35' - 6"

** PERFORMANCE OF MATERIALS IN AN EXISTING WALL CONSTRUCTION

IN DETERMINING THE PERFORMANCE OF EXISTING CONSTRUCTION AS IT RELATES

TO FIRE RATINGS, THE INDIANA LIMESTONE (ILI) HANDBOOK, 22ND EDITION,

INDICATES THE PERFORMANCE OF A 4" THICK STONE TO HAVE A 1 HOUR-12 MINUTE

FIRE PERFORMANCE WHICH WOULD EXEED THE REQUIRED 1 HOUR RATING FOR A

STAIR ENCLOSURE. GIVEN THE EXISTING WALLS THAT ARE PROPOSED TO BE USED

AS PART OF THE 1 HOUR RATED STAIR ENCLOSURE HAVE A THICKNESS OF

APPROXIMATELY 20", IT IS PRESUMED THE EXISTING CONSTRUCTION WOULD MEET,

AT MINIMUM, THE REQUIRED 1 HOUR RATING. CONDITIONS TO BE VERIFIED IN

FIELD.

375 SF

CIRCULATION

105 SF

SECURITY

52 SF

ELECTRICAL

59 SF

HAC

127 SF

STAIR

282 SF

OFFICE

AE111

F4

UP

UP

28 SF

TOILET

174 SF

CONTROL ROOM

+/- 2' - 8 1/8" +/- 23' - 8 1/8" 14' - 0" 5' - 4" 14' - 0" 4' - 4" 14' - 0" 22' - 8" 12' - 0" +/- 5' - 4 7/8"

100d 100c 100b 100a

D1

AE350

D1

AE350

F1

AE350

F1

AE350

AE201

B1

D6

AE350

D6

AE350

D

AE201 D1

AE201D5

107 SF

UTILITY

65 SF

VESTIBULE

4' - 0" 6' - 8" 3' - 4" 5' - 0"

+/- 115' - 5"

6445 SF

BOILER PLANT

FLOOR

72 SF

RESTROOM

39 SF

ACCESSIBLE TOILET

40 SF

LOCKERS

24 SF

SHOWER

AE701

B8

F8

AE450

0.1 0.2 0.3 0.4 0.5 0.8 1 3 4 5 6 7 8 9

B

A.7

A.6

A.5

A.4

A

101 101107101

101 104 104 104 104

101 101

112 112 112

125 125

135 135 135

C

107 107

AE211 1

140 140 140

44 SF

CONTROLS

/2

105105

105105

105105

UP

UP

102A

C

E49

DD

E

B U

IL

D

IN

G

N O

T

IN

S C

O P

E

A

B

B

B

100C

112112

529 SF

STORAGE

100A

135135

133133

AE111

F1

1063 3/4"

0"

/8

/8

7' - 6 1/8" 7' - 1 5/8" 13' - 9 1/8" 6' - 0 7/8"

375 SF

CIRCULATION

127 SF

STAIR

282 SF

OFFICE

105 SF

SECURITY

52 SF

ELECTRICAL

59 SF

HAC

A

A A

A

A

A

/4

B

174 SF

CONTROL ROOM

14' - 8"

2' - 4" 12' - 4"

3' - 8" 7' - 4" 1' - 4"

A

D1

AE350

D1

AE350

A

101B

A

S1

S2

F1

AE350

F1

AE350

A

65 SF

VESTIBULE

107 SF

UTILITY

AE500

B6

TO PIPE

TUNNEL

UP

C

AE211 B5

B3

B1

B7

AE211 F1

F8

F6

F3

0.2 0.3 0.4 0.5 0.8 1

A.7

A.6

A.5

A.4

A

108108

102A

B

A

AE701

B5

CT-1

CT-2

F-1

F-1

F-1 F-2

F-3

F-3

135 135

44 SF

CONTROLS

M

IN

7' - 6"

2' - 8"

A

A

25' - 7 5/8" 21' - 9 1/2"

A

A

/8

/8

5' - 4"

11' - 11 1/2"

/4

5' - 11 1/2" 6' - 7 1/2"

39 SF

ACCESSIBLE TOILET

24 SF

SHOWER

40 SF

LOCKERS

28 SF

TOILET

72 SF

RESTROOM

ø 5' - 0 " C

LEAR

12' - 7"

AE212 B9

118119120

119 118120

B7

B5

B3

AE212 D7

D8

D9

ONE HOUR FIRE BARRIER

CONSTRUCTION

TWO HOUR FIRE BARRIER

CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

589A6-16-204

BLDG

39A

BOILER

RM EAST

BOILER

RM WEST

STORAGEELECTRICAL

SHOP

OFFICE AREA

STACK

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:3

P

M

AE111

FIRST LEVEL NEW WORK PLANS REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM JTK0509-0006

BID DOCUMENTS

1/8" = 1'-0"C1 LEVEL 1 NEW WORK PLAN

KEYED NOTES

101 PROVIDE BLAST-RESISTANT WINDOW.

104 PROVIDE COILING OVERHEAD DOOR WITH BLAST RESISTANT PROTECTIVE

SCREEN BACKUP.

105 PROVIDE CONC SLAB. RE: STRUCTURAL.

106 PROVIDE CONC RAMP AND LANDING.

107 PROVIDE INFILL TO MATCH EXISTING ADJACENT CONSTRUCTION.

108 PROVIDE SOLID-SURFACE COUNTERTOP AND BACKSPLASH.

110 PROVIDE CLOSED-RISER CONCRETE PAN STAIR. PROVIDE METAL TUBE

HANDRAILS.

112 MECHANICAL EQUIPMENT (SHOWN FOR REFERENCE). RE: MECHANICAL.

113 PROVIDE WALL HUNG WATER CLOSET. RE: PLUMBING.

114 PROVIDE WALL HUNG LAVATORY. RE: PLUMBING.

115 PROVIDE SURFACE MOUNTED SOAP DISPENSER.

116 PROVIDE SURFACE MOUNTED MIRROR. MOUNT WITH BOTTOM OF REFLECTIVE

SURFACE NO GREATER THAN 40" AFF.

118 PROVIDE SURFACE MOUNTED GRAB BARS.

119 PROVIDE SURFACE MOUNTED TOILET PAPER DISPENSER.

120 PROVIDE SURFACE MOUNTED SANITARY DISPOSAL.

121 PROVIDE ACCESSIBLE SHOWER HEAD AND CONTROLS. RE: PLUMBING.

123 PROVIDE METAL GRATE STAIR.

124 PROVIDE METAL GRATE STAIRS, LANDINGS, AND CATWALKS. RE: STRUCTURAL.

125 PROVIDE EXTERIOR INFILL WALL; BRICK WITH CMU BACKUP WALL.

126 PROVIDE DROP IN SINK. RE: PLUMBING.

132 PROVIDE EMERGENCY EYEWASH/SHOWER. RE: PLUMBING.

133 PROVIDE SLAB TRENCH. RE: STRUCTURAL AND MECHANICAL.

135 STRUCTURAL STEEL FRAMING. RE: STRUCTURAL.

136 PROVIDE WALL HUNG URINAL. RE: PLUMBING.

140 PROVIDE BLAST-RESISTANT LOUVER. RE: MECHANICAL.

142 PROVIDE CASEWORK BASE CABINETS.

143 PROVIDE METAL GUARD AROUND FLOOR OPENING.

146 PROVIDE SUMP PIT. RE: STRUCTURAL & MECHANICAL.

147 PROVIDE MOP SINK. RE: PLUMBING.

NEW WORK GENERAL NOTES

1. WHERE INDICATED TO MATCH EXISTING FINISH, NEW FINISH TO MATCH IN

MANUFACTURER, PRODUCT, COLOR, STYLE, SIZE AND ALL OTHER ATTRIBUTES.

2. ALL DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRIDLINE. DO NOT SCALE

DRAWINGS.

3. PROTECT EXISTING SURFACES AND MATERIALS INDICATED TO REMAIN FROM

DAMAGE OR DETERIORATION DUE TO PERFORMANCE OF WORK. PATCH AND

REPAIR EXISTING MATERIALS AND SURFACES DAMAGED OR AFFECTED BY

PERFORMANCE OF THE WORK.

4. WORK INCLUDES PREPARATION OF EXISTING SURFACES TO RECEIVE NEW WORK

WHERE INDICATED. EXAMINE EXISTING SUBSTRATES TO RECEIVE NEW MATERIAL

OR FINISH. PREPARE SUBSTRATE AS REQUIRED TO MEET MANUFACTURER'S

INSTRUCTIONS OR RECOMMENDATIONS FOR PROPER APPLICATION OF NEW

MATERIALS.

5. COORDINATE FIRE EXTINGUISHER, FIRE ALARM STROBES AND PULL STATION

LOCATIONS WITH COR. MOUNT IN ACCORDANCE WITH FEDERAL ABAAS

STANDARDS.

6. VERIFY DIMENSIONS AND LOCATIONS OF OPENINGS, BASES AND SUPPORTS FOR

EQUIPMENTS, DUCTS, PIPING, CONDUITS, ETC. WHERE REQUIRED FOR NEW

WORK. DO NOT USE IMPACT TOOLS. REVIEW OPENING LOCATIONS WITH COR

PRIOR TO STARTING WORK. KEEP OPENINGS TO MINIMUM REQUIRED TO ALLOW

FOR NEW WORK. PROVIDE FIRE STOPPING AS REQUIRED.

7. OBTAIN BURN PERMIT FROM COR PRIOR TO PERFORMING ANY WORK REQUIRING

OPEN FLAME.

8. PROVIDE FIRE RETARDANT TREATED WOOD FOR BLOCKING AND ROUGH BUCKS.

COORDINATE LOCATIONS WITH EQUIPMENT INSTALLER. INSTALL PRIOR TO

CLOSING WALLS.

9. WHERE FLOOR FINISHES CHANGE, PLACE TRANSITION UNDER CENTER OF DOOR

OR FINISHED OPENING.

10. EXPOSED CMU TO BE FILLED AND PAINTED, SEE SPECS.

N

1/4" = 1'-0"F4 ENLARGED LEVEL 1 NEW WORK PLAN

1/2" = 1'-0"F1 ENLARGED RESTROOM PLAN

NN

PLAN LEGEND

AE112

F2

0.1 0.2 0.3 0.4 0.5 0.8 1 3 4 5 6 7 8 9

B

A.7

A.6

A.5

A.4

A

TYP.

138 138

138138138

D1

AE350

D1

AE350

8' - 6"ACT

F1

AE350

F1

AE350

8' - 0"ACT

OPEN TO ABOVE

8' - 0"ACT

8' - 0"GWB

8' - 0"ACT

OPEN TO DECK

OPEN TO DECK OPEN TO DECK

174 SF

CONTROL

ROOM

282 SF

OFFICE

375 SF

CIRCULATION

105 SF

SECURITY

52 SF

ELECTRICAL

59 SF

HAC

40 SF

LOCKERS

24 SF

SHOWER

28 SF

TOILET

72 SF

RESTROOM

107 SF

UTILITY

65 SF

VESTIBULE

8' - 0"ACT8' - 0"ACT

8' - 0"ACT

0.1 0.2 0.3 0.4 0.5 0.8 1

A.7

A.6

A.5

A.4

A

TYP.

TYP.

TYP.

138 TYP.

TYP.

TYP.

TYP.

127 SF

STAIR

7' - 8"ACT

8' - 0"ACT

OPEN TO DECK

39 SF

ACCESSIBLE

TOILET

ONE HOUR FIRE BARRIER

CONSTRUCTION

TWO HOUR FIRE BARRIER

CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

589A6-16-204

BLDG

39A

BOILER

RM EAST

BOILER

RM WEST

STORAGEELECTRICAL

SHOP

OFFICE AREA

STACK

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:4

P

M

AE112

FIRST LEVEL NEW WORK REFLECTED

CEILING PLAN

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM JTK0509-0006

BID DOCUMENTS

1/8" = 1'-0"E1 LEVEL 1 NEW WORK RCP

1. REFER TO ELECTRICAL DRAWINGS FOR LIGHT FIXTURE TYPES AND HEIGHT

PLACEMENT.

2. COORDINATE ABOVE CEILING WORK TO ENSURE ADEQUATE SPACE FOR

INSTALLATION OF EACH TRADE ITEM AND TO ALLOW FOR SERVICE ACCESS

FOLLOWING INSTALLATION.

3. CLEAN, REPLACE LENSES TO MATCH NEW AND RELAMP FIXTURES INDICATED TO

BE RELOCATED.

4. COORDINATE LOCATION OF SPRINKLER HEADS WITH LIGHTING, AIR DEVICES AND

OTHER CEILING MOUNTED ITEMS.

5. CENTER CEILINGS AND FIXTURES IN SPACE U.N.O.

6. PAINT EXPOSED EDGES OF FIELD CUT CEILING TILES TO MATCH THE FACTORY

FINISH.

7. PROVIDE ACCESS PANELS AS REQUIRED BY BUILDING CODE OR AS NEEDED FOR

ACCESS TO VALVES, VANES AND OTHER SERVICE AND ADJUSTMENT POINTS IN

ABOVE CEILING SYSTEMS.

8. FURNITURE FURBISHED BY THE VA.

GENERAL CEILING NOTES

N

KEYED NOTES

137 PROVIDE 2X2 LAY-IN TROFFER. RE: ELECTRICAL.

138 PROVIDE 1X4 SUSPENDED LED DOWNLIGHT. RE: ELECTRICAL

139 PROVIDE EXIT SIGNAGE WITH EMERGENCY LIGHTING. RE: ELECTRICAL.

1/4" = 1'-0"F2 ENLARGED LEVEL 1 NEW WORK RCP

PLAN LEGEND

510 SF

TRANSFORMER

ROOM

202 453 SF

GENERATOR ROOM

+/- 33' - 4 3/4"

18' - 0" 15' - 4 3/4"

/4

"A

DN

DN

IC

E

577 SF

BREAK ROOM

284 SF

TRAINING ROOM

303 SF

CONFERENCE

ROOM

1378 SF

ELECTRIC SHOP

139 SF

TOILETS

207131 SF

ELECTRICAL ROOM

305 SF

OFFICE

181 SF

STORAGE

183 SF

STORAGE

178 SF

OFFICE

180 SF

OFFICE

200 SF

CORRIDOR

D1

AE350

D1

AE350

F1

AE350

F1

AE350

AE201

B1

D6

AE350

D6

AE350AE121

F1

DN

AE201 D1

AE201D5

DN

B6

AE350

F1

AE450

407 SF

LINK

NOT IN SCOPE

N O

T

IN

S C

O P

E

NOT IN SCOPE

F8

AE450

0.1 0.2 0.3 0.4 0.5 0.8 1 3 4 5 6 7 8 9

C

B

A.7

A.6

A.5

A.4

A

124124

124124

124124

202B

202A

203B

201A

A

101 101 101

101 101

(ABOVE)

107 107 107

127 SF

STAIR

DN DN DN

DN

DN

DN

+/- 20' - 7 1/2"

3' - 6"

/8

AE701

F3

AE500

E4

AE500

E3

UP

AE500

F6

F5

F1

" 4' - 1" V.I.F.

V

.I .F

F6 AE201

107(ABOVE)

(ABOVE)

140140

ONE HOUR FIRE BARRIER

CONSTRUCTION

TWO HOUR FIRE BARRIER

CONSTRUCTION

D1

AE350

D1

AE350

F1

AE350

F1

AE350

AE211 D6

D3

29' - 11 3/4" 16' - 3 1/8"

+/- 46' - 2 7/8"

/4

577 SF

BREAK

ROOM

284 SF

TRAINING

ROOM

127 SF

STAIR

D

C A

A

A

DN

NOT IN SCOPE

N O

T

IN

S C

O P

E

NOT IN SCOPE

0.1 0.2 0.3 0.4 0.5 0.8 1

A.7

A.6

A.5

A.4

A

101 101 101

101 101

5' - 5 5/8"

204A

16 SF

HAC

204A

C

5' - 2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

589A6-16-204

BLDG

39A

BOILER

RM EAST

BOILER

RM WEST

STORAGEELECTRICAL

SHOP

OFFICE AREA

STACK

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:4

P

M

AE121

SECOND LEVEL NEW WORK PLANS REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM JTK0509-0006

BID DOCUMENTS

1/8" = 1'-0"E1 LEVEL 2 NEW WORK PLAN

KEYED NOTES

101 PROVIDE BLAST-RESISTANT WINDOW.

107 PROVIDE INFILL TO MATCH EXISTING ADJACENT CONSTRUCTION.

108 PROVIDE SOLID-SURFACE COUNTERTOP AND BACKSPLASH.

112 MECHANICAL EQUIPMENT (SHOWN FOR REFERENCE). RE: MECHANICAL.

122 PROVIDE METAL GRATE PLATFORM WITH METAL PIPE RAILS.

123 PROVIDE METAL GRATE STAIR.

124 PROVIDE METAL GRATE STAIRS, LANDINGS, AND CATWALKS. RE: STRUCTURAL.

126 PROVIDE DROP IN SINK. RE: PLUMBING.

127 PROVIDE UNDER-COUNTER ICE MAKER. RE: PLUMBING.

128 PROVIDE INFILL AT RECESSED SLAB TO PROVIDE UNIFORM FLOOR LEVEL.

140 PROVIDE BLAST-RESISTANT LOUVER. RE: MECHANICAL.

142 PROVIDE CASEWORK BASE CABINETS.

145 PROVIDE WALL HUNG BOTTLE FILLER. RE: PLUMBING.

147 PROVIDE MOP SINK. RE: PLUMBING.

148 PROVIDE REFRIGERATOR.

NEW WORK GENERAL NOTES

N

1. WHERE INDICATED TO MATCH EXISTING FINISH, NEW FINISH TO MATCH IN

MANUFACTURER, PRODUCT, COLOR, STYLE, SIZE AND ALL OTHER ATTRIBUTES.

2. ALL DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRIDLINE. DO NOT SCALE

DRAWINGS.

3. PROTECT EXISTING SURFACES AND MATERIALS INDICATED TO REMAIN FROM

DAMAGE OR DETERIORATION DUE TO PERFORMANCE OF WORK. PATCH AND

REPAIR EXISTING MATERIALS AND SURFACES DAMAGED OR AFFECTED BY

PERFORMANCE OF THE WORK.

4. WORK INCLUDES PREPARATION OF EXISTING SURFACES TO RECEIVE NEW WORK

WHERE INDICATED. EXAMINE EXISTING SUBSTRATES TO RECEIVE NEW MATERIAL

OR FINISH. PREPARE SUBSTRATE AS REQUIRED TO MEET MANUFACTURER'S

INSTRUCTIONS OR RECOMMENDATIONS FOR PROPER APPLICATION OF NEW

MATERIALS.

5. COORDINATE FIRE EXTINGUISHER, FIRE ALARM STROBES AND PULL STATION

LOCATIONS WITH COR. MOUNT IN ACCORDANCE WITH FEDERAL ABAAS

STANDARDS.

6. VERIFY DIMENSIONS AND LOCATIONS OF OPENINGS, BASES AND SUPPORTS FOR

EQUIPMENTS, DUCTS, PIPING, CONDUITS, ETC. WHERE REQUIRED FOR NEW

WORK. DO NOT USE IMPACT TOOLS. REVIEW OPENING LOCATIONS WITH COR

PRIOR TO STARTING WORK. KEEP OPENINGS TO MINIMUM REQUIRED TO ALLOW

FOR NEW WORK. PROVIDE FIRE STOPPING AS REQUIRED.

7. OBTAIN BURN PERMIT FROM COR PRIOR TO PERFORMING ANY WORK REQUIRING

OPEN FLAME.

8. PROVIDE FIRE RETARDANT TREATED WOOD FOR BLOCKING AND ROUGH BUCKS.

COORDINATE LOCATIONS WITH EQUIPMENT INSTALLER. INSTALL PRIOR TO

CLOSING WALLS.

9. WHERE FLOOR FINISHES CHANGE, PLACE TRANSITION UNDER CENTER OF DOOR

OR FINISHED OPENING.

10. EXPOSED CMU TO BE FILLED AND PAINTED, SEE SPECS.

PLAN LEGEND

1/4" = 1'-0"F1 ENLARGED LEVEL 2 OFFICE NEW WORK PLAN

D1

AE350

D1

AE350

F1

AE350

F1

AE350

AE201

B1

D6

AE350

D6

AE350

AE201

E1

B6

AE350

F1

AE450OPEN TO DECK

OPEN TO DECK

9' - 0"ACT

7' - 8"ACT

F8

AE450

0.1 0.2 0.3 0.4 0.5 0.8 1 3 4 5 6 7 8 9

C

B

A.7

A.6

A.5

A.4

A

OPEN TO DECK

OPEN TO DECK

407 SF

LINK

510 SF

TRANSFORMER

ROOM

453 SF

GENERATOR ROOM

577 SF

BREAK ROOM

284 SF

TRAINING ROOM

127 SF

STAIR

F5

F1F1

F6 AE201F6 AE201

F5

131 SF

ELECTRICAL ROOM

8' - 0"ACT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

589A6-16-204

BLDG

39A

BOILER

RM EAST

BOILER

RM WEST

STORAGEELECTRICAL

SHOP

OFFICE AREA

STACK

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:0

P

M

AE122

SECOND FLOOR NEW WORK REFLECTED

CEILING PLAN

REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM JTK0509-0006

BID DOCUMENTS

1/8" = 1'-0"D1 LEVEL 2 NEW WORK RCP

KEYED NOTES

137 PROVIDE 2X2 LAY-IN TROFFER. RE: ELECTRICAL.

138 PROVIDE 1X4 SUSPENDED LED DOWNLIGHT. RE: ELECTRICAL

139 PROVIDE EXIT SIGNAGE WITH EMERGENCY LIGHTING. RE: ELECTRICAL.

NEW WORK GENERAL NOTES

1. WHERE INDICATED TO MATCH EXISTING FINISH, NEW FINISH TO MATCH IN

MANUFACTURER, PRODUCT, COLOR, STYLE, SIZE AND ALL OTHER ATTRIBUTES.

2. ALL DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRIDLINE. DO NOT SCALE

DRAWINGS.

3. PROTECT EXISTING SURFACES AND MATERIALS INDICATED TO REMAIN FROM

DAMAGE OR DETERIORATION DUE TO PERFORMANCE OF WORK. PATCH AND

REPAIR EXISTING MATERIALS AND SURFACES DAMAGED OR AFFECTED BY

PERFORMANCE OF THE WORK.

4. WORK INCLUDES PREPARATION OF EXISTING SURFACES TO RECEIVE NEW WORK

WHERE INDICATED.

5. ALL ANGLES ARE 90 DEGREES UNLESS NOTED OTHERWISE.

6. COORDINATE FIRE EXTINGUISHER, FIRE ALARM STROBES AND PULL STATION

LOCATIONS WITH COR. MOUNT IN ACCORDANCE WITH FEDERAL ABAAS

STANDARDS.

7. VERIFY DIMENSIONS AND LOCATIONS OF OPENINGS, BASES AND SUPPORTS FOR

EQUIPMENTS, DUCTS, PIPING, CONDUITS, ETC. WHERE REQUIRED FOR NEW

WORK, NEATLY CUT OPENINGS IN EXISTING CONSTRUCTION USING POWER SAWS

OR CORE DRILLS. DO NOT USE IMPACT TOOLS. REVIEW OPENING LOCATIONS

WITH COR PRIOR TO STARTING WORK. KEEP OPENINGS TO MINIMUM REQUIRED

TO ALLOW FOR NEW WORK. PROVIDE FIRE STOPPING AS REQUIRED.

8. OBTAIN BURN PERMIT FROM COR PRIOR TO PERFORMING ANY WORK REQUIRING

OPEN FLAME.

9. PROVIDE FIRE RETARDANT TREATED WOOD FOR BLOCKING AND ROUGH BUCKS.

COORDINATE LOCATIONS WITH EQUIPMENT INSTALLER. INSTALL PRIOR TO

CLOSING WALLS.

10. EXAMINE EXISTING SUBSTRATES TO RECEIVE NEW MATERIAL OR FINISH.

PREPARE SUBSTRATE AS REQUIRED TO MEET MANUFACTURER'S INSTRUCTIONS

OR RECOMMENDATIONS FOR PROPER APPLICATION OF NEW MATERIALS.

11. WHERE FLOOR FINISHES CHANGE, PLACE TRANSITION UNDER CENTER OF DOOR

OR FINISHED OPENING.

12. EXPOSED CMU TO BE FILLED AND PAINTED, SEE SPECS.

13. TEMPORARY UTILITIES TO BE DEMOLISHED PRIOR TO NEW RAMP CONSTRUCTION.

D1

AE350

D1

AE350

F1

AE350

F1

AE350

AE201

B1

D6

AE350

D6

AE350

AE201 D1

AE201D5

AE201

E1

B6

AE350

F1

AE450

S

LO

P E

/2

: 1

2"

F8

AE450

0.1 0.2 0.3 0.4 0.5 0.8 1 3 4 5 6 7 8 9

C

B

A.7

A.6

A.5

A.4

A

129129 AD201

F5

F1F1

141 141

141 141 141 141

F6 AE201F6 AE201

F5

F5

AE701

144 144

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

KEYPLAN

589A6-16-204

BLDG

39A

BOILER

RM EAST

BOILER

RM WEST

STORAGEELECTRICAL

SHOP

OFFICE AREA

STACK

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:0

P

M

AE131

ROOF NEW WORK PLAN REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM JTK0509-0006

BID DOCUMENTS

1/8" = 1'-0"E1 ROOF NEW WORK PLAN

KEYED NOTES

129 PROVIDE LOW-SLOPE ROOF; SINGLE-PLY MEMBRANE ON RIGID INSULATION OVER

METAL DECK.

130 PROVIDE ASPHALT SHINGLE TO LOW-SLOPE ROOF MEMBRANE TRANSITION.

131 PROVIDE GUTTER AND DOWNSPOUTS. OUTFLOW TO SPLASH BLOCK.

141 PROVIDE EXHAUST. RE: MECHANICAL.

144 PROVIDE INFILL ROOFING TO MATCH EXISTING ADJACENT CONSTRUCTION.

NEW WORK GENERAL NOTES

1. WHERE INDICATED TO MATCH EXISTING FINISH, NEW FINISH TO MATCH IN

MANUFACTURER, PRODUCT, COLOR, STYLE, SIZE AND ALL OTHER ATTRIBUTES.

2. ALL DIMENSIONS ARE TO FINISHED FACE OF WALL OR GRIDLINE. DO NOT SCALE

DRAWINGS.

3. PROTECT EXISTING SURFACES AND MATERIALS INDICATED TO REMAIN FROM

DAMAGE OR DETERIORATION DUE TO PERFORMANCE OF WORK. PATCH AND

REPAIR EXISTING MATERIALS AND SURFACES DAMAGED OR AFFECTED BY

PERFORMANCE OF THE WORK.

4. WORK INCLUDES PREPARATION OF EXISTING SURFACES TO RECEIVE NEW WORK

WHERE INDICATED.

5. ALL ANGLES ARE 90 DEGREES UNLESS NOTED OTHERWISE.

6. COORDINATE FIRE EXTINGUISHER, FIRE ALARM STROBES AND PULL STATION

LOCATIONS WITH COR. MOUNT IN ACCORDANCE WITH FEDERAL ABAAS

STANDARDS.

7. VERIFY DIMENSIONS AND LOCATIONS OF OPENINGS, BASES AND SUPPORTS FOR

EQUIPMENTS, DUCTS, PIPING, CONDUITS, ETC. WHERE REQUIRED FOR NEW

WORK, NEATLY CUT OPENINGS IN EXISTING CONSTRUCTION USING POWER SAWS

OR CORE DRILLS. DO NOT USE IMPACT TOOLS. REVIEW OPENING LOCATIONS

WITH COR PRIOR TO STARTING WORK. KEEP OPENINGS TO MINIMUM REQUIRED

TO ALLOW FOR NEW WORK. PROVIDE FIRE STOPPING AS REQUIRED.

8. OBTAIN BURN PERMIT FROM COR PRIOR TO PERFORMING ANY WORK REQUIRING

OPEN FLAME.

9. PROVIDE FIRE RETARDANT TREATED WOOD FOR BLOCKING AND ROUGH BUCKS.

COORDINATE LOCATIONS WITH EQUIPMENT INSTALLER. INSTALL PRIOR TO

CLOSING WALLS.

10. EXAMINE EXISTING SUBSTRATES TO RECEIVE NEW MATERIAL OR FINISH.

PREPARE SUBSTRATE AS REQUIRED TO MEET MANUFACTURER'S INSTRUCTIONS

OR RECOMMENDATIONS FOR PROPER APPLICATION OF NEW MATERIALS.

11. WHERE FLOOR FINISHES CHANGE, PLACE TRANSITION UNDER CENTER OF DOOR

OR FINISHED OPENING.

12. EXPOSED CMU TO BE FILLED AND PAINTED, SEE SPECS.

13. TEMPORARY UTILITIES TO BE DEMOLISHED PRIOR TO NEW RAMP CONSTRUCTION.

OFFICE LEVEL 2

11' - 1 5/8"

T.O. CLERESTORY

42' - 8"

BOILERS LEVEL 1

0' - 0"

101 101 101

101 101

101 101

125125 125125

104 104 104 104

E E E

E E

48 48

C

104 100D 100d 100c 100b 100a

140 140 140

140140

14' - 0"16' - 0"16' - 0"16' - 0"

4' - 0"

OFFICE LEVEL 2

11' - 1 5/8"

T.O. CLERESTORY

42' - 8"

B6

AE350

BOILERS LEVEL 2

15' - 1 1/2"

129 130

OFFICE LEVEL 2

11' - 1 5/8"

T.O. CLERESTORY

42' - 8"

BOILERS LEVEL 1

0' - 0"

BOILERS LEVEL 2

15' - 1 1/2"

B.O. TRUSS

22' - 10 1/2"

101 101

D

C C

OUTLINE OF

ADJACENT BUILDING

OFFICE LEVEL 1

0' - 3 3/4"

OFFICE LEVEL 2

11' - 1 5/8"

T.O. CLERESTORY

42' - 8"

BOILERS LEVEL 2

15' - 1 1/2"

B.O. TRUSS

22' - 10 1/2"

D

XFMR FLOOR

13' - 5 3/8"

+/- 4' - 8"

XFMR FLOOR

13' - 5 3/8"

BOILERS LEVEL 2

15' - 1 1/2"

B.O. TRUSS

22' - 10 1/2"

107 107 107

4' - 0 3/4" 4' - 4 1/8" 3' - 4 3/4"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

OCULUS, INC.

ARCHITECTURAL CONSULTANT

/1

/2

:0

:1

P

M

AE201

EXTERIOR ELEVATIONS REPLACE BOILERS

IN BUILDING 39

DWIGHT D. EISENHOWER VA MEDICAL

CENTER - LEAVENWORTH, KS

2022-01-20 AM JTK0509-0006

BID DOCUMENTS

1/8" = 1'-0"B1 SOUTH ELEVATION

1/8" = 1'-0"E1 NORTH ELEVATION

1/8" = 1'-0"D5 EAST…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .