Attachment 11c - Inspection Worksheet.pdf

PDF 112 KB Posted

Attached to
Fort Meade Laundry and Dry Cleaning
Solicitation number
W91QV126QA033
Issued by

About this file

This is a Laundry & Dry Cleaning (L&DC) Inspection Worksheet used for quality assurance evaluation of contractor performance under a federal laundry service contract. The worksheet documents inspection findings against specific performance requirements outlined in the Performance Work Statement (PWS).

The inspection criteria cover seven key performance areas with defined thresholds and inspection methods. PWS 2.1.4 requires the contractor to coordinate alternate laundry service days during holidays or emergencies within the same business week, allowing 1 valid discrepancy per inspection period under random inspection. PWS 2.1.6 mandates compliance with Federal, State, Local, and Department of Health regulations plus CDC guidelines, also permitting 1 valid discrepancy per inspection period via random inspection. PWS 2.1.8 requires accurate and timely submission of deliverables per the Deliverables Schedule with zero tolerance for discrepancies, subject to periodic inspection. PWS 2.1.13 stipulates that items failing quality standards must be re-laundered at no additional government cost, with zero discrepancies allowed under 100% inspection. PWS 2.1.20 requires the contractor to repair or replace items damaged during laundering at their expense, permitting 2 valid discrepancies per period under random inspection. PWS 2.1.21 specifies that repair materials must match original specifications in type, texture, manufacture quality, color, and colorfastness, allowing 2 valid discrepancies per period. PWS 2.1.22 requires documentation and resolution of lost or damaged item claims within 10 business days, with a threshold of 2 valid discrepancies per inspection period. The worksheet provides signature lines for the Quality Assurance Evaluator (QAE) and Contractor's Representative.

View the file

Other files

File Type Posted
Pricing Sheet 15JUL26.xlsx XLSX spreadsheet
Attachment 8 - Pickup -Delivery Schedule 09JUL26.xlsx XLSX spreadsheet
Attachment 7 - Authroized Customers 09JUL26.xlsx XLSX spreadsheet
Solicitation Amendment W91QV126QA0330003 SF 30 (1).pdf PDF
Attachment 5 - Estimated Workload 15JUL26.xlsx XLSX spreadsheet
Solicitation Amendment W91QV126QA0330002 SF 30.pdf PDF
Solicitation Amendment W91QV126QA0330001 SF 30.pdf PDF
Solicitation - W91QV126QA033 Professional Appearance.pdf PDF
Technical Exhibit -K Authorized Customers (Example).pdf PDF
Technical Exhibit - H - Lost Items .pdf PDF
Technical Exhibit - C - Employee Information .xlsx XLSX spreadsheet
Attachment 11a - Inspection Worksheet.pdf PDF
Attachment 26- Pricing Matrix Fort Meade Laundry and Dry Cleaning.xlsx XLSX spreadsheet
ASC FY25 PWS LDC Standardized 12-31-25.pdf PDF
Technical Exhibit - G - Damage Item .xlsx XLSX spreadsheet
Technical Exhibit - J - Laundry Ticket - Copy.xlsx XLSX spreadsheet
Technical Exhibit - F - Rework.pdf PDF
Attachment 11b - Inspection Worksheet.pdf PDF
Attachment 5 - Estimated Workload.pdf PDF
Attachment 11d - Inspection Worksheet.xlsx XLSX spreadsheet
Attachment 3 - Linen Specifications .pdf PDF
Attachment 2 - Deliverable Schedule and Formats .pdf PDF
Technical Exhibit - A - Workload Data Tracker.xlsx XLSX spreadsheet
Technical Exhibit I- Customer Contact Information.xlsx XLSX spreadsheet
Attachment 10 - Acquisition Instruction (AI).pdf PDF
Service Contract Act Wage Determination Number 2015-4265 Revision 32 Dated 3 Dec2025.pdf PDF
Attachment 11 - Surveillance Schedule.xlsx XLSX spreadsheet
Attachment 6 - List of Items.pdf PDF
Attachment 1 PRS Laundry and Dry-Cleaning.xlsx XLSX spreadsheet
Technical Exhibit - E - Customer Complaint Record.xlsx XLSX spreadsheet
Attachment 8 - Pickup -Delivery Schedule.pdf PDF
Attachment 12 - Inspection Report.pdf PDF
Attachment 7 - Authroized Customers.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: Time:

PRS # PWS Reference PWS Paragraph Performance threshold. (This is the maxium error rate. It could possibly be zero deviation from standard.)

Inspection Method Discrepancies over allowed threshold

2 2.1.4

In the case of a holiday or emergency (e.g., inclement weather, post closure), the Contractor shall coordinate an alternate day for laundry service (pick up / delivery) during the same business week.

1 valid discrepancies per inspection period. Random Inspection

4 2.1.6

The Contractor shall be compliant with Federal, State, Local and Department of Health regulations and CDC.

1 valid discrepancies per inspection period. Random Inspection

6 2.1.8

The Contractor shall accurately and timely submit deliverables IAW Attachment 2 - Deliverables

Schedule.

0 valid discrepancies per inspection period. Periodic Inspection

11 2.1.13

All items that fail to meet quality standards shall be returned for re-laundering at no additional cost to the

Government.

0 valid discrepancies per inspection period. 100% Inspection

18 2.1.20

The Contractor at their expense shall repair (minor snags, holes, open seams, replacement of buttons, and repair or replacement of broken zippers) or replace items damaged during the laundering process. Any existing damages discovered at the time of turn in shall be so noted on the laundry or dry-cleaning ticket. The replacement linen shall be IAW

Attachment 3 - Linen Specifications.

2 valid discrepancies per inspection period. Random Inspection

19 2.1.21

Thread, material, zippers and buttons of the same type, texture, manufacture quality, color, and colorfastness used for repair and replacement shall match and be equal to or better than those used in the manufacture of the article.

2 valid discrepancies per inspection period. Random Inspection

20 2.1.22

Claims for lost or damaged items shall be documented and resolved within ten (10) business days following the date the claim is received by the Contractor.

2 valid discrepancies per inspection period. Random Inspection

QAE Signature: Contractor's Representative Siganture:

L&DC Inspection Worksheet @ Administration

Discrepancies over allowed threshold:

Contract Number:

Contracting Officer Name:

Task Order Number:

Unit/Organization:

Building Number:

COR Name:

Inspection Worksheet

File details come from the government source that posted it. Updated .