This document contains a cost proposal breakdown for a construction project to expand a national cemetery in Massachusetts. The cost proposal includes line item costs for a base bid and seven add alternates to complete site work and construct new burial sections, crypts, storage bins, roadways, and irrigation and electrical upgrades. The base bid and add alternates cover site demolition and preparation, concrete, masonry, metals work, utilities installation and other construction divisions. The total proposed cost is included. The related federal contract opportunity is to develop approximately 20 acres at the Massachusetts National Cemetery to include around 12,000 new gravesites under a tiered evaluation process.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised 7/30/20
Offeror: Solicitation No.:
Cost Proposal Breakdown
CLIN/
Division Description Cost Totals
CLIN 001 – Base Bid
01A Insurance & Bonding 01B Overhead & Profit 01C Taxes & Permits 01D Demolition 01E Clearing and Grubbing 01F General Conditions
02A Temporary Facilities Including Trailers & Other Resident Engineer Provisions
02B Restoration of Temporary Facilities 03 Concrete
04 Masonry and Stone
05 Metals
06 Wood, Plastics, And Composites
07 Thermal & Moisture Protection
08 Openings – including doors and windows
09 Finishes
10 Specialties
11 Equipment 22 Plumbing
23 HVAC
26 Electrical
27 Communications
28 Electronic Safety and Security
31 Earthwork & Site Development
31 Crypt Installation 32 Irrigation 32 Landscaping 32 Roadways & Paving
32 Exterior Improvements Including Signage and Site Furnishings
33 Utilities
Sub-Total – CLIN 001
CLIN 002 – Cost of Crypts (not including placement)
03 Concrete Crypts
Subtotal – CLIN 002
Division Description Cost Totals
CLIN 003 – Add Alternate #1 – Replacement of Concrete Caps with Bluestone Caps 01 General Requirements 02 Demolition 04 Masonry
05 Metals 06 Wood, Plastics, and Composites 07 Thermal & Moisture Protection 09 Finishes 10 Specialties
Subtotal – CLIN 003 ______________________
CLIN/
Division Description Cost Totals
CLIN 004 – Add Alt #2 – Material Storage Bin (3- Bin) 01 General Requirements 02 Demolition 03 Concrete
04 Masonry 05 Metals 06 Wood, Plastics, and Composites 07 Thermal & Moisture Protection 09 Finishes
31 Earthwork
Subtotal – CLIN 004
CLIN 005 – Add Alternate #3 – Roadway 1
01 General Requirements 02 Demolition 32 Roadways and Paving
Sub-Total – CLIN 005
CLIN 006 – Add Alternate #4 – Maintenance Building - Restrooms
03 Concrete 05 Metals 06 Wood, Plastic and Composites 07 Thermal and Moisture Protection 08 Openings 09 Finishes 10 Specialties 22 Plumbing
23 HVAC
26 Electrical
27 Communications Sub-Total – CLIN 006
CLIN 007 – Add Alternate #5 – Metal Roof Replacement
05 Metal 07 Thermal and Moisture Protection
Sub-Total – CLIN 006
CLIN 008 – Add Alternate #6 – Upgrade Irrigation Controllers
32 Irrigation
Sub-Total – CLIN 008
CLIN 009 – Add Alternate #7 Hardwire Solar Irrigation Controllers
01 General Conditions
26 Irrigation
32 Electrical
Sub-Total – CLIN 009
GRAND TOTAL CLINs 1-9