Attachment 9 818PC2032-MNC_BD_PLANS_Part6.pdf
PDF 27 MB Posted
- Solicitation number
- 36C10F20R0042
About this file
This solicitation is for the Massachusetts National Cemetery Phase 4 Expansion project in Bourne, MA. The Department of Veterans Affairs Office of Construction and Facilities Management will develop approximately 20 acres of land and include around 12,000 gravesites, both casket and cremation, in new burial sections. Offerors will be evaluated using a tiered method. The project number is 818-032.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
M-001
LM JP
MECHANICAL ABBREVIATIONS,
NOTES & SYMBOLS
STORAGE
E02
STORAGE
E01
PIC
A02
VEST
A01
STORAGE
A04
OPEN OFFICE
A03
CLOSET
A08
OFFICE
A12 CLOSET
A13
CONF
A14
OFFICE
A16
STORAGE
A19
OPERATIONS
CENTER
A15
HALL
A18
CLOSET
A17
HAC
A21
VEST
A22
LUNCH AREA
A26
MECH
A27
WOMEN'S
A25
MEN'S
A24
ELEC
A28
LUNCH ROOM
M08
TOILET
M03VEST
M01
HONOR GUARD
M02
MECH
M15
STOR
M17
OFFICE
M06
HALL
M07
VEST
M04
BOOT WASH
M05
HR
M09
PARTS
M19
VEST
M18
SHOP
M20
OFFICE
M26
STOR
M25
SHOP
M24
OFFICE
M22
STG
M23
GRAVE MARKERS
M21
FOYER
R01
TOILET
R04
WOMEN'S
R03
MEN'S
R02
HAC
R05
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
MD101
LM JP
MECHANICAL DEMOLITION PLANS
VEST
A01
PIC
A02
VEST
A22
HAC
A21
MECH
A27
WOMEN'S
A25
MEN'S
A24
OPEN OFFICE
A03
STORAGE
A19
OPERATIONS
CENTER
A15
OFFICE
A12
CLOSET
A13
CONF
A14
OFFICE
A16
CLOSET
A17
LUNCH AREA
A26
STORAGE
A04
CLOSET
A08
HALL
A18
ELEC
A28
CLOSET
A20
VEST
M01
HONOR GUARD
M02
TOILET
M03
LUNCH ROOM
M08
LOCKERS
M11
HALL
M07
OFFICE
M06 BOOT WASH
M05
VEST
M04
HR
M09
MEN'S
M10
WOMEN'S
M12
ELEC
M13
STOR
M14
MECH
M15
HAC
M16
STOR
M17
PARTS
M19
SHOP
M20
OFFICE
M26
STOR
M25
SHOP
M24
OFFICE
M22
STG
M23
GRAVE MARKERS
M21
VEST
M18
TOILET
R04
WOMEN'S
R03
HAC
R05
FOYER
R01
MEN'S
R02
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
M-101
LM JP
MECHANICAL PLANS
12911 SF
VEHICLE STORAGE
V01
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
M-102
LM JP
MECHANICAL PLANS
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
M-701
LM JP
MECHANICAL
SCHEDULES & DETAILS
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
PC001
AP AHTM
PLUMBING SYMBOLS, NOTES, AND
ABBREVIATIONS
FOYER
R01
TOILET
R04
WOMEN'S
R03
MEN'S
R02
HAC
R05
TOILET
M03
ARD
MECH
M15
STOR
M17
HALL
M07
VEST
TOILET
M03
UARD
MECH
M15
STOR
M17
HALL
M07
VEST
LUNCH ROOM
M08
TOILET
M03VEST
M01
HONOR GUARD
M02
MECH
M15
STOR
M17
OFFICE
M06
HALL
M07
VEST
M04
BOOT WASH
M05
HR
M09
PARTS
M19
VEST
M18
SHOP
M20
OFFICE
M26
STOR
M25
SHOP
M24
OFFICE
M22
STG
M23
GRAVE MARKERS
M21
FOYER
R01
TOILET
R04
WOMEN'S
R03
MEN'S
R02
HAC
R05
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
PD101
PLUMBING DEMOLITION PLANS
AP AHTM
TOILET
R04
WOMEN'S
R03
HAC
R05
FOYER
R01
MEN'S
R02
LOCKERS
M11
HALL
M07
MEN'S
M10
WOMEN'S
M12
ELEC
M13
STOR
M14
MECH
M15
HAC
M16
STOR
M17
VEST
VEST
M01
HONOR GUARD
M02
TOILET
M03
LUNCH ROOM
M08
LOCKERS
M11
HALL
M07
OFFICE
M06 BOOT WASH
M05
VEST
M04
HR
M09
MEN'S
M10
WOMEN'S
M12
ELEC
M13
STOR
M14
MECH
M15
HAC
M16
STOR
M17
PARTS
M19
SHOP
M20
OFFICE
M26
STOR
M25
SHOP
M24
OFFICE
M22
STG
M23
GRAVE MARKERS
M21
VEST
M18
TOILET
R04
WOMEN'S
R03
HAC
R05
FOYER
R01
MEN'S
R02
LOCKERS
M11
HALL
M07
MEN'S
M10
WOMEN'S
M12
ELEC
M13
STOR
M14
MECH
M15
HAC
M16
STOR
M17
VEST
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
PP101
AP AHTM
PLUMBING PLANS
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
P-700
PLUMBING DETAILS AND
SCHEDULES
AP AHTM
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
SF DS
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
SS101
SF DS
STRUCTURAL SITE PLAN
ROSTRUM
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
SS102
SF DS
STRUCTURAL SITE PLAN
COLUMBARIUM
TEST PITS
REQ'D
M A
IN
E N
T R
Y
MAIN
ENTRY
BLDG. N
O. 58002
PUBLIC
RESTROOM
BUILDING
FFE=170.00
B L D
G N
O
A D
M
IN
IS
T
R A
T
IO
N /P
U B
L
IC
IN
F
O R
M A
T
IO
N C
E N
T E
R
P .I .C
B U
IL
D
IN
G
F F
E .0
D R A
IN
FI
E
LD
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
SS103
SF DS
STRUCTURAL SITE PLAN
RETAINING WALL
HSS8x8x5/16
COLUMN (TYP)
T/WALL SLOPES
7'-4" 3'-4"
2'-4"
8"
REFER TO ARCH. DWGS
14'-0"
8"
26'-0"
REFER TO ARCH. DWGS
14'-0"
2'-0"3'-4"
8"
8"
REFER TO ARCH. DWGS
14'-0"
8"
EQ EQ. EQ. EQ. EQ.
S.O.G.
216'-0"
67'-6" 67'-6"
F40 F40 F40 F40 F40 F40 F40 F40 F40 F40
T/WALL = +5'-0"
T/WALL SLOPES
EQ.
8"
S-501
TYP
S-501
TYP
S-501
TYP
S-501
TYP
R E F E R
TO
C
IV
IL
LA
N D S C A P E
D W G S
REFER TO CIVIL/LANDSCAPE DWGS
79'-0" +/-
T/WALL = +10'-0"
S-501
TYP
T/WALL = +20'-10"
S-501
TYP @ OPENING
WALL PENETRATION;
REFER TO MECH.
DWGS FOR SIZE
AND LOCATION
(TYP)
CJ
(TYP)
S-501
TYP +
NOTE 6
NOTE 6
NOTE 6
The LA Group Aqua Engineering, Inc OCMI
RVi Miller-Remick LLC Mabbet
Leo A Daly ECS Mid-Atlantic LLC GIS Inc.
MBP Farland Corp
(518) 587-8100 (970) 372-6104 (202) 607-7575
(518) 480-0032 (856) 429-4000 (781) 275-6050
(612) 752-8709 (703) 471-8400 (205) 941-0442
(703) 641-9088 (508) 717-3479
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
BARNSTABLE COUNTY, MASSACHUSETTS
818PC2032
MARCH 13, 2020
Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Gordon PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
STRUCTURAL FOUNDATION PLAN
VEHICLE STORAGE
SF101
SF DS
SCALE: 1/8" = 1'-0"1
FOUNDATION PLAN - VEHICLE STORAGE
GENERAL SHEET NOTES:
1. FOR GENERAL STRUCTURAL NOTES, SEE DRAWING S-001.
2. REFER TO ARCHITECTURAL, CIVIL/LANDSCAPE DRAWINGS FOR
SLOPES, DIMENSIONS, ELEVATIONS, AND INFORMATION NOT SHOWN.
3. REFER TO S-520 SERIES DRAWINGS FOR TYPICAL DETAILS.
NOTES:
1. TOP OF SLAB ELEVATION = 0'-0" (FINISH FLOOR ELEVATION = +136.75')
UNLESS NOTED OTHERWISE AS (+/- X'-X") FROM 0'-0".
2. TOP OF FOOTING ELEVATION = (-2'-6") UNLESS NOTED OTHERWISE. SEE
S-520 FOR FOOTING SCHEDULE.
3. TOP OF WALL ELEVATION = AS NOTED ON PLAN.
4. S.O.G. DENOTES 8" CONCRETE SLAB-ON-GRADE REINFORCED WITH #5@12"
EACH WAY TOP.
5. PREPARE, TEST, AND REMEDIATE ALL SUBGRADE AS RECOMMENDED IN THE
GEOTECH REPORT.
6. DEPRESS SLAB -1/2" AND SLOPE TO EXTERIOR. REFER TO ARCHITECTURAL
DRAWINGS. COORDINATE EXTENT WITH DOOR MFR.
CALL 811
"KNOW WHAT'S BELOW"
" IT'S THE LAW "
UNDERGROUND UTILITIES
FOR FREE MARKOUTS TO LOCATE
CALL BEFORE YOU DIG
THE CONTRACTOR IS RESPONSIBLE TO LOCATE AND IDENTIFY ANY PUBLIC OR
PRIVATE UNDERGROUND UTILITY. FOR PUBLIC UTILITIES, CONTRACTORS MUST
CONTACT THE STATES UTILITY MARK OUT SYSTEM.
THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE LOCATION OF ALL PUBLIC
UTILITIES AND ALL PRIVATE UTILITIES THAT MAY BE EXPOSED OR COULD BE
IMPACTED BY THE WORK AND ARE WITHIN AND ADJACENT TO ANY EXCAVATIONS OR
OR UNDERGROUND WORK.
THE CONTRACTOR SHALL ENLIST THE ASSISTANCE OF THE OWNER, ENGINEER, OR
CONSTRUCTION MANAGER TO OBTAIN THEIR OPINION AS TO THE LOCATIONS OF
UNDERGROUND UTILITIES THAT MAY EXIST WITHIN THE CONSTRUCTION AREA AND
THAT MAY OR MAY NOT BE PRESENTED IN THE CONTRACT DOCUMENTS.
HSS8x8x5/16
(TYP)
EQ EQ. EQ. EQ.
216'-0"
EQ. 15'-4"
W21X44W21X44 W21X44 W21X44 W21X44 W21X44 W21X44 W21X44 W21X44 W21X44W21X44
15'-4" 15'-4"EQ.
LH
(S L)
TY
P
N O
TE
T/WALL SLOPES
T/WALL SLOPES
JOIST CROSS
BRACING (TYP)
NOTE 3
STANDING SEAM METAL ROOF;
REFER TO ARCH. DWGS
14 GA. 6" 'C' PURLINS @ 2'-6" O.C. MAX.
W/ CONT. 'X' BRACING AT MIDSPAN
T/WALL = +20'-10"
JOIST HORIZ. BRACING
@ END BAYS (TYP)
NOTE 3
S-501
TYP
S-501
TYP
S-501
TYP
W8X21 GIRT EL. +10'-0"
(TYP) U.N.O.
(T Y P
S-501
TYP @ COILING
DOOR
S-501
S-501
S-501
TYP
The LA Group Aqua Engineering, Inc OCMI
RVi Miller-Remick LLC Mabbet
Leo A Daly ECS Mid-Atlantic LLC GIS Inc.
MBP Farland Corp
(518) 587-8100 (970) 372-6104 (202) 607-7575
(518) 480-0032 (856) 429-4000 (781) 275-6050
(612) 752-8709 (703) 471-8400 (205) 941-0442
(703) 641-9088 (508) 717-3479
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
BARNSTABLE COUNTY, MASSACHUSETTS
818PC2032
MARCH 13, 2020
Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Gordon PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
STRUCTURAL FRAMING PLAN
VEHICAL STORAGE
SF102
SF DS
SCALE: 1/8" = 1'-0"1
FRAMING PLAN - VEHICLE STORAGE
GENERAL SHEET NOTES:
1. FOR GENERAL STRUCTURAL NOTES, SEE DRAWING S-001.
2. REFER TO ARCHITECTURAL DRAWINGS FOR SLOPES, DIMENSIONS,
ELEVATIONS, AND INFORMATION NOT SHOWN.
3. REFER TO S-520 SERIES DRAWINGS FOR TYPICAL DETAILS.
NOTES:
1. TOP OF STEEL ELEVATION = +15'-0" UNLESS NOTED OTHERWISE AS (+/- X'-X") FROM 0'-0".
2. TOP OF WALL ELEVATION = AS NOTED ON PLAN.
3. JOIST SHALL BE DESIGNED FOR 25 PSF DEAD LOAD (15 PSF TOP CHORD/ 10 PSF BOTTOM CHORD), 25 PSF LIVE LOAD AND 67 PSF WIND UPLIFT (82 PSF UPLIFT @ 2 JOISTS EACH END). STANDING
SEAM ROOF SYSTEM IS BEING UTILIZED. JOIST MFR SHALL PROVIDE ADEQUATE BRIDGING TO
PROPERLY BRACE THE TOP CHORD UNDER FULL DESIGN LOADS.
HSS8x8x3/8
(TYP)
(T Y P
S.O.G. S.O.G. S.O.G.
S-510
TYP
S-510
TYP
CJ
(TYP)
46'-0"
14'-0" 14'-0" 14'-0"
S-510
S-510
@ CORNER
S-510
@ END
S-510
S.O.G.
3'-11"
W14X22
W X
W X
W X
W X
W14X22
W X
W X
W X
W X
W14X22
W14X22 W14X22 W14X22
W14X22 W14X22 W14X22
46'-0"
15'-0" 15'-0" 15'-0"
(S L)
(S L)
(S L)
(S L)
(S L)
(S L)
(S L)
(S L)
STANDING SEAM METAL ROOF;
REFER TO ARCH DWGS
T/STL EL. +16'-8"
T/STL EL. +20'-8"
W X
W X
W X
W X
W X
W X
(S L)
(S L)
(S L)
(S L)
(S L)
(S L)
W X
W X
W X
W X
W X
W X
(S L)
(S L)
(S L)
(S L)
(S L)
(S L)
14 GA. 6" 'C' PURLINS @ 2'-6" O.C.
MAX. W/ CONT. 'X' BRACING AT MIDSPAN
S-510
TYP
S-510
TYP
S-510
TYP
0"
0"
0"
(2 )W X
G
IR
T
E L.
A N D
0"
(2 )W X
G
IR
T
E L.
A N D
(2 )W X
G
IR
T
E L.
A N D
W8X21 GIRT EL. +11'-6"W8X21 GIRT EL. +11'-6" W8X21 GIRT EL. +11'-6"
(2 )W X
G
IR
T
E L.
A N D
S-510
STANDING SEAM METAL
ROOF; REFER TO
ARCH DWGS
The LA Group Aqua Engineering, Inc OCMI
RVi Miller-Remick LLC Mabbet
Leo A Daly ECS Mid-Atlantic LLC GIS Inc.
MBP Farland Corp
(518) 587-8100 (970) 372-6104 (202) 607-7575
(518) 480-0032 (856) 429-4000 (781) 275-6050
(612) 752-8709 (703) 471-8400 (205) 941-0442
(703) 641-9088 (508) 717-3479
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
BARNSTABLE COUNTY, MASSACHUSETTS
818PC2032
MARCH 13, 2020
Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Gordon PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
STRUCTURAL FND & ROOF
FRAMING - MATERIAL STORAGE
SF111
SF DS
SCALE: 1/4" = 1'-0"1
FOUNDATION PLAN - MATERIAL STORAGE
SCALE: 1/4" = 1'-0"2
FRAMING PLAN - MATERIAL STORAGE
GENERAL SHEET NOTES:
1. FOR GENERAL STRUCTURAL NOTES, SEE DRAWING S-001.
2. REFER TO ARCHITECTURAL DRAWINGS FOR SLOPES, DIMENSIONS,
ELEVATIONS, AND INFORMATION NOT SHOWN.
3. REFER TO S-520 SERIES DRAWINGS FOR TYPICAL DETAILS.
NOTES:
1. TOP OF SLAB ELEVATION = 0'-0" (FINISH FLOOR ELEVATION = +136.75')
UNLESS NOTED OTHERWISE AS (+/- X'-X") FROM 0'-0".
2. TOP OF FOOTING ELEVATION = (-2'-6") FROM 0'-0".
3. TOP OF WALL ELEVATION = (+8'-0") FROM 0'-0".
4. S.O.G. DENOTES 8" CONCRETE SLAB-ON-GRADE REINFORCED WITH #5@12"
EACH WAY TOP.
5. PREPARE, TEST, AND REMEDIATE ALL SUBGRADE AS RECOMMENDED IN THE
GEOTECH REPORT.
NOTES:
1. TOP OF STEEL ELEVATION = AS NOTED ON PLAN.
2. DENOTES MOMENT CONNECTION. SEE 5/S-521.
CALL 811
"KNOW WHAT'S BELOW"
" IT'S THE LAW "
UNDERGROUND UTILITIES
FOR FREE MARKOUTS TO LOCATE
CALL BEFORE YOU DIG
THE CONTRACTOR IS RESPONSIBLE TO LOCATE AND IDENTIFY ANY PUBLIC OR
PRIVATE UNDERGROUND UTILITY. FOR PUBLIC UTILITIES, CONTRACTORS MUST
CONTACT THE STATES UTILITY MARK OUT SYSTEM.
THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE LOCATION OF ALL PUBLIC
UTILITIES AND ALL PRIVATE UTILITIES THAT MAY BE EXPOSED OR COULD BE
IMPACTED BY THE WORK AND ARE WITHIN AND ADJACENT TO ANY EXCAVATIONS OR
OR UNDERGROUND WORK.
THE CONTRACTOR SHALL ENLIST THE ASSISTANCE OF THE OWNER, ENGINEER, OR
CONSTRUCTION MANAGER TO OBTAIN THEIR OPINION AS TO THE LOCATIONS OF
UNDERGROUND UTILITIES THAT MAY EXIST WITHIN THE CONSTRUCTION AREA AND
10'-4"
S.O.G.
S-521
TYP
PREFAB BOOTH STRUCTURE;
REFER TO ARCH DWGS
16'-0"
S-520
TYP
S.O.G.
PREFAB BREAK STRUCTURE;
REFER TO ARCH DWGS
S-521
TYP
EXIST UNDERGROUND UTILITY;
VERIFY LOCATION AND DEPTH IN
THE FIELD; COORD W/ CIVIL DWGS
(TYP)
The LA Group Aqua Engineering, Inc OCMI
RVi Miller-Remick LLC Mabbet
Leo A Daly ECS Mid-Atlantic LLC GIS Inc.
MBP Farland Corp
(518) 587-8100 (970) 372-6104 (202) 607-7575
(518) 480-0032 (856) 429-4000 (781) 275-6050
(612) 752-8709 (703) 471-8400 (205) 941-0442
(703) 641-9088 (508) 717-3479
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
BARNSTABLE COUNTY, MASSACHUSETTS
818PC2032
MARCH 13, 2020
Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Gordon PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
STRUCTURAL FOUNDATION PLAN
BREAK SHELTER & CORTEGE
SF121
SF DS
GENERAL SHEET NOTES:
1. FOR GENERAL STRUCTURAL NOTES, SEE DRAWING S-001.
2. REFER TO ARCHITECTURAL DRAWINGS FOR SLOPES, DIMENSIONS,
ELEVATIONS, AND INFORMATION NOT SHOWN.
3. REFER TO S-520 SERIES DRAWINGS FOR TYPICAL DETAILS.
NOTES:
1. TOP OF SLAB ELEVATION = 0'-0" (FINISH FLOOR ELEVATION = +163.50')
UNLESS NOTED OTHERWISE AS (+/- X'-X") FROM 0'-0".
2. S.O.G. DENOTES 9" TURN DOWN CONCRETE SLAB-ON-GRADE REINFORCED WITH
#5@12" EACH WAY TOP & BOTTOM.
3. PREPARE, TEST, AND REMEDIATE ALL SUBGRADE AS RECOMMENDED IN THE
GEOTECH REPORT.
SCALE: 1/4" = 1'-0"2
FOUNDATION PLAN - CORTEGE BOOTH
SCALE: 1/4" = 1'-0"1
FOUNDATION PLAN - BREAK SHELTER NOTES:
1. TOP OF SLAB ELEVATION = 0'-0" (FINISH FLOOR ELEVATION = +136.50')
UNLESS NOTED OTHERWISE AS (+/- X'-X") FROM 0'-0".
2. S.O.G. DENOTES 9" TURN DOWN CONCRETE SLAB-ON-GRADE REINFORCED WITH
#5@12" EACH WAY TOP & BOTTOM.
3. PREPARE, TEST, AND REMEDIATE ALL SUBGRADE AS RECOMMENDED IN THE
GEOTECH REPORT.
CALL 811
"KNOW WHAT'S BELOW"
" IT'S THE LAW "
UNDERGROUND UTILITIES
FOR FREE MARKOUTS TO LOCATE
CALL BEFORE YOU DIG
THE CONTRACTOR IS RESPONSIBLE TO LOCATE AND IDENTIFY ANY PUBLIC OR
PRIVATE UNDERGROUND UTILITY. FOR PUBLIC UTILITIES, CONTRACTORS MUST
CONTACT THE STATES UTILITY MARK OUT SYSTEM.
THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE LOCATION OF ALL PUBLIC
UTILITIES AND ALL PRIVATE UTILITIES THAT MAY BE EXPOSED OR COULD BE
IMPACTED BY THE WORK AND ARE WITHIN AND ADJACENT TO ANY EXCAVATIONS OR
OR UNDERGROUND WORK.
THE CONTRACTOR SHALL ENLIST THE ASSISTANCE OF THE OWNER, ENGINEER, OR
CONSTRUCTION MANAGER TO OBTAIN THEIR OPINION AS TO THE LOCATIONS OF
UNDERGROUND UTILITIES THAT MAY EXIST WITHIN THE CONSTRUCTION AREA AND
1 2
C
D
29'-0"7" 7"
(E) 8" MASONRY SHEAR WALL BELOW
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E W X
(E) W18X40 SLOPED
(E W X
(E W X
(E W X
T.O.S. EL. 17'-0"
ALONG LINE 1
(E) W18X40 SLOPED
(E) 8" MASONRY SHEAR WALL BELOW
T.O.S. EL. 20'-7 1/2"
ALONG LINE 2
(E) 8" MASONRY SHEAR
WALL #5 BAR 24" O.C.
(TYP)
(E) W
6X25 (TYP)
SF131
SF131
4"
4"
SF131
SIM
SF131
SI
M
EXIST CRACK IN
VERTICAL MORTAR JOINT
EXIST 8" CMU
EXIST CONC WALL
V.I.F.
T/STEEL;
SEE PLAN
EXIST CRACK IN VERTICAL MORTAR
JOINT SHALL BE CLEANED AND
REPAIRED W/ AN EPOXY CRACK
REPAIR MORTAR MATERIAL ON BOTH
SIDES OF THE WALL
10MM HELICAL STAINLESS STEEL
SPIRAL WALL TIE. TIE SHALL EXTEND
MIN 4" INTO EACH WYTHE
T/WALL
EL 8'-0"+/-
(V.I.F.)
SF131
EXIST 8" CMU
10MM HELICAL STAINLESS STEEL
SPIRAL WALL TIE AT 8" O.C.
FULL HEIGHT OF CMU WALL.
PATCH THE TIE HOLE W/MORTAR
NOTE:
DO NOT DRILL OR CUT ANY EXISTING CMU WALL REINFORCING.
USE A NON-DESTRUCTIVE BAR DETECTION METHOD TO LOCATE
EXISTING REINFORCING PRIOR TO DRILLING.
TO AVOID EXIST REINF
4"+/-
ADJUST AS REQ'D
The LA Group Aqua Engineering, Inc OCMI
RVi Miller-Remick LLC Mabbet
Leo A Daly ECS Mid-Atlantic LLC GIS Inc.
MBP Farland Corp
(518) 587-8100 (970) 372-6104 (202) 607-7575
(518) 480-0032 (856) 429-4000 (781) 275-6050
(612) 752-8709 (703) 471-8400 (205) 941-0442
(703) 641-9088 (508) 717-3479
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
BARNSTABLE COUNTY, MASSACHUSETTS
818PC2032
MARCH 13, 2020
Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Gordon PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
STRUCTURAL EXISTING
WASH BAY & MATERIAL STORAGE
SF131
SF DS
SCALE: 1/4" = 1'-0"1
EXISTING WASHBAY & MATERIAL STORAGE ROOF FRAMING PLAN:
CMU REPAIR
SCALE: 3/4" = 1'-0"2
SECTION - CMU WALL REPAIR CORNER ELEVATION
SCALE: 3/4" = 1'-0"3
CMU REPAIR DETAIL
GENERAL SHEET NOTES:
1. FOR GENERAL STRUCTURAL NOTES, SEE DRAWING S-001.
2. REFER TO ARCHITECTURAL, CIVIL/LADSCAPE DRAWINGS FOR
SLOPES, DIMENSIONS, ELEVATIONS, AND INFORMATION NOT SHOWN.
3. REFER TO S-520 SERIES DRAWINGS FOR TYPICAL DETAILS.
1'-8"8"1'-8"
REFER TO
CIVIL/LANDSCAPE DWGS
8" CMU WALL
#6 @12" O.C. T&B
PAVING; REFER TO CIVIL/LANDSCAPE DWGS
(5) #6 T&B
CAP; REFER TO
CIVIL/LANDSCAPE DWGS
T/SLAB
REFER TO LANDSCAPE
DWGS
T/FTG
SEE PLAN
T/WALL
REFER TO
CIVIL/LANDSCAPE DWGS
M
IN
CONC. SLAB-ON-GRADE; SEE PLAN
VENEER; REFER TO CIVIL/LANDSCAPE DWGS
DOWELS TO MATCH
WALL REINF.
4" CMU; GROUT SOLID
#6 @16"
CONT. BOND BEAM
W/(2)#5
ISOLATION JOINT
6'-0" SQUARE
REFER TO CIVIL/LANDSCAPE
DWGS
16"X16" CMU COLUMN
(7)#6 E.W. T&B
PAVING; REFER TO CIVIL/LANDSCAPE DWGS
CAP; REFER TO
CIVIL/LANDSCAPE DWGS
T/SLAB
REFER TO LANDSCAPE
DWGS
T/FTG
SEE PLAN
T/WALL
REFER TO
CIVIL/LANDSCAPE DWGS
M
IN
CONC. SLAB-ON-GRADE; SEE PLAN
VENEER; REFER TO CIVIL/LANDSCAPE DWGS
4" CMU; GROUT SOLID
(4)#6 CMU COLUMN
REINF.
ISOLATION JOINT
SEE PLAN
10"
T/PAVING; REFER TO
CIVIL/LANDSCAPE
DWGS
4" COMPACTED
CRUSHED STONE
COMPACTED
SUBGRADE
(8)#5 HORIZ.
CONT.
#5 @12 E.F.
T/SLAB SLOPES
S E E
P
LA
N
6"
M
IN
ISOLATION JOINT
SLAB REINF;
SEE PLAN
#5 @12
T/PAVING
REFER TO
CIVIL/LANDSCAPE DWGS
#3 NOSING
BAR
M
IN
6"
#5 @12
CIVIL/LANDSCAPE DWGS
REFER TO
PAVING; REFER TO CIVIL/LANDSCAPE DWGS
T/SLAB
SEE PLAN
S E E
P
LA
N
C
IV
IL
LA
N D S C A P E
D W G S
R E F E R
TO
REFER TO LANDSCAPE DWGS
ISOLATION JOINT
8"8"8"
#5 @12" x3'-0"
CONC. SALB-ON-GRADE
T/FTG
SEE PLAN
T/SLAB
SLOPES
S E E
P
LA
N
SLAB REINF; SEE PLAN
#5 @12"
(3)#5 CONT.
M
IN
FIN. GRADE
#5 @12" E.W; E.F.
4"8"4"
CONC. SLAB/STAIRS;
SEE PLAN
#5 @12
(4)#5 CONT.
T/SLAB SLOPES
T/FTG
SEE PLAN
T/WALL
REFER TO CIVIL/LANDSCAPE
DWGS
M
IN
CONC. RAMP SLAB; SEE PLAN
DOVETAIL SLOTS EACH FACE; COORD. SPACING
W/VENEER ANCHORS; REFER TO CIVIL/LANDSCAPE DWGS
#5 @12" (TYP)
8" 8"
NOTE:
1. STEP SHELF AS REQUIRED TO
MAINTAIN 8" MINIMUM BELOW SALB.
N O
TE
M
IN
S E E
P
LA
N
T/SLAB VARIES
SEE PLAN
P
LA
N
S E E
N O
TE
M
IN
VENEER; REFER TO CIVIL/LANDSCAPE DWGS
CAP; REFER TO
CIVIL/LANDSCAPE DWGS
ISOLATION JOINT (TYP)
The LA Group Aqua Engineering, Inc OCMI
RVi Miller-Remick LLC Mabbet
Leo A Daly ECS Mid-Atlantic LLC GIS Inc.
MBP Farland Corp
(518) 587-8100 (970) 372-6104 (202) 607-7575
(518) 480-0032 (856) 429-4000 (781) 275-6050
(612) 752-8709 (703) 471-8400 (205) 941-0442
(703) 641-9088 (508) 717-3479
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
BARNSTABLE COUNTY, MASSACHUSETTS
818PC2032
MARCH 13, 2020
Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Gordon PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
STRUCTURAL SITE
SECTIONS AND DETAILS
S-301
SF DS
SCALE: 3/4" = 1'-0"1
SECTION
SCALE: 3/4" = 1'-0"2
SECTION
SCALE: 3/4" = 1'-0"3
SECTION
SCALE: 3/4" = 1'-0"4
SECTION
SCALE: 3/4" = 1'-0"5
SECTION
SCALE: 3/4" = 1'-0"6
SECTION
1'-0"1'-0"
FINISH GRADE/PAVING;
SEE CIVIL/LANDSCAPE DWGS
#8 @7"
5-#8 CONT.
#8 @7" HORIZ.
3"
TYP.
4"
3'-6"
M
IN
T/WALL
SEE CIVIL/LANDSCAPE
DWGS
#8 @12"
1'-0"1'-0"
FINISH GRADE/PAVING;
REFER TO CIVIL/LANDSCAPE DWGS
#8 @7" VERT.
"5-#8 CONT.
#8 @7" HORIZ. E.F.
CLR
2"
DOVETAIL SLOTS EACH FACE;
COORD. SPACING W/ VENEER ANCHORS.
REFER TO CIVIL/LANDSCAPE DWGS
CLR
2"
#8 @7" VERT.
DOWELS TO MATCH SIZE AND SPACING
OF VERT. REINF.
#8 TYP.
#8 @7"
CLR
3"
M
IN
C
LR3
T/LEDGE;
REFER TO CIVIL/LANDSCAPE DWGS
4'-4"
TYP.
5"
T/WALL
SEE CIVIL/LANDSCAPE DWGS
#8 @12"
NOTE:
1. PROVIDE 4" SHELF DIMENSION ALONG LONG PIER FACE.
S E E
P
LA
N
SEALANT
6" CONT. WATERSTOP CUT 50 PERCENT
OF HORIZ. REINF.
C JOINT; SEE PLAN
NOTES:
1. PROVIDE CONSTRUCTION JOINT AT MAXIMUM 20'-0" SPACING.
2. PROVIDE JOINT IN VENEER AT WALL CONSTRUCTION JOINT
LOCATIONS.
CONTROL JOINT
S E E
P
LA
N
EXPANSION JOINT FILLER,
BACKER ROD AND SEALANT
EACH SIDE
9" CONT. FLEXABLE WATERSTOP
FOR EXPANSION JOINT
DISCONTINUE 100 PERCENT
OF HORIZ. REINF.
C JOINT; SEE PLAN
NOTES:
1. PROVIDE EXPANSION JOINT AT CHANGE IN DIRECTION OF WALL,
WHERE TWO OR MORE WALLS COME TOGETHER FROM DIFFERENT
DIRECTIONS, AND AT 40'-0" ON CENTER MAXIMUM.
2. PROVIDE JOINT IN VENEER AT WALL EXPANSION JOINT LOCATIONS.
EXPANSION JOINT
BACKFILLED SIDE
EXPOSED SIDEEXPOSED SIDE
3/8" OR 1" CLR
The LA Group Aqua Engineering, Inc OCMI
RVi Miller-Remick LLC Mabbet
Leo A Daly ECS Mid-Atlantic LLC GIS Inc.
MBP Farland Corp
(518) 587-8100 (970) 372-6104 (202) 607-7575
(518) 480-0032 (856) 429-4000 (781) 275-6050
(612) 752-8709 (703) 471-8400 (205) 941-0442
(703) 641-9088 (508) 717-3479
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
BARNSTABLE COUNTY, MASSACHUSETTS
818PC2032
MARCH 13, 2020
Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Gordon PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
STRUCTURAL SITE
SECTIONS AND DETAILS
S-302
SF DS
SCALE: 1/2" = 1'-0"1
SECTION
SCALE: 1/2" = 1'-0"2
SECTION
SCALE: 3/4" = 1'-0"3
SECTION
GENERAL SHEET NOTES:
1. FOR GENERAL STRUCTURAL NOTES, SEE DRAWING S-001.
2. REFER TO ARCHITECTURAL AND CIVIL/LANDSCAPE DRAWINGS FOR
SLOPES, DIMENSIONS, ELEVATIONS, AND INFORMATION NOT SHOWN.
3'-0"1'-0"5'-0"
#7 @8" O.C.
FINISH GRADE;
SEE CIVIL/LANDSCAPE DWGS
ISOLATION JOINT
#7 @12" O.C.
#7 @12" EW; T&B
SLAB; SEE PLAN
T/SLAB
SEE PLAN
T/FTG
SEE PLAN
4" MIN. PORIUS FILL
WRAP POROUS FILL WITH
GEOTECTILE FABRIC
4" SLOPED DRAIN PIPE;
REFER TO CIVIL DWGS
M
IN
1'-0"1'-0"1'-0"
FINISH GRADE/PAVING;
SEE CIVIL/LANDSCAPE DWGS
ISOLATION JOINT
#7 @8" E.F.
#7 @12" O.C. T&B
SLAB; SEE PLAN
#7 @12" O.C. T&B
#7 @12" E.F.
METAL PANEL;
SEE ARCH DWGS
T/SLAB
SEE PLAN
T/FTG
SEE PLAN
T/WALL
SEE PLAN
M
IN
NOTE:
1. SEE 10/S-501 FOR ADDITIONAL
REINFORCING AT COLUMNS.
3'-0"1'-0"5'-0"
#7 @8" O.C.
FINISH GRADE;
SEE CIVIL/LANDSCAPE DWGS
ISOLATION JOINT
#7 @12" O.C.
#7 @12" EW; T&B
PAVEMENT; REFER TO CIVIL DWGS
T/PAVEMENT
REFER TO CIVIL DWGS
T/FTG
SEE PLAN
FACE OF WALL SHALL BE PATTERNED CONCRETE;
REFER TO ARCH/CIVIL/LANDSCAPE DWGS
4" MIN PORIUS FILL
WRAP POROUS FILL WITH
GEOTECTILE FABRIC
4" SLOPED DRAIN PIPE
M
IN
1'-0"1'-0"1'-0"
FINISH GRADE/PAVING;
SEE CIVIL/LANDSCAPE DWGS
#5 @12" DOWELS
#7 @12" O.C. T&B
SLOPE SLAB;
REFER TO ARCH DWGS
#7 @12" O.C. T&B
T/SLAB
SEE PLAN
T/FTG
SEE PLAN
1'-0"#7 @12" E.F, E.W.
48"
SLAB REINF; SEE PLAN
M
IN
GALV L2X2X1/4 CONT. W/ 3/8" DIA
X 4" LONG HEADED ANCHOR @2'-0"
O.C. TYP 3 SIDESSEE PLAN
SEE
PLAN
#5 CONT
PURLIN CONN. TO
PLATE BY PURLIN
MFR
T/PURLIN VARIES
SEE PLAN
STANDING SEAM METAL ROOF;
SEE ARCH DWGS
T/WALL SLOPES
'C' PURLIN; SEE PLAN
TOP & BOTTOM CHORD HORIZ
JOIST END BRACING; SEE PLAN
1/2" X 8" X CONT. PLATE
W/(2) 3/4" DIA X 6" HEADED
STUD ANCHORS @24" O.C.
WALL REINF; SEE
FOUNDATION DETAIL
CONC WALL
1'-0"
STANDING SEAM METAL ROOF;
SEE ARCH DWGS
T/WALL
SEE PLAN
'C' PURLIN; SEE PLAN
1/2" X 10" X 10" PLATE
W/(4) 3/4" DIA. X 6"
HEADED STUD ANCHORS
WALL REINF; SEE
FOUNDATION DETAIL
1'-0"
CONC WALL
STANDING SEAM METAL ROOF;
SEE ARCH. DWGS
T/STEEL
SEE PLAN
'C' PURLIN; SEE PLAN
WF BEAM; SEE PLAN
HSS COL;
SEE PLAN
GALV HSS 3 1/2 X 3 1/2 X
5/16 X CONT; COORD EXTENTS
W/ COILING DOOR MFR
5/16
T/WALL
SLOPES
3/4" PLATE X 12" WIDE X 21" DEEP
W/ 2 ROWS OF (3) 3/4" DIA X 8"
HEADED STUD ANCHORS (6 TOTAL)
1'-0"
T/STEEL
SEE PLAN
CONC. WALL
CONCRETE WALL;
SEE PLAN
TYP
1 3/4"
TY
P
(4) 3/4" DIA ANCHOR RODS WITH 18"
EMBEDMENT. PROVIDE STD HOLES IN
BASE PLATE OR OVERSIZED WASHERS
W/ STD HOLES WELDED ALL AROUND
TO BASE PLATE 5/16
3/4" X10" X1'-4" BASE PLATE
ON NON-SHRINK GROUT
(1" MIN/ 2" MAX)
HSS COLUMN;
SEE PLAN
NOTE:
1. PROVIDE (2) SETS OF #3 TIES @4" O.C.
AROUND (8) VERTICAL WALL BARS (4 E.F.)
CENTERED ON COLUMN. CONFIGURATION OF
TIES SHALL CONFORM TO ACI 318.
The LA Group Aqua Engineering, Inc OCMI
RVi Miller-Remick LLC Mabbet
Leo A Daly ECS Mid-Atlantic LLC GIS Inc.
MBP Farland Corp
(518) 587-8100 (970) 372-6104 (202) 607-7575
(518) 480-0032 (856) 429-4000 (781) 275-6050
(612) 752-8709 (703) 471-8400 (205) 941-0442
(703) 641-9088 (508) 717-3479
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
BARNSTABLE COUNTY, MASSACHUSETTS
818PC2032
MARCH 13, 2020
Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Gordon PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
STRUCTURAL
SECTIONS AND DETAILS
S-501
SF DS
SCALE: 3/4" = 1'-0"1
SECTION
GENERAL SHEET NOTES:
1. FOR GENERAL STRUCTURAL NOTES, SEE DRAWING S-001.
2. REFER TO ARCHITECTURAL AND CIVIL/LANDSCAPE DRAWINGS FOR
SLOPES, DIMENSIONS, ELEVATIONS, AND INFORMATION NOT SHOWN.
SCALE: 3/4" = 1'-0"2
SECTION
CALL 811
"KNOW WHAT'S BELOW"
" IT'S THE LAW "
UNDERGROUND UTILITIES
FOR FREE MARKOUTS TO LOCATE
CALL BEFORE YOU DIG
THE CONTRACTOR IS RESPONSIBLE TO LOCATE AND IDENTIFY ANY PUBLIC OR
PRIVATE UNDERGROUND UTILITY. FOR PUBLIC UTILITIES, CONTRACTORS MUST
CONTACT THE STATES UTILITY MARK OUT SYSTEM.
THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE LOCATION OF ALL PUBLIC
UTILITIES AND ALL PRIVATE UTILITIES THAT MAY BE EXPOSED OR COULD BE
IMPACTED BY THE WORK AND ARE WITHIN AND ADJACENT TO ANY EXCAVATIONS OR
OR UNDERGROUND WORK.
THE CONTRACTOR SHALL ENLIST THE ASSISTANCE OF THE OWNER, ENGINEER, OR
CONSTRUCTION MANAGER TO OBTAIN THEIR OPINION AS TO THE LOCATIONS OF
UNDERGROUND UTILITIES THAT MAY EXIST WITHIN THE CONSTRUCTION AREA AND
THAT MAY OR MAY NOT BE PRESENTED IN THE CONTRACT DOCUMENTS.
SCALE: 3/4" = 1'-0"3
SECTION
SCALE: 3/4" = 1'-0"4
SECTION
SCALE: 3/4" = 1'-0"5
SECTION
SCALE: 3/4" = 1'-0"6
SECTION
SCALE: 3/4" = 1'-0"7
SECTION
SCALE: 1 1/2" = 1'-0"8
SECTION
SCALE: 3/4" = 1'-0"9
SECTION
SCALE: 3/4" = 1'-0"10
3'-6"1'-0"3'-6"
FINISH GRADE/PAVING;
SEE CIVIL/LANDSCAPE DWGS
ISOLATION JOINT
#6 @8" E.F.
#6 @12" O.C. T&B
SLAB; SEE PLAN
#6 @12" E.F.
METAL PANEL;
SEE ARCH DWGS
T/SLAB
SEE PLAN
T/FTG
SEE PLAN
T/WALL
SEE PLAN
M
IN
NOTE:
1. SEE 6,7,8/S-510 FOR ADDITIONAL REINFORCING AT COLUMNS.
STANDING SEAM METAL ROOF;
SEE ARCH DWGS
T/STEEL
SEE PLAN
'C' PURLIN; SEE PLAN
STANDING SEAM METAL ROOF;
SEE ARCH DWGS
T/STEEL
SEE PLAN
'C' PURLIN; SEE PLAN
3/4" CHAMFER
3"
SLAB REINF; SEE PLAN
C
LR2
10" 6"
FINISH GRADE;
REFER TO
CIVIL/LANDSCAPE
DWGS
4" COMPACTED
CRUSHED STONE
COMPACTED
SUBGRADE
T/SLAB; SEE PLAN
#5 @12" HORIZ CONT
#5 @12 E.F.
M
IN
T/STEEL SLOPES
SEE PLAN
PURLIN CONN. TO BEAM
BY PURLIN MFR
T/PURLIN VARIES
SEE PLAN
STANDING SEAM METAL ROOF;
SEE ARCH DWGS
WF BEAM; SEE PLAN
'C' PURLIN; SEE PLAN
CONCRETE WALL;
SEE PLAN
TYP
1 3/4"
TY
P
5/16
3/4" X10" X1'-4" BASE PLATE
ON NON-SHRINK GROUT
(1" MIN/ 2" MAX)
HSS COLUMN;
SEE PLAN
(4) 3/4" DIA ANCHOR RODS WITH 18"
EMBEDMENT. PROVIDE STD HOLES IN
BASE PLATE OR OVERSIZED WASHERS
W/ STD HOLES WELDED ALL AROUND
TO BASE PLATE
NOTE:
1. PROVIDE (2) SETS OF #3 TIES @4" O.C.
AROUND (8) VERTICAL WALL BARS (4 E.F.)
CENTERED ON COLUMN. CONFIGURATION OF
TIES SHALL CONFORM TO ACI 318.
CONCRETE WALL;
SEE PLAN
TYP
1 3/4"
TY
P
(8) 3/4" DIA X 0'-8"
HEADED STUD ANCHOR
5/16
3/4" BASE PLATE
ON NON-SHRINK GROUT
(1" MIN/ 2" MAX)
HSS COLUMN;
SEE PLAN
1'-6 1/2"
TY
P
NOTE:
1. PROVIDE (2) SETS OF #3 TIES @4" O.C. AROUND
(8) VERTICAL WALL BARS (4 E.F.) ALONG EACH SIDE
OF WALL AT CORNER (4 SETS TOTAL). CONFIGURATION
OF TIES SHALL CONFORM TO ACI 318.
(6) 3/4" DIA X 0'-8"
HEADED STUD ANCHOR
5/16
3/4" X10" X 1'-6 1/2" BASE
PLATE ON NON-SHRINK GROUT
(1" MIN/ 2" MAX)
HSS COLUMN;
SEE PLAN
TY
P
TYP
1 3/4"
CONCRETE WALL;
SEE PLAN
NOTE:
1. PROVIDE (2) SETS OF #3 TIES @4" O.C. AROUND
(8) VERTICAL WALL BARS (4 E.F.) CONFIGURATION
OF TIES SHALL CONFORM TO ACI 318.
3'-6"1'-0"
FINISH GRADE/PAVING;
REFER TO CIVIL/LANDSCAPE DWGS
ISOLATION JOINT
#6 @8" E.F.
#6 @12" O.C.
T&B
SLAB; SEE PLAN
#6 @12" E.F.
T/SLAB
SEE PLAN
T/FTG
SEE PLAN
M
IN
CFMF; REFER
TO ARCH DWGS
#6 @12" EF,EW
1'-0"
SEE PLAN
8"
1'-0"
(2) #6
SLAB; SEE PLAN
SEE ARCH DWGS
CFMF; REFER
TO ARCH DWGS
3/4" PLYWOOD;
REFER TO ARCH DWGS
STANDING SEAM METAL ROOFING;
REFER TO ARCH DWGS
METAL SIDING;
REFER TO ARCH
DWGS
The LA Group Aqua Engineering, Inc OCMI
RVi Miller-Remick LLC Mabbet
Leo A Daly ECS Mid-Atlantic LLC GIS Inc.
MBP Farland Corp
(518) 587-8100 (970) 372-6104 (202) 607-7575
(518) 480-0032 (856) 429-4000 (781) 275-6050
(612) 752-8709 (703) 471-8400 (205) 941-0442
(703) 641-9088 (508) 717-3479
Location
Issue Date
Project Number
Drawing Number
Project Title
Checked Drawn
BARNSTABLE COUNTY, MASSACHUSETTS
818PC2032
MARCH 13, 2020
Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Gordon PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
STRUCTURAL
SECTIONS AND DETAILS
S-510
SF DS
SCALE: 3/4" = 1'-0"1
SECTION
SCALE: 1" = 1'-0"3
SECTION
SCALE: 1" = 1'-0"4
SECTION
SCALE: 3/4" = 1'-0"2
SECTION
SCALE: 1" = 1'-0"5
SECTION
GENERAL SHEET NOTES:
1. FOR GENERAL STRUCTURAL NOTES, SEE DRAWING S-001.
2. REFER TO ARCHITECTURAL AND CIVIL/LANDSCAPE DRAWINGS FOR
SLOPES, DIMENSIONS, ELEVATIONS, AND INFORMATION NOT SHOWN.
SCALE: 3/4" = 1'-0"6
SECTION
SCALE: 3/4" = 1'-0"7
SECTION
SCALE: 3/4" = 1'-0"8
SECTION
SCALE: 3/4" = 1'-0"9
SECTION
SCALE: 3/4" = 1'-0"10
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
T/LEDGE
REFER TO CIVIL/
LANDSCAPE DWGS
T/WALL
REFER TO CIVIL DWGS
1'-8"
1'-2"
#6@10" DOWELS
FINAL GRADE
REFER TO CIVIL DWGS
#4@10"
GEO-FABRIC FILTER
CLEAN DRAINAGE
GRAVEL BACKFILL
CONT. 6" DIA. DRAIN PIPE
SLOPED 1/8" /FT TO DRAIN
#6@10" DOWELS
#6@10" VERT.
#4 @12" HORIZ. EF
FINAL GRADE
REFER TO CIVIL DWGS
#6@10" VERT.
DOVETAIL SLOTS; COORD. SPACING
W/ MASONRY ANCHORS. REFER TO
CIVIL/ LANDSCAPE DWGS
7 - #5 CONT.
#6 @12"
STONE VENEER TO MATCH ROSTRUM AND
CORTEGE BOOTH; REFER TO LANDSCAPE
AND ARCHITECTURAL DWGS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200
Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
Dwg. of 225
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
M
AI
N
EN
TR
Y
MAIN
ENTRY
BLDG. NO. 58002
PUBLIC
RESTROOM
BUILDING
FFE=170.00
BL
D
G .N
O .5
AD
M
IN
IS
TR
AT
IO
N/
PU
BL
IC
IN
FO
R M
AT
IO
N C
EN
TE
R (P
.I.
C.
BU
IL
DI
NG
FF
E=
0.
DRAIN
FIE
LD
TEST PITS
REQ'D
SHELTER
(FFE=136.70)
SEE SHEET
AE102
SITE SECURITY PLAN
SE101
LEGEND: VASS SECURITY NOTES:
ADMINISTRATIVE BUILDING AREA MAINTENANCE YARD
CCTV #1
CCTV #2
CCTV WARNING
SIGNAGE
CCTV #3
CCTV WARNING
CCTV #4
CCTV #5
CCTV #6
CCTV WARNING
SIGNAGE
NVR #2*
ACM #2*
*NOTE 9
NVR #1*
ACM #1*
*NOTE 9
CCTV #7
CCTV WARNING
SIGNAGE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
M06
M08
M07
M19
M05
M04
M09
M18
M03
M01
M02
M11
M10
M12
M13 M15
M14
M16
M17
M20
M21
M22M23
M24
M26
M25
EM EM
MD
MD MD
MD
MD
MD
MD
MD
MD
MD
DT
DT
DT
DT
DT
DT
DT
DT
DT
DT
DT
W
W W
W
W
W
W
NVR #1
ACM #1
IDS #1
A03
A01
A02
A04
A08
A12
A13
A14
A16
A15
A19
A20
A18
A21
A17
A22
A26 A27
A25
A24
A28
EM
EM
MD DT
DT
MD
DT
DT
MD
DT
MD DT
MD
DT
DT
DT
MD
DT
MD
MD
DT
DT
MD
DT
DT
DT
MD
W
W
W
W
W
W
W
W W
W
W W
W W
NVR #2
ACM #2 IDS #2
EM
NVR
ACM
DT
MD
W
DT
IDS
SECURITY FLOOR PLANS
SE102
SCALE: 1/8" = 1'-0"A BLDG 58004 - MAINTENANCE BUILDING
SCALE: 1/8" = 1'-0"B BLDG 58001 - ADMINISTRATION BUILDING
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
| Electrical Complied S&S - Copy |
| E-501 |
| E-601 |
| E-701 |
| E-702 |
| E-703 |
| EL102 |
| EP101 |
| EP102 |
| FA102 |
| Mechanical Complied S&S |
| M-001 |
| M-101 |
| M-102 |
| M-701 |
| MD101 |
| Plumbing Compiled S&S |
| P-700 |
| PC001 |
| PD101 |
| PP101 |
| Structural Compiled S&S |
| S-001 |
| S-301 |
| S-302 |
| S-501 |
| S-510 |
| S-520 |
| S-521 |
| SF101 |
| SF102 |
| SF111 |
| SF121 |
| SF131 |
| SS101 |
| SS102 |
| SS103 |
File details come from the government source that posted it. Updated .