Attachment 22a.2 - PDRS Support information for integration task.pptx

PPTX presentation 3 MB Posted

Attached to
DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP Federal contract opportunity
Solicitation number
W31P4Q-20-R-0015
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

About this file

This document contains information related to a proposed Passive Identification Friend or Foe (PIFF) system integration task. It includes details on a proposed intermediate cable for the ADAM shelter, specifications for the PDRS radio unit, and plans for installation within the Integrated Battle Command System shelter. Key information includes specifications for the PDRS such as dimensions, weight, power requirements, and receiver sensitivity. It outlines the proposed locations and types of connectors for entrance to and exit from the separation panel enclosure. Additionally, it provides estimated cable lengths and requirements for mounting the PDRS unit within the IBCS rack shelves as well as connecting internal and external cables to the patch panel and potential antenna locations.

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP, newest first.
File Type Posted
Attachment 15b - Fixed Price Level of Effort Labor Categories.xlsx XLSX spreadsheet
Attachment 10h - SWFMEA RESULTS.xlsx XLSX spreadsheet
Attachment 22a.1.h - PL-ALH-211130 00 CABLE ASSEMBLY CASS DC POWER.pdf PDF
Attachment 04c - ECT_Acceptance Test Procedures_FINAL.DOCX DOCX document
Attachment 22a.1.a - ALH-208670 05 IBCS SHELTER INTERCONNECT.pdf PDF
Attachment 10a.4 – R004 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 13 - Training Documentation.docx DOCX document
Attachment 10a.9 – R015 PDU Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 10a.5 – R005 SCIM-FMECA.xlsx XLSX spreadsheet
Attachment 22a.1.j - PL-ALH-215333 00 S-280 CASS INSTALLATION.PDF PDF
Attachment 10c.5 – E050 KG-250X-FMECA.xlsx XLSX spreadsheet
Attachment 10b.9 – E033 R112 Shelter – Server Stack – 03-FMECA.xlsx XLSX spreadsheet
Attachment 10b.2 – E002 Power Inverter Shelter Power-FMECA.xlsx XLSX spreadsheet
Attachment 10a.13 – R031 Black Router--FMECA.xlsx XLSX spreadsheet
Attachment 10a.1 – R001 HRFU-FMECA.xlsx XLSX spreadsheet
Attachment 19 - Section L - Instructions - Conditions - And Notices To Offerors.docx DOCX document
Attachment 10c.8 – E053 Shelter Time Server-FMECA.xlsx XLSX spreadsheet
Attachment 10e.9 – E147 – Table 3 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 22a.1.b - ALH-209032 00 CABLE ASSEMBLY CASS ETHERNET.pdf PDF
Attachment 10c.1 – E043 Firewall Red-FMECA.xlsx XLSX spreadsheet
Attachment 02 - AIAMD System of Systems (SoS)(MIS-PRF-56500).pdf PDF
Attachment 10b.1 – E001 28VDC Pwr Supply Shelter Power-FMECA.xlsx XLSX spreadsheet
Attachment 10e.11 – E149 – Table 5 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 10d.2 – E144 RWS Bkup Batteries-FMECA.xlsx XLSX spreadsheet
Attachment 12 - Risk Management Plan.pdf PDF
Attachment 10d.8 – E153 RS112 Server -07 Shelter with PT-FMECA.xlsx XLSX spreadsheet
Attachment 15a- Example Skill Classification Crosswalk.xlsx XLSX spreadsheet
Attachment 16 - Example Cage Code and Cognizant DCMA DCAA Information.xlsx XLSX spreadsheet
Attachment 10a.11 – R029 PFPU SSHD-1—FMECA.xlsx XLSX spreadsheet
Attachment 10c.2 – E044 Firewall Black-FMECA.xlsx XLSX spreadsheet
Attachment 13d - IBCS-A301-003 Vol III Program of Instruction.pdf PDF
Attachment 10g - IBCS - 243-003 HW FMECA Results.pdf PDF
Attachment 10d.9 – E156 UPS-FMECA.xlsx XLSX spreadsheet
Attachment 10d.6 – E153 RS112 Server -05 Shelter with PT-FMECA.xlsx XLSX spreadsheet
Attachment 10b.10 – E034 R112 Shelter – Server Stack – 04-FMECA.xlsx XLSX spreadsheet
Attachment 10e.1 – E067 – EtherNet Switch-FMECA.xlsx XLSX spreadsheet
Attachment 10d.4 – E151 – Media Converter 04-FMECA.xlsx XLSX spreadsheet
Attachment 10c.3 – E048 HRFU-FMECA.xlsx XLSX spreadsheet
Attachment 10b.7 – E031 R112 Shelter – Server Stack – 01-FEMCA.xlsx XLSX spreadsheet
Attachment 22a.3 - S280_SystemPowerAnalysis_Draft_12-5-2017.xlsx XLSX spreadsheet
Attachment 10c.16 – E069 Media Converter 03 - FMECA.xlsx XLSX spreadsheet
Attachment 10b.6 – E030 KVM Console-FMECA.xlsx XLSX spreadsheet
Attachment 13a -A293-004 ETM 60 Percent Draft.pdf PDF
Attachment 10d.10 – E157 KVM Switch 2 Shelter-FMECA.xlsx XLSX spreadsheet
Attachment 10c.12 – E062 Shelter Router-Red-FMECA.xlsx XLSX spreadsheet
Attachment 14 - Technical Library.docx DOCX document
Attachment 10e.2 – E082 thru E091 Wkstn Laptop-FMECA.xlsx XLSX spreadsheet
Attachment 10c.14 – E064 Shelter Router Black – FMECA.xlsx XLSX spreadsheet
Attachment 10c.9 – E059 Shelter Switch – 01-FMECA.xlsx XLSX spreadsheet
Attachment 22a.1.i - PL-ALH-213030 00 CABLE ASSEMBLY, CASS J1 AND J3.pdf PDF
Show all 50

DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Critical Design Review (CDR) for the C-5 – US Army Passive Identification Friend or Foe (PIFF) System

January 28, 2020 Post CDR Updates www.telephonics.com

COVER DISCLAIMER

PROPRIETARY INFORMATION

Data contained in, revealed by, or shown in this document is proprietary as marked and belongs to Telephonics Corporation, A Griffon Company. Data marked as Proprietary shall not be used, duplicated, or disclosed in whole or in part without the prior written authorization of Telephonics Corporation.

Note 1:

LIMITED RIGHTS

Contract No.: W15QKN-17-9-5555/CS-18-0043 Contractor Name: Telephonics Corporation Contractor Address: 815 Broad Hollow Road, Farmingdale, New York 11735 The Government's rights to use, modify, reproduce, release, perform, display, or disclose these technical data are restricted by paragraph (b)(3) of the Rights in Technical Data--Noncommercial Items clause contained in the above identified contract. Any reproduction of technical data or portions thereof marked with this legend must also reproduce the markings. Any person, other than the Government, who has been provided access to such data must promptly notify the above named Contractor..

EXPORT WARNING (ITAR)

These items are controlled by the U.S. Government and authorized for export only to the country of ultimate destination for use by the ultimate consignee or end-user(s) herein identified. They may not be resold, transferred, or otherwise disposed of, to any other country or to any person other than the authorized ultimate consignee or end-user(s), either in their original form or after being incorporated into other items, without first obtaining approval from the U.S. government or as otherwise authorized by U.S. law and regulations. USML Category: XI(d)

3/4/2020

System Block/Interface Diagram

SEP PDRS Intermediate Cable

Block Diagram Proposed PDRS Intermediate Cable for the ADAM Shelter To be installed in existing Separation Panel (SEP)

IBCS Shelter

SEP

PDRS

PDRS Antenna 748-1201-XXX Cable 748-1201-XXX Cable Intermediate Cable P S S P P S S

P

Telephonics PDRS Turnkey Solution

Dual-Band (1090/978MHz) 6-Channel Antenna and Integrated GPS/SAASM Receiver Command, Control and Report Rugged Work Station

PDRS/KIV-77

978 MHz UAT 1090 Extended Squitter Mode 5 Level 2/Level 2B Rugged 3U VPX Chassis

Complete Antenna/Display System Cable Set (Lengths to Order)

Fixed/Telescoping Antenna Tower Options

PDRS Radio

Weight30 lb
Dimensions (in.)7.2 W x 9.65 H x 8.65 D
Primary Power24-28 VDC
Receiver SensitivityTo -94 dBm (adjustable)
Range>200 NM with 6-channel Antenna and LNA

Without shock insulator tray With shock insulator tray

Dimensions with TraySway Space
Length11.55 in0.5 in
Width8.25 in.5 in
Height11.5 in.31 in
Weight36.5 lb

Shock isolating base not required for an isolated cabinet. If mounted without base, the PDRS will fit into current rack with 0.92 in. clearance. However, some method for securing is needed.

SEP PDRS Intermediate Cable (cont.)

Connector PDRS Intermediate Cable will utilize connector P/N D38999/20WJ8** (Wall Mount type) Due to limited space available in the SEP and on the connector mounting panels Appropriate EMI backshells will be used on both connectors This connector will be used for both entrance and exit interfaces of the SEP

Cable Exit Location 3/4/2020 Current SEP Configuration (Outside View) Proposed PDRS SEP Intermediate

Cable Exit Location (cont.)

The existing connector must move down from its current location Necessary to allow for required RF cable bend radius Current connector is depicted in green

The existing connector must move down from its current location Necessary to allow for required RF cable bend radius Current connector is depicted in green

Cable Exit Location (Alternate Location) 3/4/2020 Current SEP Configuration (Outside View)

The existing connector must move down and over from its current location Necessary to allow for required RF cable bend radius Current connector is depicted in gold Allows intermediate cable to rub up the side of the enclosure Minimal or no interference with other SEP cables

Cable Entrance Location 3/4/2020 Current SEP Configuration (Inside View)

Cable Entrance Location

Cable Entrance Location (cont.)

The RF connector mounts to the current removable top panel SEP PDRS Intermediate Cable (cont.)

Cable Entrance Location (cont.)

Side view SEP PDRS Intermediate Cable (cont.)

Shelter Installation (cont.)

IBCS Shelter Installation During Telephonics site visit to NGC, the location and installation of the PDRS within the IBCS Shelter was discussed PDRS Mounting PDRS is to be mounted on an available rack shelf within the IBCS shelter The rack to be used for the PDRS mounting location is mid-cabin on the right side of the shelter Available space on rack shelf: 10.50 in. H x 19.00 in. D PDRS requires 10.59 in. minimum height

9.65 in. PDRS max height

0.79 in. Mounting Tray max height

0.15 in. Minimum clearance for J-hook clamps Additional height must be provided in the IBCS rack to allow for the required height of the PDRS and mounting tray When using PDRS Mounting Tray, existing shelf must be modified to allow clearance for J-hook clamps

IBCS Shelter Installation (cont.)

PDRS Cables PDRS Internal Cable Length: 16 ft.

From right side rack to IBCS patch panel on the rear of the shelter Point-to-point, including bend radius and internal rack routing Additional length may be required Rack shelf pulls out for access, requiring additional cable length for service loop Recommend D38999/24 Jam Nut connector for patch panel feed through PDRS Power Cable Telephonics to provide a 10 ft. power cable From power block to PDRS, including rack routing IBCS wire termination is TBD Option 1: Telephonics to supply PDRS power connector, NGC attaches connector to existing IBCS CAS power cable Option 2: NGC builds PDRS power cable complete

IBCS Shelter Installation (cont.)

PDRS External Cable Length: Estimated to be 84 ft.

100 ft. maximum length for all RF cabling Less 16 ft. for internal cable Option 1 Mount PDRS antenna where CASS antenna is mounted Use standard 6 ft. PDRS RF cable length Option 2 Mount PDRS antenna on top of Trilos pole 18 ft. (6 m) PDRS RF cable length Option 3 Mount PDRS antenna to Blue Sky Mast 45 ft. (15 m) maximum PDRS RF cable length image2.jpeg image4.png image5.png image6.png image7.jpeg image8.png image3.jpeg image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.png image30.png image1.jpeg