This solicitation is for the Massachusetts National Cemetery Phase 4 Expansion project in Bourne, MA. The Department of Veterans Affairs Office of Construction and Facilities Management will develop approximately 20 acres of land including around 12,000 gravesites for both caskets and cremated remains in new burial sections. The project number is 818-032. Offerors will be evaluated using a tiered method. The solicitation number is 36C10F20R0042.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENTRY GATE
KEY NOTES LEGEND:
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETS
24' (TYP.)
EX. CB 18
RIM=108.79 (BASE BID)
RIM=109.42 (BID ALT1)
EX. CB 17
RIM=108.79 (BASE BID)
RIM=109.42 (BID ALT1)
R=610.38',L=136.79',D=12.8400
R =233.75' ,L=190.17 ' ,D
4 6. 6127
R =32 8.4 3' ,L=1 58.2 0 ' ,D
2 7.5985
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
SITE LAYOUT AND UTILITY PLAN
AREA 2
CS102
KEY MAP
(NOT TO SCALE)
111213 14 5
NORTH
SITE LAYOUT NOTES:
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY
A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,
USING COORDINATES & BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON GRID
COORDINATE SYSTEM IN U.S. FEET AND BASED ON THE
HORIZONTAL DATUM NAD 1983 AND VERTICAL DATUM NGVD 1929.
18' (TYP.)
9' (TYP.)
R10'
R10'
R5'
5'10'
4'
R5'
R5'
9' (TYP.)
18' (TYP.)
PARKING
SPACES
(34)
PARKING
SPACES
(10)
FLUSH
CONNECT TO
EX. SIDEWALK
FLUSH
CONNECT TO
EX. SIDEWALK
SEE SHEET L-503
FOR ROSTRUM
DETAILS
MATCH EX.
CURB AT
NEAREST
JOINT
RETAINING WALL
(REFER TO
STRUCTURAL
PLANS)
MATCH EX.
CURB NEAREST
EXPANSION
JOINT
MATCH EX.
CURB AT
NEAREST
JOINT
MATCH EX.
CURB
MATCH EX.
CURB AT
NEAREST
JOINT
16 16
161616
TEST PITS
REQ'D
FLUSH
CONNECT TO
EX. SIDEWALK
12' (T
YP.)24
8'
10'SEE
ARCHITECTURAL
SHEET AE102
10'
8'
4.5' 24'
R50' R62'
TEST PITS
REQ'D
MATCH EX.
CURB
MATCH EX.
CURB
R30'
R50'
RELOCATED EX. SIGN
#7 (SEE SHEET CI101
FOR SIGN INVENTORY)
SAW CUT
SAW CUT
M
AI
N
EN
TR
Y
MAIN
ENTRY
BLDG. NO. 58002
PUBLIC
RESTROOM
BUILDING
FFE=170.00
BL
D
G .N
O .5
AD
M
IN
IS
TR
AT
IO
N/
PU
BL
IC
IN
FO
R M
AT
IO
N C
EN
TE
R (P
.I.
C.
BU
IL
DI
NG
FF
E=
0.
DRAIN
FIE
LD
CONTRACTOR TO VERIFY HORIZONTAL
& VERTICAL LOCATION OF GAS LINE.
EX. SLEEVE TO BE EXTENDED WIDTH
OF CORTEGE LANE. CONTRACTOR TO
RELOCATE GAS LINE AS NEEDED TO
ENSURE MIN. 3' COVER.
CONTRACTOR TO VERIFY LOCATION OF EX. WATERLINE
AND RELOCATE AS NEEDED TO AVOID CONFLICTS WITH
CORTEGE BOOTH, ASSOCIATED UTILITIES, AND NEW
STORM PIPE. MAINTAIN EXISTING DEPTH OF COVER.
RELOCATED
EX. SECTION
MARKER
RELOCATED EX. SIGN
#5 (SEE SHEET CI101
FOR SIGN INVENTORY)
MATCH EX.
CURB AT
NEAREST
JOINT
RELOCATED EX. SIGN
#4 (SEE SHEET CI101
FOR SIGN INVENTORY)
RELOCATED EX. SIGN
#6 (SEE SHEET CI101
FOR SIGN INVENTORY)
R50'
ENTRY GATE
KEY NOTES LEGEND:
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
SITE LAYOUT AND UTILITY PLAN
AREA 3
CS103
KEY MAP
(NOT TO SCALE)
111213 14 5
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE
LAID OUT BY A LICENSED LAND SURVEYOR ENGAGED
BY THE CONTRACTOR, USING COORDINATES &
BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON
GRID COORDINATE SYSTEM IN U.S. FEET AND BASED
ON THE HORIZONTAL DATUM NAD 1983 AND
VERTICAL DATUM NGVD 1929.
3. UTILITY LOCATING FIRM TO PERFORM TEST PITS
PRIOR TO CONSTRUCTION TO VERIFY THE VERTICAL
AND HORIZONTAL LOCATION OF THE UNDERGROUND
UTILITY. 3 FEET OF COVER MUST BE PROVIDED.
4. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY
AND IF NEEDED, RELOCATE EXISTING
UNDERGROUND UTILITIES. SPECIAL CARE WILL BE
TAKEN IN CRITICAL AREAS AROUND BUILDINGS.
SITE LAYOUT NOTES:
CONNECT TO
EX. CURB AT
NEAREST JOINT
BUILDING
FOOTING
BUILDING
FOOTING
SHELTER
(FFE=136.70)
SEE SHEET
AE102
CONNECT TO
EP
RETAINING
WALL (SEE
STRUCTURAL
SHEET S-501)
PARKING
SPACES
(6)
PARKING
SPACES
(1)
SAW CUT
SAW CUT
EX. AD B
EX. CB A
EX. HEADWALL
EX. DMH A
RIM=137.00
RIM=136.70
RIM=136.50
EX. 12" RCP
EX. FES 6
EX. AD A
RIM=137.80
6A
4A
4" HDPE FOUNDATION
DRAIN (SEE ARCH.
SHEETS)
ELECTRIC
LINE
ELECTRIC
LINE
SEE IRRIGATION PLAN FOR
HYDRANT REHABILITATION
SEE INSET FOR
TRENCH/FOUNDATION DRAINS
ENTRY GATE
KEY NOTES LEGEND:
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETS
EX. FES 6
8" HDPE 8" HDPE
INV.=127.00
INV.=134.25
INV.=134.06
INV.=134.50
INV.=134.50
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
SITE LAYOUT AND UTILITY PLAN
AREA 4
CS104
KEY MAP
(NOT TO SCALE)
111213 14 5
NORTH
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE
LAID OUT BY A LICENSED LAND SURVEYOR ENGAGED
BY THE CONTRACTOR, USING COORDINATES &
BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON
GRID COORDINATE SYSTEM IN U.S. FEET AND BASED
ON THE HORIZONTAL DATUM NAD 1983 AND
VERTICAL DATUM NGVD 1929.
3. UTILITY LOCATING FIRM TO PERFORM TEST PITS
PRIOR TO CONSTRUCTION TO VERIFY THE VERTICAL
AND HORIZONTAL LOCATION OF THE UNDERGROUND
UTILITY.
4. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY
AND IF NEEDED, RELOCATE EXISTING
UNDERGROUND UTILITIES.
5. FILL APPROXIMATELY 2,500 LF OF LINEAR CRACKING
IN MAINTENANCE LOTS. EXACT LOCATION TO BE
APPROVED BY RE/COR.
6. SEE ELECTRIC PLAN FOR CONTINUATION OF FIRE
LINE AND FEEDER.
SITE LAYOUT NOTES:
KEY NOTES LEGEND (CONT.):
KEY NO. DESCRIPTION DETAIL/PG
25 OIL /WATER SEPERATOR
26 TRENCH DRAIN
27 LEECHING BASIN
TRENCH/FOUNDATION DRAIN INSET
SCALE: 1" = 20'
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETS
CONTINUE EX.
ROADWAY
CROSS-SLOPE
AT 2%
CONTINUE EX.
ROADWAY
CROSS-SLOPE
AT 2%
15'
15'
R 15'
15'
R54.5'
R39.5'
R 20'R30'
R30'
15'
15'
COMMITTAL
SHELTER
COMMITTAL
SHELTER
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
SITE LAYOUT AND UTILITY PLAN
AREA 5
CS105
KEY MAP
(NOT TO SCALE)
111213 14 5
NORTH
SITE LAYOUT NOTES:
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY
A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,
USING COORDINATES & BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON GRID
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETS
SEE LANDSCAPE
SHEETS FOR PLANTING
INFORMATION
APPROXIMATE LOCATION OF EX. 4'X8'
CRYPTS (EXTENTS TO BE FIELD
LOCATED & FLAGGED DURING
CONSTRUCTION). NO FENCING,
MATERIALS, EXCAVATION, OR OTHER
CONSTRUCTION ACTIVITIES ARE
PERMITTED OVER EXISTING CRYPTS.
CONNECT TO
EX. PAVEMENT
24' (TYP.)
22' (TYP.)
19 21
COMMITTAL
SHELTER
R=245.00',L=383.71',D=89.7353
R=200.00',L=44.82',D=12.8406
R=200.00',L=20.43',D=5.8533
CONTRACTOR TO REPLACE UP
TO 25 SF OF DAMAGED
CONCRETE ON NORTH SIDE
OF COMMITTAL SHELTER
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
SITE LAYOUT AND UTILITY PLAN
AREA 6
CS106
KEY MAP
(NOT TO SCALE)
111213 14 5
NORTH
SITE LAYOUT NOTES:
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY
A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,
USING COORDINATES & BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON GRID
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETS
3'
AI
SL
E
(T
YP
SECTION 61
2,580 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'X8' PLOTS)
56' (TYP.)
TY
P.
90°
SM61B
SM62A
SECTION 62
2,800 IN-GROUND CREMAIN
SECTIONS
(WITHIN 4'X4' PLOTS)
24' (TYP.)
24' (T
YP.)
' (T
YP.)
48' (TYP.)
48'(T YP .)
M62A BM62 M62B
M61A
BM61
M61B
90°
20 21
CO
CO
CO
4" HDPE
PERFORATED
PIPE (TYP.)
CO
88.04 ',L=240.76 ',D =35.5493
R=6
.8 0 ', L
=435.2 6',D
=38.8
R=245.00 ', L =383.71
', D =89
.7
R =450. 00' ,L=1416.07 ' ,D
=18 0. 30 00
PR. IRRIGATION WELL
VAULT (REFER TO
IRRIGATION PLANS
FOR DETAILS)
12' (TYP.)
R20'
R 30' R30
12' (TYP.)
12' (T
YP.)
R4 4'
R5 6'
R56
R4 4'
R44
R56
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
SITE LAYOUT AND UTILITY PLAN
AREA 7
CS107
KEY MAP
(NOT TO SCALE)
111213 14 5
MONUMENT LAYOUT CHART
MONUMENT
NORTHING EASTING
M61A 2704772.8064 907275.0832 M61B 2704800.9926 907226.6937 M62A 2704793.2776 907436.8358 M62B 2704795.3520 907484.7909
BASELINE
BEARING [DEFINED BY]
BM61 N59° 46' 47.21"W [M61A TO M61B]
BM62 N87° 31' 31.51"E [M62A TO M62B]
SEC. MARKER LAYOUT CHART
MARKER
NORTHING EASTING
SM61B 2704886.8303 907305.8221
SM62A 2704903.1401 907350.7074
NORTH
SITE LAYOUT NOTES:
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY
A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,
USING COORDINATES & BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON GRID
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETS
COLUMBARIUM H
1,500 COLUMBARIUM/
MEMORIAL WALLS
FLOWER
WATERING
STATION,
FWS (TYP.)
SM61A
FLOWER
WATERING
STATION,
FWS (TYP.)
SM62B
SM63B
SM63A
SM64B
SM64A
SM65B
SECTION 64
290 TRADITIONAL FULL CASKET PLOTS
(WITHIN 4'X10' PLOTS)
SECTION 63
1,420 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'X8' PLOTS)
SECTION 61
2,580 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'X8' PLOTS)
SECTION 62
2,800 IN-GROUND CREMAIN
SECTIONS
(WITHIN 4'X4' PLOTS)
SECTION 65
3,200 IN-GROUND CREMAIN
SECTIONS
(WITHIN 4'X4' PLOTS)
56' (TYP.)
TY
P.
90°
56' (TYP.)
TY
P.
90°
56' (TYP.)
TY
P.
90°
PARKING
SPACES
(19)
3'
AI
SL
E
(T
YP
4'
AI
SL
E
(T
YP
BEGIN FLUSH
CURB
4'
AI
SL
E
(T
YP
SMH
24' (TYP.)
10' (TYP.)
24' (TYP.)
R10'
END FLUSH
CURB
48' (TYP.) 48' ( TY P.)
TY
P.
48' (TYP.)
M65A
BM65
M65B
M64A
BM64
M64B
M63A
BM63
M63B
90°
SECTION 64
300 PRE-PLACED OVERSIZED CRYPTS
(WITHIN 4'X10' PLOTS)
R10'
6" HDPE
SOLID PIPE
(TYP.)
CO
4" HDPE
PERFORATED
PIPE (TYP.)
6" HDPE
SOLID PIPE
(TYP.)
4" HDPE
PERFORATED
PIPE (TYP.)
CO
CO
CO
CO
R=180.00',L=519.21',D=165.2682
R=450.00 ',L=1416.07 ',D =180.3000
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
SITE LAYOUT AND UTILITY PLAN
AREA 8
CS108
KEY MAP
(NOT TO SCALE)
111213 14 5
MONUMENT LAYOUT CHART
MONUMENT
NORTHING EASTING
M63A 2704539.1717 907074.1866 M63B 2704567.3579 907025.7971 M64A 2704375.4211 906971.8606 M64B 2704403.6073 906923.4712 M65A 2704188.8154 906861.9861 M65B 2704141.9943 906851.4132
BASELINE
BEARING [DEFINED BY]
BM63 N59° 46' 47.21"W [M63A TO M63B]
BM64 N59° 46' 47.21"W [M64A TO M64B]
BM65 N12° 43' 29.29"E [M65B TO M65A]
SEC. MARKER LAYOUT CHART
MARKER
NORTHING EASTING
SM61A 2704542.3455 907294.1392
SM62B 2704598.4381 907366.3431
SM63A 2704385.8042 907164.7013
SM63B 2704493.6953 907266.5463
SM64A 2704306.4255 906846.9483
SM64B 2704364.9223 907133.8848
SM65B 2704259.3517 906981.9419
SMH 2704453.7082 907379.0359
FWS LAYOUT CHART
STATION #
NORTHING EASTING
FWS-1 2704442.6400 907379.4252
FWS-2 2704529.6358 907298.1002
FWS-3 270.4352.1771 907130.6255
SITE LAYOUT NOTES:
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY
A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,
USING COORDINATES & BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON GRID
COORDINATE SYSTEM IN U.S. FEET AND BASED ON THE
NORTH
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETS
FLOWER
WATERING
STATION,
FWS (TYP.)
SM64A
SM65B
SM65A
SECTION 65
3,200 IN-GROUND CREMAIN
SECTIONS
(WITHIN 4'X4' PLOTS)
SECTION 64
290 TRADITIONAL FULL CASKET PLOTS
(WITHIN 4'X10' PLOTS)
SECTION 65
3,200 IN-GROUND CREMAIN
SECTIONS
(WITHIN 4'X4' PLOTS)
56' (TYP.)
TY
P.
90°
3'
AI
SL
E
(T
YP
4'
AI
SL
E
(T
YP
4'
AI
SL
E
(T
YP
24' (TYP.)
TY
P.
48' (TYP.)
M65A
BM65
M65B
M64A
BM64
M64B
90°
4" HDPE
PERFORATED
PIPE (TYP.)
6" HDPE
SOLID PIPE
(TYP.)
4" HDPE
PERFORATED
PIPE (TYP.)
CO
R =2 50.00' ,L =172.44' ,D
=39.5213
R=450.00 ' ,L=1416.07 ' ,D=180.3000
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
SITE LAYOUT AND UTILITY PLAN
AREA 9
CS109
KEY MAP
(NOT TO SCALE)
111213 14 5
MONUMENT LAYOUT CHART
MONUMENT
NORTHING EASTING
M64A 2704375.4211 906971.8606 M64B 2704403.6073 906923.4712 M65A 2704188.8154 906861.9861 M65B 2704141.9943 906851.4132
BASELINE
BEARING [DEFINED BY]
BM64 N59° 46' 47.21"W [M64A TO M64B]
BM65 N12° 43' 29.29"E [M65B TO M65A]
SEC. MARKER LAYOUT CHART
MARKER
NORTHING EASTING
SM64A 2704306.4255 906846.9483
SM65A 2704339.1338 906639.3864
SM65B 2704259.3517 906981.9419
FWS LAYOUT CHART
STATION #
NORTHING EASTING
FWS-4 2704324.2222 906747.1897
SITE LAYOUT NOTES:
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY
A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,
USING COORDINATES & BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON GRID
COORDINATE SYSTEM IN U.S. FEET AND BASED ON THE
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETS
24' (T
YP.)
24' (TYP.)
24' (TYP.)
' (T
YP.)
R = 3 00. 00' ,L=322 .41' ,D
=61. 5756
R=388.04 ',L=240.76 ',D =35.5493
R=6
.8 0 ', L
=435.
26', D
=38.8
R=479.70 ',L=242.08',D=28.9145
PC: 1
1+
.21
PT: 14+95.62
10' GRAVEL ROAD
TO CONNECT TO
EX. GRAVEL
ACCESS ROAD
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
SITE LAYOUT AND UTILITY PLAN
AREA 10
CS110
KEY MAP
(NOT TO SCALE)
111213 14 5
NORTH
SITE LAYOUT NOTES:
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY
A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,
USING COORDINATES & BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON GRID
24' (T
YP.)
R30
R30'
START NEW
CURB
52.7'
24'
45'
35'
45'
INV.=161.00
4" HDPE
FOUNDATION
DRAIN (SEE
ARCH. SHEETS)
INV.=159.30
OPEN
STORAGE
OPEN
STORAGE
OPEN
STORAGE
OPEN
STORAGE
R=335.00' ,L=351.46 ' ,D=60.1114
R
0 .
', L
=1
.0 3 '
, D
.5
PT: 14+95.62
PC: 15+93.08
PT: 17+90.11
PC: 18+38.67
PT
: 2
1+
.1
TY
P.
START NEW
CURB
MATCH EX.
CURB
BASE BID CL
PC
: 2
6+
.0
PT: 27+84.70
BP
: 2
6+
.5
PC
: 2
6+
.0
ENTRY GATE
KEY NOTES LEGEND:
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
SITE LAYOUT AND UTILITY PLAN
AREA 11
CS111
KEY MAP
(NOT TO SCALE)
111213 14 5
NORTH
SITE LAYOUT NOTES:
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY
A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,
USING COORDINATES & BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON GRID
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETS
TY
P.
FLOWER
WATERING
STATION TO BE
RELOCATED
FLOWER
WATERING
STATION TO BE
RELOCATED
START NEW
CURB
CONNECT TO
EX. CURB
ADD ALT CL
RELOCATED EX. SIGN
#66 (SEE SHEET CI101
FOR SIGN INVENTORY)
R=255.00 ',L=529.73 ',D=119.0258
R =3
.8
2 ' , L
=1
.3 2'
, D =3
0.
R=25 0.
', L
=1
.9 6'
, D =3
1.
8 4
PI
: 2
6+
.5
PC
: 2
6+
.0
PC
: 2
6+
.0
PT: 2
7+
.15
EP: 2
8+
.79
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
SITE LAYOUT AND UTILITY PLAN -
ADD ALT. 1 - AREA 1
CS112
KEY MAP
(NOT TO SCALE)
111213 14 5
NORTH
SITE LAYOUT NOTES:
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY
A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,
USING COORDINATES & BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON GRID
COORDINATE SYSTEM IN U.S. FEET AND BASED ON THE
HORIZONTAL DATUM NAD 1983 AND VERTICAL DATUM NGVD 1929.
3. MAINTENANCE ROAD AND ADD ALTERNATE ROAD WILL BE
NAVIGATING AROUND EXISITNG BURIAL SECTIONS. CONTRACTOR
TO TAKE EXTRA CARE TO LOCATE, FLAG, AND PROTECT EXISTING
CRYPTS.
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETS
22 21
R = 3304.11' ,L =
4 9
4. 38' ,D
= 8.57 30
R=432.00' ,L=262.23' ,D=34.7799
R=480.83' ,L=146.02 ' ,D=17.4003
R=255.00 ' ,L=529.73 ' ,D=119.0258
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
SITE LAYOUT AND UTILITY PLAN -
ADD ALT. 1 - AREA 2
CS113
KEY MAP
(NOT TO SCALE)
111213 14 5
NORTH
SITE LAYOUT NOTES:
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY
A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,
USING COORDINATES & BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON GRID
GRAVESIDE GRID MONUMENT
BURIAL SECTION MARKER
CHAIN LINK VEHICLE SWING GATE
PRECAST WHEEL STOP
PAVEMENT KEY
HANDICAP SYMBOL
MOUNTABLE CURB
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
HEADSTONE FACE DIRECTION
CONCRETE SIDEWALK
PRE-PLACED CRYPTS
MOUNTABLE CURB
SAWCUT LINE
## EXISTING BURIAL
SECTION NUMBER
HEAVY DUTY BITUMINOUS
PAVEMENT
MILL AND OVERLAY
EXISTING PARKING
AREAS
CROSSWALK MARKING
CAST CURB
GRAVEL/RIP RAP
CURB ACCESS RAMP
KEY NO. DESCRIPTION DETAIL/PG
RIP RAP SWALE15
CURB TRANSITION16
GUARDRAIL INSTALLATION17
STORM MANHOLE18
TYPE A DROP INLET19
TYPE D DROP INLET20
LIGHT DUTY BITUMINOUS
PAVEMENT
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
ENTRY SIGN FEATURE
2 PIPE BOLLARD
FLUSH CURB12
RIP RAP OUTLET PROTECTION21
END SECTION22
GRANITE CURB23
SINGLE SWING GATE24
TRADITIONAL FULL
CASKETSCONNECT TO
EX. CURB
24' (TYP.)
EX. AD 3
RIM=168.50
EX. DMH 9
RIM=167.67
EX. FES 2 (12")
EX. RIP RAP
INV.=159.60
EX. RIP RAP
EX. CB 26
RIM=162.97
EX. FES 4 (12")
EX
. 1
2"
HD
PE
EX. 12"
HDPE
EX. RIP RAP
EX. CB 23
RIM=163.61
EX. 1
2"
HDPE
EX. 12" HDPE
EX. CB 24
RIM=163.61
EX. 1
2"
HDPE
EX. FES 3 (12")
EX. CB 25
RIM=162.97
EX. 12"
HDPE
CATCH BASIN
INV.=160.81
R =500.00' ,L=185.57' ,D
=21.2653
R =3304.11' ,L=
4. 38' ,D
= 8.5730
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
SITE LAYOUT AND UTILITY PLAN -
ADD ALT. 1 - AREA 3
CS114
KEY MAP
(NOT TO SCALE)
111213 14 5
NORTH
SITE LAYOUT NOTES:
1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY
A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,
USING COORDINATES & BEARINGS SHOWN.
2. COORDINATE INFORMATION SHOWN IS BASED ON GRID
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
KEY MAP
(NOT TO SCALE)
NORTH
BURIAL SECTION NUMBERING PLAN
SECTION 61
CS150
GRAPHIC LEGEND:
PRE-PLACED CRYPTS
IN-GROUND CREMAINS PLOTS
SECTION MARKER
GRAVESIDE GRID MONUMENT
INTERIOR
CRYPT (TYP.)
PERIMETER
CRYPT (TYP.)
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
KEY MAP
(NOT TO SCALE)
NORTH
BURIAL SECTION NUMBERING PLAN
SECTION 62
CS151
GRAPHIC LEGEND:
PRE-PLACED CRYPTS
IN-GROUND CREMAINS PLOTS
SECTION MARKER
GRAVESIDE GRID MONUMENT
INTERIOR
CRYPT (TYP.)
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
KEY MAP
(NOT TO SCALE)
NORTH
BURIAL SECTION NUMBERING PLAN
SECTION 63
CS152
GRAPHIC LEGEND:
PRE-PLACED CRYPTS
IN-GROUND CREMAINS PLOTS
SECTION MARKER
GRAVESIDE GRID MONUMENT
INTERIOR
CRYPT (TYP.)
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
KEY MAP
(NOT TO SCALE)
NORTH
BURIAL SECTION NUMBERING PLAN
SECTION 64
CS153
GRAPHIC LEGEND:
PRE-PLACED CRYPTS
IN-GROUND CREMAINS PLOTS
SECTION MARKER
GRAVESIDE GRID MONUMENT
INTERIOR
CRYPT (TYP.)
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
KEY MAP
(NOT TO SCALE)
NORTH
BURIAL SECTION NUMBERING PLAN
SECTION 65
CS154
GRAPHIC LEGEND:
PRE-PLACED CRYPTS
IN-GROUND CREMAINS PLOTS
SECTION MARKER
GRAVESIDE GRID MONUMENT
INTERIOR
CRYPT (TYP.)
S33°56'19"E
3530.00'
S66°58'37"E 4858.11'
.9 8'
S0 8°
'2
2" W
9.
S1 7°
'2
0" W
1066.86' N87°39'36"W
287.16'N77°03'38"W
215.65' N57°29'19"W
218.96' N43°07'22"W
781.83'
N71°35'06"W
200.00' S31°05'49"W
261.22' N58°54'11"W
255.82' N47°47'15"W
230.39' N40°36'38"W
1297.20'N76°20'34"W
1268.26'
S83°00'10"W
361.86'
S89°20'53"W
850.11' N86°20'57"W
S0 5°
'2
7" E
.1 0'
N2 0°
'4
6" E
.9 4'
N02°21'58"E 251.82'
L=612.91' R=850.54' D=41°17'19"
L=86.62' R=428.66' D=11°34'41"
L=341.56' R=400.00' D=48°55'32"
S43°26'26"W 56.97'
N
°2 2'
"W
8.
N
°4 6'
"E
7.
N14°18'30"E 218.18'
N14°30'54"E 109.44'
N
°1 1'
"E
0.
N
°1 9'
"E
0.
N14°32'37"E 122.69'
L=623.87' R=1081.92' D=33°02'18"
L=2216.24' R=15307.63' D=8°17'43"
1591.14'N69°55'28"W
N:2706146.28 E:911710.47
N:2706456.94 E:902811.21
N:2703809.59 E:907712.92
BUNKER
HILL
CIRCLE
PLYMOUTH
LANE
LANECONCORD
CIRCLE
LEXING
TON
WAYVETERANS
VETERANS
W
AY CIRCLE
WAMPANOAG
BO
UL
EV
AR
D
BE
NN
IN
GT
ON
PA
TR
IO
T
LA
NE
M
EM
O
RIAL
CIRCLE
BO
U
R
NE
D R
IVE
McKENNA ROAD
F F E = 163.40
COLUMBARIUM COMPLEX
PHASE 4
USS
CONSTITUTION
AVENUE
MAYFLOWER
WAY
MAYFLOWER WAY
BOURNE DRIVE
(EXTENSION)
ADD ALTERNATE
ROAD MAINTENANCE
ROAD
USS
CONSTITUTION
AVENUE
S80°30'24"E 175.68'N45°19'17"E
222.85'
N:2711395.58 E:904620.77
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
OVERALL GRADING AND DRAINAGE
PLAN
CG100
PUMP
HOUSE
TRANSFORMER
4:1
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
GRADING AND DRAINAGE PLAN
AREA 1
CG101
KEY MAP
(NOT TO SCALE)
111213 14 5
EX. CB 18
RIM=108.79 (BASE BID)
RIM=109.42 (BID ALT1)
EX. CB 17
RIM=108.79 (BASE BID)
RIM=109.42 (BID ALT1)
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN
AREA 2
CG102
KEY MAP
(NOT TO SCALE)
111213
M
AI
N
EN
TR
Y
MAIN
ENTRY
BLDG. NO. 58002
PUBLIC
RESTROOM
BUILDING
FFE=170.00
BL
D
G .N
O .5
AD
M
IN
IS
TR
AT
IO
N/
PU
BL
IC
IN
FO
R M
AT
IO
N C
EN
TE
R (P
.I.
C.
BU
IL
DI
NG
FF
E=
0.
DRAIN
FIE
LD
62.9
62.9
FFE =163.40
SEE SHEET L-102
FOR GRADING IN
THIS AREA
SEE SHEET CG115
FOR DETAILED
GRADING IN THIS
AREA
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN
AREA 3
CG103
KEY MAP
(NOT TO SCALE)
EX. AD B
EX. CB A
EX. HEADWALL
EX. DMH A
RIM=137.00
RIM=136.70
RIM=136.50
EX. 12" RCP
EX. FES 6
EX. AD A
RIM=137.80
6A
7A
4A
SHELTER
(FFE=136.70)
SEE SHEET
AE102
INV.=134.50INV.=134.50
INV.=134.50
INV.=134.06
INV.=134.25
4" HDPE FOUNDATION
DRAIN (SEE ARCH.
SHEETS)
INV.=127.00
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN
AREA 4
CG104
KEY MAP
(NOT TO SCALE)
COMMITTAL
SHELTER
COMMITTAL
SHELTER
EP
EP
EP
EP
EP
EP
EP
EP
EP
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN
AREA 5
CG105
KEY MAP
(NOT TO SCALE)
COMMITTAL
SHELTER
APPROXIMATE LOCATION OF EX. 4'X8'
CRYPTS (EXTENTS TO BE FIELD
LOCATED & FLAGGED DURING
CONSTRUCTION). NO FENCING,
MATERIALS, EXCAVATION, OR OTHER
CONSTRUCTION ACTIVITIES ARE
PERMITTED OVER EXISTING CRYPTS.
TIE INTO EXISTING
PAVEMENT
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN
AREA 6
CG106
KEY MAP
(NOT TO SCALE)
SECTION 61
2,580 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'X8' PLOTS)
SECTION 62
2,800 IN-GROUND CREMAIN
SECTIONS
(WITHIN 4'X4' PLOTS)
CO
CO
CO
4" HDPE
PERFORATED
PIPE (TYP.)
CO
PR. GUARDRAIL
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN
AREA 7
CG107
KEY MAP
(NOT TO SCALE)
COLUMBARIUM H
1,500 COLUMBARIUM/
MEMORIAL WALLS
SECTION 64
290 TRADITIONAL FULL CASKET PLOTS
(WITHIN 4'X10' PLOTS)
SECTION 63
1,420 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'X8' PLOTS)
SECTION 61
2,580 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'X8' PLOTS)
SECTION 62
2,800 IN-GROUND CREMAIN
SECTIONS
(WITHIN 4'X4' PLOTS)
SECTION 65
3,200 IN-GROUND CREMAIN
SECTIONS
(WITHIN 4'X4' PLOTS)
SECTION 64
300 PRE-PLACED OVERSIZED CRYPTS
(WITHIN 4'X10' PLOTS)
SEE SHEET CS402
FOR DETAILED
GRADING IN THIS
AREA
6" HDPE
SOLID PIPE
(TYP.)
CO
4" HDPE
PERFORATED
PIPE (TYP.)
6" HDPE
SOLID PIPE
(TYP.)
4" HDPE
PERFORATED
PIPE (TYP.)
CO
CO
CO
CO
POSSIBLE
STOCKPILE AREA
FOR FUTURE
PHASES
CONTRACTOR TO SPREAD ANY EXCESS SOIL
IN THIS AREA, CREATING A LEVEL AREA WITH
POSITIVE DRAINAGE AND SEEDING AS
SHOWN ON THE LANDSCAPE PLANS.
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN
AREA 8
CG108
KEY MAP
(NOT TO SCALE)
SECTION 65
3,200 IN-GROUND CREMAIN
SECTIONS
(WITHIN 4'X4' PLOTS)
SECTION 64
290 TRADITIONAL FULL CASKET PLOTS
(WITHIN 4'X10' PLOTS)
SECTION 65
3,200 IN-GROUND CREMAIN
SECTIONS
(WITHIN 4'X4' PLOTS)
4" HDPE
PERFORATED
PIPE (TYP.)
6" HDPE
SOLID PIPE
(TYP.)
4" HDPE
PERFORATED
PIPE (TYP.)
CO
PR. GUARDRAIL
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN
AREA 9
CG109
KEY MAP
(NOT TO SCALE)
EX. STEEP SOIL STORAGE
AREA TO BE CUT BACK TO
2:1 AND BE PLANTED PER
GEOTECH REPORT, SEE
SHEET 3 FOR REFERENCE
DOCUMENTATION
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN
AREA 10
CG110
KEY MAP
(NOT TO SCALE)
BASE BID CL
INV.=161.00
4" HDPE
FOUNDATION
DRAIN (SEE
ARCH. SHEETS)
INV.=159.30
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN
AREA 11
CG111
KEY MAP
(NOT TO SCALE)
ADD ALT CL
1 3
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN -
ADD ALT. 1 - AREA 1
CG112
KEY MAP
(NOT TO SCALE)
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN -
ADD ALT. 1 - AREA 2
CG113
KEY MAP
(NOT TO SCALE)
EX. AD 3
RIM=168.50
EX. DMH 9
RIM=167.67
EX. FES 2 (12")
EX. RIP RAP
INV.=159.60
EX. RIP RAP
EX. CB 26
RIM=162.97
EX. FES 4 (12")
EX
. 1
2"
HD
PE
EX. 12"
HDPE
EX. RIP RAP
EX. CB 23
RIM=163.61
EX. 1
2"
HDPE
EX. 12" HDPE
EX. CB 24
RIM=163.61
EX. 1
2"
HDPE
EX. FES 3 (12")
EX. CB 25
RIM=162.97
EX. 12"
HDPE
CATCH BASIN
INV.=160.81
GRAPHIC LEGEND:
PROPERTY LINE
LIMITS OF WORK
PRE-PLACED CRYPTS
OVERSIZED
PRE-PLACED CRYPTS
PERIMETER
CRYPTS
INTERIOR
CRYPTS
NEW STORM SEWER
CRYPT UNDERDRAIN
PROPOSED EDGE OF PAVEMENT
ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
PROPOSED TOP OF CURB
ELEVATION
PROPOSED ELEVATION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
818PC2032
MARCH 13, 2020 JPW KAE Dwg. of 225
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
BID DOCUMENTS SUBMISSION
BID
DOCUMENTS
321 4 5 6 7 8 9 10
4501 Daly Drive, Suite 200 Chantilly, VA 20151
Phone: 703-263-1900 www.gordon.us.com
MASSACHUSETTS NATIONAL
CEMETERY
PHASE IV DEVELOPMENT
NORTH
GRADING AND DRAINAGE PLAN -
ADD ALT. 1 - AREA 3
CG114
KEY MAP
(NOT TO SCALE)
GRAPHIC LEGEND:
PROPERTY…