Attachment_10_-_SOW_Appendix_D_Floor_Plan_Drawings_(For_Information_Only).pdf
PDF 714 KB Posted
- Attached to
- YUMA AREA OFFICE ROOF REPAIRS
- Solicitation number
- 140R3025R0013
About this file
The provided documents are architectural floor plan drawings for the Yuma Desalting Plant, specifically showing detailed plans for multiple buildings including an administrative area, process area, and a modular trailer. The drawings include first and second floor plans for the desalting building, with precise measurements and room layouts for both administrative and process spaces. Key details include:
The floor plans document room-specific square footages, locations of offices, conference rooms, classrooms, restrooms, and technical spaces across different building sections. The drawings are part of the Colorado River Basin Salinity Control Project by the U.S. Department of the Interior's Bureau of Reclamation, with a focus on the Yuma Desalting Plant facility. The plans are marked "FOR INFORMATION ONLY" and include precise architectural details such as room numbers, dimensions, elevations, and specific building components like cable entry boxes, concrete aprons, and various technical specifications for the facility's construction.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5 4
1292-D-5535A
N
D
T
* 603.87
12471 *301.25
12411
* 144.00
* 1980.29 12631
12461
* 144.00
12601 @ 12841 l28ol * 974.95
12441 C
* 142.49 C 12621
* 178.70
* 176.80
* 144.00 C * 178.70 12451
* 138 34 12431 12421 12401 * 393.60
1 2611 * 267.84 * 139.87
* 178.50
12571 � LJl><I 12351 12341 1281 1
* 301.24
* 144.00 * 144.02 * 75.66 * 75.83
* 304.46 12581 Ii 12501 l)
* 346.41
21 12101 l)* 144.00
12121 * 188.29
12561 * 360.15 * 142.49 c_ 1 2511 l255I
B
* 1009.06
12131 * 560.42 12531 12541
* 178.43
* 178.83
0 B
A
5 4
3 2
12281 12211
* 372 27 * 585.81
12241
* 172.77 12221
(l Ii * 150.35 12111 G
12231 (l
* 2293.81
12261
* 140.47 * 361.27
12201
* 583.23
L12211
* 241.29
* 1871.26
12331
* 159 99 \j
12311 l)\j 12321 * 349.23 � * 144.95
* 134.66
* 135.35 * 505.63
G G 12051 12031
12301
* 3164.39 12J6 I l2J1 I
* 272.47 * 298.38 �
* 163.97
NOTE.
* = Measurements are in square feet
SECOND FLOOR PLAN
0 16 32
SCALE OF FEET
3 2
12141
* 1226.46
* 161. 12
121 61
121 51;
;c:
12021
* 245.36
12081
* 229. 74
* 260.51
G
* 37775
12131 rYl.
C)
C 12121 C
* 1328.23
WOMEN
* 159.32
MEN
* 158.81
FOR INFORMATION ONLY
GB ALWAYS THINK SAFETY
UNITED STATES
DEPARTMENT OF THE INTERIOR
BUREAU OF RffLAMATION
COLORA RIVER BASIN SALINITY CONTROL PROJECT
TITLE I DIVI N - DESALTING COMPLEX UNIT - ARIZONA
YUMA SALTING PLANT
DESALTING BLDG ADMIN & SERVICE AREA
ARCHI TURAL
SECOND FLOOR VISIONS
DESIGNED ___________ _
DRAWN_ E. ELIAS/J MARCUM ____ SUBMITTED_ M VAND _ DE
P
CHECKED_ J. L. SANDERSON C E. T. _
NOVEMBER
D
C
B
A
442 SQFT
550 SQFT.
308 SQFT.
270 SQFT.275 SQFT.
123 SQFT.
118 SQFT.
119 SQFT.
118 SQFT.
FOR INFORMATION ONLY
agrodriguez Line agrodriguez Line
D
C
B
A
1292-D-1475
N'
.JL
lt
Fence, S££ DETAIL 1, (1292-D-1477)
11120 [36'-6"1
Concrete apron
Active leaf
1'' \
10140 {33'-.3"1
SEE DETAIL 2,
(1292-D-1477)
L A
[1'-8"1
Top of wall, Exterior
EL 42.465
-i_
Wal/panel luminaire �
Fence not shown � Finish floor, EL 38. 780
.02• Slope assembly---.,.
�" I' ii
""-..._ Trim Cable trench, / ry Cable ent box
SEE (1292-D-1698)
NORTH ELEVATION
{NTS}
11 � I (j_)
Concrete a ron p
Cable entry box, SEE (1292-D-148O)
EJ
Roof drain piping, SEE (1292-D-1597)
Trim
EJ
Grovel surfacing Aluminum floor plate cover
11460 {37'-rJ
Cable entry box, SEE (1292-D-148O)
15520 {50'-11"1
FLOOR PLAN
� I / Fence not shown j / Finish grade, EL 38.630
.02" Slope
Cable trench, SEE (1292-D-1698)
Cr>- (1292-D-1476)
SEE DETAIL 9,
G
(1292-D-1478) (Typ.)
B r >-(1292-D-1476)
BATTERY
ROOM
I 1021
[11·-2·1
[12·-1·1
FD
Fence not shown
� Finish floor, EL 38.780
.02• Slope spout Down n ozzle
Concrete spl ash block
Concrete apron ..J
Fence, SEE (1292-D-1694)
EJ
Sanitary vent
[1·-s·1
_J A (1292-
D-1476)
Concrete splash block
Exterior luminaire
Top of woll, EL 42.465
L i;;:::;=;;:;t=��;::::;:::;::-;::::;=t:.;::::;:::;::;::::;:::;::;::::;:=;=;::::;:=;=:;:,;i Fence not shown
Cable entry box, Cable entry box
Finish floor, EL 38.780
Concrete sidewalk
Fence not shown
Cable entry box Concrete apron
Cable trench
ABBREVIATIONS
AC = Acoustic CONT = Continuous EL = Elevation FD = Floor drain FIN = Finished FL = Floor GYP BD = Gypsum board HP = High point L V = Lavatory MET = Metal SS = Service sink SUSP = Suspended TTD = Toilet tissue dispenser EFBS = Eye-face and body spray REQD = Required
TYP
= Typical
OC
= On center
VAT
= Vinyl asbestos tile CONG = Concrete
DF
= Drain funnel EJ = Expansion joint WC = Water closet
PTD
= Paper towel dispenser
EAST ELEVATION
(NTS)
Wall panel assembly
WEST ELEVATION
(NTS)
NOTES:
SEE (1292-D-148O)
Cable trench, SEE (1292-D-1698)
Cable entry box, SEE (1292-D-148O)
Finish floor, EL 38.780
Concrete apron
1. All dimensions are in millimeters, with ft-inches in brackets, unless otherwise noted.
2. All elevations are in meters unless otherwise noted.
3. Field verify all dimensions and elevations.
4. Fence not shown on building elevations.
REFERENCE DRAWINGS:
1292-D-1476, Switchyard control building, architechtural, sections, roof plan, and ceiling plan 1292-D-1477, Switchyard control building, structural, details 7292-D-1478, Switchyard control building, structural, schedules, and details 1292-D-1480, Switchyard control building, structural 1292-D-7482, Switchyard control building, HVAC, plan, and sections
1292-D-1593, Intake pumping plant, miscellaneous metalwork, ladders, platforms, frames and covers 1292-D-1597, Switchyard control building, piping roof drains 1292-D-7604, Switchyard control building, sanitary, water piping, plan, and riser diagrams 1292-D-1693, Switchyard, grading, plot plan, and oil spill containment 1292-D-1694, Switchyard, foundations, general plan 1292-D-1698, Switchyard, cable trench, plan outline, reinforcement, cover, plans, and sections
10-.J-00
303-PB
5-14-86
D- LD.F
1:50
IA
AS-BUILT. CONVERTED TOACAD. VISUALLY CORRECT.
AS BUILT BY 330, LT.R. 5-19-83. FOR SPECIFICATIONS N0-30-C745.J.
r Wall panel assembly
EB ALWAYS THINK SAFETY Ill
UNITED STA1ES
D£PA!rTM£NT OF TH£ INTERIOR
BURE°AU OF �CIAMATION
I u
@ !I IL l--1-rr
, Cable entry box ___,, I
SOUTH ELEVATION
NTS (, )
�r Fence not shown
Trim Finish grade, EL 38.630
-Downspout nozzle Concrete splash block
- Concrete side walk
COLORAOO RIVER BASIN SALINITY CONTROL PROJECT
TITLE I DIVISION - DESALTING COMPLEX UNIT - ARIZONA
YUMA DESALTING PLANT
SWITCHYARD CONTROL BUILDING
ARCHITECTURAL
FLOOR PLAN AND ELEVATIONS
DESIGNED _ �!! !I!!f'J,£ .if!:.. ____ ID:H. APPR- _____ 2·£ �!!.££.fl!. __ _
DRAWN ___ A.W. TEMPLE JR., J.M.T. __ SUBMITTED ______
NEIL N. BUTLER __ _
A. W. TEMPL.£ JR. W. R. ANDE:RSON
D
C
B
A
FOR INFORMATION ONLY
agrodriguez Line agrodriguez Line
| 1292-303-5638-1-1 |
| Floor Plan |
| Carpet & Tile Layout |
| 1292-D-1475 SWITCH YARD BUILDING.pdf |
| 1292-D-1475 |
| Model |
File details come from the government source that posted it. Updated .