Attachment 5 818PC2032-MNC_BD_PLANS_Part2.pdf

PDF 26 MB Posted

Attached to
Y1PC--Massachusetts National Cemetery Phase 4 Expansion
Solicitation number
36C10F20R0042
Issued by

About this file

This solicitation is for the Massachusetts National Cemetery Phase 4 Expansion project in Bourne, MA. The Department of Veterans Affairs Office of Construction and Facilities Management will develop approximately 20 acres of land including around 12,000 gravesites for both caskets and cremated remains in new burial sections. The project number is 818-032. Offerors will be evaluated using a tiered method. The solicitation number is 36C10F20R0042.

View the file

Other files

File Type Posted
Pre-Proposal Inquiry (PPI) Form-- VA Responses dated 7-30-20.pdf PDF
36C10F20R0042 0005.pdf PDF
Cost Proposal Breakdown Revised 7-30-20.pdf PDF
Geotechnical Engineering Report MNC BOURNE MA dated July 12 2019.pdf PDF
Pre-Proposal Inquiry (PPI) Form--VA Responses dated 7-29-20.pdf PDF
36C10F20R0042 0004.pdf PDF
36C10F20R0042 0003.pdf PDF
Pre-Proposal Inquiry (PPI) Form--VA Responses dated 7-27-20 Amendment 0003.pdf PDF
36C10F20R0042 0002.pdf PDF
Pre-Proposal Inquiry (PPI) Form--VA Responses dated 7-27-2020.pdf PDF
MASSACHUSETTS NATIONAL CEMETERY ITINERARY.pdf PDF
36C10F20R0042 0001.pdf PDF
Attachment 7 818PC2032-MNC_BD_PLANS_Part4.pdf PDF
Attachment 1 Wage Determination MA20200008 03-13-2020.pdf PDF
Attachment 8 818PC2032-MNC_BD_PLANS_Part5.pdf PDF
Attachment 4 818PC2032-MNC_BD_PLANS_Part1.pdf PDF
Attachment 13 Cost Proposal Breakdown.pdf PDF
Attachment 2 818PC2032-MNC_BD_SPEC_VOL1.pdf PDF
Attachment 3 818PC2032-MNC_BD_SPEC_VOL2.pdf PDF
Attachment 12 Pre-Proposal Inquiry (PPI) Form.pdf PDF
36C10F20R0042.docx DOCX document
Attachment 6 818PC2032-MNC_BD_PLANS_Part3.pdf PDF
Attachment 11 Contractor Safety and Environmental Record Evaluation Form.pdf PDF
Attachment 9 818PC2032-MNC_BD_PLANS_Part6.pdf PDF
Attachment 10 Past Performance Questionnaire.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENTRY GATE

KEY NOTES LEGEND:

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETS

24' (TYP.)

EX. CB 18

RIM=108.79 (BASE BID)

RIM=109.42 (BID ALT1)

EX. CB 17

RIM=108.79 (BASE BID)

RIM=109.42 (BID ALT1)

R=610.38',L=136.79',D=12.8400

R =233.75' ,L=190.17 ' ,D

4 6. 6127

R =32 8.4 3' ,L=1 58.2 0 ' ,D

2 7.5985

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

SITE LAYOUT AND UTILITY PLAN

AREA 2

CS102

KEY MAP

(NOT TO SCALE)

111213 14 5

NORTH

SITE LAYOUT NOTES:

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY

A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,

USING COORDINATES & BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON GRID

COORDINATE SYSTEM IN U.S. FEET AND BASED ON THE

HORIZONTAL DATUM NAD 1983 AND VERTICAL DATUM NGVD 1929.

18' (TYP.)

9' (TYP.)

R10'

R10'

R5'

5'10'

4'

R5'

R5'

9' (TYP.)

18' (TYP.)

PARKING

SPACES

(34)

PARKING

SPACES

(10)

FLUSH

CONNECT TO

EX. SIDEWALK

FLUSH

CONNECT TO

EX. SIDEWALK

SEE SHEET L-503

FOR ROSTRUM

DETAILS

MATCH EX.

CURB AT

NEAREST

JOINT

RETAINING WALL

(REFER TO

STRUCTURAL

PLANS)

MATCH EX.

CURB NEAREST

EXPANSION

JOINT

MATCH EX.

CURB AT

NEAREST

JOINT

MATCH EX.

CURB

MATCH EX.

CURB AT

NEAREST

JOINT

16 16

161616

TEST PITS

REQ'D

FLUSH

CONNECT TO

EX. SIDEWALK

12' (T

YP.)24

8'

10'SEE

ARCHITECTURAL

SHEET AE102

10'

8'

4.5' 24'

R50' R62'

TEST PITS

REQ'D

MATCH EX.

CURB

MATCH EX.

CURB

R30'

R50'

RELOCATED EX. SIGN

#7 (SEE SHEET CI101

FOR SIGN INVENTORY)

SAW CUT

SAW CUT

M

AI

N

EN

TR

Y

MAIN

ENTRY

BLDG. NO. 58002

PUBLIC

RESTROOM

BUILDING

FFE=170.00

BL

D

G .N

O .5

AD

M

IN

IS

TR

AT

IO

N/

PU

BL

IC

IN

FO

R M

AT

IO

N C

EN

TE

R (P

.I.

C.

BU

IL

DI

NG

FF

E=

0.

DRAIN

FIE

LD

CONTRACTOR TO VERIFY HORIZONTAL

& VERTICAL LOCATION OF GAS LINE.

EX. SLEEVE TO BE EXTENDED WIDTH

OF CORTEGE LANE. CONTRACTOR TO

RELOCATE GAS LINE AS NEEDED TO

ENSURE MIN. 3' COVER.

CONTRACTOR TO VERIFY LOCATION OF EX. WATERLINE

AND RELOCATE AS NEEDED TO AVOID CONFLICTS WITH

CORTEGE BOOTH, ASSOCIATED UTILITIES, AND NEW

STORM PIPE. MAINTAIN EXISTING DEPTH OF COVER.

RELOCATED

EX. SECTION

MARKER

RELOCATED EX. SIGN

#5 (SEE SHEET CI101

FOR SIGN INVENTORY)

MATCH EX.

CURB AT

NEAREST

JOINT

RELOCATED EX. SIGN

#4 (SEE SHEET CI101

FOR SIGN INVENTORY)

RELOCATED EX. SIGN

#6 (SEE SHEET CI101

FOR SIGN INVENTORY)

R50'

ENTRY GATE

KEY NOTES LEGEND:

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETS

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

SITE LAYOUT AND UTILITY PLAN

AREA 3

CS103

KEY MAP

(NOT TO SCALE)

111213 14 5

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE

LAID OUT BY A LICENSED LAND SURVEYOR ENGAGED

BY THE CONTRACTOR, USING COORDINATES &

BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON

GRID COORDINATE SYSTEM IN U.S. FEET AND BASED

ON THE HORIZONTAL DATUM NAD 1983 AND

VERTICAL DATUM NGVD 1929.

3. UTILITY LOCATING FIRM TO PERFORM TEST PITS

PRIOR TO CONSTRUCTION TO VERIFY THE VERTICAL

AND HORIZONTAL LOCATION OF THE UNDERGROUND

UTILITY. 3 FEET OF COVER MUST BE PROVIDED.

4. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY

AND IF NEEDED, RELOCATE EXISTING

UNDERGROUND UTILITIES. SPECIAL CARE WILL BE

TAKEN IN CRITICAL AREAS AROUND BUILDINGS.

SITE LAYOUT NOTES:

CONNECT TO

EX. CURB AT

NEAREST JOINT

BUILDING

FOOTING

BUILDING

FOOTING

SHELTER

(FFE=136.70)

SEE SHEET

AE102

CONNECT TO

EP

RETAINING

WALL (SEE

STRUCTURAL

SHEET S-501)

PARKING

SPACES

(6)

PARKING

SPACES

(1)

SAW CUT

SAW CUT

EX. AD B

EX. CB A

EX. HEADWALL

EX. DMH A

RIM=137.00

RIM=136.70

RIM=136.50

EX. 12" RCP

EX. FES 6

EX. AD A

RIM=137.80

6A

4A

4" HDPE FOUNDATION

DRAIN (SEE ARCH.

SHEETS)

ELECTRIC

LINE

ELECTRIC

LINE

SEE IRRIGATION PLAN FOR

HYDRANT REHABILITATION

SEE INSET FOR

TRENCH/FOUNDATION DRAINS

ENTRY GATE

KEY NOTES LEGEND:

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETS

EX. FES 6

8" HDPE 8" HDPE

INV.=127.00

INV.=134.25

INV.=134.06

INV.=134.50

INV.=134.50

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

SITE LAYOUT AND UTILITY PLAN

AREA 4

CS104

KEY MAP

(NOT TO SCALE)

111213 14 5

NORTH

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE

LAID OUT BY A LICENSED LAND SURVEYOR ENGAGED

BY THE CONTRACTOR, USING COORDINATES &

BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON

GRID COORDINATE SYSTEM IN U.S. FEET AND BASED

ON THE HORIZONTAL DATUM NAD 1983 AND

VERTICAL DATUM NGVD 1929.

3. UTILITY LOCATING FIRM TO PERFORM TEST PITS

PRIOR TO CONSTRUCTION TO VERIFY THE VERTICAL

AND HORIZONTAL LOCATION OF THE UNDERGROUND

UTILITY.

4. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY

AND IF NEEDED, RELOCATE EXISTING

UNDERGROUND UTILITIES.

5. FILL APPROXIMATELY 2,500 LF OF LINEAR CRACKING

IN MAINTENANCE LOTS. EXACT LOCATION TO BE

APPROVED BY RE/COR.

6. SEE ELECTRIC PLAN FOR CONTINUATION OF FIRE

LINE AND FEEDER.

SITE LAYOUT NOTES:

KEY NOTES LEGEND (CONT.):

KEY NO. DESCRIPTION DETAIL/PG

25 OIL /WATER SEPERATOR

26 TRENCH DRAIN

27 LEECHING BASIN

TRENCH/FOUNDATION DRAIN INSET

SCALE: 1" = 20'

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETS

CONTINUE EX.

ROADWAY

CROSS-SLOPE

AT 2%

CONTINUE EX.

ROADWAY

CROSS-SLOPE

AT 2%

15'

15'

R 15'

15'

R54.5'

R39.5'

R 20'R30'

R30'

15'

15'

COMMITTAL

SHELTER

COMMITTAL

SHELTER

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

SITE LAYOUT AND UTILITY PLAN

AREA 5

CS105

KEY MAP

(NOT TO SCALE)

111213 14 5

NORTH

SITE LAYOUT NOTES:

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY

A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,

USING COORDINATES & BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON GRID

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETS

SEE LANDSCAPE

SHEETS FOR PLANTING

INFORMATION

APPROXIMATE LOCATION OF EX. 4'X8'

CRYPTS (EXTENTS TO BE FIELD

LOCATED & FLAGGED DURING

CONSTRUCTION). NO FENCING,

MATERIALS, EXCAVATION, OR OTHER

CONSTRUCTION ACTIVITIES ARE

PERMITTED OVER EXISTING CRYPTS.

CONNECT TO

EX. PAVEMENT

24' (TYP.)

22' (TYP.)

19 21

COMMITTAL

SHELTER

R=245.00',L=383.71',D=89.7353

R=200.00',L=44.82',D=12.8406

R=200.00',L=20.43',D=5.8533

CONTRACTOR TO REPLACE UP

TO 25 SF OF DAMAGED

CONCRETE ON NORTH SIDE

OF COMMITTAL SHELTER

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

SITE LAYOUT AND UTILITY PLAN

AREA 6

CS106

KEY MAP

(NOT TO SCALE)

111213 14 5

NORTH

SITE LAYOUT NOTES:

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY

A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,

USING COORDINATES & BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON GRID

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETS

3'

AI

SL

E

(T

YP

SECTION 61

2,580 DOUBLE-DEPTH

PRE-PLACED CRYPTS

(WITHIN 3'X8' PLOTS)

56' (TYP.)

TY

P.

90°

SM61B

SM62A

SECTION 62

2,800 IN-GROUND CREMAIN

SECTIONS

(WITHIN 4'X4' PLOTS)

24' (TYP.)

24' (T

YP.)

' (T

YP.)

48' (TYP.)

48'(T YP .)

M62A BM62 M62B

M61A

BM61

M61B

90°

20 21

CO

CO

CO

4" HDPE

PERFORATED

PIPE (TYP.)

CO

88.04 ',L=240.76 ',D =35.5493

R=6

.8 0 ', L

=435.2 6',D

=38.8

R=245.00 ', L =383.71

', D =89

.7

R =450. 00' ,L=1416.07 ' ,D

=18 0. 30 00

PR. IRRIGATION WELL

VAULT (REFER TO

IRRIGATION PLANS

FOR DETAILS)

12' (TYP.)

R20'

R 30' R30

12' (TYP.)

12' (T

YP.)

R4 4'

R5 6'

R56

R4 4'

R44

R56

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

SITE LAYOUT AND UTILITY PLAN

AREA 7

CS107

KEY MAP

(NOT TO SCALE)

111213 14 5

MONUMENT LAYOUT CHART

MONUMENT

NORTHING EASTING

M61A 2704772.8064 907275.0832 M61B 2704800.9926 907226.6937 M62A 2704793.2776 907436.8358 M62B 2704795.3520 907484.7909

BASELINE

BEARING [DEFINED BY]

BM61 N59° 46' 47.21"W [M61A TO M61B]

BM62 N87° 31' 31.51"E [M62A TO M62B]

SEC. MARKER LAYOUT CHART

MARKER

NORTHING EASTING

SM61B 2704886.8303 907305.8221

SM62A 2704903.1401 907350.7074

NORTH

SITE LAYOUT NOTES:

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY

A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,

USING COORDINATES & BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON GRID

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETS

COLUMBARIUM H

1,500 COLUMBARIUM/

MEMORIAL WALLS

FLOWER

WATERING

STATION,

FWS (TYP.)

SM61A

FLOWER

WATERING

STATION,

FWS (TYP.)

SM62B

SM63B

SM63A

SM64B

SM64A

SM65B

SECTION 64

290 TRADITIONAL FULL CASKET PLOTS

(WITHIN 4'X10' PLOTS)

SECTION 63

1,420 DOUBLE-DEPTH

PRE-PLACED CRYPTS

(WITHIN 3'X8' PLOTS)

SECTION 61

2,580 DOUBLE-DEPTH

PRE-PLACED CRYPTS

(WITHIN 3'X8' PLOTS)

SECTION 62

2,800 IN-GROUND CREMAIN

SECTIONS

(WITHIN 4'X4' PLOTS)

SECTION 65

3,200 IN-GROUND CREMAIN

SECTIONS

(WITHIN 4'X4' PLOTS)

56' (TYP.)

TY

P.

90°

56' (TYP.)

TY

P.

90°

56' (TYP.)

TY

P.

90°

PARKING

SPACES

(19)

3'

AI

SL

E

(T

YP

4'

AI

SL

E

(T

YP

BEGIN FLUSH

CURB

4'

AI

SL

E

(T

YP

SMH

24' (TYP.)

10' (TYP.)

24' (TYP.)

R10'

END FLUSH

CURB

48' (TYP.) 48' ( TY P.)

TY

P.

48' (TYP.)

M65A

BM65

M65B

M64A

BM64

M64B

M63A

BM63

M63B

90°

SECTION 64

300 PRE-PLACED OVERSIZED CRYPTS

(WITHIN 4'X10' PLOTS)

R10'

6" HDPE

SOLID PIPE

(TYP.)

CO

4" HDPE

PERFORATED

PIPE (TYP.)

6" HDPE

SOLID PIPE

(TYP.)

4" HDPE

PERFORATED

PIPE (TYP.)

CO

CO

CO

CO

R=180.00',L=519.21',D=165.2682

R=450.00 ',L=1416.07 ',D =180.3000

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

SITE LAYOUT AND UTILITY PLAN

AREA 8

CS108

KEY MAP

(NOT TO SCALE)

111213 14 5

MONUMENT LAYOUT CHART

MONUMENT

NORTHING EASTING

M63A 2704539.1717 907074.1866 M63B 2704567.3579 907025.7971 M64A 2704375.4211 906971.8606 M64B 2704403.6073 906923.4712 M65A 2704188.8154 906861.9861 M65B 2704141.9943 906851.4132

BASELINE

BEARING [DEFINED BY]

BM63 N59° 46' 47.21"W [M63A TO M63B]

BM64 N59° 46' 47.21"W [M64A TO M64B]

BM65 N12° 43' 29.29"E [M65B TO M65A]

SEC. MARKER LAYOUT CHART

MARKER

NORTHING EASTING

SM61A 2704542.3455 907294.1392

SM62B 2704598.4381 907366.3431

SM63A 2704385.8042 907164.7013

SM63B 2704493.6953 907266.5463

SM64A 2704306.4255 906846.9483

SM64B 2704364.9223 907133.8848

SM65B 2704259.3517 906981.9419

SMH 2704453.7082 907379.0359

FWS LAYOUT CHART

STATION #

NORTHING EASTING

FWS-1 2704442.6400 907379.4252

FWS-2 2704529.6358 907298.1002

FWS-3 270.4352.1771 907130.6255

SITE LAYOUT NOTES:

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY

A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,

USING COORDINATES & BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON GRID

COORDINATE SYSTEM IN U.S. FEET AND BASED ON THE

NORTH

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETS

FLOWER

WATERING

STATION,

FWS (TYP.)

SM64A

SM65B

SM65A

SECTION 65

3,200 IN-GROUND CREMAIN

SECTIONS

(WITHIN 4'X4' PLOTS)

SECTION 64

290 TRADITIONAL FULL CASKET PLOTS

(WITHIN 4'X10' PLOTS)

SECTION 65

3,200 IN-GROUND CREMAIN

SECTIONS

(WITHIN 4'X4' PLOTS)

56' (TYP.)

TY

P.

90°

3'

AI

SL

E

(T

YP

4'

AI

SL

E

(T

YP

4'

AI

SL

E

(T

YP

24' (TYP.)

TY

P.

48' (TYP.)

M65A

BM65

M65B

M64A

BM64

M64B

90°

4" HDPE

PERFORATED

PIPE (TYP.)

6" HDPE

SOLID PIPE

(TYP.)

4" HDPE

PERFORATED

PIPE (TYP.)

CO

R =2 50.00' ,L =172.44' ,D

=39.5213

R=450.00 ' ,L=1416.07 ' ,D=180.3000

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

SITE LAYOUT AND UTILITY PLAN

AREA 9

CS109

KEY MAP

(NOT TO SCALE)

111213 14 5

MONUMENT LAYOUT CHART

MONUMENT

NORTHING EASTING

M64A 2704375.4211 906971.8606 M64B 2704403.6073 906923.4712 M65A 2704188.8154 906861.9861 M65B 2704141.9943 906851.4132

BASELINE

BEARING [DEFINED BY]

BM64 N59° 46' 47.21"W [M64A TO M64B]

BM65 N12° 43' 29.29"E [M65B TO M65A]

SEC. MARKER LAYOUT CHART

MARKER

NORTHING EASTING

SM64A 2704306.4255 906846.9483

SM65A 2704339.1338 906639.3864

SM65B 2704259.3517 906981.9419

FWS LAYOUT CHART

STATION #

NORTHING EASTING

FWS-4 2704324.2222 906747.1897

SITE LAYOUT NOTES:

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY

A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,

USING COORDINATES & BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON GRID

COORDINATE SYSTEM IN U.S. FEET AND BASED ON THE

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETS

24' (T

YP.)

24' (TYP.)

24' (TYP.)

' (T

YP.)

R = 3 00. 00' ,L=322 .41' ,D

=61. 5756

R=388.04 ',L=240.76 ',D =35.5493

R=6

.8 0 ', L

=435.

26', D

=38.8

R=479.70 ',L=242.08',D=28.9145

PC: 1

1+

.21

PT: 14+95.62

10' GRAVEL ROAD

TO CONNECT TO

EX. GRAVEL

ACCESS ROAD

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

SITE LAYOUT AND UTILITY PLAN

AREA 10

CS110

KEY MAP

(NOT TO SCALE)

111213 14 5

NORTH

SITE LAYOUT NOTES:

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY

A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,

USING COORDINATES & BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON GRID

24' (T

YP.)

R30

R30'

START NEW

CURB

52.7'

24'

45'

35'

45'

INV.=161.00

4" HDPE

FOUNDATION

DRAIN (SEE

ARCH. SHEETS)

INV.=159.30

OPEN

STORAGE

OPEN

STORAGE

OPEN

STORAGE

OPEN

STORAGE

R=335.00' ,L=351.46 ' ,D=60.1114

R

0 .

', L

=1

.0 3 '

, D

.5

PT: 14+95.62

PC: 15+93.08

PT: 17+90.11

PC: 18+38.67

PT

: 2

1+

.1

TY

P.

START NEW

CURB

MATCH EX.

CURB

BASE BID CL

PC

: 2

6+

.0

PT: 27+84.70

BP

: 2

6+

.5

PC

: 2

6+

.0

ENTRY GATE

KEY NOTES LEGEND:

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETS

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

SITE LAYOUT AND UTILITY PLAN

AREA 11

CS111

KEY MAP

(NOT TO SCALE)

111213 14 5

NORTH

SITE LAYOUT NOTES:

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY

A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,

USING COORDINATES & BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON GRID

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETS

TY

P.

FLOWER

WATERING

STATION TO BE

RELOCATED

FLOWER

WATERING

STATION TO BE

RELOCATED

START NEW

CURB

CONNECT TO

EX. CURB

ADD ALT CL

RELOCATED EX. SIGN

#66 (SEE SHEET CI101

FOR SIGN INVENTORY)

R=255.00 ',L=529.73 ',D=119.0258

R =3

.8

2 ' , L

=1

.3 2'

, D =3

0.

R=25 0.

', L

=1

.9 6'

, D =3

1.

8 4

PI

: 2

6+

.5

PC

: 2

6+

.0

PC

: 2

6+

.0

PT: 2

7+

.15

EP: 2

8+

.79

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

SITE LAYOUT AND UTILITY PLAN -

ADD ALT. 1 - AREA 1

CS112

KEY MAP

(NOT TO SCALE)

111213 14 5

NORTH

SITE LAYOUT NOTES:

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY

A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,

USING COORDINATES & BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON GRID

COORDINATE SYSTEM IN U.S. FEET AND BASED ON THE

HORIZONTAL DATUM NAD 1983 AND VERTICAL DATUM NGVD 1929.

3. MAINTENANCE ROAD AND ADD ALTERNATE ROAD WILL BE

NAVIGATING AROUND EXISITNG BURIAL SECTIONS. CONTRACTOR

TO TAKE EXTRA CARE TO LOCATE, FLAG, AND PROTECT EXISTING

CRYPTS.

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETS

22 21

R = 3304.11' ,L =

4 9

4. 38' ,D

= 8.57 30

R=432.00' ,L=262.23' ,D=34.7799

R=480.83' ,L=146.02 ' ,D=17.4003

R=255.00 ' ,L=529.73 ' ,D=119.0258

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

SITE LAYOUT AND UTILITY PLAN -

ADD ALT. 1 - AREA 2

CS113

KEY MAP

(NOT TO SCALE)

111213 14 5

NORTH

SITE LAYOUT NOTES:

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY

A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,

USING COORDINATES & BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON GRID

GRAVESIDE GRID MONUMENT

BURIAL SECTION MARKER

CHAIN LINK VEHICLE SWING GATE

PRECAST WHEEL STOP

PAVEMENT KEY

HANDICAP SYMBOL

MOUNTABLE CURB

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

HEADSTONE FACE DIRECTION

CONCRETE SIDEWALK

PRE-PLACED CRYPTS

MOUNTABLE CURB

SAWCUT LINE

## EXISTING BURIAL

SECTION NUMBER

HEAVY DUTY BITUMINOUS

PAVEMENT

MILL AND OVERLAY

EXISTING PARKING

AREAS

CROSSWALK MARKING

CAST CURB

GRAVEL/RIP RAP

CURB ACCESS RAMP

KEY NO. DESCRIPTION DETAIL/PG

RIP RAP SWALE15

CURB TRANSITION16

GUARDRAIL INSTALLATION17

STORM MANHOLE18

TYPE A DROP INLET19

TYPE D DROP INLET20

LIGHT DUTY BITUMINOUS

PAVEMENT

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

ENTRY SIGN FEATURE

2 PIPE BOLLARD

FLUSH CURB12

RIP RAP OUTLET PROTECTION21

END SECTION22

GRANITE CURB23

SINGLE SWING GATE24

TRADITIONAL FULL

CASKETSCONNECT TO

EX. CURB

24' (TYP.)

EX. AD 3

RIM=168.50

EX. DMH 9

RIM=167.67

EX. FES 2 (12")

EX. RIP RAP

INV.=159.60

EX. RIP RAP

EX. CB 26

RIM=162.97

EX. FES 4 (12")

EX

. 1

2"

HD

PE

EX. 12"

HDPE

EX. RIP RAP

EX. CB 23

RIM=163.61

EX. 1

2"

HDPE

EX. 12" HDPE

EX. CB 24

RIM=163.61

EX. 1

2"

HDPE

EX. FES 3 (12")

EX. CB 25

RIM=162.97

EX. 12"

HDPE

CATCH BASIN

INV.=160.81

R =500.00' ,L=185.57' ,D

=21.2653

R =3304.11' ,L=

4. 38' ,D

= 8.5730

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

SITE LAYOUT AND UTILITY PLAN -

ADD ALT. 1 - AREA 3

CS114

KEY MAP

(NOT TO SCALE)

111213 14 5

NORTH

SITE LAYOUT NOTES:

1. ALL GRAVESITE GRID MONUMENTS SHOWN SHALL BE LAID OUT BY

A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR,

USING COORDINATES & BEARINGS SHOWN.

2. COORDINATE INFORMATION SHOWN IS BASED ON GRID

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

KEY MAP

(NOT TO SCALE)

NORTH

BURIAL SECTION NUMBERING PLAN

SECTION 61

CS150

GRAPHIC LEGEND:

PRE-PLACED CRYPTS

IN-GROUND CREMAINS PLOTS

SECTION MARKER

GRAVESIDE GRID MONUMENT

INTERIOR

CRYPT (TYP.)

PERIMETER

CRYPT (TYP.)

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

KEY MAP

(NOT TO SCALE)

NORTH

BURIAL SECTION NUMBERING PLAN

SECTION 62

CS151

GRAPHIC LEGEND:

PRE-PLACED CRYPTS

IN-GROUND CREMAINS PLOTS

SECTION MARKER

GRAVESIDE GRID MONUMENT

INTERIOR

CRYPT (TYP.)

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

KEY MAP

(NOT TO SCALE)

NORTH

BURIAL SECTION NUMBERING PLAN

SECTION 63

CS152

GRAPHIC LEGEND:

PRE-PLACED CRYPTS

IN-GROUND CREMAINS PLOTS

SECTION MARKER

GRAVESIDE GRID MONUMENT

INTERIOR

CRYPT (TYP.)

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

KEY MAP

(NOT TO SCALE)

NORTH

BURIAL SECTION NUMBERING PLAN

SECTION 64

CS153

GRAPHIC LEGEND:

PRE-PLACED CRYPTS

IN-GROUND CREMAINS PLOTS

SECTION MARKER

GRAVESIDE GRID MONUMENT

INTERIOR

CRYPT (TYP.)

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

KEY MAP

(NOT TO SCALE)

NORTH

BURIAL SECTION NUMBERING PLAN

SECTION 65

CS154

GRAPHIC LEGEND:

PRE-PLACED CRYPTS

IN-GROUND CREMAINS PLOTS

SECTION MARKER

GRAVESIDE GRID MONUMENT

INTERIOR

CRYPT (TYP.)

S33°56'19"E

3530.00'

S66°58'37"E 4858.11'

.9 8'

S0 8°

'2

2" W

9.

S1 7°

'2

0" W

1066.86' N87°39'36"W

287.16'N77°03'38"W

215.65' N57°29'19"W

218.96' N43°07'22"W

781.83'

N71°35'06"W

200.00' S31°05'49"W

261.22' N58°54'11"W

255.82' N47°47'15"W

230.39' N40°36'38"W

1297.20'N76°20'34"W

1268.26'

S83°00'10"W

361.86'

S89°20'53"W

850.11' N86°20'57"W

S0 5°

'2

7" E

.1 0'

N2 0°

'4

6" E

.9 4'

N02°21'58"E 251.82'

L=612.91' R=850.54' D=41°17'19"

L=86.62' R=428.66' D=11°34'41"

L=341.56' R=400.00' D=48°55'32"

S43°26'26"W 56.97'

N

°2 2'

"W

8.

N

°4 6'

"E

7.

N14°18'30"E 218.18'

N14°30'54"E 109.44'

N

°1 1'

"E

0.

N

°1 9'

"E

0.

N14°32'37"E 122.69'

L=623.87' R=1081.92' D=33°02'18"

L=2216.24' R=15307.63' D=8°17'43"

1591.14'N69°55'28"W

N:2706146.28 E:911710.47

N:2706456.94 E:902811.21

N:2703809.59 E:907712.92

BUNKER

HILL

CIRCLE

PLYMOUTH

LANE

LANECONCORD

CIRCLE

LEXING

TON

WAYVETERANS

VETERANS

W

AY CIRCLE

WAMPANOAG

BO

UL

EV

AR

D

BE

NN

IN

GT

ON

PA

TR

IO

T

LA

NE

M

EM

O

RIAL

CIRCLE

BO

U

R

NE

D R

IVE

McKENNA ROAD

F F E = 163.40

COLUMBARIUM COMPLEX

PHASE 4

USS

CONSTITUTION

AVENUE

MAYFLOWER

WAY

MAYFLOWER WAY

BOURNE DRIVE

(EXTENSION)

ADD ALTERNATE

ROAD MAINTENANCE

ROAD

USS

CONSTITUTION

AVENUE

S80°30'24"E 175.68'N45°19'17"E

222.85'

N:2711395.58 E:904620.77

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

OVERALL GRADING AND DRAINAGE

PLAN

CG100

PUMP

HOUSE

TRANSFORMER

4:1

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

GRADING AND DRAINAGE PLAN

AREA 1

CG101

KEY MAP

(NOT TO SCALE)

111213 14 5

EX. CB 18

RIM=108.79 (BASE BID)

RIM=109.42 (BID ALT1)

EX. CB 17

RIM=108.79 (BASE BID)

RIM=109.42 (BID ALT1)

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN

AREA 2

CG102

KEY MAP

(NOT TO SCALE)

111213

M

AI

N

EN

TR

Y

MAIN

ENTRY

BLDG. NO. 58002

PUBLIC

RESTROOM

BUILDING

FFE=170.00

BL

D

G .N

O .5

AD

M

IN

IS

TR

AT

IO

N/

PU

BL

IC

IN

FO

R M

AT

IO

N C

EN

TE

R (P

.I.

C.

BU

IL

DI

NG

FF

E=

0.

DRAIN

FIE

LD

62.9

62.9

FFE =163.40

SEE SHEET L-102

FOR GRADING IN

THIS AREA

SEE SHEET CG115

FOR DETAILED

GRADING IN THIS

AREA

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN

AREA 3

CG103

KEY MAP

(NOT TO SCALE)

EX. AD B

EX. CB A

EX. HEADWALL

EX. DMH A

RIM=137.00

RIM=136.70

RIM=136.50

EX. 12" RCP

EX. FES 6

EX. AD A

RIM=137.80

6A

7A

4A

SHELTER

(FFE=136.70)

SEE SHEET

AE102

INV.=134.50INV.=134.50

INV.=134.50

INV.=134.06

INV.=134.25

4" HDPE FOUNDATION

DRAIN (SEE ARCH.

SHEETS)

INV.=127.00

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN

AREA 4

CG104

KEY MAP

(NOT TO SCALE)

COMMITTAL

SHELTER

COMMITTAL

SHELTER

EP

EP

EP

EP

EP

EP

EP

EP

EP

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN

AREA 5

CG105

KEY MAP

(NOT TO SCALE)

COMMITTAL

SHELTER

APPROXIMATE LOCATION OF EX. 4'X8'

CRYPTS (EXTENTS TO BE FIELD

LOCATED & FLAGGED DURING

CONSTRUCTION). NO FENCING,

MATERIALS, EXCAVATION, OR OTHER

CONSTRUCTION ACTIVITIES ARE

PERMITTED OVER EXISTING CRYPTS.

TIE INTO EXISTING

PAVEMENT

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN

AREA 6

CG106

KEY MAP

(NOT TO SCALE)

SECTION 61

2,580 DOUBLE-DEPTH

PRE-PLACED CRYPTS

(WITHIN 3'X8' PLOTS)

SECTION 62

2,800 IN-GROUND CREMAIN

SECTIONS

(WITHIN 4'X4' PLOTS)

CO

CO

CO

4" HDPE

PERFORATED

PIPE (TYP.)

CO

PR. GUARDRAIL

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN

AREA 7

CG107

KEY MAP

(NOT TO SCALE)

COLUMBARIUM H

1,500 COLUMBARIUM/

MEMORIAL WALLS

SECTION 64

290 TRADITIONAL FULL CASKET PLOTS

(WITHIN 4'X10' PLOTS)

SECTION 63

1,420 DOUBLE-DEPTH

PRE-PLACED CRYPTS

(WITHIN 3'X8' PLOTS)

SECTION 61

2,580 DOUBLE-DEPTH

PRE-PLACED CRYPTS

(WITHIN 3'X8' PLOTS)

SECTION 62

2,800 IN-GROUND CREMAIN

SECTIONS

(WITHIN 4'X4' PLOTS)

SECTION 65

3,200 IN-GROUND CREMAIN

SECTIONS

(WITHIN 4'X4' PLOTS)

SECTION 64

300 PRE-PLACED OVERSIZED CRYPTS

(WITHIN 4'X10' PLOTS)

SEE SHEET CS402

FOR DETAILED

GRADING IN THIS

AREA

6" HDPE

SOLID PIPE

(TYP.)

CO

4" HDPE

PERFORATED

PIPE (TYP.)

6" HDPE

SOLID PIPE

(TYP.)

4" HDPE

PERFORATED

PIPE (TYP.)

CO

CO

CO

CO

POSSIBLE

STOCKPILE AREA

FOR FUTURE

PHASES

CONTRACTOR TO SPREAD ANY EXCESS SOIL

IN THIS AREA, CREATING A LEVEL AREA WITH

POSITIVE DRAINAGE AND SEEDING AS

SHOWN ON THE LANDSCAPE PLANS.

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN

AREA 8

CG108

KEY MAP

(NOT TO SCALE)

SECTION 65

3,200 IN-GROUND CREMAIN

SECTIONS

(WITHIN 4'X4' PLOTS)

SECTION 64

290 TRADITIONAL FULL CASKET PLOTS

(WITHIN 4'X10' PLOTS)

SECTION 65

3,200 IN-GROUND CREMAIN

SECTIONS

(WITHIN 4'X4' PLOTS)

4" HDPE

PERFORATED

PIPE (TYP.)

6" HDPE

SOLID PIPE

(TYP.)

4" HDPE

PERFORATED

PIPE (TYP.)

CO

PR. GUARDRAIL

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN

AREA 9

CG109

KEY MAP

(NOT TO SCALE)

EX. STEEP SOIL STORAGE

AREA TO BE CUT BACK TO

2:1 AND BE PLANTED PER

GEOTECH REPORT, SEE

SHEET 3 FOR REFERENCE

DOCUMENTATION

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN

AREA 10

CG110

KEY MAP

(NOT TO SCALE)

BASE BID CL

INV.=161.00

4" HDPE

FOUNDATION

DRAIN (SEE

ARCH. SHEETS)

INV.=159.30

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN

AREA 11

CG111

KEY MAP

(NOT TO SCALE)

ADD ALT CL

1 3

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN -

ADD ALT. 1 - AREA 1

CG112

KEY MAP

(NOT TO SCALE)

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN -

ADD ALT. 1 - AREA 2

CG113

KEY MAP

(NOT TO SCALE)

EX. AD 3

RIM=168.50

EX. DMH 9

RIM=167.67

EX. FES 2 (12")

EX. RIP RAP

INV.=159.60

EX. RIP RAP

EX. CB 26

RIM=162.97

EX. FES 4 (12")

EX

. 1

2"

HD

PE

EX. 12"

HDPE

EX. RIP RAP

EX. CB 23

RIM=163.61

EX. 1

2"

HDPE

EX. 12" HDPE

EX. CB 24

RIM=163.61

EX. 1

2"

HDPE

EX. FES 3 (12")

EX. CB 25

RIM=162.97

EX. 12"

HDPE

CATCH BASIN

INV.=160.81

GRAPHIC LEGEND:

PROPERTY LINE

LIMITS OF WORK

PRE-PLACED CRYPTS

OVERSIZED

PRE-PLACED CRYPTS

PERIMETER

CRYPTS

INTERIOR

CRYPTS

NEW STORM SEWER

CRYPT UNDERDRAIN

PROPOSED EDGE OF PAVEMENT

ELEVATION

NEW STORM STRUCTURE

DRAINAGE FLOW ARROW

PROPOSED TOP OF CURB

ELEVATION

PROPOSED ELEVATION

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

818PC2032

MARCH 13, 2020 JPW KAE Dwg. of 225

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID

DOCUMENTS

321 4 5 6 7 8 9 10

4501 Daly Drive, Suite 200 Chantilly, VA 20151

Phone: 703-263-1900 www.gordon.us.com

MASSACHUSETTS NATIONAL

CEMETERY

PHASE IV DEVELOPMENT

NORTH

GRADING AND DRAINAGE PLAN -

ADD ALT. 1 - AREA 3

CG114

KEY MAP

(NOT TO SCALE)

GRAPHIC LEGEND:

PROPERTY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .