Attachment 4 818PC2032-MNC_BD_PLANS_Part1.pdf
PDF 44 MB Posted
- Solicitation number
- 36C10F20R0042
About this file
This solicitation is for the Massachusetts National Cemetery Phase 4 Expansion project in Bourne, MA. The Department of Veterans Affairs Office of Construction and Facilities Management will develop approximately 20 acres of land including around 12,000 gravesites for both casket and cremation burials in new sections. The project number is 818-032. Offerors will be evaluated using a tiered method.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE IV DEVELOPMENT
PROJECT NUMBER: 818PC2032
BID DOCUMENTS
DEPARTMENT OF
VETERANS AFFAIRS
BOURNE TOWNSHIP
BARNSTABLE COUNTY, MASSACHUSETTS
MASSACHUSETTS NATIONAL CEMETERY
COVER SHEET
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business www.miller-remick.com p lan n in g + la nds cap e a rch i tecture
712 Congress Avenue, Suite 300 Austin, Texas 78701
(512) 480-0032
GRAVESITE YIELD SUMMARY
COLUMBARIUM
NICHES
IN-GROUND
CREMAIN
(4'X4')
300 1,5006,000
CREMAIN PLOTS
PRE-PLACED
DOUBLE-DEPTH
CRYPTS (3'x8')
4,000
CASKET PLOTS
PRE-PLACED
OVERSIZED
CRYPTS (4'x10')
375 EAST HORSETOOTH ROAD
BLDG 2-202
PH. 970-372-6104
FORT COLLINS, CO 80525
AQUA ENGINEERING, INC.
WWW.AQUAENGR.COM
GI001
TOTAL NUMBER
OF GRAVESITES
12,090290
TRADITIONAL
FULL CASKET
(4'X10')
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
DRAWING INDEX
1. GI001 COVER SHEET
2. GI002 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
CIVIL
3. BI101 SUBSURFACE BORING LOCATION PLAN
4. GI200 CONSTRUCTION SEQUENCING PLAN
5. GC100 OVERALL DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN
6. GC101 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN AREA 1
7. GC102 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN AREA 2
8. GC103 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN AREA 3
9. GC104 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN AREA 4
10. GC105 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN AREA 5
11. GC106 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN AREA 6
12. GC107 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN AREA 7
13. GC108 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN AREA 8
14. GC109 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN AREA 9
15. GC110 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN AREA 10
16. GC111 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN AREA 11
17. GC112 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN - ADD ALT. 1 - AREA 1
18. GC113 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN - ADD ALT. 1 - AREA 2
19. GC114 DEMO & INITIAL EROSION & SEDIMENT CONTROL PLAN - ADD ALT. 1 - AREA 3
20. GC200 OVERALL STAGE II EROSION AND SEDIMENT CONTROL PLAN
21. GC201 EROSION AND SEDIMENT CONTROL PLAN AREA 1
22. GC202 EROSION AND SEDIMENT CONTROL PLAN AREA 2
23. GC203 EROSION AND SEDIMENT CONTROL PLAN AREA 3
24. GC204 EROSION AND SEDIMENT CONTROL PLAN AREA 4
25. GC205 EROSION AND SEDIMENT CONTROL PLAN AREA 5
26. GC206 EROSION AND SEDIMENT CONTROL PLAN AREA 6
27. GC207 EROSION AND SEDIMENT CONTROL PLAN AREA 7
28. GC208 EROSION AND SEDIMENT CONTROL PLAN AREA 8
29. GC209 EROSION AND SEDIMENT CONTROL PLAN AREA 9
30. GC210 EROSION AND SEDIMENT CONTROL PLAN AREA 10
31. GC211 EROSION AND SEDIMENT CONTROL PLAN AREA 11
32. GC212 EROSION AND SEDIMENT CONTROL PLAN AREA - ADD ALT. 1 - AREA 1
33. GC213 EROSION AND SEDIMENT CONTROL PLAN AREA - ADD ALT. 1 - AREA 2
34. GC214 EROSION AND SEDIMENT CONTROL PLAN AREA - ADD ALT. 1 - AREA 3
35. GC500 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS
36. GC501 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS
37. CS100 OVERALL SITE LAYOUT AND UTILITY PLAN
38. CS101 SITE LAYOUT AND UTILITY PLAN AREA 1
39. CS102 SITE LAYOUT AND UTILITY PLAN AREA 2
40. CS103 SITE LAYOUT AND UTILITY PLAN AREA 3
41. CS104 SITE LAYOUT AND UTILITY PLAN AREA 4
42. CS105 SITE LAYOUT AND UTILITY PLAN AREA 5
43. CS106 SITE LAYOUT AND UTILITY PLAN AREA 6
44. CS107 SITE LAYOUT AND UTILITY PLAN AREA 7
45. CS108 SITE LAYOUT AND UTILITY PLAN AREA 8
46. CS109 SITE LAYOUT AND UTILITY PLAN AREA 9
47. CS110 SITE LAYOUT AND UTILITY PLAN AREA 10
48. CS111 SITE LAYOUT AND UTILITY PLAN AREA 11
49. CS112 SITE LAYOUT AND UTILITY PLAN AREA - ADD ALT. 1 - AREA 1
50. CS113 SITE LAYOUT AND UTILITY PLAN AREA - ADD ALT. 1 - AREA 2
51. CS114 SITE LAYOUT AND UTILITY PLAN AREA - ADD ALT. 1 - AREA 3
52. CS150 BURIAL LAYOUT AND UTILITY PLAN SECTION 61
53. CS151 BURIAL LAYOUT AND UTILITY PLAN SECTION 62
54. CS152 BURIAL LAYOUT AND UTILITY PLAN SECTION 63
55. CS153 BURIAL LAYOUT AND UTILITY PLAN SECTION 64
56. CS154 BURIAL LAYOUT AND UTILITY PLAN SECTION 65
57. CG100 OVERALL GRADING AND DRAINAGE PLAN
58. CG101 GRADING AND DRAINAGE PLAN AREA 1
59. CG102 GRADING AND DRAINAGE PLAN AREA 2
60. CG103 GRADING AND DRAINAGE PLAN AREA 3
61. CG104 GRADING AND DRAINAGE PLAN AREA 4
62. CG105 GRADING AND DRAINAGE PLAN AREA 5
63. CG106 GRADING AND DRAINAGE PLAN AREA 6
64. CG107 GRADING AND DRAINAGE PLAN AREA 7
65. CG108 GRADING AND DRAINAGE PLAN AREA 8
66. CG109 GRADING AND DRAINAGE PLAN AREA 9
67. CG110 GRADING AND DRAINAGE PLAN AREA 10
68. CG111 GRADING AND DRAINAGE PLAN AREA 11
69. CG112 GRADING AND DRAINAGE PLAN AREA - ADD ALT. 1 - AREA 1
70. CG113 GRADING AND DRAINAGE PLAN AREA - ADD ALT. 1 - AREA 2
71. CG114 GRADING AND DRAINAGE PLAN AREA - ADD ALT. 1 - AREA 3
72. CG115 HANDICAP PARKING AREA AND RAMP GRADING
73. CG150 BURIAL SECTION GRADING ENLARGEMENT SECTION 61
74. CG151 BURIAL SECTION GRADING ENLARGEMENT SECTION 62
75. CG152 BURIAL SECTION GRADING ENLARGEMENT SECTION 63
76. CG153 BURIAL SECTION GRADING ENLARGEMENT SECTION 64
77. CG154 BURIAL SECTION GRADING ENLARGEMENT SECTION 65
78. CT201 NEW ROAD CENTERLINE PROFILES
79. CT202 NEW ROAD CENTERLINE PROFILES
80. CT203 NEW ROAD CENTERLINE PROFILES
81. CT204 NEW ROAD CENTERLINE PROFILES
82. CT205 NEW ROAD CENTERLINE PROFILES - ADD ALT. 1
83. CT206 NEW ROAD CENTERLINE PROFILES - ADD ALT. 1
84. CT500 PAVEMENT CROSS-SECTIONS
85. C-010 OVERALL PAVEMENT REPLACEMENT PLAN
86. C-011 PAVEMENT REPLACEMENT PLAN AREA 1
87. C-012 PAVEMENT REPLACEMENT PLAN AREA 2
88. C-013 PAVEMENT REPLACEMENT PLAN AREA 3
89. CU260 STORM PROFILES
90. CU261 STORM PROFILES
91. CU262 STORM PROFILES
92. CU263 STORM PROFILES
93. CU264 STORM COMPUTATIONS
94. CU265 STORM COMPUTATIONS
95. DT500 CRYPT AND BURIAL DETAILS
96. DT501 CRYPT AND BURIAL DETAILS
97. DT502 CRYPT AND BURIAL DETAILS
98. CG500 SITE DETAILS
99. CG501 SITE DETAILS
100. CG502 SITE DETAILS
101. CG503 SITE DETAILS
102. CG504 SITE DETAILS
103. CI101 SITE SIGNAGE EXISTING INVENTORY
104. CI102 EXISTING SITE SIGNAGE PHOTOS
105. CI103 EXISTING SITE SIGNAGE PHOTOS
106. CI201 SITE SIGNAGE PLAN
107. CI501 PROPOSED SIGN DETAILS
108. CI502 PROPOSED SIGN DETAILS
COLUMBARIUMS
109. CS401 PHASE 4 COLUMBARIUM LAYOUT ENLARGEMENT
110. CS402 PHASE 4 COLUMBARIUM GRADING ENLARGEMENT
111. CS403 PHASE 4 COLUMBARIUM DRAINAGE ENLARGEMENT
112. CS405 PHASE 4 COLUMBARIUM 'A' IMPROVEMENT PLAN
113. CS406 PHASE 4 COLUMBARIUM 'A' RESTORATION ELEVATIONS
114. CS407 PHASE 4 COLUMBARIUM 'B' IMPROVEMENT PLAN
115. CS408 PHASE 4 COLUMBARIUM 'B' RESTORATION ELEVATIONS - 1
116. CS409 PHASE 4 COLUMBARIUM 'B' RESTORATION ELEVATIONS - 2
117. CS410 ORIGINAL COLUMBARIUM 'A' & 'B' CONSTRUCTION DETAILS
118. CI201 COLUMBARIUM ELEVATIONS - 1
119. CI202 COLUMBARIUM ELEVATIONS - 2
120. CI501 COLUMBARIUM DETAILS 1
121. CI502 COLUMBARIUM DETAILS 2
122. CI503 COLUMBARIUM DETAILS 3
123. CI504 COLUMBARIUM DETAILS 4
124. CI505 COLUMBARIUM DETAILS 5
LANDSCAPE
125. L-100 OVERALL LANDSCAPE PLAN
126. L-101 ROADWAY EXPANSION LANDSCAPE PLAN
127. L-102 PARKING EXPANSION & ROSTRUM LANDSCAPE PLAN
128. L-103 ROADWAY EXPANSION LANDSCAPE PLAN
129. L-104 BURIAL SECTION LANDSCAPE PLAN
130. L-105 MAINTENANCE FACILITY AND LANDSCAPE ENLARGEMENTS
131. L-106 ROADWAY EXPANSION LANDSCAPE PLAN
132. L-107 ADD ALT. ROADWAY EXPANSION LANDSCAPE PLAN
133. L-501 PLANTING SCHEDULE AND DETAILS
134. L-502 SITE AMENITY DETAILS
135. L-503 ROSTRUM DETAILS
136. L-504 PHASE 4 EXISTING AMENITY REPLACEMENT PLAN
137. L-510 PHASE 4 LANDSCAPE WALL RESTORATION PLAN
138. L-511 LANDSCAPE WALL RESTORATION DETAILS - 2
139. L-512 LANDSCAPE WALL RESTORATION DETAILS - 3
140. L-513 LANDSCAPE WALL RESTORATION DETAILS - 3
141. L-514 LANDSCAPE WALL RESTORATION DETAILS - 4
IRRIGATION
142. LI100 IRRIGATION NOTES AND LEGENDS
143. LI101 IRRIGATION LAYOUT
144. LI102 IRRIGATION LAYOUT
145. LI103 IRRIGATION LAYOUT
146. LI104 IRRIGATION LAYOUT
147. LI105 IRRIGATION LAYOUT
148. LI106 IRRIGATION LAYOUT
149. LI107 IRRIGATION LAYOUT
150. LI108 IRRIGATION LAYOUT
151. LI109 IRRIGATION LAYOUT
152. LI110 IRRIGATION LAYOUT
153. LI111 IRRIGATION LAYOUT
154. LI1A1 IRRIGATION LAYOUT
155. LI1A2 IRRIGATION LAYOUT
156. LI1A3 IRRIGATION LAYOUT
157. LI112 IRRIGATION LAYOUT
158. LI201 FIRE HYDRANT REMOVAL/REPLACEMENT PLAN
159. LI202 IRRIGATION CONTROLLER ALTERNATIVES
160. LI501 IRRIGATION DETAILS
161. LI502 IRRIGATION DETAILS
162. LI503 IRRIGATION DETAILS
163. LI504 IRRIGATION DETAILS
164. LI510 IRRIGATION WELL DETAIL
ARCHITECTURAL
165. AE001 SYMBOLS, ABBREVIATIONS & MOUNTING HEIGHTS
166. AE002 OVERALL FLOOR PLANS
167. AE003 LIFE SAFETY PLANS
168. AE100 DEMOLITION PLANS
169. AE101 FLOOR PLANS
170. AE102 FLOOR PLANS
171. AE103 ROOF PLANS
172. AE104 ROOF PLANS
173. AE111 CEILING PLANS
174. AE112 CEILING PLANS
175. AE121 FINISH PLANS
176. AE201 EXTERIOR ELEVATIONS
177. AE211 INTERIOR ELEVATIONS
178. AE301 BUILDING SECTIONS
179. AE311 WALL SECTIONS
180. AE501 DETAILS
181. AE502 DETAILS
182. AE503 DETAILS
183. AE504 DETAILS
184. AE601 SCHEDULES
ELECTRICAL
185. E-001 ELECTRICAL ABBREVIATIONS, & SYMBOLS
186. E-002 ELECTRICAL NOTES
187. ED101 ELECTRICAL DEMOLITION PLANS
188. ES101 ELECTRICAL POWER SITE PLAN
189. ES102 ELECTRICAL POWER SITE PLAN
190. EL101 ELECTRICAL LIGHTING PLANS
191. EL102 ELECTRICAL LIGHTING PLANS
192. EP101 ELECTRICAL POWER PLANS MAINTENANCE
193. EP102 ELECTRICAL POWER PLANS
194. FA102 ELECTRICAL FIRE ALARM PLAN VEHICLE STORAGE
195. E-501 ELECTRICAL DETAILS
196. E-601 ELECTRICAL SINGLE LINE - EXISTING CONDITIONS 'FOR REFERENCE ONLY'
197. E-701 ELECTRICAL SCHEDULES
198. E-702 ELECTRICAL SCHEDULES
199. E-703 ELECTRICAL SCHEDULES
MECHANICAL
200. M-001 MECHANICAL ABBREVIATIONS, NOTES, & SYMBOLS
201. MD101 MECHANICAL DEMOLITION PLANS
202. M-101 MECHANICAL PLANS
203. M-102 MECHANICAL PLANS
204. M-701 MECHANICAL SCHEDULES & DETAILS
PLUMBING
205. PC001 PLUMBING SYMBOLS, NOTES, AND ABBREVIATIONS
206. PD101 PLUMBING DEMOLITION PLANS
207. PP101 PLUMBING PLANS
208. P-700 PLUMBING DETAILS AND SCHEDULES
STRUCTURAL
209. S-001 STRUCTURAL ABBREVIATIONS AND NOTES
210. SS101 STRUCTURAL SITE PLAN ROSTRUM
211. SS102 STRUCTURAL SITE PLAN COLUMBARIUM
212. SS103 STRUCTURAL SITE PLAN RETAINING WALL
213. SF101 STRUCTURAL FOUNDATION PLAN VEHICLE STORAGE
214. SF102 STRUCTURAL FRAMING PLAN VEHICLE STORAGE
215. SF111 STRUCTURAL FDN & ROOF FRAMING - MATERIAL STORAGE
216. SF121 STRUCTURAL FOUNDATION PLAN BREAK SHELTER & CORTEGE
217. SF131 STRUCTURAL EXISTING WASH BAY & MATERIAL STORAGE
218. S-301 STRUCTURAL SITE SECTIONS AND DETAILS
219. S-302 STRUCTURAL SITE SECTIONS AND DETAILS
220. S-501 STRUCTURAL SECTIONS AND DETAILS
221. S-510 STRUCTURAL SECTIONS AND DETAILS
222. S-520 STRUCTURAL TYPICAL DETAILS
223. S-521 STRUCTURAL TYPICAL DETAILS
SECURITY
224. SE101 SITE SECURITY PLAN
225. SE102 SECURITY FLOOR PLANS
NO. DRAWING DRAWING TITLE
PROJECT
LOCATION
RHODE ISLANDCONNECTICUT
NEW HAMPSHIRE
ATLANTIC OCEAN
PROJECT
SITE
LEO A DALY
730 SECOND AVENUE SOUTH
SUITE 1300
MINNEAPOLIS, MN 55402
PH. 612-752-8709
WWW.LEOADALY.COM
Ce rti f ie d Irr igat ion Des igner
IR
R
I G AT I ON A S S OC I A T I O
NCID
46102
JO
HN D. LEONARD
3/13/2020
March 13, 2020
GI002
GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
GENERAL NOTES:
1. THE PROPOSED SITE IMPROVEMENTS FOR 'MASSACHUSETTS NATIONAL CEMETERY PHASE 4 DEVELOPMENT' INCLUDES, BUT IS
NOT LIMITED TO, DEMOLITION OF EXISTING ASPHALT PAVEMENT AND SUBBASE MATERIALS, EXISTING CURB & GUTTER, EXISTING STORM DRAIN INFRASTRUCTURE, AND EXISTING VEGETATION. THE IMPROVEMENTS INCLUDE EXPANDED ROADWAYS, GRAVESITE EXPANSION, CONSTRUCTION OF ADDITIONAL BURIAL SECTIONS, A COLUMBARIUM, IRRIGATION EXTENSIONS, DEMOLITION AND UPDATES OF 2 EXISTING COMMITTAL SERVICE SHELTERS, ELECTRICAL UPGRADES, BUILDING RENOVATIONS, NEW VEHICLE STORAGE BUILDING, ADDITIONAL ASPHALT PAVEMENT, CONCRETE CURB & GUTTER, CONCRETE WALKS, STORM DRAIN INFRASTRUCTURE, SITE FURNISHINGS, AND LANDSCAPING. THE PROJECT IS LOCATED IN BARNSTABLE COUNTY, MASSACHUSETTS. THE TOTAL SITE AREA IS 749.29 ACRES.
2. THE TOPOGRAPHIC CONTOUR INTERVAL IS ONE (1) FOOT. TOPOGRAPHIC INFORMATION IS BASED ON AERIAL RUN TOPOGRAPHY BY FARLAND CORP. DATED SEPTEMBER THROUGH OCTOBER 2018. THE HORIZONTAL DATUM IS REFERENCED TO NAD83 MASSACHUSETTS STATE PLANE MAINLAND ZONE. THE VERTICAL DATUM IS REFERENCED TO NAVD88.
3. THE SUBJECT PROPERTY IS LOCATED ON F.E.M.A. MAP 25001C0512J DATED JUNE 16, 2014. NO PORTIONS OF THE PROJECT
AREA ARE LOCATED WITHIN THE 100-YEAR FLOODPLAIN AREA.
4. SEE THIS SHEET FOR LEGEND OF SYMBOLS USED HEREIN.
5. BURIAL CEREMONIES MAY BE SCHEDULED THROUGHOUT THE COURSE OF THIS PROJECT. DURING ALL CEREMONIES, ALL WORK MUST STOP, ESPECIALLY WHEN HEAVY EQUIPMENT ACTIVITY OR NOISE PRODUCING WORK IS BEING DONE. LIGHT WORK ACTIVITY CAN CONTINUE IF IT DOES NOT CREATE NOISE OR DISTRACTIONS TO THE CEREMONY. COORDINATE DAILY ACTIVITIES WITH THE CEMETERY DIRECTOR OR HIS APPROVED REPRESENTATIVE TO ACCOMMODATE SCHEDULED BURIALS.
6. DUE TO THE SENSITIVE NATURE OF THE CEMETERY SITE, CONTRACTOR SHALL MAINTAIN EACH WORK AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH DAY AND/OR MORE FREQUENTLY AS REQUIRED.
7. AFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMAL AND SHALL BE COORDINATED WITH THE CEMETERY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS. CONTRACTOR SHALL PROVIDE TWO SIGNS SIMILAR TO THE CEMETERY'S "PARDON OUR APPEARANCE" SIGNS. SIZE TO BE A MINIMUM OF 4'X5' HIGH MOUNTED ON TWO 4"X4" POSTS, PLACED IN A LOCATION AS DETERMINED BY THE CEMETERY DIRECTOR. TEXT SIZE SHALL BE MAXIMUM SIZE PROPORTIONAL TO WIDTH/HEIGHT OF SIGN.
TEXT WILL BE PROVIDED BY CEMETERY DIRECTOR.
8. THERE SHALL BE AT ALL TIMES WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE. THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
9. IF THE CONTRACTOR SHOULD ENCOUNTER UNEXPLODED ORDINANCE (UXO), CALL PAUL E. RENDON (508) 320-6906 OR BEN
GREGSON (508) 968-5821 IMMEDIATELY.
CONSTRUCTION NOTES:
1. THE CONTRACTING OFFICER REPRESENTATIVE AND CONTRACTOR ARE RESPONSIBLE FOR REVIEWING THE PLANS PRIOR
TO CONSTRUCTION AND NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CIRCUMSTANCES FOUND WITHIN THESE PLANS IN NEED OF VERIFICATION SO THAT APPROPRIATE REVISIONS CAN BE MADE, IF WARRANTED.
2. DEVELOPMENT OF THE SITE INCLUDING CONSTRUCTION AND MATERIALS SHALL BE IN CONFORMANCE WITH THE U.S.
DEPARTMENT OF VETERANS AFFAIRS REQUIREMENTS AND THE MASSCHUSETTS DEPARTMENT OF TRANSPORTATION
CONSTRUCTION STANDARDS AND SPECIFICATIONS, WHERE APPLICABLE.
3. EROSION AND SEDIMENT CONTROL DEVICES ARE TO BE IN PLACE PRIOR TO ANY LAND DISTURBANCE. REFER TO EROSION
AND SEDIMENT CONTROL PLAN FOR PHASING AND DETAILS.
4. ALL LAND ON OR OFF-SITE WHICH IS DISTURBED BY CONSTRUCTION AND WHICH IS NOT BUILT UPON OR SURFACED SHALL
BE ADEQUATELY STABILIZED TO CONTROL EROSION AND SEDIMENTATION.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY
CHANGES OR CONDITIONS ATTACHED TO PERMITS REQUIRED FOR CONSTRUCTION.
6. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES NECESSARY TO ENSURE THAT STREETS ARE KEPT IN A CLEAN
AND DUST FREE CONDITION AT ALL TIMES.
7. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION
ACTIVITIES.
8. THE CONTRACTOR SHALL CLEAR THE SITE OF ALL TREES, BUILDINGS, FOUNDATIONS, ETC. WITHIN THE LIMITS OF CONSTRUCTION AND SHALL BE RESPONSIBLE FOR COORDINATING ANY DISCONNECTION AND/OR ABANDONMENT OF EXISTING UTILITIES AND STRUCTURES. IF NECESSARY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND ABANDONING ALL EXISTING WELLS AND/OR SEPTIC DRAIN FIELDS AND COORDINATING THEIR ABANDONMENT WITH THE
HEALTH DEPARTMENT.
9. CONTRACTOR SHALL CONTACT MASSACHUSETTS 811 AT 888-DIG-SAFE OR BY DIALING 811 ON A MASSACHUSETTS PHONE LINE OR HTTP://WWW.DIGSAFE.COM/CONTACT.PHP A MINIMUM OF THREE (3) BUSINESS DAYS PRIOR TO ANY EXCAVATION WITHIN AREAS SERVED BY UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE
PRESENCE OF ANY UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
10. GORDON DOES NOT CERTIFY TO THE LOCATION OF OR THE EXISTENCE OF ANY EXISTING UNDERGROUND UTILITIES. ANY UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE RECORDS AND DISCUSSION WITH THE OWNER.
THIS DOES NOT CONSTITUTE A GUARANTEE OF THEIR ACTUAL LOCATIONS OR THAT THEY HAVE ALL BEEN SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING ANY CONSTRUCTION.
THESE TEST HOLES WILL BE MADE TO VERIFY ALL CROSSINGS BETWEEN NEW AND EXISTING FACILITIES AND AT CRITICAL GRADE CHANGES. IF CONDITIONS ARE FOUND IN THE FIELD, WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY GORDON. SO THAT APPROPRIATE REVISIONS IF WARRANTED CAN BE MADE TO THE PLANS AT
THE GOVERNMENT'S EXPENSE.
11. GORDON DOES NOT CERTIFY TO THE SUB-SURFACE CONDITIONS OF THE SITE, THE LOCATION OF UNDERLYING ROCK, OR THE LOCATION OF POTENTIAL SINKHOLES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES TO VERIFY SUB-SURFACE CONDITIONS PRIOR TO BEGINNING ANY CONSTRUCTION. IF SINKHOLES ARE FOUND IN THE FIELD, REMEDIATION WILL BE REQUIRED AS SPECIFIED BY A QUALIFIED GEOTECHNICAL ENGINEERING FIRM.
12. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING
FIRM AND PAID FOR BY THE CONTRACTOR.
13. ALL PROPOSED ELEVATIONS AS SHOWN HEREIN ARE FINISHED GRADE UNLESS OTHERWISE NOTED.
14. MAINTAIN A MINIMUM VERTICAL CLEARANCE OF ONE (1) FOOT SIX (6) INCHES BETWEEN CROSSING OF ALL UTILITY LINES
UNLESS OTHERWISE NOTED.
15. EARTHWORK SHALL BE COMPACTED IN ACCORDANCE WITH EARTHWORK SPECIFICATION 31 20 00.
16. THE CONTRACTING OFFICER REPRESENTATIVE, CONTRACTOR, AND/OR SURVEYOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CONDITIONS FOUND IN THE FIELD PRIOR TO STAKEOUT THAT VARY FROM THE APPROVED PLANS OR THAT MAKE CONSTRUCTABILITY IMPOSSIBLE SO THAT APPROPRIATE REVISIONS CAN BE MADE PRIOR TO STAKEOUT AND/OR CONSTRUCTION. ANY OBSERVATIONS REGARDING APPARENT INCONSISTENCIES IN THE PLANS SHALL BE BROUGHT TO THE U.S. DEPARTMENT OF VETERANS AFFAIRS ATTENTION FOR
VERIFICATION PRIOR TO STAKEOUT.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF ITS WORK AND THE WORK OF ITS SUBCONTRACTORS.
GORDON SHALL NOT HAVE CONTROL OVER, CHARGE OF, OR RESPONSIBILITY FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE
WORK.
BUNKER
HILL
CIRCLE
PLYMOUTH
LANE
LANECONCORD
CIRCLE
LEXING
TON
WAYVETERANS
VETERANS
W
AY CIRCLE
WAMPANOAG
BO
UL
EV
AR
D
BE
NN
IN
GT
ON
PA
TR
IO
T
LA
NE
M
EM
O
RIAL
CIRCLE
BO
U
R
NE
D R
IVE
McKENNA ROAD
B-12
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
LEGEND:
FULL DEPTH BORING LOCATION
NOTES:
1. REFER TO GEOTECHNICAL REPORT
PROVIDED BY ECS DATED JULY 12, 2019 FOR
SUB-SURFACE INVESTIGATION REPORT
BORING LOG INFORMATION,
RECOMMENDATIONS, AND SOIL MAP.
ROAD PAVEMENT CORE LOCATION
TEST PIT LOCATION
NORTH
SUBSURFACE BORING LOCATION
PLAN
BI101
T EST PITS
REQ 'D
T EST PITS
REQ 'D
S33°56'19"E
3530.00'
N71°35'06"W
200.0 S31°0
261.22' N58°54'11"W
255.82' N47°47'15"W
230.39' N40°36'38"W
1297.20'N76°20'34"W
.26' 10"W
361.86'
S89°20'53"W
850.11' N86°20'57"W
S0 5°
'2
7" E
.1 0'
L=612.91' R=850.54' D=41°17'19"
L=623.87' R=1081.92' D=33°02'18"
N:2703809.59 E:907712.92
BUNKER
CIRCLE
PLYMOUTH
LANE
LANECONCORD
CIRCLE
LEXING
TON
WAYVETERANS
VETERANS
W
AY CIRCLE
WAMPANOAG
BO
UL
EV
AR
D
BE
NN
IN
GT
ON
PA
TR
IO
T
LA
NE
M
EM
O
RIAL
CIRCLE
BO
U
R
NE
D R
IVE
McKENNA ROAD
B1
B2
B3
F1
F2
R1
R2
R3
R4 R5
T1
B1
B1
B3
B3
F3
R3
R6
E1
E2
E3
R7
R7
R7
B4
B4
B5
B5
F4
F5
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
CONTRACTOR PRIMARY
CONSTRUCTION ACCESS
NOTE: ACCEPTABLE EXCESS EARTH SHALL BE SPOILED ON CEMETERY
PROPERTY IN LOCATIONS IDENTIFIED ON THE PLANS.
CONSTRUCTION SEQUENCING ACTIVITIES:
· CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE MASSACHUSETTS NATIONAL
CEMETERY DIRECTOR AND DESIGNATED STAFF THROUGH THE RESIDENT
ENGINEER/CONTRACTING OFFICER'S REPRESENTATIVE (RE/COR) TO MINIMIZE IMPACT TO
CEMETERY OPERATION.
· ALL COSTS TO MEET THE CONSTRUCTION SEQUENCING REQUIREMENTS SHALL BE INCLUDED IN
THE CONTRACTOR'S BID AND SHALL NOT BE THE BASIS FOR ADDITIONAL COSTS TO THE
OWNER.
· THE CONTRACTOR SHALL DEVELOP A SEQUENCING PLAN, PROJECT SCHEDULE, TRAFFIC
CONTROL PLAN, & NETWORK ANALYSIS SYSTEM (NAS) SCHEDULE DEMONSTRATING
FULFILLMENT OF THE CONTRACT REQUIREMENTS IN ACCORDANCE WITH SPECIFICATION
SCHEDULE 01 32 16.13 NETWORK ANALYSIS SCHEDULES. THE NAS SCHEDULE SHALL ACCOUNT
FOR ALL OPERATIONAL CONSTRUCTION SEQUENCING ACTIVITIES, PHASING AND ANY SPECIFIC
IDENTIFIED WORK SEQUENCING TASKS INCLUDED IN THE CONSTRUCTION DOCUMENTS. THE
NAS SHALL BE SUBMITTED, REVIEWED AND MODIFIED AS REQUIRED UNTIL APPROVED BY THE
RE/COR AND CEMETERY DIRECTOR. THE APPROVED NAS SCHEDULE SHALL, AS MUCH AS
POSSIBLE, ALLOW THE CONTRACTOR FLEXIBILITY IN MEANS AND METHODS.
· DEVIATIONS FROM THE NAS SCHEDULE SHALL BE CONSIDERED ONLY IF THE CEMETERY
OPERATIONS AND INCONVENIENCE TO THE PUBLIC HAVE BEEN SATISFACTORILY ADDRESSED.
SUCH DEVIATION MUST BE APPROVED IN ADVANCE IN WRITING BY THE RE/COR.
· CONFIRM ALL APPLICABLE PERMITS FOR BARNSTABLE COUNTY, MASSACHUSETTS
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP), AND ALL OTHER LOCAL, STATE, AND
FEDERAL REGULATORY AGENCIES.
· SEE GC100 FOR ADMINISTRATIVE BUILDING AREA DEMO PLAN. LOGISTICS RELATED TO THE
WORK SCHEDULE AND ALLOWABLE DAILY CONSTRUCTION EFFORTS FOR THE NEW TURN LANE,
ADDITIONAL CORTEGE LANE, CORTEGE BOOTH, AND RELATED CONSTRUCTION IN
SURROUNDING AREA IS TO BE COORDINATED WITH CEMETERY STAFF TO AVOID DISTURBING
CEMETERY ACTIVITIES. THIS CONSTRUCTION ACTIVITY IS TO BE COMPLETED FIRST.
· THE CONTRACTOR SHALL FURNISH THE RE/COR A SCHEDULE OF APPROXIMATE DATES ON
WHICH THE CONTRACTOR INTENDS TO ACCOMPLISH WORK IN EACH SPECIFIC AREA OF SITE,
BUILDING OR PORTION THEREOF. IN ADDITION, THE CONTRACTOR SHALL NOTIFY THE RE/COR
TWO WEEKS IN ADVANCE OF THE PROPOSED DATE OF STARTING WORK IN EACH SPECIFIC
AREA OF SITE, BUILDING OR PORTION THEREOF. ARRANGE SUCH DATES TO INSURE
ACCOMPLISHMENT OF THIS WORK IN SPECIFIED SEQUENCES MUTUALLY AGREEABLE TO THE
RE/COR AND THE CEMETERY DIRECTOR.
GENERAL CONSTRUCTION REQUIREMENTS:
BEFORE ANY GENERAL CONSTRUCTION ACTIVITIES MAY COMMENCE, THE CONTRACTOR SHALL:
· INSTALL AN RE/COR FIELD OFFICE IN ACCORDANCE WITH PART 1.17 RE/COR FIELD OFFICE OF
SPECIFICATION SECTION 01 00 01 GENERAL REQUIREMENTS.
· THE CONTRACTOR PARKING AND STAGING/LAY-DOWN AREAS ARE SUBJECT TO
STAFF/RESIDENT ENGINEER APPROVAL.
· INSTALL TEMPORARY CONSTRUCTION FENCING AND TEMPORARY SIGNAGE (IF APPLICABLE).
· COMPLETE INSTALLATION OF EROSION AND SEDIMENT CONTROLS FOR THE WORK AREAS.
INSTALL IMMEDIATELY PRIOR TO THE START OF THE WORK IN ACCORDANCE WITH THE
APPROVED EROSION & SEDIMENT CONTROL PLAN.
· RETAIN A PRIVATE UNDERGROUND LOCATOR SERVICE AND PERFORM THE TRACING AND
MARKING OF ALL THE ONSITE BELOW GRADE IMPROVEMENTS WITHIN OR ADJOINING THE
CONTRACTOR WORK AREAS FOR THE PROJECT. CONTRACTOR MUST WALK THE
CONSTRUCTION AREAS WITH THE RE/COR AND, IF REQUESTED BY THE RE/COR, ADJUST THE
LOCATIONS OF THE NEW WORK AS REQUIRED BY A/E TO AVOID CONFLICTS, DAMAGE OR
UNINTENDED INTERRUPTIONS OF THE SERVICES BEING PROVIDED BY THE UNDERGROUND
FACILITIES.
· THE CONTRACTOR WILL BE REQUIRED TO PROVIDE TEMPORARY ELECTRIC, COMMUNICATIONS,
POTABLE WATER, AND SANITARY SERVICES TO THE RE/COR TRAILER. SEE SPECIFICATION 01 00
00 GENERAL REQUIREMENTS.
· PROVIDE THE INFORMATION IN THE SPECIFICATION SECTIONS 11 83 00 & 11 83 02 REGARDING
THE GPS/GIS SYSTEM SO THERE IS NO LOSS OF DATA COLLECTION FROM THE BEGINNING OF
THE PROJECT.
· OBSERVE AND DOCUMENT THE FUNCTIONALITY OF THE IRRIGATION SYSTEM IN THE VICINITY
OF THE CONSTRUCTION AREA. DAMAGED OR NONFUNCTIONAL IRRIGATION SYSTEM
EQUIPMENT NOT IDENTIFIED AS BEING DAMAGED OR NONFUNCTIONAL DURING THE
PRE-CONSTRUCTION SURVEY SHALL BE FULLY REPAIRED AND MADE FUNCTIONAL
IMMEDIATELY UPON DETECTION OF ANY DAMAGE, AT NO ADDED COST TO THE OWNER.
· FURNISH AND INSTALL TEMPORARY COMMUNICATIONS SERVICE TO THE RE/COR TRAILER FOR
TELEPHONE AND INTERNET ACCESS. TEMPORARY SERVICE SHALL BE THE FUNCTIONAL
EQUIVALENT TO COMMUNICATIONS SERVICE AT THE ADMINISTRATION BUILDING. ROUTING AND
MEANS OF CONSTRUCTION SHALL BE APPROVED BY THE SERVICE PROVIDER. UNDERGROUND
INSTALLATION IS REQUIRED UNLESS SPECIFICALLY DIRECTED OTHERWISE BY THE SERVICE
PROVIDER.
· CONTROL TRUCK AND EQUIPMENT MOVEMENT SO THEY DO NOT TRANSIT BETWEEN ONGOING
SERVICES AT THE COMMITTAL SHELTERS.
· CONTRACTOR'S PRIMARY STAGING AREA FOR OPERATION WILL BE WITHIN AREA B1/R3.
· THE CONTRACTOR MAY REQUEST LIMITED USE OF OPEN AREAS THROUGHOUT THE CEMETERY
FOR SECONARY STAGING. USE OF SUCH OPEN AREAS MUST BE APPROVED BY THE RE/COR
AND MUST BE DETERMINED TO BE OUT OF THE WAY OF DAILY OPERATIONS.
· GENERAL CONTRACTOR SHALL NOT USE MAIN PUBLIC ACCESS TO CEMETERY AT ANY TIME FOR
ANY REASON, AND ALL SIGNAGE NEEDED TO KEEP CONSTRUCTION TRAFFIC AWAY FROM MAIN
ENTRANCE SHALL BE PROVIDED BY CONTRACTOR AT THEIR COST.
· ALL WORK AREAS SHALL ACCESS THE SITE FROM THE MAINTENANCE AREA ENTRANCE OFF
CONNERY AVENUE AT ALL TIMES EXCEPT FOR THE CONSTRUCTION OF USS CONSTITUTION
AVENUE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING THE EXISTING ROADS
ALONG THE PATH OF THE CONSTRUCTION ENTRANCE AT THE END OF CONSTRUCTION.
· ANY ROADWAY USED FOR CONSTRUCTION ACTIVITIES THAT IS DAMAGED DURING PHASE 4
CONSTRUCTION NOT SLATED TO RECEIVED MILL & OVERLAY/FULL DEPTH REPLACEMENT SHALL
BE REHABBED OR REPLACED AFTER CONSTRUCTION HAS BEEN COMPLETED.
· THE CONTRACTOR WILL BE RESPONSIBLE FOR ADEQUATE TRAFFIC CONTROL AND SIGNAGE TO
SAFELY REROUTE THE PUBLIC AND STAFF DURING CEMETERY ROAD CLOSURES.
· THE CONTRACTOR WILL BE RESPONSIBLE FOR ADEQUATE VISITOR PARKING AND WAYFINDING
TO SAFELY DIRECT THE PUBLIC AND STAFF IN THE VICINITY OF THE PIC/ADMINISTRATION
BUILDING AND PUBLIC BATHROOMS DURING CONSTRUCTION ACTIVITIES IN THAT AREA.
· ALL SIGNAGE AND TRAFFIC MARKINGS INCLUDING CONSTRUCTION SIGNAGE SHALL COMPLY
WITH MASSACHUSETTS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
· EXISTING FACILITIES DAMAGED BY CONTRACTOR DURING CONSTRUCTION OPERATIONS SHALL
BE REPLACED BY THE CONTRACTOR TO APPLICABLE STANDARDS.
· THE CONTRACTOR WILL BE RESPONSIBLE FOR GRADING ALL AREAS TO ENSURE POSITIVE
DRAINAGE.
· THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND/OR SALVAGING AND LEGAL
OFFSITE DISPOSAL OF ALL WASTE MATERIAL GENERATED BY CONSTRUCTION .
· THE CONTRACTOR MUST KEEP ALL EXISTING STREETS CLEAN AND CLEAR OF CONSTRUCTION
RELATED DEBRIS AND EQUIPMENT AT ALL TIMES.
· OFF - SITE TRACKING OF CONSTRUCTION SITE SEDIMENTS OR OTHER SUBSTANCES SHALL NOT
BE ALLOWED. CONSTRUCTION SITE ENTRANCE/EXIT STABILIZATION MEASURES, ALONG WITH
FREQUENT ADJACENT STREET SWEEPING OR CLEANING OF EQUIPMENT WASH RACK AREAS,
SHALL BE EMPLOYED TO PREVENT OFF-SITE TRACKING AND TO CONTROL THE GENERATION OF
FUGITIVE DUST. OFF - SITE TRACKING CONTROLS WILL BE REQUIRED TO PROTECT ROADS AND
FACILITIES WITH EXISTING CEMETERY PROPERTY AS WELL AS EXTERIOR ROADS AND
FACILITIES.
· WHEREVER EXCAVATION FOR NEW UTILITY LINES CROSS EXISTING ROADS, AT LEAST ONE
LANE MUST BE OPEN TO TRAFFIC AT ALL TIMES. FLAGGING PERSONNEL SHALL BE PROVIDED
FOR SUCH INSTANCES OF ROAD WORK. WHERE EXISTING ROADS ARE BEING REMOVED,
MODIFIED OR NEW ROADS ARE BEING CONSTRUCTED, PROVIDE TEMPORARY ACCESS ROADS,
FLAGGERS, AND /OR SIGNAGE TO SAFELY MAINTAIN TRAFFIC FLOW AND VEHICULAR ACCESS
TO AND FROM FUNCTIONING AREAS.
· IN THE EVENT THAT ELECTRICAL POWER ON SITE WILL BE REQUIRED TO BE SHUT OFF FOR
IMPROVEMENTS THE CONTRACTOR SHALL NOTIFY THE RE/COR AND CEMETERY DIRECTOR.
SHUT OFF OF ELECTRICAL POWER MUST BE COORDINATED WITH AND APPROVED BY THE
RE/COR AND CEMETERY DIRECTOR. THE CONTRACTOR MUST MAKE REASONABLE EFFORTS TO
COMPLETE WORK AND LIMIT THE TIME THAT THE CEMETERY GOES WITHOUT ELECTRICAL
POWER.
· THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVAL OF TEMPORARY FACILITIES
REQUIRED BY THIS SEQUENCING PLAN AND BY THE CONTRACT DOCUMENTS. THE
CONTRACTOR SHALL RESTORE ALL GRADES, LANDSCAPING, IRRIGATION, UTILITIES, SIDEWALK, CURB AND PAVEMENT ALTERED OR DAMAGED BY INSTALLATION OF USE OF TEMPORARY
FACILITIES BACK TO THEIR PRE-CONSTRUCTION CONDITION OR TO THE PROPOSED CONDITION
WHERE SPECIFIED BY THE CONTRACT DOCUMENTS.
· MILL AND OVERLAY/FULL DEPTH REPLACEMENT SHALL NOT BEGIN UNTIL THE MAJORITY OF THE
PROJECT IS COMPLETE INCLUDING COMPLETION OF THE SIDEWALK REPLACEMENT AND NEW
ASPHALT AREAS ARE COMPLETED.
· BRING OVERLAYED ASPHALT TO SIDEWALK/EXISTING ASPHALT GRADE.
· COMPLETE ANY AND ALL OTHER CONTRACTUAL REQUIREMENTS AS IDENTIFIED ELSEWHERE IN
THE CONSTRUCTION DOCUMENTS.
MAINTENANCE OF TRAFFIC
· PREPARE A CONSTRUCTION TRAFFIC CONTROL PLAN IN ACCORDANCE WITH PART 1.16 USE OF
ROADWAYS IN SPECIFICATION SECTION 01 00 01 GENERAL REQUIREMENTS.
· CONTRACTOR IS REQUIRED TO PREPARE A CONSTRUCTION SEQUENCING PLAN FOR MILL AND
OVERLAY OPERATIONS AND SUBMIT TO THE RE/COR FOR REVIEW AND APPROVAL.
· DO NOT USE GENERAL PUBLIC ENTRANCE TO CEMETERY AT ANY TIME FOR ANY REASON, AND
ALL SIGNAGE NEEDED TO KEEP CONSTRUCTION TRAFFIC AWAY FROM THE MAIN ENTRANCE
SHALL BE PROVIDED BY CONTRACTOR AND MAINTAINED THROUGHOUT CONSTRUCTION AT THE
CONTRACTORS COST.
· TEMPORARY SIGNAGE IS REQUIRED THROUGHOUT THE PROJECT TO FACILITATE PUBLIC
ACCESS TO THE CEMETERY AND ADVANCE NOTIFICATION OF CONSTRUCTION ACTIVITIES.
· ACCESS TO COLUMBARIUMS SHALL BE MAINTAINED DURING ANY CONSTRUCTION ACTIVITIES.
· CONTRACTOR SHALL USE THE PRIMARY CONSTRUCTION ACCESS IDENTIFIED IN THE
CONSTRUCTION DOCUMENTS UNLESS OTHERWISE AUTHORIZATED IN ADVANCE BY THE
RE/COR.
· MAINTAIN ONE LANE OF TRAFFIC OPEN TO THE PUBLIC AT ALL TIMES, UNLESS OTHERWISE
AUTHORIZED BY THE RE/COR. THE EXCEPTION TO THIS REQUIREMENT IS THE LOOP TO THE
NEW BURIAL AREAS.
· EXISTING ROADWAYS AND CONSTRUCTION AREAS NEAR THE PUBLIC SHALL REMAIN CLEAN
AND FREE OF DEBRIS. ALL DEBRIS SHALL BE REMOVED AS IT OCCURS.
· CONTRACTOR SHALL MAINTAIN CEMETERY ROADS USED DURING CONSTRUCTION ACTIVITIES
THROUGH REGULAR STREET SWEEPING.
· CONTRACTOR SHALL ENSURE THE NOISE FROM TRUCK AND EQUIPMENT TRAFFIC DOES NOT
INTERFERE WITH FUNERAL SERVICES AT THE COMMITTAL SERVICE SHELTERS.
· ROADWAY PAVING AND MILLING OPERATIONS ON EXISTING CEMETERY ROADS SHALL BE
PERFORMED AT NIGHT TO MINIMIZE DAYTIME ROAD CLOSURES. CONTRACTOR SHALL PROVIDE
ALL NECESSARY EQUIPMENT, INCLUDING TEMPORARY LIGHTING, AS REQUIRED. ROADS SHALL
BE STABILIZED AND OPENED FOR PUBLIC USE BY 7 AM DAILY. MILL AND OVERLAY OPERATIONS
ARE TO OCCUR AT THE SAME TIME THE FINAL COAT IS ADDED TO THE NEWLY CONSTRUCTED
ROADS.
· CONTRACTOR STAGING AND STORAGE SHALL BE WITHIN AN AREA ISOLATED FROM PUBLIC
ACCESS WITHIN NEW BURIAL SECTIONS AND COLUMBARIUM COMPLEX, AND WHERE APPROVED
ALONG THE CONTRACTOR CONSTRUCTION ACCESS ROADWAY.
· ROADWAY ACCESS TO THE ADMINISTRATION BUILDING AND MAINTENANCE YARD SHALL
REMAIN OPEN AT ALL TIMES DURING CONSTRUCTION, INCLUDING PAVING OPERATIONS. ONE
LANE CLOSURES AND THE USE OF FLAGMEN IS ACCEPTABLE. TEMPORARY USE OF MILLED
ROADWAY IS ACCEPTABLE AS LONG AS THE CONTRACTOR HAS PROVIDED TRANSITIONS AND
PROTECTION AROUND EXPOSED MANHOLES AND OTHER ENCUMBRANCES THAT MIGHT
DAMAGE A CAR OR ITS TIRES.
LEGEND
NEW BURIAL SECTIONS
· PRE-PLACED CASKET PLOT SECTIONS
· IN-GROUND CREMAINS PLOT SECTIONS
B1
NEW COLUMBARIUM
· NEW COLUMBARIUM COMPLEXB2
COMMITTAL SHELTERS
· UPDATES TO EX. SHELTERSB3
PUBLIC RESTROOMS
· RESTROOM RENOVATION
· TEMPORARY ACCESSIBLE RESTROOM TRAILER
F1
PIC/ADMIN BUILDING AREA
· NEW CORTEGE BOOTHF2
MAINTENANCE FACILITY
· NEW VEHICLE STORAGE STRUCTURE
· BUILDING/ RESTROOM RENOVATIONS IN EX.
MAINTENANCE BUILDING
F3
CONNECTION TO CONNERY DRIVE
· CONSTRUCT ROADWAY ON EX. GRAVEL ROADR1
CORTEGE LANES
· CONSTRUCT RIGHT TURN-IN LANE OFF
BENNINGTON BLVD. INTO CORTEGE LANE AREA
· CONSTRUCT ADDITIONAL CORTEGE LANE
· CREATE PARKING LOT BY PIC/ADMIN BUILDING
R2
PHASE 4 AREA
· CONSTRUCT BOURNE DRIVE EXTENSION
· CONSTRUCT NEW ROAD LOOPS (USS
CONSTITUTION AVENUE AND MAYFLOWER WAY)
R3
MAINTENANCE ROAD
· CONSTRUCT NEW MAINTENANCE ROADR4
ADD ALTERNATIVE #1
· CONSTRUCT ROAD TO CONNECT PATRIOT LANE
AND BUNKER HILL CIRCLE
R5
MAINTENANCE FACILITY AREA
· CONSTRUCT ADDITIONAL PARKING AREA
· RENOVATE EXISTING PARKING LOT TO ALLOW
DRIVE-THROUGH CONNECTION TO EX.STORAGE
STRUCTURE
R6
CONSTRUCTION SEQUENCING PLAN
GI200
TEMPORARY CONTRACTOR YARD
· RESIDENT ENGINEER TRAILER W/ UTILITIES
· CONTRACTOR TRAILER W/ UTILITIES
T1
GENERAL PUBLIC ENTRANCE
· NOT TO BE USED BY CONTRACTORE1
PRIMARY CONSTRUCTION ENTRANCEE2
SECONDARY CONSTRUCTION ENTRANCE
· ENTRANCE ONLY TO BE USED FOR USS
CONSTITUTION AVENUE CONSTRUCTION
E3
FULL DEPTH REPLACE
· FULL DEPTH REPLACEMENT OF VETERANS WAY
FROM PIC/ADMIN AREA TO USS CONSTITUTION
AVENUE
R7
NOTE: THIS DEVELOPMENT DOES NOT INCLUDE EARLY TURNOVER.
COLUMBARIUM A & B
· RENOVATIONS TO WALL, SHELTER, & PAVEMENTB4
SEQUENCING PLAN FOR SENSITIVE
AREAS (LIST IS NOT INTENDED TO BE
ALL INCLUSIVE)
- CONSTRUCTION MUST BE COMPLETED WITHIN
A REASONABLE TIMEFRAME (APPROVED BY THE
OWNER) FROM COMMENCING WORK. WORK
SHALL BE PRIMARILY FOCUSED IN THE FALL.
- EXISTING ASPHALT AT PROPOSED ROSTRUM
AREA SHALL REMAIN UNTIL ALL PARKING AT
THE PIC/ADMIN AREA IS COMPLETED.
F1
F2
- CONSTRUCTION MUST BE PERFORMED ON ONE
COMMITTAL SHELTER AT A TIME AND WITHIN A
REASONABLE TIMEFRAME (APPROVED BY THE
OWNER) FROM COMMENCEMENT OF WORK.
- THE WESTERN PORTION OF MEMORIAL CIRCLE
SHALL ONLY BE USED FOR CONSTRUCTION ON
COLUMBARIUM B.
R2
B3
B4
PUBLIC RESTROOM
PIC/ADMIN BUILDING AREA
CORTEGE LANES
COMMITTAL SHELTERS
COLUMBARIUM A& B
R3 PHASE 4 AREA - EXTENSION OF BOURNE DRIVE
- AS STATED ON PLAN CRYPTS ARE TO BE
LOCATED AND FLAGGED PRIOR TO
CONSTRUCTION. SPECIAL CARE IS TO BE
TAKEN FOR BOURNE DRIVE EXTENSION
THROUGH SECTION 11 DURING CONSTRUCTION.
COLUMBARIUM A & B
· REPLACE COLUMBARIUM CAPSB5
ROSTRUM
· NEW ROSTRUM AREAF4
STORAGE AREA
· NEW MATERIAL STORAGE BUILDINGF5
F3 MAINTENANCE FACILITY
- CONSTRUCTION MUST BE PERFORMED WITHIN
A REASONABLE TIMEFRAME (APPROVED BY THE
OWNER) FROM COMMENCING WORK TO LIMIT
DISRUPTION TO ONGOING CEMETERY
MAINTENANCE ACTIVITIES.
R6
S33°56'19"E
3530.00'
S66°58'37"E 4858.11'
.9 8'
S0 8°
'2
2" W
9.
S1 7°
'2
0" W
1066.86' N87°39'36"W
287.16'N77°03'38"W
215.65' N57°29'19"W
218.96' N43°07'22"W
781.83'
N71°35'06"W
200.00' S31°05'49"W
261.22' N58°54'11"W
255.82' N47°47'15"W
230.39' N40°36'38"W
1297.20'N76°20'34"W
1268.26'
S83°00'10"W
361.86'
S89°20'53"W
850.11' N86°20'57"W
S0 5°
'2
7" E
.1 0'
N2 0°
'4
6" E
.9 4'
N02°21'58"E 251.82'
L=612.91' R=850.54' D=41°17'19"
L=86.62' R=428.66' D=11°34'41"
L=341.56' R=400.00' D=48°55'32"
S43°26'26"W 56.97'
N
°2 2'
"W
8.
N
°4 6'
"E
7.
N14°18'30"E 218.18'
N14°30'54"E 109.44'
N
°1 1'
"E
0.
N
°1 9'
"E
0.
N14°32'37"E 122.69'
L=623.87' R=1081.92' D=33°02'18"
L=2216.24' R=15307.63' D=8°17'43"
1591.14'N69°55'28"W
N:2706146.28 E:911710.47
N:2706456.94 E:902811.21
N:2703809.59 E:907712.92
BUNKER
HILL
CIRCLE
PLYMOUTH
LANE
LANECONCORD
CIRCLE
LEXING
TON
WAYVETERANS
VETERANS
W
AY CIRCLE
WAMPANOAG
BO
UL
EV
AR
D
BE
NN
IN
GT
ON
PA
TR
IO
T
LA
NE
M
EM
O
RIAL
CIRCLE
BO
U
R
NE
D R
IVE
McKENNA ROAD
F F E = 163.40C
O
F
D
B I
J
G
M
H
N
Q
R
Z
S80°30'24"E 175.68'N45°19'17"E
222.85'
N:2711395.58 E:904620.77
1268.26'
S83°00'10"WN
°2 2'
"W
8.
S
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
OVERALL DEMO & INITIAL EROSION
& SEDIMENT CONTROL PLAN
GC100
KEY NOTES
GENERAL NOTES
PUMP
HOUSE
TRANSFORMER
LEGEND:
PROPERTY LINE
LIMITS OF WORK
INLET PROTECTION
## BURIAL SECTION
NUMBER
DRAINAGE DIVIDE
DIVERSION DIKE
TEMPORARY STONE
ACCESS DRIVE
EROSION CONTROL
BLANKET
DEMOLITION LEGEND:
REMOVE EX. CURB
DEMOLISH EX. PAVEMENT
DEMOLISH EX. STRUCTURE/ITEM
DEMOLISH EX. STORM PIPE
DEMOLISH EX. GRAVEL ROAD
SILT FENCE/
WILDLIFE BARRIER
SEDIMENT TRAP
REMOVE EX. FENCE
REMOVE EX. TREE/SHRUB
SAFETY FENCE
SURFACE
ROUGHENING
ROCK CHECK DAM
OUTLET PROTECTION
DEMOLISH EX. PAVEMENT FOR ADD
ALTERNATE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
DEMO & INITIAL EROSION &
SEDIMENT CONTROL PLAN AREA 1
GC101
KEY MAP
(NOT TO SCALE)
111213 14 5
EX. CB 18
RIM=108.79 (BASE BID)
RIM=109.42 (BID ALT1)
EX. CB 17
RIM=108.79 (BASE BID)
RIM=109.42 (BID ALT1)
LEGEND:
PROPERTY LINE
LIMITS OF WORK
INLET PROTECTION
## BURIAL SECTION
NUMBER
DRAINAGE DIVIDE
DIVERSION DIKE
TEMPORARY STONE
ACCESS DRIVE
EROSION CONTROL
BLANKET
DEMOLITION LEGEND:
REMOVE EX. CURB
DEMOLISH EX. PAVEMENT
DEMOLISH EX. STRUCTURE/ITEM
DEMOLISH EX. STORM PIPE
DEMOLISH EX. GRAVEL ROAD
SILT FENCE/
WILDLIFE BARRIER
SEDIMENT TRAP
REMOVE EX. FENCE
REMOVE EX. TREE/SHRUB
SAFETY FENCE
SURFACE
ROUGHENING
ROCK CHECK DAM
OUTLET PROTECTION
DEMOLISH EX. PAVEMENT FOR ADD
ALTERNATE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
DEMO & INITIAL EROSION &
SEDIMENT CONTROL PLAN AREA 2
GC102
KEY MAP
(NOT TO SCALE)
M
AI
N
EN
TR
Y
MAIN
ENTRY
BLDG. NO. 58002
PUBLIC
RESTROOM
BUILDING
FFE=170.00
BL
D
G .N
O .5
AD
M
IN
IS
TR
AT
IO
N/
PU
BL
IC
IN
FO
R M
AT
IO
N C
EN
TE
R (P
.I.
C.
BU
IL
DI
NG
FF
E=
0.
DRAIN
FIE
LD
SEE SHEET CS103 FOR TEST PIT AND
UNDERGROUND UTILITY LOCATING.
LEGEND:
PROPERTY LINE
LIMITS OF WORK
INLET PROTECTION
## BURIAL SECTION
NUMBER
DRAINAGE DIVIDE
DIVERSION DIKE
TEMPORARY STONE
ACCESS DRIVE
EROSION CONTROL
BLANKET
DEMOLITION LEGEND:
REMOVE EX. CURB
DEMOLISH EX. PAVEMENT
DEMOLISH EX. STRUCTURE/ITEM
DEMOLISH EX. STORM PIPE
DEMOLISH EX. GRAVEL ROAD
SILT FENCE/
WILDLIFE BARRIER
SEDIMENT TRAP
REMOVE EX. FENCE
REMOVE EX. TREE/SHRUB
SAFETY FENCE
SURFACE
ROUGHENING
ROCK CHECK DAM
OUTLET PROTECTION
DEMOLISH EX. PAVEMENT FOR ADD
ALTERNATE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
DEMO & INITIAL EROSION & SEDIMENT
CONTROL PLAN AREA 3
GC103
KEY MAP
(NOT TO SCALE)
111213 14 5
1. SEE SHEET GC100 FOR ADMINISTRATIVE BUILDING
AREA PHASING PLAN.
2. CONSTRUCTION FENCE POSTS IN CRITICAL AREAS
MUST BE STABILIZED ABOVE GROUND.
3. SEE IRRIGATION PLAN FOR IRRIGATION DEMOLITION.
NOTES:
EX. AD B
EX. RIP RAP
EX. CB A
EX. HEADWALL
EX. DMH A
RIM=137.00
RIM=136.70
RIM=136.50
EX. 12" RCP
EX. FES 6
EX. AD A
RIM=137.80
6A
7A
4A
FINAL TRAILER LAYOUT TO
BE DETERMINED IN FIELD.
CONTRACTOR TO AVOID
IMPACTING EX. UTILITIES
AND STRUCTURES.
SEE IRRIGATION PLAN FOR
HYDRANT REPLACEMENT
LEGEND:
PROPERTY LINE
LIMITS OF WORK
INLET PROTECTION
## BURIAL SECTION
NUMBER
DRAINAGE DIVIDE
DIVERSION DIKE
TEMPORARY STONE
ACCESS DRIVE
EROSION CONTROL
BLANKET
DEMOLITION LEGEND:
REMOVE EX. CURB
DEMOLISH EX. PAVEMENT
DEMOLISH EX. STRUCTURE/ITEM
DEMOLISH EX. STORM PIPE
DEMOLISH EX. GRAVEL ROAD
SILT FENCE/
WILDLIFE BARRIER
SEDIMENT TRAP
REMOVE EX. FENCE
REMOVE EX. TREE/SHRUB
SAFETY FENCE
SURFACE
ROUGHENING
ROCK CHECK DAM
OUTLET PROTECTION
DEMOLISH EX. PAVEMENT FOR ADD
ALTERNATE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
DEMO & INITIAL EROSION &
SEDIMENT CONTROL PLAN AREA 4
GC104
KEY MAP
(NOT TO SCALE)
COMMITTAL
SHELTER
COMMITTAL
SHELTER
REMOVE EX.
GUARD RAIL
STONE WALL
LEGEND:
PROPERTY LINE
LIMITS OF WORK
INLET PROTECTION
## BURIAL SECTION
NUMBER
DRAINAGE DIVIDE
DIVERSION DIKE
TEMPORARY STONE
ACCESS DRIVE
EROSION CONTROL
BLANKET
DEMOLITION LEGEND:
REMOVE EX. CURB
DEMOLISH EX. PAVEMENT
DEMOLISH EX. STRUCTURE/ITEM
DEMOLISH EX. STORM PIPE
DEMOLISH EX. GRAVEL ROAD
SILT FENCE/
WILDLIFE BARRIER
SEDIMENT TRAP
REMOVE EX. FENCE
REMOVE EX. TREE/SHRUB
SAFETY FENCE
SURFACE
ROUGHENING
ROCK CHECK DAM
OUTLET PROTECTION
DEMOLISH EX. PAVEMENT FOR ADD
ALTERNATE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
DEMO & INITIAL EROSION &
SEDIMENT CONTROL PLAN AREA 5
GC105
KEY MAP
(NOT TO SCALE)
111213 14 5
NOTES: CONSTRUCTION FENCE POSTS IN
CRITICAL AREAS MUST BE STABILIZED ABOVE
GROUND.
SHELTER
*SEE LANDSCAPE
SHEETS FOR WORK
APPROXIMATE LOCATION OF EX. 4'X8'
CRYPTS (EXTENTS TO BE FLAGGED DURING
CONSTRUCTION). NO FENCING, MATERIALS,
EXCAVATION, OR OTHER CONSTRUCTION
ACTIVITIES ARE PERMITTED OVER EXISTING
CRYPTS.
LEGEND:
PROPERTY LINE
LIMITS OF WORK
INLET PROTECTION
## BURIAL SECTION
NUMBER
DRAINAGE DIVIDE
DIVERSION DIKE
TEMPORARY STONE
ACCESS DRIVE
EROSION CONTROL
BLANKET
DEMOLITION LEGEND:
REMOVE EX. CURB
DEMOLISH EX. PAVEMENT
DEMOLISH EX. STRUCTURE/ITEM
DEMOLISH EX. STORM PIPE
DEMOLISH EX. GRAVEL ROAD
SILT FENCE/
WILDLIFE BARRIER
SEDIMENT TRAP
REMOVE EX. FENCE
REMOVE EX. TREE/SHRUB
SAFETY FENCE
SURFACE
ROUGHENING
ROCK CHECK DAM
OUTLET PROTECTION
DEMOLISH EX. PAVEMENT FOR ADD
ALTERNATE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
DEMO & INITIAL EROSION &
SEDIMENT CONTROL PLAN AREA 6
GC106
KEY MAP
(NOT TO SCALE)
111213 14 5
NOTES: CONSTRUCTION FENCE POSTS IN
CRITICAL AREAS MUST BE STABILIZED ABOVE
GROUND.
LEGEND:
PROPERTY LINE
LIMITS OF WORK
INLET PROTECTION
## BURIAL SECTION
NUMBER
DRAINAGE DIVIDE
DIVERSION DIKE
TEMPORARY STONE
ACCESS DRIVE
EROSION CONTROL
BLANKET
DEMOLITION LEGEND:
REMOVE EX. CURB
DEMOLISH EX. PAVEMENT
DEMOLISH EX. STRUCTURE/ITEM
DEMOLISH EX. STORM PIPE
DEMOLISH EX. GRAVEL ROAD
SILT FENCE/
WILDLIFE BARRIER
SEDIMENT TRAP
REMOVE EX. FENCE
REMOVE EX. TREE/SHRUB
SAFETY FENCE
SURFACE
ROUGHENING
ROCK CHECK DAM
OUTLET PROTECTION
DEMOLISH EX. PAVEMENT FOR ADD
ALTERNATE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
DEMO & INITIAL EROSION &
SEDIMENT CONTROL PLAN AREA 7
GC107
KEY MAP
(NOT TO SCALE)
LIMITS OF WORK
INLET PROTECTION
## BURIAL SECTION
NUMBER
DRAINAGE DIVIDE
DIVERSION DIKE
TEMPORARY STONE
ACCESS DRIVE
EROSION CONTROL
BLANKET
DEMOLITION LEGEND:
REMOVE EX. CURB
DEMOLISH EX. PAVEMENT
DEMOLISH EX. STRUCTURE/ITEM
DEMOLISH EX. STORM PIPE
DEMOLISH EX. GRAVEL ROAD
SILT FENCE/
WILDLIFE BARRIER
SEDIMENT TRAP
REMOVE EX. FENCE
REMOVE EX. TREE/SHRUB
SAFETY FENCE
SURFACE
ROUGHENING
ROCK CHECK DAM
OUTLET PROTECTION
DEMOLISH EX. PAVEMENT FOR ADD
ALTERNATE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
DEMO & INITIAL EROSION &
SEDIMENT CONTROL PLAN AREA 8
GC108
KEY MAP
(NOT TO SCALE)
LIMITS OF WORK
INLET PROTECTION
## BURIAL SECTION
NUMBER
DRAINAGE DIVIDE
DIVERSION DIKE
TEMPORARY STONE
ACCESS DRIVE
EROSION CONTROL
BLANKET
DEMOLITION LEGEND:
REMOVE EX. CURB
DEMOLISH EX. PAVEMENT
DEMOLISH EX. STRUCTURE/ITEM
DEMOLISH EX. STORM PIPE
DEMOLISH EX. GRAVEL ROAD
SILT FENCE/
WILDLIFE BARRIER
SEDIMENT TRAP
REMOVE EX. FENCE
REMOVE EX. TREE/SHRUB
SAFETY FENCE
SURFACE
ROUGHENING
ROCK CHECK DAM
OUTLET PROTECTION
DEMOLISH EX. PAVEMENT FOR ADD
ALTERNATE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
DEMO & INITIAL EROSION &
SEDIMENT CONTROL PLAN AREA 9
GC109
KEY MAP
(NOT TO SCALE)
LIMITS OF WORK
INLET PROTECTION
## BURIAL SECTION
NUMBER
DRAINAGE DIVIDE
DIVERSION DIKE
TEMPORARY STONE
ACCESS DRIVE
EROSION CONTROL
BLANKET
DEMOLITION LEGEND:
REMOVE EX. CURB
DEMOLISH EX. PAVEMENT
DEMOLISH EX. STRUCTURE/ITEM
DEMOLISH EX. STORM PIPE
DEMOLISH EX. GRAVEL ROAD
SILT FENCE/
WILDLIFE BARRIER
SEDIMENT TRAP
REMOVE EX. FENCE
REMOVE EX. TREE/SHRUB
SAFETY FENCE
SURFACE
ROUGHENING
ROCK CHECK DAM
OUTLET PROTECTION
DEMOLISH EX. PAVEMENT FOR ADD
ALTERNATE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
DEMO & INITIAL EROSION &
SEDIMENT CONTROL PLAN AREA 10
GC110
KEY MAP
(NOT TO SCALE)
STONE WALL
SHED TO REMAIN
LEGEND:
PROPERTY LINE
LIMITS OF WORK
INLET PROTECTION
## BURIAL SECTION
NUMBER
DRAINAGE DIVIDE
DIVERSION DIKE
TEMPORARY STONE
ACCESS DRIVE
EROSION CONTROL
BLANKET
DEMOLITION LEGEND:
REMOVE EX. CURB
DEMOLISH EX. PAVEMENT
DEMOLISH EX. STRUCTURE/ITEM
DEMOLISH EX. STORM PIPE
DEMOLISH EX. GRAVEL ROAD
SILT FENCE/
WILDLIFE BARRIER
SEDIMENT TRAP
REMOVE EX. FENCE
REMOVE EX. TREE/SHRUB
SAFETY FENCE
SURFACE
ROUGHENING
ROCK CHECK…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .