The provided documents are architectural floor plan drawings for the Yuma Desalting Plant, specifically showing detailed plans for multiple buildings including an administrative area, process area, and a modular trailer. The drawings include first and second floor plans for the desalting building, with precise measurements and room layouts for both administrative and process spaces. Key details include:

The floor plans document room-specific square footages, locations of offices, conference rooms, classrooms, restrooms, and technical spaces across different building sections. The drawings are part of the Colorado River Basin Salinity Control Project by the U.S. Department of the Interior's Bureau of Reclamation, with a focus on the Yuma Desalting Plant facility. The plans are marked "FOR INFORMATION ONLY" and include precise architectural details such as room numbers, dimensions, elevations, and specific building components like cable entry boxes, concrete aprons, and various technical specifications for the facility's construction.

View the file

Other files

File Type Posted
Sol_140R3025R0013_Amd_0007.pdf PDF
Revised_Page_B-2_0007.pdf PDF
Revised_Page_M-3_0006.pdf PDF
Revised_Section_B_0006.pdf PDF
Revised_Page_L-14_0006.pdf PDF
Sol_140R3025R0013_Amd_0006.pdf PDF
Plans_0005.zip ZIP file
Revised_Section_B_0005.pdf PDF
Sol_140R3025R0013_Amd_0005.pdf PDF
Questions_and_Answers_140R3025R0013_0005.pdf PDF
Revised_Attachment_1_-_SOW_0005.pdf PDF
52_223_23_Devation_February_2025_0004.pdf PDF
Sol_140R3025R0013_Amd_0004.pdf PDF
52_223_02_Devation_February_2025_0004.pdf PDF
Revised_Attachment_12_Wage_Determination_0004.pdf PDF
140R3025R0013_-_Site_Visit_Sign_In_Sheet_0003.pdf PDF
Sol_140R3025R0013_Amd_0003.pdf PDF
Sol_140R3025R0013_Amd_0002.pdf PDF
Sol_140R3025R0013_Amd_0001.pdf PDF
SF_1442_0001.pdf PDF
Attachment_8_-_SOW_Appendix_B_1292-303-60221_Vicinity_and_Location_Maps.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF
Attachment_5_-_SOW_Appendix_A_3.pdf PDF
Attachment_9_-_SOW_Appendix_C_2010_YDP_Seismic_Strengthening_Roof_Drawings_Set_(For_Information_Only).pdf PDF
Solicitation_No__140R3023R0013.pdf PDF
Attachment_2_-_SOW_Appendix_A_YAO_-_Roof_Leak_Inspection_Report.pdf PDF
Attachment_14_-_Past_Performanc_Questionnaire.pdf PDF
Attachment_6_-_SOW_Appendix_A_4.pdf PDF
Sol_140R3025R0013.pdf PDF
Attachment_3_-_SOW_Appendix_A_1.pdf PDF
Attachment_7_-_SOW_Appendix_A_5.pdf PDF
Attachment_11_-_SOW_Appendix_E_Asbestos_and_Lead_Inspection_Report.pdf PDF
Attachment_12_Wage_Determination.pdf PDF
Attachment_4_-_SOW_Appendix_A_2.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5 4

1292-D-5535A

N

D

T

* 603.87

12471 *301.25

12411

* 144.00

* 1980.29 12631

12461

* 144.00

12601 @ 12841 l28ol * 974.95

12441 C

* 142.49 C 12621

* 178.70

* 176.80

* 144.00 C * 178.70 12451

* 138 34 12431 12421 12401 * 393.60

1 2611 * 267.84 * 139.87

* 178.50

12571 � LJl><I 12351 12341 1281 1

* 301.24

* 144.00 * 144.02 * 75.66 * 75.83

* 304.46 12581 Ii 12501 l)

* 346.41

21 12101 l)* 144.00

12121 * 188.29

12561 * 360.15 * 142.49 c_ 1 2511 l255I

B

* 1009.06

12131 * 560.42 12531 12541

* 178.43

* 178.83

0 B

A

5 4

3 2

12281 12211

* 372 27 * 585.81

12241

* 172.77 12221

(l Ii * 150.35 12111 G

12231 (l

* 2293.81

12261

* 140.47 * 361.27

12201

* 583.23

L12211

* 241.29

* 1871.26

12331

* 159 99 \j

12311 l)\j 12321 * 349.23 � * 144.95

* 134.66

* 135.35 * 505.63

G G 12051 12031

12301

* 3164.39 12J6 I l2J1 I

* 272.47 * 298.38 �

* 163.97

NOTE.

* = Measurements are in square feet

SECOND FLOOR PLAN

0 16 32

SCALE OF FEET

3 2

12141

* 1226.46

* 161. 12

121 61

121 51;

;c:

12021

* 245.36

12081

* 229. 74

* 260.51

G

* 37775

12131 rYl.

C)

C 12121 C

* 1328.23

WOMEN

* 159.32

MEN

* 158.81

FOR INFORMATION ONLY

GB ALWAYS THINK SAFETY

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF RffLAMATION

COLORA RIVER BASIN SALINITY CONTROL PROJECT

TITLE I DIVI N - DESALTING COMPLEX UNIT - ARIZONA

YUMA SALTING PLANT

DESALTING BLDG ADMIN & SERVICE AREA

ARCHI TURAL

SECOND FLOOR VISIONS

DESIGNED ___________ _

DRAWN_ E. ELIAS/J MARCUM ____ SUBMITTED_ M VAND _ DE

P

CHECKED_ J. L. SANDERSON C E. T. _

NOVEMBER

D

C

B

A

442 SQFT

550 SQFT.

308 SQFT.

270 SQFT.275 SQFT.

123 SQFT.

118 SQFT.

119 SQFT.

118 SQFT.

FOR INFORMATION ONLY

agrodriguez Line agrodriguez Line

D

C

B

A

1292-D-1475

N'

.JL

lt

Fence, S££ DETAIL 1, (1292-D-1477)

11120 [36'-6"1

Concrete apron

Active leaf

1'' \

10140 {33'-.3"1

SEE DETAIL 2,

(1292-D-1477)

L A

[1'-8"1

Top of wall, Exterior

EL 42.465

-i_

Wal/panel luminaire �

Fence not shown � Finish floor, EL 38. 780

.02• Slope assembly---.,.

�" I' ii

""-..._ Trim Cable trench, / ry Cable ent box

SEE (1292-D-1698)

NORTH ELEVATION

{NTS}

11 � I (j_)

Concrete a ron p

Cable entry box, SEE (1292-D-148O)

EJ

Roof drain piping, SEE (1292-D-1597)

Trim

EJ

Grovel surfacing Aluminum floor plate cover

11460 {37'-rJ

Cable entry box, SEE (1292-D-148O)

15520 {50'-11"1

FLOOR PLAN

� I / Fence not shown j / Finish grade, EL 38.630

.02" Slope

Cable trench, SEE (1292-D-1698)

Cr>- (1292-D-1476)

SEE DETAIL 9,

G

(1292-D-1478) (Typ.)

B r >-(1292-D-1476)

BATTERY

ROOM

I 1021

[11·-2·1

[12·-1·1

FD

Fence not shown

� Finish floor, EL 38.780

.02• Slope spout Down n ozzle

Concrete spl ash block

Concrete apron ..J

Fence, SEE (1292-D-1694)

EJ

Sanitary vent

[1·-s·1

_J A (1292-

D-1476)

Concrete splash block

Exterior luminaire

Top of woll, EL 42.465

L i;;:::;=;;:;t=��;::::;:::;::-;::::;=t:.;::::;:::;::;::::;:::;::;::::;:=;=;::::;:=;=:;:,;i Fence not shown

Cable entry box, Cable entry box

Finish floor, EL 38.780

Concrete sidewalk

Fence not shown

Cable entry box Concrete apron

Cable trench

ABBREVIATIONS

AC = Acoustic CONT = Continuous EL = Elevation FD = Floor drain FIN = Finished FL = Floor GYP BD = Gypsum board HP = High point L V = Lavatory MET = Metal SS = Service sink SUSP = Suspended TTD = Toilet tissue dispenser EFBS = Eye-face and body spray REQD = Required

TYP

= Typical

OC

= On center

VAT

= Vinyl asbestos tile CONG = Concrete

DF

= Drain funnel EJ = Expansion joint WC = Water closet

PTD

= Paper towel dispenser

EAST ELEVATION

(NTS)

Wall panel assembly

WEST ELEVATION

(NTS)

NOTES:

SEE (1292-D-148O)

Cable trench, SEE (1292-D-1698)

Cable entry box, SEE (1292-D-148O)

Finish floor, EL 38.780

Concrete apron

1. All dimensions are in millimeters, with ft-inches in brackets, unless otherwise noted.

2. All elevations are in meters unless otherwise noted.

3. Field verify all dimensions and elevations.

4. Fence not shown on building elevations.

REFERENCE DRAWINGS:

1292-D-1476, Switchyard control building, architechtural, sections, roof plan, and ceiling plan 1292-D-1477, Switchyard control building, structural, details 7292-D-1478, Switchyard control building, structural, schedules, and details 1292-D-1480, Switchyard control building, structural 1292-D-7482, Switchyard control building, HVAC, plan, and sections

1292-D-1593, Intake pumping plant, miscellaneous metalwork, ladders, platforms, frames and covers 1292-D-1597, Switchyard control building, piping roof drains 1292-D-7604, Switchyard control building, sanitary, water piping, plan, and riser diagrams 1292-D-1693, Switchyard, grading, plot plan, and oil spill containment 1292-D-1694, Switchyard, foundations, general plan 1292-D-1698, Switchyard, cable trench, plan outline, reinforcement, cover, plans, and sections

10-.J-00

303-PB

5-14-86

D- LD.F

1:50

IA

AS-BUILT. CONVERTED TOACAD. VISUALLY CORRECT.

AS BUILT BY 330, LT.R. 5-19-83. FOR SPECIFICATIONS N0-30-C745.J.

r Wall panel assembly

EB ALWAYS THINK SAFETY Ill

UNITED STA1ES

D£PA!rTM£NT OF TH£ INTERIOR

BURE°AU OF �CIAMATION

I u

@ !I IL l--1-rr

, Cable entry box ___,, I

SOUTH ELEVATION

NTS (, )

�r Fence not shown

Trim Finish grade, EL 38.630

-Downspout nozzle Concrete splash block

- Concrete side walk

COLORAOO RIVER BASIN SALINITY CONTROL PROJECT

TITLE I DIVISION - DESALTING COMPLEX UNIT - ARIZONA

YUMA DESALTING PLANT

SWITCHYARD CONTROL BUILDING

ARCHITECTURAL

FLOOR PLAN AND ELEVATIONS

DESIGNED _ �!! !I!!f'J,£ .if!:.. ____ ID:H. APPR- _____ 2·£ �!!.££.fl!. __ _

DRAWN ___ A.W. TEMPLE JR., J.M.T. __ SUBMITTED ______

NEIL N. BUTLER __ _

A. W. TEMPL.£ JR. W. R. ANDE:RSON

D

C

B

A

FOR INFORMATION ONLY

agrodriguez Line agrodriguez Line

1292-303-5638-1-1
Floor Plan
Carpet & Tile Layout
1292-D-1475 SWITCH YARD BUILDING.pdf
1292-D-1475
Model

File details come from the government source that posted it. Updated .