This document contains a cost proposal breakdown for the Massachusetts National Cemetery Phase 4 Expansion project. The proposal includes line item costs for a base bid and seven add alternates. The base bid (CLIN 001) covers site work such as demolition, utilities installation, and landscaping. The cost of concrete crypts is provided separately (CLIN 002). Add alternates include replacing concrete caps with bluestone (CLIN 003), adding a material storage bin (CLIN 004), upgrading a roadway (CLIN 005), adding maintenance building restrooms (CLIN 006), replacing a metal roof (CLIN 007), upgrading irrigation controllers (CLIN 008), and installing solar-powered irrigation controllers (CLIN 009). The total proposed cost is listed at the bottom.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offeror: Solicitation No.:
Cost Proposal Breakdown
CLIN/
Division Description Cost Totals
CLIN 001 – Base Bid
01A Insurance & Bonding
01B Overhead & Profit
01C Taxes & Permits
01D Demolition
01E Clearing and Grubbing
02A Temporary Facilities Including Trailers & Other Resident Engineer Provisions
02B Restoration of Temporary Facilities
03 Concrete
04 Masonry and Stone
05 Metals
06 Wood, Plastics, And Composites
07 Thermal & Moisture Protection
08 Openings – including doors and windows
09 Finishes
10 Specialties
11 Equipment
22 Plumbing
23 HVAC
26 Electrical
27 Communications
28 Electronic Safety and Security
31 Earthwork & Site Development
31 Crypt Installation
32 Irrigation
32 Landscaping
32 Roadways & Paving
Exterior Improvements Including Signage and Site Furnishings
33 Utilities
Sub-Total – CLIN 001
Division
CLIN 002 – Cost of Crypts (not including placement)
03 Concrete Crypts
Subtotal – CLIN 002
Division
Description Cost Totals
CLIN 003 – Add Alternate #1 – Replacement of Concrete Caps with Bluestone Caps
01 General Requirements
02 Demolition
04 Masonry
05 Metals
06 Wood, Plastics, and Composites
07 Thermal & Moisture Protection
09 Finishes
10 Specialties
Subtotal – CLIN 003 ______________________
CLIN/
Division Description Cost Totals
CLIN 004 – Add Alt #2 – Material Storage Bin (3- Bin)
01 General Requirements
02 Demolition
03 Concrete
04 Masonry
05 Metals
06 Wood, Plastics, and Composites
07 Thermal & Moisture Protection
09 Finishes
10 Specialties
31 Earthwork
Subtotal – CLIN 004
Division
CLIN 005 – Add Alternate #3 – Roadway 1
01 General Requirements
02 Demolition
32 Roadways and Paving
Sub-Total – CLIN 005
Division
CLIN 006 – Add Alternate #4 – Maintenance Building - Restrooms
03 Concrete
05 Metals
06 Wood, Plastic and Composites
07 Thermal and Moisture Protection
08 Openings
09 Finishes
10 Specialties
22 Plumbing
23 HVAC
26 Electrical
Communications Sub-Total – CLIN 006
Division
CLIN 007 – Add Alternate #5 – Metal Roof Replacement
05 Metal
07 Thermal and Moisture Protection
10 Specialties
Sub-Total – CLIN 006
Division
CLIN 008 – Add Alternate #6 – Upgrade Irrigation Controllers
32 Irrigation
Sub-Total – CLIN 008
Division
CLIN 009 – Add Alternate #7 Hardwire Solar Irrigation Controllers
01 General Conditions
26 Irrigation
32 Electrical
Sub-Total – CLIN 009
GRAND TOTAL CLINs 1-9